SystemMGAs & Delegated Authority

MGA Program Performance Analytics

MGA program performance analytics that redraw every program’s loss ratio the day its bordereaux land

See one case, screen by screen ↓

Built forHeads of program businessProgram underwritersProgram actuariesBordereaux analystsMGA executives

The Problem Today

Analysts re-key each MGA's bordereaux into templates, so the quarterly pack shows a program off plan a quarter late.

84%
of carriers exited at least one program in two years published
16 days
to build one program review by hand our estimate

Re-keyed into templates by hand

  • Risks
  • Premium
  • Claims
  • Rate guide
  • Rate misses found at auditA surcharge the MGA skipped surfaces months later
  • The why, argued in meetingsPacks show a loss ratio without what moved it

The Solution

  1. Each bordereau checkedMapped to one standard and checked row by row against the binder
  2. Each renewal re-ratedOn the rate guide, with each surcharge or credit not applied listed
  3. The loss ratio explainedPlan against projected, split by rate, mix, large losses and attritional
  4. The head of program signsRe-price, line size or exit chosen; the actuary signs the loss pick

Built-in controls

  • Each bar traces to its bordereau row
  • MGA data is read, not changed
  • Each MGA sees its own program only

What You Get

Off-plan programs reach a re-price review in the month they drift, before more renewals go out on the old terms.

4.5 days
of review work per program a quarter, with the solution our estimate
  • Re-price levels tested monthlyEach program against its own re-price and exit levels
  • Commentary drafted and citedEach sentence sourced to a row, a clause or the plan
  • Mix drift spotted earlyOlder buildings above the plan's share, flagged as written
In short

What is MGA Program Performance Analytics?

MGA program performance analytics is how a program carrier tracks each MGA’s program on loss ratio, rate, mix and large losses against the binder and business plan. MGA Program Performance Analytics does it as each month’s bordereaux land, instead of in a quarterly pack, and shows each program’s distance to its re-price and off-ramp levels.

How to choose AI solutions for insurance →

Updated

The problem

Quarterly program packs show a loss ratio without the reasons it moved

A program carrier judges each MGA on a handful of numbers: loss ratio against the business plan, rate achieved against the rate guide, the mix of what is written, and the large losses. Then it acts: grow, re-price, cut the line or exit. But the risk, premium and claims bordereaux arrive from each MGA in its own layout, and analysts re-key them into templates before anyone can read them.

So the review runs quarterly, and the pack shows a loss ratio, not why it moved. Rate shortfall, mix drift and large losses are argued over in the meeting. A surcharge the MGA did not charge turns up at the on-site audit. By the time the pack says a program is off plan, it has been off plan for a quarter, and the business is already written on the wrong terms.

typical84%of carriers exited at least one program in two years, mostly for performance
typical2× a yearon-site review of each MGA’s underwriting and claims, at least, under state MGA Acts
Where a program review’s days go, each quarterestimated
By hand16 days
With the solution4.5 days
  • Re-keying bordereaux into templates4 → 0.5 d
  • Checking rows against the binder and chasing the MGA2 → 1 d
  • Re-rating renewals on the rate guide3 → 0.5 d
  • Working out why the loss ratio moved3 → 0.5 d
  • Writing the commentary and the review pack3 → 1 d
  • Review, loss pick and sign-off1 → 1 d

Estimated days for one program’s quarterly review, by hand and with the solution. Re-keying follows practitioner estimates of 3–5 days a cycle.

How it works

Bordereau to signed decision: the program performance run, agent by agent

What comes in
Data in4 sources · bordereaux, binder, plan and rate guide, loss development
Agents at work
Bordereau intake checkerevery row vs the binder
Then
Rate monitor
Mix analyst
Loss projector
Then
Bridge builderwhat moved · triggers
Then
Commentary writerevery sentence cited
A person decides
Head of program businessdecides and signs
What comes out
Loss ratio bridge
Re-price and off-ramp watchlist
Commentary and review pack
One case, step by step

A program’s loss ratio bridge, redrawn the morning its bordereau lands

An MGA writes a habitational program for the carrier: apartment property and general liability in five states. One June morning at 08:12, its May bordereaux land. Here is that morning, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0108:12

    The bridge, as at April, with May waiting

    Head of program business

    The head of program business opens the program’s loss ratio bridge: a 58.0% plan, plus rate (+2.0), mix (+1.5) and large losses (+3.1), less attritional (−1.2), to a projected ultimate of 63.4%, 1.6 points from the re-price level in clause 9.3. The MGA’s May bordereaux landed at 08:12, 13 days before they are due: 4,982 risk rows, 1,204 premium rows, 318 claims rows.

