WorkflowClinical Development

Protocol Design Optimization

Protocol design optimization that catches avoidable amendments before the committee meets

See one case, screen by screen ↓
Watch with transcript →

Built forClinical scientistsBiostatisticiansMedical monitorsClinical operations leadsCommittee chairs

The Problem Today

Six teams send comments by email and nobody rereads past amendments, so the same design mistakes come back.

57%
of protocols had at least one substantial amendment published
45%
of those amendments were judged avoidable published

What reviewers check by eye

  • Synopsis
  • Body text
  • Schedule
  • Amendments
  • Approvals start overEthics and agency reviews again, after the first participant joins
  • Participants re-consentA safety rule added mid-study means new consent signatures

The Solution

  1. Five reviewers read itEligibility, schedule, endpoints, safety and feasibility, in parallel
  2. Set beside past amendmentsEach finding cites the protocol line and the amendment it resembles
  3. Each visit cross-checkedSynopsis, body and schedule compared for each procedure and visit
  4. The protocol lead signsHigh findings are decided before signing, then the committee pack is built

Built-in controls

  • A named owner decides each finding
  • Your protocol stays your document
  • People and agents on one audit trail

What You Get

Each draft reaches the committee with its amendment risks decided by their owners.

  • Costly amendments flagged earlypublishedA median $535K and about 3 months per Phase 3 amendment
  • Committee pack built for youDecisions, reasons and risk by section, citations checked
  • Your own history put to workPast summaries of changes read, classified and cited
In short

What is Protocol Design Optimization?

Protocol design optimization means checking a draft protocol before it is final. It looks for design choices that will hurt enrollment, add participant burden or force an amendment. Protocol Design Optimization does this with six reviewer agents. They read each draft section by section against your own past amendments, your design standards and ICH E6(R3), E8(R1) and E9(R1). Each draft's amendment risk shows on one board.

How to choose AI solutions for life sciences →

Updated

The problem

Each new protocol repeats design mistakes that forced past amendments

A protocol is the plan for a clinical trial. It sets who can join, what happens at each visit, what is measured and how safety is watched. Before a draft is final, it goes out for comment to six functions. These are clinical science, biostatistics, safety, clinical operations, medical writing and regulatory. Comments come back by email and in tracked changes. The protocol lead pulls them together. By eye, the lead also checks that the synopsis, the body and the Schedule of Activities (the visit-by-visit table) agree. Then the lead builds a pack for the Protocol Review Committee.

Nobody has time to reread the archive of past summaries of changes, the documents that explain each old amendment. So the same design choices come back. An inclusion criterion, a rule for who may join, is stricter than the target label, the approved use the sponsor is aiming for. A washout, the drug-free gap before joining, is longer than the standard. A screening window is too short to fit a centrally read colonoscopy. An estimand, the exact question the main analysis answers, does not say how to handle intercurrent events. These are events such as rescue medication that change what a result means. The protocol leaves them to the analysis plan. A product with earlier liver findings has no stopping rules. Each one is found after the first participant joins, as a substantial amendment. That means ethics and agency approvals again, new consent from participants, and months of study time.

typical57%of protocols had at least one substantial amendment, and 45% of those were judged avoidable
typical$535Kmedian direct cost of one Phase 3 amendment, with about 3 months added
typical3.3amendmentsper amended protocol in the Tufts CSDD 2024 study of 950 protocols
Where a protocol's review days goestimated
By hand23 days
With the solution7.5 days
  • Collecting comments from six functions10 → 3 d
  • Checking the draft against past amendments and design standards4 → 0.5 d
  • Reconciling the synopsis, the body and the Schedule of Activities2 → 0.5 d
  • Deciding each comment and redrafting5 → 3 d
  • Writing the committee pack2 → 0.5 d

Estimated split, in working days, for one Phase 3 draft from first circulation to the committee, by hand and with the solution.

