WorkflowClinical Development

eTMF Quality Check

An eTMF quality check that runs every day, scoring each site on what is due today

See one case, screen by screen ↓
Watch with transcript →

Built forTrial master file leadsQC reviewersSite monitorsClinical trial managers

The Problem Today

Each site's list of expected documents lives in a spreadsheet that goes out of date with each staff change, so gaps are found at inspection.

38 days
to file one document after it is signed, by hand our estimate

What the file team tracks by hand

  • Site docs
  • Visit notes
  • Milestones
  • Spreadsheet
  • Sampled checks, once a quarterGaps are found only at the next quarterly review
  • Last-minute filing looks badA pile filed just before an inspection is a warning sign

The Solution

  1. Each document filed in placePlaced in the file with its site, date, version and signatures
  2. Due dates from milestonesEach site's expected documents worked out from its own events
  3. A staff change is spottedA new sub-investigator named in a visit report makes new documents due
  4. The TMF lead confirmsFilings the agents are unsure of go to a person, who signs each with its meaning

Built-in controls

  • Each gap carries its evidence and an owner
  • Only a person removes an expected document
  • Inspector access is read-only and expires

What You Get

Each day you see what every site owes and has filed, with each gap owned and dated before an inspector asks.

  • High-confidence filings need no oneFiled on their own once the date and signature checks pass
  • Batches filed as they arriveFrom the portal, file drop and email, filed or held for a check
  • Late filings seen at onceEach document's days from signature to filing, in view
In short

What is eTMF Quality Check?

It is a review of the electronic trial master file (eTMF) for the three things inspectors look at: completeness, timeliness and quality. The eTMF Quality Check solution runs it each day, in place of a review once a quarter. Four agents file each document to the TMF Reference Model and work out what each site should have by today. They score each zone at each site on a heatmap, for the TMF lead to confirm and sign.

How to choose AI solutions for life sciences →

Updated

The problem

Trial teams cannot see which documents each site is missing today

Every clinical trial keeps a trial master file, or TMF. It is the official record of the trial. It holds documents from the sites, the vendors and the CROs, the contract research organizations that run trial work for the sponsor. A Phase 3 trial at 46 sites builds a file of tens of thousands of documents. When inspectors arrive, they ask three things. Is the file complete? Was each document filed on time? Is each one correct? Many TMF teams rely on a sampled check once a quarter and a filing backlog worked by hand. They keep the list of documents each site should have in a spreadsheet.

That list goes out of date as soon as a site changes staff. Say a new sub-investigator joins a site. The monitoring visit report records it, but nobody updates the spreadsheet. The site still looks complete. Yet the updated delegation log and the new person's CV, GCP certificate and financial disclosure are missing. This is one of the most common things inspectors find. Late filings stay hidden too. On the sample study, an investigator's Form FDA 1572, their signed commitment to the FDA, reached the file 94 days after signing. Nobody saw it until someone looked. And a pile of documents filed just before an inspection is a warning sign in itself.

typical25yearsthe shortest time EU trial law (Art. 58) says the TMF must be kept after the trial ends
Where a document's days go, from signature to filedestimated
By hand38 days
With the solution1.6 days
  • Waiting in the inbox and the filing backlog20 → 0.2 d
  • Sorting into the TMF Reference Model and indexing6 → 0.1 d
  • Quality check (QC) of the filing7 → 0.8 d
  • Chasing missing signatures and dates4 → 0.4 d
  • Updating the expected-document list1 → 0.1 d

Our estimate of where the days go. By hand, the sample study took a median of 38 days to file a document. The target with the solution is 1.6 days.

