- Before
- Knows where each loss stands, but the only copy is in their head. Six open large losses are held together in email and memory.
- Now
- Each document, payment and reserve sits on one timeline per loss. The adjuster accepts dates and pays, and the agents keep the picture current.
A frozen-food plant fire, a late steel delivery and a reserve changed the same day
A frozen-food plant in Colorado burned early on a Sunday. The roof collapsed over the 41,000 sq ft production hall, and three spiral freezers were lost. It is now Monday, day 120 of the claim. Here is what happens next in the working solution, screen by screen.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Monday, day 120
The whole loss on one timeline
General adjusterThe whole claim sits on one screen across a year. It holds 64 documents from 10 parties, each linked to its page. Each coverage part has its own lane: building and equipment, stock, business interruption and extra expense. Each lane shows its events, reports and payments, with its reserve and paid amount on the label. The totals read reserved $29.6M, paid $15.37M, projected $28.55M, and back to normal next March.
Timeline keeper · 07:12: “The contractor’s revised schedule (p.2) moves roof steel 57 days later and rebuild complete eight weeks later. Proposed for you to accept.”
- 0207:12
The contractor’s letter, read with its page
Document readerThe screen opens the contractor’s revised construction schedule, Rev. 3, six pages long. On page 2, the steel fabricator’s backlog moves joist girders and roof deck 57 days later. Substantial completion moves eight weeks later, into March. On page 3, the contractor says it will seek about $180,000 in extended general conditions, the cost of keeping the site running longer. That is not in the $14.2M building reserve, so it becomes an open item.
Document reader: “Steel delivery moves 57 days. The steel milestone on the building lane moves with it.”
- 03Next decision
The adjuster decides on the new rebuild date
General adjusterOn the building lane, the letter shows the three facts the agents took from it, each with its page. On the old date the reserves hold. Accepting the new date moves the business income projection and the reserves with it. The decision is the adjuster’s.
Timeline keeper: “Restoration date is the adjuster’s to accept.”
- 0409:14 · accepted
The income line moves out two months
Income projectorThe adjuster applies the revised schedule. The rebuild-complete flag moves eight weeks, and the recovery line on the business interruption lane moves with it. Back to normal goes from March to May. Income still at stake goes from $3.94M to $5.75M, which is $1.81M more. Business interruption now shows its reserve short by $1.1M, and extra expense short by $0.4M. Projected incurred rises to $30.73M.
“Projection moved out 8 weeks · reserve adviser recommends +$1.5M · 3 open items added.”
- 05Seconds later
Each step in view, with what it found
The agentsThe run is on the page, step by step. The rebuild-complete date moved, and the recovery was projected again against the policy limits. Business interruption and extra expense were found short. Three open items were added and Thursday’s briefing was redrafted. The last step waits for a person.
“Waiting for the director: reserve change +$1.5M is over the $1M authority.”
- 06Business income
The forensic accountant’s figure, checked against the policy
Income projectorThe policy pays actual loss sustained for 12 months, after a 72-hour waiting period. A 90-day extended period of indemnity covers the time sales take to recover. The limit is $18.0M, including extra expense. The forensic accountant measured $4,282,000 of loss to the end of September. Normal income is $400K a week, from last year’s P&L adjusted for trend. The adjuster can switch between the original, revised and revised-plus-four-weeks schedules. Each policy check cites its page, including the engineer’s estimate of 18 to 22 weeks against the contractor’s 28.
“The projection is the agents’ view, for reserving. The measured loss is the forensic accountant’s, and the restoration date is yours to accept.”
- 07Recommended
A +$1.5M reserve change by coverage part, with its reasons
Reserve adviserThe building and stock reserves hold. Business interruption goes from $9.6M to $10.7M, and extra expense from $2.4M to $2.8M. Total incurred goes from $29.6M to $31.1M. There are four numbered reasons, each cited. The first two are the moved rebuild and the forensic accountant’s ten-week ramp. The third is business income projected at $10.40M plus a 3% margin. The fourth is freezer trailers and a co-packer running eight weeks longer at $46K a week.
- 0809:20 · approved
The director approves the same morning
Claims director, major and complex lossThe change is over $1M, so it goes to the director with the timeline, the projection and the reasons. It is approved at 09:20. The advice to the reinsurer is drafted next. The per-risk treaty has a $10M retention, the amount the insurer keeps before reinsurance pays. The amount due from the reinsurer moves from $19.6M to $21.1M. Reinsurance accounting sends the advice.
Director: “Agreed. Get the engineer’s view before Thursday.”
- 09Owners and dates
Who owes what, by when
Open items trackerOpen items are grouped by who owes them: the insured, the broker, the experts and contractor, and the carrier. Two are new this morning. The engineer must confirm by Friday that the delay comes from the fabricator’s backlog. A co-packer’s quote now runs into April. The sworn proof of loss for business income is 10 days late. Each reminder is drafted, and nothing goes out until the adjuster sends it.
- 10For Thursday
A one-page briefing, each line cited
Briefing writerThe briefing is for Thursday’s large loss review. Its first line says the insured needs +$1.5M of reserve, because the rebuild has slipped eight weeks and business income will run into May. It then covers what changed this week, reserves by coverage part, business income and the decision. It has 7 citations to 5 documents. The adjuster edits it and sends it to the director.
Briefing writer: “Left the coverage view to you; no coverage position stated.”