How it works

Five reviewers in parallel, then a lead reviewer who ranks and assigns

What comes in
Draft in1 draft protocol · + past amendments and design standards
Agents at work
Eligibility reviewer
Schedule & burden reviewer
Endpoint & estimand reviewer
Safety monitoring reviewer
Feasibility reviewer
Then
Lead reviewerrank + assign
A person decides
Protocol ownersaccept or reject each finding; the lead signs
What comes out
Protocol board
Findings with precedents
Signed committee pack
One case, step by step

A Phase 3 Crohn's draft read for protocol design risk before committee

The sample is a Phase 3 study of an investigational drug in moderately to severely active Crohn's disease. It plans 640 participants at about 180 sites in 22 countries, over 52 weeks. Draft v0.9 runs to 148 pages and goes to the Protocol Review Committee in seven days. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Seven days out

    Each draft before the committee, on one board

    Protocol lead

    The board opens on the eight drafts due at committee in the coming weeks, in committee order. Each column is one protocol. Its ten sections are colored by the strongest open finding in each. This draft stands out at 73% amendment risk. It has three findings in §5 Population and three in §8 Assessments & schedule. Across the board, 18 of 26 open findings cite a past amendment.

    “Risk = chance of at least one avoidable substantial amendment, estimated from 148 past amendments.”

  2. 02§5 Population

    Three findings, each beside the amendment it resembles

    Eligibility reviewer

    Inclusion 3 says patients must have failed at least two classes of biologic drugs. The eligibility reviewer gives it a 22% chance of forcing an amendment. It sits beside Amendment 2 of an earlier study of the same drug, which took 4.1 months, cost $162K and re-consented 64 people. The 12-month washout in exclusion 7 sits beside an amendment to another product's study. That amendment followed 112 screen failures. “History of any malignancy” sits beside Amendment 1 of the drug's psoriasis study. There, 37 screen failures were people with a treated basal cell carcinoma, a common skin cancer.

    “Inclusion criterion 3 was broadened … Enrollment was 41% of plan at month 6, and 58% of screen failures were due to criterion 3.”

  3. 03The precedent

    The summary of changes behind the finding

    Protocol lead

    One click opens that Amendment 2 itself. Its rationale says the target label did not require the original criterion. Investigators at 31 of 52 sites reported eligible patients being referred elsewhere. The amendment cost $162K directly and took 4.1 months from decision to last approval. It needed 52 ethics committee approvals, and 64 participants were re-consented.

  4. 04One click

    The protocol lead accepts the suggested wording

    Protocol lead

    In the review, the finding shows the protocol line and the precedent. It also cites §3.2 of the sponsor's eligibility design standard and ICH E8(R1) §3.3, an international trial guideline. It notes a clash with the randomization stratum “prior biologic exposure (yes or no)”, a factor kept balanced between groups. With this criterion, each participant would be “yes”. The protocol lead accepts, and the new wording goes in as a tracked change. It reads “conventional therapy (corticosteroids or immunomodulators) or at least one biologic class”. Risk falls from 73% to 67%, and expected cost from $656K to $556K.

    “17% once every fix is accepted.”

  5. 05Consistency

    Week 12 in the synopsis, Week 10 in Table 2

    Lead reviewer

    The lead reviewer compares the synopsis, the body text and the Schedule of Activities for each procedure and visit. The ileocolonoscopy behind a co-primary endpoint is at Week 12 in the synopsis and §8.2. But Table 2 places it at Week 10, and sites follow the table. An earlier study recorded 18 deviations before its amendment. There are six mismatches in all, each fixable in Table 2. Hours on site per visit show Week 4 at 6.5 hours. The burden index is 1.38× the Crohn's study median.