How it works

Each document filed, scored and chased in the eTMF quality check

What comes in
Documents in3 channels · site portal, vendor drop, email
Agents at work
ClassifierTMF artifact + confidence
Metadata extractorsite, date, signatures
Then
Completeness checkerdue by today + heatmap
Then
Gap follow-up agentrequests and reminders
A person decides
TMF leadconfirms and signs
What comes out
Filed in the right place
Zone × site heatmap
Gaps with owners
One case, step by step

A staff change at one site, found by the morning eTMF quality check

The sample study is a Phase 3 trial of a new drug for moderate-to-severe plaque psoriasis. It is randomized and double-blind, with 46 sites in 12 countries. It runs under a US IND, the application to the FDA to test a drug in people. Here is what its TMF lead sees and does, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Early morning

    The whole file on one heatmap

    TMF lead and QC reviewer

    The heatmap shows the file's zones down the side and the sites across. Zones are the main sections of the TMF Reference Model, the industry's standard filing structure. The completeness checker scored each cell before the day began. The study is 94.2% complete. Of 46 sites, 33 are ready in every zone, and 37 gaps are open. Trial-level zones show a dash, because they are filed once for the whole study. Late filings carry a red dot. The side panel lists the five weakest cells. By hand, this study once had 4,820 documents waiting to be filed.

    “Each cell counts only the documents a site should have by today.”

  2. 02Hatched cells

    A blank cell is not a gap

    Completeness checker

    One site was activated only recently. Its Zone 06 cell is hatched, which marks it as not yet due. The first shipment of the trial drug (IP, the investigational product) has not arrived. So nothing in IP and Trial Supplies is due yet. Local lab documents become due at first patient. Visit reports become due after the first monitoring visit.

    “The cell turns on when that milestone is reached. Until then a blank is not a gap.”

  3. 03One click

    One site's Zone 05: 67% complete, 75% on time

    TMF lead and QC reviewer

    The weakest site has 12 of the 18 Site Management documents it should have by today. The milestone strip shows why 18 are expected. The site was selected and activated, enrolled its first patient, added a sub-investigator and held Visit 3. The strip also shows 7 more documents that are not due yet. Five documents are missing and three were filed late. The worst is the investigator's Form FDA 1572, filed 94 days after it was signed.

  4. 04The evidence

    A staff change found inside a visit report

    Completeness checker

    No spreadsheet knew that a new sub-investigator had joined. The checker found it on page 3 of the Visit 3 monitoring report. He had joined as Sub-Investigator and already rated psoriasis severity (the PASI and IGA scores) for two subjects. The checker compared this with delegation log v1, which has no entry for him. It also checked section 6.3 of the study's TMF plan v2.1. Then it opened a gap, with each passage one click away.

    The Visit 3 report says the Site Signature and Delegation Log has not yet been updated to include him.

  5. 05One step

    Four gaps go to the site's CRA

    TMF lead and QC reviewer

    The Zone 05 owner rule suggests the CRA who covers the site, the monitor who visits it. The TMF lead assigns delegation log v2 and the three gaps that go with it: the new sub-investigator's CV, GCP certificate and financial disclosure. Each has a due date and a note on what to collect. For the late 1572, the gap follow-up agent drafts a request to the investigator for a note to file.

    “Nothing is sent until you press Send.”

  6. 06The register

    Each gap with an owner, a stage and a due date

    CRA

    The four gaps now sit with the CRA, marked assigned and requested. The register shows the 14 most urgent of the 37 open gaps. At another site, the local lab's normal ranges and lab certificate are 28 days open and overdue. A second CRA is chasing them. A third site is missing its monthly temperature log. A fourth has no return record for expired IP kits.

  7. 07Re-derived

    Nine rules turn milestones into due dates

    Completeness checker

    The list of expected documents is built from rules in the TMF plan and the TMF SOP. Each rule names an event and the documents due by then. The events include a site activated, a staff member added, a 1572 signed or an amendment approved. They also include IP kits expiring, a visit held, a month of enrollment closing, IP shipped or a site closed out. To rebuild the list for 46 sites, the checker reads the milestones and applies the 9 rules. Then it compares the result with what is filed.

    “38,655 documents expected across 46 sites today · 1,214 more will become due at future milestones.”

