- Before
- Learns a recovery is lost only when the statute runs out, long after the file closed.
- Now
- Starts on the money still recoverable, sorted by deadline. Confirms each find with the proof in front of them.
Subrogation identification on one closed water heater claim
A homeowners claim closed with the note “No subro: wear and tear.” Nineteen months later, the weekly reread picks it up. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Monday morning
This week’s reread: 1,906 closed claims
Subrogation supervisorThe supervisor opens Missed money. It shows $1,147,120 still recoverable in 54 closed claims. This week’s batch covers one quarter of losses. That is 1,906 homeowners, auto and small commercial claims in five states, and 1,412 of them closed with “no subrogation”. The supervisor presses Reread now. The agents read 38,412 notes, 2,960 statements and reports and 21,804 photo captions.
Each Sunday a quarter of losses is reread, and each file is also read on the day it closes.
- 02Reread done
Seven new finds go on the statute clock
Closed-file rereaderIn 118 claims, a sentence pointed at another party, and 94 parties were named. Of those files, 61 were already recovered, waived or under the minimum. Another 26 were past their date. Seven are new, worth $139,460. Each goes on the statute clock on the day its time to sue runs out. The total climbs to $1,286,580. Nine files, worth $197,440, run out within 90 days.
“26 more were already past their date: $412,800 that no one can recover now.”
- 03Top find
The file, read like a document with notes in the margin
Claim readerIt is a homeowners claim in Ohio. A 50-gallon gas water heater split overnight and flooded the finished basement. The first notice says “water heater burst”. The adjuster’s note names the installer and says the tank split at the bottom seam. Each of these sentences is highlighted with a note in the margin, and so is the closing note.
Closed as wear and tear. The margin note reads: “The facts above point to the tank and its installer. They do not point to wear.”
- 04Next
The maker, from the rating plate
Responsible party finderPhoto 8 is the rating plate, the label on the heater. It shows the maker, model, serial number, month of manufacture and a 6-year tank warranty. Photo 9 shows the split along the bottom weld. Photo 11 shows a pressure-reducing valve on the water main and no expansion tank on the cold line. The agents cite four of the 22 photos.
A split seam at 5 years 7 months is inside the 6-year tank warranty.
- 05Liability read
A suggested split, with the facts for and against
Liability estimatorThe suggested split is the heater maker 75% ($36,720), the plumbing contractor 25% ($12,240) and the insureds 0%. It follows Ohio’s modified comparative rule (ORC 2315.33). Under that rule, a party more than 50% at fault recovers nothing. Each party gets the facts that point to it and its likely argument. The maker will raise the flushing recommendation. The plumber will say the valve may not have been there when the heater went in. The supervisor can drag the split to change it, and each change is saved with its reason.
“No fact in the file suggests the insureds caused the failure.”
- 0663 days left
The deadline, the evidence and three letters
Statute clock · Evidence and notice drafterA product claim against the maker runs out in 63 days under ORC 2305.10(A). A negligence claim against the plumber for damage to the house runs two years longer. The earliest date is the one that counts. Seven items to keep are listed, with where each one is now. The failed tank went to the plumber’s shop, and no one has confirmed it is being held. The solution drafts three letters. One asks the plumber to keep the evidence. One is a notice of claim to the maker, and one goes to the insureds.
Letters drafted. Nothing is sent without your signature.
- 07Signed
The hold request goes first
Subrogation supervisorThe supervisor reads and signs the preservation request, the letter asking the plumber to keep the evidence. It asks the plumber to keep the failed heater, its fittings and any photos as they are. It also asks them to say by a set date where the unit is held, and to pass the letter to their liability insurer. On the evidence list, the tank changes to “Hold requested”.
- 08Confirmed
Confirmed and sent to recovery, with its deadline
Subrogation supervisorOne confirmation sends the file to the property specialist for Ohio and Kentucky. It goes with the amount recoverable ($48,960), the split (maker 75%, plumber 25%), the product deadline, the first action and a note. The file leaves the missed-money total. It joins the quarter’s hand-offs, now 39 files worth $661,360.
“The tank is at the plumber’s shop. Get the hold confirmed before anything else. Notice to the maker this week.”
- 09End of the quarter
Where the misses come from
Closed-file rereaderThe Where we miss screen looks back at the 99 files found or sent this quarter. Of these, 37 had been closed with “no subro” checked and no reason given. Another 22 were closed as “sudden and accidental, covered”, and 18 as “wear and tear”. The screen lists the phrases that found them, such as “rear-ended”, “supply line … burst” and “water heater burst”. It also shows each team’s catch rate at first notice.
Each of these phrases was in the first notice.
- 10The same morning, at intake
Read at first notice, so the next one is flagged while still open
Claims intakeThe New claims screen shows each first notice read as it arrives. Since 06:00 there have been 214, with 23 naming another party and 6 to watch. The median time from notice to read is 48 seconds. In Indiana, a city crew’s backhoe is flagged with its 180-day deadline to notify the city. A hailstorm and a deer strike are closed to subrogation, with the reason. An insured’s 11-month-old sump pump goes on watch.
Flags go to the adjuster on the claim and to the subrogation team.