  6. 06Owners decide

    Each finding goes to the person who owns the area

    Biostatistician, medical monitor, operations lead

    Estimands go to the biostatistician and safety to the medical monitor. Feasibility goes to the clinical operations lead, and consistency checks to a named reviewer. The medical monitor has already accepted the wording for retesting with the tuberculosis blood test (IGRA). The biostatistician has raised the placebo endoscopic-response assumption for the committee. Other findings are still open. They include the 28-day screening window (18%) and the missing liver stopping rules (11%). Another is the primary estimand that leaves intercurrent events to the analysis plan (14%).

    Each decision is logged with who, when and why. This is the record the committee and inspectors see.

  7. 07Pack

    The committee pack, built from the decisions

    Lead reviewer

    The protocol lead clicks “Generate pack”. The lead reviewer collects the decisions and reasons and draws the risk profile by section. It writes the summary and the questions for the committee, and checks that each citation leads to its source. The pack for the committee chair reads 74% at draft and 67% now. Two findings were accepted, one was raised for the committee and nine are still open. Ten past amendments are cited.

    Each statement in the pack links to a finding and its sources.

  8. 08Before it goes

    High findings must be decided first

    Protocol lead

    When the lead tries to sign, the solution stops. Three high findings are still open, each shown with its owner and likelihood. They are the 28-day screening window, the 12-month washout and the primary estimand. Once each high finding has a decision, the lead signs the decision log. The signature states its meaning, “I confirm these dispositions as protocol lead”. Then the draft goes to the committee.

    The committee receives the draft once each high finding has a decision.

  9. 09Meanwhile

    A new draft is read the moment it arrives

    The reviewer agents

    Another draft arrives as v0.6 for a later committee. It is a Phase 2 dose-ranging study in HCM, a disease of the heart muscle. “Run the crew” sends its 104 pages to the five reviewers in parallel. The lead reviewer then compares the synopsis, body and schedule, and merges duplicate findings. It estimates each likelihood from the 148 past amendments, ranks the findings and assigns owners.

    The lead reviewer ranks the findings. It does not decide a finding or sign.

  10. 10Across the portfolio

    Design quality, measured draft by draft

    Protocol Review Committee

    The dashboard tracks amendment risk at draft against risk at committee sign-off. It shows findings by area of the protocol, decisions by reviewer, and where findings cluster by section and therapy area. On the sample portfolio, §5 Population in immunology carries the most findings per protocol. The Consistency check has the highest acceptance.

Who it’s for

Who owns each section of a draft protocol

Five owners of one draft, and how their part of the review changes.

Clinical scientist, protocol lead
Takes the draft to committee
Before
Collects comments from six functions and defends the draft at committee. Wants to know which sections the committee will send back, and why.
Now
Opens each draft already read section by section. Decides the eligibility findings with the precedent beside each, and signs the decision log.
Biostatistics lead
Owns endpoints and estimands
Before
Knows the agency will ask about an estimand left to the analysis plan, but finds the gap late, in someone else's draft.
Now
Receives each estimand and sample-size finding with ICH E9(R1) and the benchmark studies cited. Raises what needs the committee's view.
Medical monitor
Owns safety monitoring
Before
Had to add liver rules to an earlier study after three cases, and does not want to do it again.
Now
Each safety finding comes to the medical monitor, matched to the earlier finding and the amendment it caused. None is downgraded below Medium.
Clinical operations lead
Owns operational feasibility
Before
Heard from sites that 28 days was not enough to get a colonoscopy slot. The lesson stayed in one person's head and missed the next draft.
Now
Screening windows, shipping and visit hours are checked against site history before the draft is final. The burden per visit is on one chart.
Committee chair
Approves the protocol
Before
Reads long drafts and comment threads before each meeting, with no view of what was decided or why.
Now
Receives a pack with risk at draft and now, each decision with its precedent, and only the questions the committee must answer.
The agents

Six reviewer agents, from eligibility and estimands to feasibility

Five reviewers and a lead read every section and cite the past amendment behind each flag. Owners decide, and the protocol lead signs.

