- Before
- Can audit one bill in ten, and the other nine get paid as billed.
- Now
- Opens each bill already checked, with each reduction cited, and sends one return note per bill.
A hurricane fee bill, its photo time stamps and one adjuster's long day
A hurricane made landfall in Texas. Two weeks later, an outside adjusting firm bills the carrier $2,619.90 for one homeowner's claim. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01A weekday morning
The bill stack, and the bill already checked
IA program managerThe program manager opens the storm's bill stack. There are 438 fee bills waiting, the oldest waiting 9 days. They total $1.21M billed, with $118.4K not allowed so far. First in the stack is one firm's bill for a homeowner's claim, 14 lines for $2,619.90. The gross loss is $187,460, which is over $150,000. So under guideline §3.2 it is billed as time and expense. Lines over guideline are already struck through, with the allowed amount written beside them.
“6 agents checked this bill at 08:53 · 14 lines · 31 rules · 64 photos · check-in log · claim notes · 38 s”
- 02Replay the audit
Each line tested, one check at a time
The agentsReplay shows the run on the bill itself. The fee bill reader checks that each quantity times rate adds up to the $2,619.90 total. The guideline checker confirms the billing basis. Mileage is cut from 142 to 92 miles, since the first 50 miles of a round trip are not billable (§5.3). Photos are paid as 40 at $1.50 instead of 64 at $2.00 (§5.5). File set-up and postage are struck as overhead (§4.6, §5.8).
- 03One click on the field-time line
Four hours billed, 35 minutes on site
Photo and time cross-checkerThe adjuster billed 4.0 hours of field inspection, $380.00. The field app's GPS shows check-in at the insured home at 10:35 and check-out at 11:10. The 64 photos run from 10:42:17 to 11:03:05. The adjuster's next photo, on another claim, is at 11:48. Field time means documented time on site. Here that is 35 minutes, rounded up to 0.6 h, so $57.00 is allowed.
§4.3 says field time is “the time on site at the risk, supported by the inspection check-in and check-out and by the photographs”. It is “billed at $95 an hour to the next 0.1 hour”.
- 04The adjuster’s whole day
Seven inspections on one time line
Photo and time cross-checkerThe cross-checker lays out every claim the adjuster billed that Saturday, side by side. There were seven large-loss inspections between 08:05 and 16:21. By the adjuster's own check-ins, each was 35 to 41 minutes on site, with 412 photos in all. The bills claim 26.5 hours of field time in a day that ran 8 hours 16 minutes. Only 4.45 hours are documented on site.
“It reports time only. Whether this is a pattern is for vendor management to decide.”
- 05The day as billed
Billed hours laid one after another
IA program managerSwitch to the day as billed, and the seven field-time blocks are laid one after another. They run past the last check-out at 16:21, past midnight, to 10:35 on Sunday. One button applies documented time to all seven bills. Another refers the pattern to vendor management. A referral asks for a review and is not a finding.
- 06Report check
Nine of 12 report guidelines met, three to return
Report reviewerThe report reviewer checks the first report against the report guidelines. Contact came 19 hours after assignment, the inspection 2 days after contact and the first report 3 days after the inspection. The reviewer also checks the cause of loss and its evidence, and a test square on each roof slope. The sketch, the tie to the estimate and the named mortgage lender are checked too. Three items are not met. Only the front, left and right sides of the house were photographed. Bedroom 2 has no moisture reading. A later re-inspection has no approval in the notes.
- 07Report and photos
The report with margin notes
Report reviewerThe report opens as pages, with a margin note against each guideline it meets or misses. Beside it are the elevation map and a contact sheet of the 64 photos. Bedroom 2 has five photos and no moisture reading. Yet it has the largest drywall replacement, 412 sq ft, and the examiner had asked for the readings.
- 08Decision
Pay what the file shows, return what it doesn’t
Return note writerThe bill goes from $2,619.90 billed to $1,878.40 allowed. Six of the 14 lines are reduced, and $741.50, or 28.3%, is not allowed. The held re-inspection line is paid when its evidence arrives. Beside it is one return note to the firm's branch manager. It lists three report items and six bill lines, each with its section. The program manager can edit it before it goes.
“Reply here with any evidence we have not seen and we will look at the line again.”
- 09Signed at 09:14
Two signatures, then the payment run
IA program manager · Claims supervisorThe program manager approves $1,878.40, sends the note and refers the adjuster's Saturday to vendor management. The reduction is over $500 and carries a time flag. So the claims supervisor in the CAT unit, which handles catastrophe claims, co-signs from a phone. The bill goes into Thursday's payment run.
“Your signature, the evidence for each line and the note are kept with the bill. The agents proposed; you decide.”