- Before
- Meets adverse development on the new diagonal after quarter-end, then asks claims what happened.
- Now
- Sees the cell the month it breaks, then the claims and the passages behind it, and decides what it means.
A contractors liability accident year that left its pattern in July
The carrier watches eight commercial casualty segments each week. Its contractors general liability segment, one recent accident year, sat exactly on its pattern at the Q2 review. Here is what happened next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Tuesday morning
The triangle, already compared
Reserving actuaryMonday’s run went automatically at 05:40 on the August evaluation. The actuary opens the triangle for contractors general liability (GL). It covers ten accident years, with an expected final cost, the indicated ultimate, of $559.5M. Each cell is shaded by how far it sits from expected. The development curves are drawn over their own ages. Five of 80 accident years across the eight segments are outside their expected range.
“18,412 paid and case reserve transactions since last week’s run, 8 segments”, along with 2,906 notes, 61 large-loss reports and 44 counsel letters read.
- 02Back to June
At the Q2 review, everything sat on its pattern
Reserving actuaryThe evaluation scrubber replays the triangle as it stood at each month-end. At the June evaluation, the accident year was on its pattern. Actual minus expected stayed flat inside its band, and no segment was outside its range.
“Each accident year inside its range. At the June evaluation no segment had left its pattern. This is what the Q2 review saw.”
- 03July evaluation
The curve leaves its range at 31 months
Emergence comparatorAt the July evaluation, the accident year reported 50.6% of its indicated ultimate. The expected range was 45.3% to 50.2%. That is +$1.9M unexpected, with actual at 3.6 times expected (A/E 3.6×). The comparator marked the break on the curve. It raised the flag on the first Monday of August, eight weeks before the Q3 quarter-end.
“Left its pattern · July evaluation · 31 mo” · “flagged 8 weeks before quarter-end”
- 04Any cell
Each cell shows its arithmetic
Reserving actuaryA cell that is not hot still opens its numbers. An older accident year at 48 months has reported $33.4M. From 36 to 48 months it was expected to add +$5.4M, and it added +$5.0M. So it is 63.3% reported, inside its range of 61.0% to 65.8%. Expected is the Bornhuetter-Ferguson emergence from the selected pattern.
“Inside its expected range. No claim moved more than $100,000 against its expected in this period.”
- 05One click
Where the movement came from
Reserving actuaryThe hot cell opens the flag. A bridge shows where the money came from. Reported losses stood at $31.9M at the end of June. Expected emergence added +$1.5M and the other 474 claims added +$0.3M. Twelve claims added +$4.6M, for $38.3M at the end of August. Below it are three views of the ultimate. It was $68.4M at the Q2 review. Bornhuetter-Ferguson with the unexpected added gives $73.3M, and chain ladder on the new diagonal gives $78.4M.
“For you to select. The agents never pick.”
- 06Behind it
Twelve claims, and what the notes said first
Adjuster note readerEach of the twelve claims shows what happened and its case reserve at the end of June and of August. It also shows the signal in the notes and how many days the note led the reserve. There are three expert reports, three demands, three suits served or amended and three letters of representation. That makes twelve signals, a median 15 days ahead of the reserve.
Each signal cites its passage. The note reader does not infer a signal the text does not state.
- 07The largest claim
The note came 13 days before the reserve
Casualty claims leaderThe claim is a residential owners’ association suing the builder. The adjuster’s mid-July note records the plaintiff’s expert. The expert found water intrusion in 212 of the 240 units, with a repair estimate of $6.8M plus $0.9M for relocation. Defense counsel recommended an indemnity reserve of $1,700,000. Thirteen days later, the case reserve went from $150,000 to $1,700,000.
Margin note: “Signal. The adjuster records the reserve as inadequate on the day of the report.”
- 08Decided
The actuary sends it to the reserve review
Reserving actuaryThe accident year has been outside its range at two evaluations, so the agents propose the reserve review. The choice is the actuary’s. The actuary marks it for the reserve review and keeps the reason with the flag. Construction defect expert reports and suits in one county’s courts were not in the Q2 a priori, the starting estimate. Both indications should go to the committee.
“Queued for the Q3 reserve committee · range +$4.9M to +$10.0M”
- 09This week
The brief for the Chief Actuary
Development brief writerThe weekly development brief to the Chief Actuary is drafted from the run and the actuary’s decision. Across the eight segments, +$45.8M was reported against +$36.3M expected. Half of the unexpected sits in one accident year. Net of the $700,000 ceded to reinsurers on the largest claim, the accident year is +$4.2M. The brief cites seven sources, each numbered in the text.
The brief writer does not select an ultimate or recommend a reserve, and only the actuary sends it.
- 10Committee day
On the committee agenda, with its evidence
Chief ActuaryThe accident year is first on the Q3 reserve committee list. It brings twelve claims, nine cited notes and the range for the ultimate. The reserving actuary presents and the Chief Actuary decides. Two year-end questions wait beside it. One is re-selecting the contractors GL pattern from 24 to 48 months. The other is making construction defect its own segment.