Eligibility reviewer

Reads the inclusion and exclusion criteria, washouts and population definitions. Compares each criterion with the target label and the sponsor's eligibility design standard. Also checks it against each past amendment that changed a similar criterion. Estimates the likelihood that a criterion forces a substantial amendment.

  • Each finding cites a protocol line and a source
  • Proposes changes, and never edits the controlled document
Schedule & burden reviewer

Reads the Schedule of Activities and section 8. Totals participant hours and invasive procedures per visit. Compares them with the therapy-area median and the sponsor's schedule and burden standard. Flags visits over 4 hours, and procedures with no endpoint or safety reason.

  • Cites the visit and procedure, and shows the basis for each burden figure
  • Never removes an assessment the statistician needs
Endpoint & estimand reviewer

Checks the five estimand attributes in ICH E9(R1) for each primary and key secondary objective. Flags any intercurrent event without a stated strategy, and any assumption without a benchmark source.

  • Statistical suggestions go to the biostatistician
  • Never sets the sample size or changes the analysis
Safety monitoring reviewer

Reads the investigator brochure and earlier study results for the product. Confirms that each known or suspected risk has monitoring and a rule for stopping or pausing treatment. Cites the earlier finding and the sponsor's safety monitoring standard.

  • Safety findings always go to the medical monitor
  • Never downgrades a safety finding below Medium
Feasibility reviewer

Compares screening windows, sample shipping, vendor turnaround and country plans with site feasibility history. That history covers screening times, colonoscopy waits and courier times from 1,240 site records.

  • Cites the site or vendor evidence
  • Never contacts sites
Lead reviewer

Compares each endpoint and procedure across the synopsis, the body and Table 2, and merges duplicate findings. Estimates each finding's likelihood from the amendment archive and ranks them. Assigns the owner by area and writes the committee pack.

  • Ranks, and never decides a finding or signs
  • Each pack statement links to a finding
Protocol owners

Decide each finding; the lead signs.

Ask in plain words

Protocol design questions about precedents, estimands and liver rules

Ask in plain words which findings matter most, what a precedent says or whether the schedule agrees, or say what to change. Each answer points to its source. These answers use the sample data.

Has this biologic criterion forced an amendment before?

Yes. Amendment 2 of an earlier study of the same drug changed the same criterion. It had required failure of at least two biologic classes, and was broadened to conventional therapy or one biologic. Enrollment was 41% of plan at month 6, and 58% of screen failures came from that criterion. The amendment cost $162K directly and 4.1 months. Inclusion 3 of this draft repeats the old wording. The eligibility reviewer estimates a 22% chance it forces an amendment.

What is wrong with this draft's estimand?

Section 3.2 says intercurrent events “will be handled as described in the statistical analysis plan”. ICH E9(R1) expects the strategy for each intercurrent event to be stated in the protocol. Another product's study did the same. The agency asked for the strategies after the first participant had joined. That led to Amendment 2, which cost $610K and 4 months. The suggestion is a composite strategy for rescue medication or stopping for lack of efficacy, and treatment policy for other reasons. The owner is the biostatistician.

Are the liver safety rules adequate?

No. This draft has no liver stopping rules. In the earlier study, 2.1% of participants on the drug had ALT above 3× ULN, against 0.6% on placebo. ALT is a liver enzyme, and ULN is the upper limit of normal. Amendment 4 had to add stopping rules mid-study and re-consent 211 participants. The safety standard requires these rules when an earlier study shows liver findings. The same gap is in the planned extension study. The owner is the medical monitor.

Add a rule: flag screening windows under 35 days when an endoscopy is needed

Done. The feasibility reviewer will flag any screening window under 35 days when screening needs an endoscopy with central reading. The rule comes from the earlier study, where the median wait for a colonoscopy slot was 19 days plus 6 days of central reading. It applies from the next review and already matches this draft. You can switch it off in Settings.