  8. 08The morning batch

    240 new documents, read and filed

    Classifier and Metadata extractor

    The batch held 612 pages. The site upload portal sent 162 documents, the vendor file drop 51 and CRA email 27. The classifier matched each document to its artifact, its exact slot in TMF Reference Model v3.3.1. The metadata extractor read the site, document date, version, signatures and people named. Of these, 228 were filed at 90% confidence or more. Six were held for a QC reviewer. Another 6 were set aside: 4 duplicates found by their content and 2 that are not trial documents.

    The weakest site is still red in Zone 05 Site Management, because the delegation log v2 was not in this batch.

  9. 09To confirm

    A letter that looks like a report, at 64% confidence

    Classifier

    The Visit 3 follow-up letter arrived titled “Site Visit Summary”. Visit reports often use that title, so the classifier gave Monitoring Visit Report a 29% chance. But this is a letter to the PI, the site's lead investigator, listing agreed action items. It also says the sponsor holds the full visit report. So the classifier places it at 05.04.04 Monitoring Visit Follow-up Letter. It highlights the passages it relied on and holds the document for the TMF lead.

  10. 10Signed

    The TMF lead confirms the filing with a signature

    TMF lead and QC reviewer

    The TMF lead files the letter at 05.04.04 and signs. The signature records what it means: “Reviewed, filing and details are correct”. The site's Zone 05 moves from 67% to 72%, or 13 of 18 expected documents. Delegation log v2 is still with the CRA. The cell stays red until it arrives and passes QC.

    “Your signature, the time and the reason are written to the audit trail and cannot be changed.”

Who it’s for

TMF lead, CRA, trial manager and QC reviewer on one trial master file

Four people keep the trial master file ready for inspection. Here is their week by hand, and their week now.

TMF lead and QC reviewer
Confirms and signs filings
Before
Learns what was missing only at the quarterly QC review. Works a backlog of thousands by hand and keeps the expected-document list in a spreadsheet.
Now
Sees what is missing today, site by site and zone by zone. Confirms only the filings the agents were unsure of, and signs each one.
Clinical research associate
Collects missing documents from sites
Before
Chases documents from a list that does not say why each is needed or by when. The site would send them if told which ones and why.
Now
Gets each gap with the passage that made it due, the TMF plan rule and a due date. A drafted request to the site comes with it.
Clinical trial manager
Approves exports and exceptions
Before
Before each inspection, has to predict what an inspector would find at any site tomorrow.
Now
Approves each decision to mark a document not required. Also approves each inspection export, a read-only copy with the index, metadata, QC records and audit trail.
QC reviewer
Reviews doubtful filings
Before
Works through whole batches, though only the few filings the agents are unsure of need a person.
Now
Gets only the filings held below 90% confidence, each with candidates, reasons and the details read. Also checks a 10% weekly sample of the rest.
The agents

A classifier, an extractor, a completeness checker and a follow-up agent

Agents read and file documents, score each zone on what is due today and chase gaps with their owners. The TMF lead confirms and signs.

Classifier

Reads each incoming document and finds its place in the TMF Reference Model: zone, section and artifact. Gives its top three candidates, a confidence and the reasons, each tied to a passage. Flags duplicates and documents that are not trial documents.

  • Below 90% confidence goes to a QC reviewer
  • Critical artifacts always go to QC
  • Cites a passage for each reason
Metadata extractor

Pulls the study, site, document date, version, language, people named and each signature with its date. Marks each value with its confidence and source passage. Checks that dates and signatures are present.

  • Never guesses a date
  • Flags personal data beyond subject IDs for redaction
Completeness checker

Works out which documents each site should have. It uses the site's milestones and events it reads in documents, such as staff changes, expired IP kits and amendments. Then it scores each zone at each site for completeness and timeliness. Last, it opens gaps with the evidence passage, a suggested owner and a due date.

  • A gap always cites its evidence
  • Never marks a document “not required”. Only a person can, with a reason and approval
Gap follow-up agent

Drafts the request to the site and notes to file. Sends reminders by the owner rules, and closes a gap when the document arrives and passes QC.

  • Nothing is sent without a person pressing Send
  • Copies the clinical trial manager on overdue gaps
TMF lead

Confirms low-confidence filings and signs.