    “Six agents are ready to check, re-rate, re-project and redraw. Nothing changes on the bridge until you apply.”

  2. 02One click

    “Apply the May bordereaux”

    The agents

    The run plays out in the right-hand rail. The three files are mapped to one standard and checked against the binder, 212 May renewals are re-rated on the rate guide, two new large losses are found, and the ultimate is re-projected. The bridge redraws with April on screen as a ghost.

  3. 036.8 seconds later

    Large losses lit up, re-price level crossed

    Bridge builder

    The large-loss bar grows from +3.1 to +9.4 points. Projected ultimate is now 69.4%, above the 65.0% re-price level and 2.6 points under the 72.0% off-ramp. Below it: written $36.8M against a $35.0M plan, six large losses for $2.6M, 99.5% of rows passing checks.

    “Large losses moved most: +6.3 points since April. The re-price trigger at 65.0% is crossed.”

  4. 04Checked

    Each row checked against the binder

    Bordereau intake checker

    Row counts tie to the MGA’s control totals, and the $7.41M written in May ties to the account statement. One risk in Lake Charles, Louisiana sits outside the binder territory and goes to the program underwriter as a referral. 23 risks with $41.3M of TIV have no year built; they are queried back to the MGA and held out of the mix step.

    “Held out until the MGA replies. Nothing was filled in.”

  5. 05Drill

    The rows behind the large-loss bar

    Loss projector

    Six claims over $250,000 come to $2,613,000: 18.4 points of the $14.2M earned, against a 9.0-point load. The biggest is new in May, a dryer-vent fire at a Houston apartment complex with 14 of 168 units out and $905,000 incurred, from claims bordereau row 112. A negligent-security suit at a Jacksonville complex adds $365,000.

    “Large losses are taken at reported incurred, uncapped. Excess of $1M per risk is ceded under the per-risk treaty and is not on this bridge.”

  6. 06Drill

    Where the rate guide was not followed

    Rate monitor

    On 1,146 renewals, rate achieved is +5.4% against +9.0% planned, weakest in Texas at +4.0% against +10.0%. The rate guide adds 15% for frame buildings built before 1980, and the MGA did not charge it on 61 of 214 pre-1980 renewals, among them the Houston complex: $96,400 charged where the guide gives $110,900.

    “About a third of the shortfall is one rule not applied.”

  7. 07Drill

    Older buildings than the plan allowed

    Mix analyst

    Buildings from before 1980 are 26.4% of insured value against 18.0% in the business plan, mostly new accounts in Houston and Atlanta. At the plan’s loss relativity for older frame (1.18), that is 1.6 points. The 23 risks with no year built stay out of the step; if all were pre-1980, it would be +1.8.

  8. 0808:14

    The binder opens a re-price review

    Bridge builder

    The watchlist shows each program against its own re-price and off-ramp levels, month by month. The habitational program’s re-price review is open under clause 9.3: rate can change on 60 days’ notice, with a decision due a month later. Small fleet auto is above its 72.0% off-ramp level for a second month, and landscapers and tree care is on watch at 62.5% against 64.0%.

    The agents open the review. They send no notice; that needs the signature of the head of program business.

  9. 09Signed 08:41

    A loss pick the actuary can trace to a claim

    Program actuary

    The May commentary was drafted at 08:16 in the house layout (headline, large losses, rate, mix, attritional and what the carrier asks of the MGA), each sentence citing a bordereau row, a binder clause, the rate guide or the business plan. The program actuary signs the 69.4% loss pick: chain ladder on incurred, with Bornhuetter-Ferguson at 58.0% a priori for months under 12. The head of program business approves the commentary, and it goes to the MGA’s CEO.

