- Before
- Runs 57 requests from a spreadsheet, and finds out on day ten that a file was wrong.
- Now
- Watches each request fill in on its business-day clock, with problems flagged and explained before it is sent.
A 79-file homeowners claims sample, pulled, checked and sent in early
The insurer is on day 6 of fieldwork in a targeted market conduct exam by the Ohio Department of Insurance. The examiner-in-charge has asked for 79 homeowners claims that were closed without payment. They are due Thursday. Here is what happens, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Monday · 10:40
The whole exam in the request room
Exam coordinatorThe coordinator opens the request room. Across the top runs the life of the exam, from the call letter through fieldwork to the draft report. Below it sit all 57 requests, grouped by exam area. Each shows its owner, its business-day clock and one cell for each file or answer it needs. Of these, 34 are submitted, 11 are due this week and 0 are late. So far the examiners have billed 742 hours.
“Please replace 4 claim numbers in the list sent last week: they were closed with payment. The due date is unchanged: Thursday.” Examiner-in-charge, 09:55
- 02One click
The sample request starts filling, file by file
Call letter reader · File pullerThe request asks for a sample of 79 homeowners claims closed without payment. The coordinator presses Fill. The call letter reader reads the corrected sample list, with 4 claim numbers replaced and the due date unchanged. It counts 5 business days to Thursday and skips Columbus Day. The file puller brings in each file from the claim system, the policy system and the agency mailbox. Each file holds notes, letters, payments and photos. The 79 cells turn blue as the files arrive.
- 03File 38 of 79
One file turns amber
Standards pre-checkerAs each file is checked, its cell turns green or amber. File 38 is a water claim. The claim system says the claim was acknowledged in 7 days. The pre-checker counts from the day the insureds called their agent instead, and that makes it 18 days.
“Late acknowledgment · 18 days, limit 15. Acknowledged 18 days after the insured called the agent; the claim system shows 7.”
- 04Tested
All 79 files checked the way the examiner will check them
Standards pre-checkerThe sample is 79 files and 782 documents. Of these, 73 are clean and 6 have an issue. Each standard is measured against the 7% claims tolerance. Acknowledgment within 15 days: 3 of 79 missed (3.8%). Decision within 21 days of proof of loss: 0 missed. Status letter every 45 days: 1 of 79 missed (1.3%). Denial cites the policy provision: 2 of 79 missed (2.5%). Those are two free-form letters, and they repeat finding 3 from the last exam.
The pre-checker explains and routes. It does not decide that an exception is a violation.
- 05The file
Two clocks, and the email that proves the date
Exam coordinatorThe sampled file opens on its timeline. First come the call and the email to the agent. The agency entered the claim 11 days later, and the acknowledgment letter went out a week after that. Then come the inspection, the proof of loss and the denial citing Section I Exclusion 2.c.(6). The agent's email sits beside it with a note in the margin. Under Model 902 §6A, telling the agent counts as telling the insurer.
- 06Before submission
The explanation, drafted before the examiner asks
Response drafterThe response drafter writes the company's explanation from the file and from the fix already made. Since the middle of last year, agents report claims through the direct first-notice line. Late acknowledgments on homeowners claims reported by agents fell from 4.1% to 0.6%. The draft cites the agency email, the first-notice record, the claims procedure and the acknowledgment report. The claims compliance director confirms the facts, and the coordinator sends it to counsel.
The draft is marked Draft. It does not go to the examiner on its own.
- 07Checked
The count matched to MCAS before the examiner compares them
Consistency checkerThe request says 1,391 homeowners claims closed without payment in the exam year. The MCAS filing says 1,427. The consistency checker finds the reason. In that year, 36 claims were reopened and closed again, and MCAS counts each closing. The 36 claim numbers go in the package. Elsewhere it finds a real contradiction. The complaint register is 7 short of the department's count, so that one goes to counsel.
No number is changed to make it agree.
- 0811:12 · 11:16
Counsel approves, the manager signs off
Regulatory counselCounsel approves the three explanations at 11:12. The market conduct manager signs off the package at 11:16. Only then does Submit to the examiner light up. The package goes to the examiner-in-charge through the department's exam portal. It holds 79 claim files, 782 documents and the MCAS reconciliation of 36 claims. A cover letter lists 6 issues the company found itself and gives 3 explanations.
- 0911:20 · 3 business days early
Submitted, and back to the list
Exam coordinatorThe coordinator submits the sample request at 11:20 on Monday, three business days before it is due. The request room now counts 35 submitted. The agents' run is kept beside it, step by step.
- 10When a criticism lands
Agree, disagree or explain, said once from the file
Regulatory counselWhen the examiners write a criticism, it arrives with a draft response. One says 3 of 50 complaints were answered to the department after 21 days. The draft agrees with it and explains how the mailbox was routed during a system change. It cites the complaint files and the complaint-handling procedure, and commits to a daily check of the department mailbox by a set date. Counsel approves each agree or disagree.