- Before
- Did not know the estimate was waiting on them, and thought the insurer was writing it. Two calls in a week, and neither one said what was missing.
- Now
- Sees the one thing the claim needs, uploads it from a phone in the evening, and watches the payment date appear.
A burst supply line, a contractor's estimate and a payment date by text
A supply line under a policyholder’s kitchen sink burst. Sixteen days later the claim is waiting on the policyholder’s own contractor estimate, and neither of the two phone calls told them so. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01An evening after work
The claim, tracked like a parcel
PolicyholderAfter work, the policyholder opens the claim page. Reported and Inspected are ticked off; the marker sits on Estimate, which names the one thing it is waiting for: the contractor’s estimate, asked for 7 days ago, with an upload button right there. The payment line reads “3 business days after the estimate is agreed”.
“Everything else is done. Upload your contractor’s estimate here and your adjuster will compare it with our inspection within 2 business days.”
- 02A minute later
Two questions: one answered, one handed over
PolicyholderThe policyholder asks how the deductible applies. The answer comes from the policy declarations and the payment record: $1,500, once, from the repair payment; the $3,840.00 paid to the water mitigation company went out in full. Then comes a question about whether the insurer will pay for a hotel while the kitchen is out. That is a coverage question, so it is not answered: it goes to the adjuster in the policyholder’s own words.
“That’s a decision for your adjuster … who will reply by Wednesday, 5 p.m., here and by text. Keep receipts for any extra costs from today.”
- 03The upload
The estimate is checked inside the stage
Document checkerThe policyholder uploads the contractor’s 4-page estimate from a phone. The checks run on screen: it is for this claim and this address, both on page 1; all 23 lines read and the $18,642.37 total adds up; the contractor license is active. The original file is kept with its fingerprint.
The Document checker does not accept or approve a document: a mismatched claim or address is held for a person.
- 0434 seconds later
The tracker moves forward
Estimate comparerCompared with the inspection: 21 lines match and 2 differ, base cabinets at 14 ft against the inspection’s 12 ft, and the countertop replaced rather than reset. The Estimate stage now reads “With your adjuster · by Wednesday”, and a payment date appears: Thursday, if the adjuster agrees by Wednesday.
“Received tonight at 19:46: 21 of its 23 lines match our inspection; your adjuster decides the other 2 by Wednesday, 5 p.m., and you’ll get a text.”
- 05Same evening
Only the work that needs a decision
Property desk adjusterThe adjuster’s task list has this estimate to compare and the hotel question at the top, each with the time the policyholder was promised. The hotel task carries the policyholder’s exact words and the file context: kitchen unusable for about 5 working days per the contractor, bedrooms and bathrooms unaffected, Coverage D loss of use $97,200. Self-service answered 418 questions on the region’s claims today; these came to the adjuster because they need judgment.
“0 past a promised time · 0 near day 15”
- 06On the record
Each step on the claim file
Contact loggerThe claim file’s run log shows each step with its time: the tracker opened, the deductible answered from the declarations and payment record in 5.8 s, the hotel question classified as coverage under the message guidelines, the 15-day response clock started, the upload’s fingerprint kept, the 23 lines matched with five inspection photos attached.
From the run log: “15-day response clock started (10 CCR §2695.5(b)) · day 1 of 15”.
- 07Next morning
The adjuster decides each difference
Property desk adjusterSide by side, line by line. One inspection photo shows the base cabinet run at 14 ft 1 in where the sketch said 12 ft, so the adjuster agrees 14 LF, +$596.40. Four photos show no damage to the quartz slab, so the adjuster keeps detach and reset, with a supplement if it cracks on removal. Agreed: $17,500.52.
The Estimate comparer lists each difference with the photo or measurement behind it. It does not agree a price or change the inspection estimate.
- 08A minute later
“Your payment of $13,785.92 is on its way”
PolicyholderThe policyholder gets a text, and the tracker shows Payment: $17,500.52 agreed, less $2,214.60 held for depreciation until the repairs are done, less the $1,500 deductible, for $13,785.92 by check to the policyholder and the mortgage lender, mailed Thursday. The contractor can start the repairs now.
“Why is my lender on it?” sits on the Payment stage, answered from the mortgage clause of the policy.
- 09On the board
Who each claim is waiting on
Claims supervisorThe supervisor sees all 2,192 open property claims in the region by who has the next move: the customer, contractors, adjusters, payments and others such as lenders, public adjusters and the city, each with the one item and the days waiting. Another policyholder’s signed proof of loss is at 16 days, reminded 3 times, with an adjuster call due. The burst-pipe claim has moved to payments.
- 10Each week
Fewer status calls, and the clocks inside time
Claims CX leadIn one week, adjusters took 501 status calls against a July average of 1,284. Self-service answered 3,146 of 3,358 questions and handed 212 to adjusters, each with the customer’s words; 41% were asked between 18:00 and 08:00. All three clocks (answer within 15 days, reply by the promised time, written status every 30 days) stand at 100%.