    “We ask the MGA to (1) charge the pre-1980 surcharge on all renewals from next month, (2) send the year built for the 23 risks within nine days, and (3) meet us next week to review rates under clause 9.3.”

  10. 10Decided

    Re-price, chosen and signed

    Head of program business

    The capacity review sets out four options with next-year projections: continue as written (68.1%), re-price (60.8%), cut the line to 60% (68.1% on $52.9M), or off-ramp, closed because clause 14.2 needs two months above 72.0%. The head of program business chooses re-price: the pre-1980 surcharge on all renewals, +6% on Houston and Atlanta frame, and pre-1980 capped at 22% of insured value. A clause 9.3 notice is drafted for the MGA’s CEO, with new rates from mid-August renewals.

    “The agents project; they do not choose. The decision, the reason and the notice are yours.”

Who it’s for

Program performance seen from five seats, carrier and MGA

The same May bordereau, seen by the five people who carry it: the quarter by hand, then the month with the solution.

Head of program business
Decides re-price, line size and exit
Before
Learns a program is off plan from the quarterly pack, a quarter after it went off.
Now
Sees the program cross its re-price level the morning the bordereau lands, with the commentary drafted and four options projected.
Program actuary
Picks each program’s ultimate loss ratio, monthly
Before
Will sign a loss pick, but not a number that cannot be traced to a claim.
Now
Signs a 69.4% loss pick where each bar drills to its bordereau rows and the method sits beside the signature.
Program underwriter
Reviews referrals and rate adherence
Before
Knows the rate guide adds 15% on pre-1980 frame, and wants to see where it was not charged.
Now
Gets the 61 renewals without the surcharge, each with the premium short, and the out-of-territory risk as a referral.
Bordereaux analyst
Chases late and incomplete bordereaux
Before
Treats twenty-three rows with no year built as a real gap, and chases each one by hand.
Now
Sees each MGA’s landing day against the due day and each failed check, with the query or match to confirm already lined up.
MGA chief executive
Runs the program for the MGA
Before
Wants the numbers the carrier sees, in time to fix them before renewal.
Now
Sees the MGA’s own program bridge and gets the signed commentary with its three asks, two months before the quarterly pack.
The agents

Program bridges checked, re-rated and redrawn by six agents

When a bordereau lands, agents check it, re-rate, re-project and redraw the bridge; the actuary and the head of program business sign.

Bordereau intake checker

Reads each MGA’s risk, premium and claims bordereaux, maps them to one standard and checks each row against the binder: row counts against control totals, premium against the account statement, limits, territory, classes and binder dates. It scores data quality.

  • Read-only on the MGA’s data
  • A missing field is queried, never guessed
  • Each check cites the file and row
Rate monitor

Re-rates each renewal on the program’s rate guide, measures rate achieved against plan by state and segment, and lists each surcharge or credit not applied, with the premium short.

  • Never changes a rate or a premium
  • Shows the rule and the clause for each miss
Mix analyst

Compares what the MGA writes with the business plan by state, year built, insured-value band and class, and applies the plan’s loss relativities to express the shift in loss-ratio points.

  • Never refuses, cancels or re-classes a risk
  • Holds out rows with missing segment data and says how many
Loss projector

Develops incurred to ultimate with the program’s factors, using Bornhuetter-Ferguson on the plan loss ratio for months under 12, separates claims above the large-loss threshold, and explains each change from last month with the claims behind it.

  • Proposes the loss pick; the program actuary signs it
  • Never sets or changes a case reserve
Bridge builder

Walks each program from plan to projected through rate, mix, large losses and attritional, flags any step that moved 0.3 points or more since last month, and tests the re-price and off-ramp levels in the binder.

  • Opens a review; never sends a notice
  • Each bar traces to bordereau rows
Commentary writer

Drafts the monthly program commentary, notices and the capacity review pack in the house layout, citing each number to its file and row or clause.

  • No sentence without a citation
  • Stays a draft until a person approves
Head of program business

Decides; program actuary signs the loss pick.