The screens

Each screen of a protocol design review, from the board to the committee pack

From the working solution, on its sample data. Pick one to see it large.

The protocol boardEach draft before the committee as a column of sections, each colored by its strongest open finding, with its amendment risk and committee date.
Findings beside their precedentsThe selected section's findings, each beside the past amendment it resembles, with months lost, direct cost and re-consent. The committee runway sits beneath.
ProtocolsDrafts and approved protocols with their findings, amendment risk, stage and committee date. Search and filter by phase and therapy area.
The reviewers at workFive reviewers read a new draft in parallel. The lead reviewer then compares, merges, estimates and ranks.
The reviewThe protocol text with each finding highlighted, the risk dial, and each finding with its protocol line, precedent, standard and guideline.
Synopsis, body and scheduleTable 2 checked against the synopsis and the body for each procedure and visit, with the hours on site per visit against the 4-hour standard.
The committee packRisk at draft and now, risk by section, decisions taken and the questions for the committee, each statement linked to its finding.
The decision logEach finding, who decided it, when and why, the protocol lead's signature and the audit trail.
High findings firstThe draft cannot go to the committee while a high finding is open. Each one is listed with its owner and likelihood.
The amendment archive148 amendments from 41 protocols, by area of change, avoidability, direct cost, delay and how often current reviews cite them.
One summary of changesWhat changed and why, what it cost, and the live findings that cite it.
The dashboardAmendment risk at draft against sign-off, findings by area, decisions by reviewer and where findings cluster by section and therapy area.
SettingsWhich reviewers run, when a finding is raised, what blocks the committee, owners by area, review rules and the sources read.
Governance

Owners decide each finding, and the protocol lead signs

No finding without its line and its sourceEach finding cites the protocol line it is about and at least one source. A source can be a past amendment from the archive, a design standard or an ICH guideline. The review shows them side by side.
An owner by area accepts, rejects or raisesThe agents propose. The owner of each area accepts the finding, rejects it or raises it to the committee. A rejection needs a written reason, and it goes in the decision log.
High findings hold the draft backThe draft cannot be sent to the committee while a high finding is open. Each one needs a decision first. This rule is a setting.
The protocol lead signs with meaningThe protocol lead signs the decision log electronically, before the committee chair decides on the protocol. The signature records its meaning, the name and the time.
Accepted suggestions arrive as tracked changesThe agents do not edit the controlled document. An accepted suggestion goes in as a tracked change, and the draft remains the sponsor's own.
Agent steps, decisions and signatures recordedEach agent step, decision, pack and signature is recorded with who, what and when, on an audit trail that cannot be changed.
Configuration

Thresholds, owners and review rules for protocol design optimization

What the reviewers raise, who decides it and what holds a draft back are settings, and each change to them is on the record.

SettingDefaultChoose from
Minimum likelihood of an amendment3%3% · 5% · 10%. Findings below it go to a watch list instead of the owner
Block “Send to committee” while high findings are openOnOn · Off
Re-run the crew on every new draft versionOn, and decisions carry over when the line is unchangedOn · Off
Eligibility & population findings go toProtocol leadProtocol lead · Biostatistics lead · Medical monitor · Clinical operations lead · Consistency owner
Endpoints & estimands findings go toBiostatistics leadProtocol lead · Biostatistics lead · Medical monitor · Clinical operations lead · Consistency owner
Safety monitoring findings go toMedical monitorProtocol lead · Biostatistics lead · Medical monitor · Clinical operations lead · Consistency owner
Review rulesFour rules, such as “Flag visits longer than 4 hours” (burden standard §4.1) and “Flag primary estimands without an intercurrent-event strategy” (ICH E9(R1))Add a rule
What the reviewers readAmendment archive, design standards, ICH E6(R3), E8(R1), E9(R1), ICH M11 template, site feasibility historyRe-index any source
Connections

