- Before
- Runs 12 sites in 7 countries from a tracker. “I don't need another tracker. I need to know which site will miss its SIV, and why, before the CRA is on a plane.”
- Now
- Opens a runway that shows which site breaks, on which date and why; confirms each finding and signs the green light.
Two sites, one morning: a break caught early and a packet green-lit by lunch
VLT-305 is a Phase 3, placebo-controlled study of veltrimab in moderate-to-severe ulcerative colitis, on protocol 3.0 (Amendment 2, Aug 28, 2026), with 12 sites in 7 countries and first patient in targeted for Nov 16. It is Oct 7. Here is what happens next, screen by screen, in the working solution.
- 01Oct 7, morning
Every site as a runway to its initiation visit
Lena Ortiz · Study start-up leadLena's home screen puts the 12 sites on one calendar, each a bar toward its SIV, with Today and First patient in marked. Three breaks are still to clear, five are requested from sites and 2 of 12 sites are green-lit. On the right, breaks are listed nearest initiation visit first, and a new packet from 104 Hill Country Digestive Research — 23 documents through the site portal at 07:40 — waits to be checked.
“Each site is a bar toward its initiation visit, broken where an essential document is missing, expired or inconsistent.”
- 0228 days before the visit
Bologna's bar breaks on Nov 2 — two days short
Version and expiry checkerSite 207, Ospedale San Lorenzo, has its SIV on Nov 4. Dr. Marco Gallo, a sub-investigator delegated eligibility and adverse-event assessment, completed GCP training on Nov 2, 2023, so his certificate lapses on Nov 2, 2026. His CV, investigator suitability form, Italian register entry, delegation log and declaration of interests all agree on name and site — written as “Marco Gallo, MD” on one and “GALLO Marco” on another. Only the date breaks.
“Certificate valid to Nov 2 · Initiation visit Nov 4 · 2 days short of the visit.”
- 03One click
The request to Bologna, in English and Italian
Fix-request writerOne click on Draft request and the fix-request writer addresses Elena Rossi, the study coordinator, with Prof. Chiara Benedetti and the CRA Priya Raman in copy: one item, a refreshed GCP certificate for Dr. Gallo dated before Nov 2, and why. A switch shows the same request in Italian. Lena sends it; the break on the runway now reads “GCP · Dr. Gallo lapses Nov 2 · due Oct 14”.
The fix-request writer drafts; a person sends.
- 04Check now
Five agents read Austin's 23 documents
The agentsOn the runway, Lena presses Check now on Hill Country's new packet. Packet intake sorts the 23 documents into 12 families and attaches them to 6 people. The field reader reads 61 pages and 214 fields — names, dates, signatures, versions. The people cross-checker, the version and expiry checker and the country rules checker then test them against the Oct 21 visit, protocol 3.0 and the United States list.
Each agent's step is shown as it runs, with what it found and how long it took.
- 0564 seconds later
Four findings, each with the passages behind it
Lena Ortiz · Study start-up leadLena opens the packet. Two findings are high, one medium, one low; 42 of 46 checks passed. Dr. Kwame Mensah does medical tasks but is not on the Form FDA 1572. Meridian IRB approved protocol 2.0, not 3.0. Dr. Hannah Lowe's GCP certificate expired on Sep 12, 2026. The CLIA certificate for Hill Country Regional Laboratory runs to Nov 30, only 40 days after the visit. Each finding cites its pages and suggests a decision: ask the site, accept with a note, or not an issue.
- 06People cross-check
Six people, lined up across the 1572, the log and their certificates
People cross-checkerEach person on the delegation log is matched to Section 1 or 6 of the 1572 and to their CV, licence, GCP certificate and disclosure. Dr. Mensah is line 4 of the log, delegated eligibility and adverse-event assessment from Sep 22, but not in Section 6 — and he has no financial disclosure. The coordinator Mia Alvarez and the pharmacist Daniel Ruiz have no medical tasks, so they need not be on the statement.
Anyone with eligibility, examination or adverse-event tasks (B, D, E) must be on the statement.
- 07One request
Three items to ask, one note to approve
Lena Ortiz · Study start-up leadLena takes the suggestions. The CLIA certificate is accepted with a note — “Renewal is routine and not due before activation. Reminder set for Nov 1 to collect the renewed certificate.” — which goes to Omar Haddad for a second approval. The other three become one request to Mia Alvarez, with Dr. Rafael Moreno and Sam Patel in copy, due Oct 12, sent through the site portal.
“Drafted by the fix-request writer from the findings you confirmed.”
- 08Same morning
Five corrected documents, re-checked
Mia Alvarez · Study coordinator, Hill CountryMia uploads a revised Form FDA 1572, Dr. Mensah's financial disclosure, the IRB approval of Amendment 2, consent form 3.0 and Dr. Lowe's new GCP certificate. The re-check keeps the 3 older versions and marks them superseded, finds Dr. Mensah in Section 6, the IRB approval of Amendment 2 dated Oct 6 and Dr. Lowe's training dated Oct 6, 2026. Nothing is open: 46 checks done, 1 accepted with a note.
“Ready for green light. 46 checks done · 0 open · 1 accepted with a note.”
- 0910:58 · green-lit
She signs the green light, and the packet is filed to the eTMF
Lena Ortiz · Study start-up leadLena signs with her name, password and the meaning “I approve activation of this site”, confirming the essential records are complete and current. All 12 document families are complete. The 24 documents are filed to the eTMF in Zones 04, 05 and 08 with their metadata, the depot is told it may ship VLT-305 kits to site 104, and Sam Patel is asked to book the initiation visit.
From 23 documents arriving at 07:40 to a signed green light at 10:58, the same day.