Ask in plain words

Loss ratio moves and missed surcharges, traced back to bordereau rows

Ask about any program, step or bordereau row, or say what to change. Each answer cites its source. These use the sample data.

Why did the habitational program jump six points in May?

Two large losses in the May bordereau: the Houston fire, reserved at $905,000 with 14 units out in a 1978 frame building, and the Jacksonville negligent-security suit at $365,000. Large losses are now 18.4 points against a 9.0 load, so that step went from +3.1 to +9.4. Rate, mix and attritional together moved −0.3.

Where was the pre-1980 surcharge missed?

On 61 of 214 pre-1980 renewals since January: $486,000 of premium. Section 3.1 of the rate guide requires 15% on frame buildings built before 1980. Most are in Houston and the Atlanta suburbs, the largest being the Houston complex that also had May’s fire. It explains 1.1 of the 3.6-point rate shortfall.

Which programs are closest to an off-ramp?

Small fleet auto is past it: 73.6% in April and 74.8% in May, both above its 72.0% level, so clause 14.2 is open. The habitational program is at 69.4%, past re-price (65.0) but 2.6 points from off-ramp. Landscapers and tree care is 1.5 points from its re-price level.

Add a trigger when pre-1980 frame passes 25% of insured value

Done: “Pre-1980 frame above 25% of insured value → re-price review”, for habitational programs. The habitational program is at 26.4% today, so it shows as crossed. You can change it in Settings.

The screens

The loss ratio bridge, the watchlist and the capacity review

From the working solution, on its sample data. Pick one to see it large.

The loss ratio bridgeThe program from a 58.0% plan to a 69.4% projected ultimate, April as a ghost, re-price and off-ramp lines across it.
A bordereau landsThe bridge as at April, with the May bordereaux waiting and what moved since March.
Agents at workEach step of the run: files read, binder checks, renewals re-rated, large losses found, ultimate re-projected.
Bordereau checksControl totals, account statement, limits and territory checked; queries and referrals raised, nothing filled in.
Large lossesEach claim over $250,000 with its bordereau row, new claims marked, against the plan load.
Rate adherenceRate achieved against plan by state, and each pre-1980 renewal charged without the surcharge.
Mix against planInsured value by year built and by state, against the business plan.
All programsNine programs as small bridges, closest to a trigger first, with plan, projected, this month’s move and premium.
Bordereau timelinessWhen each MGA’s bordereaux landed against the due date, and the share of rows passing all binder checks.
Triggers and watchlistEach program’s projected loss ratio by month against its re-price and off-ramp levels.
Monthly commentaryDrafted from the bordereaux with a citation beside each sentence, and two sign-offs: loss pick and commentary.
Capacity reviewFour options with next-year projections and premium, the pack contents and the signed decision.
Plans, triggers and who signsPlan loss ratios, loads and trigger levels per program, bridge settings, custom triggers and signers.
Governance

Cited rows and named signers in MGA program performance analytics

Each bar traces to a rowEach step on the bridge drills to the bordereau file and row behind it, and each trigger names its binder clause. The MGA’s original files are kept as sent.
The MGA’s data is read-onlyThe agents do not edit a bordereau, change a rate or a premium, or set a case reserve. A missing field goes back to the MGA as a query; nothing is filled in.
The actuary signs the loss pickThe loss projector proposes; the program actuary signs the loss pick and the option projections, with the method recorded beside the signature.
One person decides, and signsRe-price, line size and off-ramp are decided by the head of program business. The signature records the name, the time and its meaning, and no notice reaches an MGA until it is signed.
Each MGA sees its own program onlyThe MGA’s CEO and CUO see the same bridge and commentary the carrier sees, for their own program and no other.
Each run, query and decision on the recordEach landing, check, query, signature and decision is kept with who, what and when, so the next on-site review starts from the record.
Configuration

Plan loss ratios, re-price and off-ramp levels, program by program

Plans, triggers, clocks and who signs are set per program, from each binder and business plan.