The amendment archive and the standards each draft is read against

Draft protocols and synopsesWord drafts, split into ICH M11 sections, the synopsis and the Schedule of Activities
Past protocols and their amendmentssummaries of changes from the TMF, classified by area, avoidability, cost and delay
Design standards and SOPsyour eligibility, schedule and burden, estimand and safety monitoring standards
ICH guidelinesE6(R3) quality by design, E8(R1) critical-to-quality factors, E9(R1) estimands
Site feasibility historyscreening times, colonoscopy waits and courier times by site and country
Investigator brochures and earlier studiesthe earlier findings each new protocol must monitor for
What it changes

Protocol design optimization results, from first draft to sign-off

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
24%
target chance of an amendment at committee sign-off, from 72% at first draft
At first draft72%
At sign-off24%
typical
$535K
published direct cost of one Phase 3 amendment, plus about 3 months
target
71%
of findings accepted by owners; the rest rejected with a reason
findings accepted by owners

“Demo” means seen in the working solution, on its sample protocols. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate. “Typical” means published figures. The first source is Tufts CSDD, Getz et al., Ther Innov Regul Sci 2016. It found 57% of protocols with at least one substantial amendment, and 45% of those avoidable. It also found a $535K median direct cost per Phase 3 amendment, with about 3 months added. A Tufts CSDD 2024 study of 950 protocols found 3.3 amendments per amended protocol. ICH E6(R3), E8(R1) and E9(R1) are named as context. Names on the screens are sample data.

Questions

What study teams want to know about protocol design optimization

What is protocol design optimization?

Protocol design optimization means checking a draft protocol before it is final. It looks for design choices that will hurt enrollment, add participant burden or force an amendment. Protocol Design Optimization does this with six reviewer agents. They read each draft section by section against your own past amendments, your design standards and ICH E6(R3), E8(R1) and E9(R1). Each draft's amendment risk shows on one board.

How does it predict which protocol sections will be amended?

Each finding is matched to the past amendment it resembles. That shows what changed, how many months it took and what it cost. The lead reviewer then estimates its likelihood from the archive. Amendment risk is the chance of at least one avoidable substantial amendment. On the sample archive, it is estimated from 148 past amendments.

Does it use our own amendment history?

Yes. It reads your summaries of changes from past protocols, classified by area, avoidability, direct cost and delay. It cites them by study and amendment number. When a study is amended, the new summary of changes is read and classified. A person confirms it, and it joins the archive for the next review.

Which guidelines and standards does it check against?

It checks against your own design standards and three ICH guidelines, the international guidelines for clinical trials. ICH E6(R3) covers quality by design and operational feasibility. ICH E8(R1) covers critical-to-quality factors, and ICH E9(R1) covers estimands. Drafts are split into the sections of ICH M11, the standard protocol template. The synopsis, body and Schedule of Activities are compared for each procedure and visit.

Does the AI change our protocol?

No. The agents propose changes, and they never edit the controlled document. When an owner accepts a suggestion, it goes in as a tracked change. Statistical suggestions always go to the biostatistician, and safety suggestions to the medical monitor.

Who decides a finding, and what stops a draft going to committee?

A named owner decides each finding. They can accept it, reject it with a written reason, or raise it to the committee. High findings must be decided before the draft can be sent. The protocol lead signs the decision log, and the committee chair approves the protocol.

Can we set our own thresholds, owners and review rules?

Yes. Settings cover the minimum likelihood to raise a finding and whether open high findings block the committee. They also cover re-review on each new version and the owner for each area. Your review rules and the sources the reviewers read are settings too.

Which of our documents does it need?

Your design standards, protocol template and past summaries of changes. The Agentic Solution Engine builds and deploys it from those and your requirements, and it goes live once each quality gate has passed. We will walk you through it on one of your own draft protocols first.

Put your next draft protocol
through protocol design optimization.

We'll run Protocol Design Optimization on one of your draft protocols, against your own past amendments.