SettingDefaultChoose from
Plan, large-loss load, re-price and off-ramp levelsThe habitational program: 58.0 · 9.0 · 65.0 · 72.0Per program, from its binder
Large-loss threshold$250,000 ground up, per claimAny amount
Compare the bridge withPrevious monthPrevious month · Same month last year · Last quarterly pack
Highlight a step that moves by0.3 points or moreAny number of points
Off-ramp ruleAbove the level in 2 consecutive monthsAny number of months
Custom triggersRate more than 3 points under plan · data quality under 97% · bordereaux more than 5 days lateOn or off; add your own in plain words
Who signsLoss pick: program actuary · re-price, line, off-ramp and notices: head of program businessAny named person
Commentary goes toThe MGA’s CEO, the program underwriter, the capacity review fileAny named recipient
Connections

Bordereaux, binders and rate guides behind program performance analytics

Risk, premium and claims bordereauxin each MGA’s own layout, mapped to one standard
Binders and agreed KPIsterritory, limits, re-price and off-ramp clauses
Business plans and rate guidesplan loss ratio, plan mix and the rating rules
Reserve and loss development datadevelopment triangles for each program
MGA account statementspremium tied out month by month
Queries, referrals and noticesback to the MGA and the program underwriter
What it changes

Program performance reviewed monthly, in days of work instead of weeks

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
Same day
a program's bridge moves when the bordereau lands
Quarterly pack2–3 months
With agentssame day
typical
84%
of carriers exited at least one program in two years, mostly for performance
Programs cut
TMPAA 2025 study
typical
2× a year
on-site review of each MGA's underwriting and claims, at least
NAIC Model 225
state MGA Acts

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate, the days for one program’s quarterly review in the chart above (re-keying days from practitioner estimates) · “typical” = published figures (Target Markets 2025 State of Program Business Study, via Insurance Business: 84% of carriers exited at least one program in two years; NAIC MGA Model Act 225 and state MGA Acts such as C.R.S. §10-2-1005: on-site review of the MGA at least semiannually). Names on the screens are sample data.

Questions

MGA program performance analytics questions from program carriers

What is MGA program performance analytics?

MGA program performance analytics is how a program carrier tracks each MGA’s program on loss ratio, rate, mix and large losses against the binder and business plan. MGA Program Performance Analytics does it as each month’s bordereaux land, instead of in a quarterly pack, and shows each program’s distance to its re-price and off-ramp levels.

How does the loss ratio bridge work?

The bridge walks a program from its plan loss ratio to the projected ultimate in four steps: rate achieved against plan rate, written mix against plan mix, large losses against the load, and attritional frequency and severity. Last month stays on screen as a ghost, and a step that moved 0.3 points or more is highlighted. Every bar drills to the bordereau rows behind it.

Does it change the MGA’s bordereaux or our reserves?

No. The agents read bordereaux and binders. They do not edit the MGA’s data, change a rate or premium, or set a case reserve. A missing field goes back to the MGA as a query, and the original files are kept as sent.

How does it handle late or incomplete bordereaux?

The bordereaux screen shows when each MGA’s files landed against the due date and the share of rows passing each check; late or low-quality bordereaux can trigger a reminder. Rows missing data, such as year built, are held out of the step they affect and counted, not guessed.

Who signs the loss pick and a re-price notice?

The program actuary signs the loss pick that the loss projector proposes. The head of program business decides re-price, line size and off-ramp, and signs any notice to an MGA. The agents open a review when a trigger is crossed; they send no notice.

Can the MGA see the same numbers?

Yes, for its own program only. The MGA’s CEO and CUO see their program’s bridge and receive the signed monthly commentary, so a rate or mix problem can be fixed before renewal.

Can we set our own plans and triggers?

Yes. Plan loss ratio, large-loss load, re-price and off-ramp levels are set per program from each binder. The large-loss threshold, comparison month, off-ramp rule, custom triggers and who signs are settings, and a trigger can be added in plain words.

What do we send to see one program redrawn?

Your binders, business plans and rate guides, and a sample of your MGAs’ bordereaux. The Agentic Solution Engine builds and deploys it from those documents, and it goes live once each quality gate has passed.

Try program performance analytics
on a recent month of your bordereaux.

We’ll run MGA Program Performance Analytics on your own binders and a recent month of your MGAs’ bordereaux.