Ask in plain words

Red zones, site readiness and automatic filing in the trial master file

Ask in plain words about a site, a document or a gap, or say what to change. Each answer points to the passage it came from. These answers use the sample data.

Why is this site red in Zone 05?

A new Sub-Investigator joined the site and has already done PASI and IGA assessments. The Visit 3 report says the delegation log was not updated. The TMF plan expects an update within 14 days of a staff change. So 5 documents are missing: delegation log v2, his CV, GCP certificate and financial disclosure, and the latest screening log. Timeliness is red too. The investigator's Form FDA 1572 reached the file 94 days after it was signed, against a 30-day target.

Which sites are least ready for an inspection?

Two sites are below 80% in a zone. One is at 67% in Zone 05 Site Management, where a new Sub-Investigator is missing from the delegation log. The other is at 78% in Zone 08, where new local lab ranges are not filed yet. Next lowest are a third site at 84% in Zone 06 and a fourth at 86% in Zone 05.

Why is the site's follow-up letter only 64%?

Its title reads “Site Visit Summary”, which visit reports often use, so the classifier gave Monitoring Visit Report a 29% chance. But it is a letter to the PI with agreed actions, and it says the sponsor holds the full report. That makes it a follow-up letter (05.04.04). Confirming it lifts the site's Zone 05 from 67% to 72%.

How does automatic filing work?

The Classifier files a document on its own when it is 90% confident or more and the date and signature checks pass. Anything lower goes to a QC reviewer. Delegation logs, consent forms and ethics approvals always do. A 10% weekly sample of automatic filings is checked too, and 97.4% were kept as filed.

The screens

Heatmap, gap register, document review and the inspection export

From the working solution, on its sample data. Pick one to see it large.

The eTMF heatmapZones down the side and sites across, each cell scored against what is due today. Beside it, the five weakest cells and how scoring works.
Not expected yetA hatched cell at a newly activated site, with the milestone that will make its documents due.
One cell, openedCompleteness and timeliness, the milestones that made 18 documents expected, and what is missing, filed late or waiting for QC.
Site checklist and evidenceThe site's checklist by section and the open gap with its suggested owner. Beside it, the passages from the visit report, delegation log and TMF plan behind it.
Assign a gapThe suggested owner from the gap-owner rules, the due date, the related gaps and a note to the owner.
The gap registerMissing, late and unusable documents with owner, progress, days open, due date and status.
Expected documentsNine rules from the TMF plan that make documents due, a site's milestone timeline, and the latest rebuild of the list, step by step.
A batch, filed240 documents read, classified and filed by zone, with each agent's step, its time and what it found.
Document reviewThe page with highlighted passages, artifact candidates with confidence, the reasons, and each detail read from the document.
Confirm and signThe artifact the document is filed to, the meaning of the signature and the signer, written to the audit trail.
The dashboardBacklog, days to file, QC first-time right, inspection-ready sites, completeness by week and open gaps by zone.
Inspection exportA read-only copy of the TMF with its index, metadata, QC records and open gaps, sent for approval before anyone outside sees it.
SettingsTMF structure, auto-file confidence, QC sample, critical documents, timeliness target and approvers, each one a setting.
Governance

How the eTMF quality check keeps filings signed and access read-only

Filings cite their passagesEach filing shows the artifact candidates with their confidence, the reasons and the passages behind them. Each detail read (site, dates, version, signer) shows where it came from.
Low confidence and critical documents are signedA QC reviewer confirms each filing under 90% confidence. The same goes for all consent forms, delegation logs, ethics approvals and IP accountability logs. The reviewer signs electronically, and the signature records the name, the time and the meaning.
Gaps cite the passage that made them dueA gap names the passage that made the document due and the rule in the TMF plan. It also has an owner from the gap-owner rules and a due date. Owners are reminded 7 days before the due date and on the day.
Dropping a document needs a reason and an approvalA person can mark a document “not required” to take it off a site's expected list. That needs a written reason and the clinical trial manager's approval. The agents do not remove an expected document on their own.
Approved, read-only inspector accessAn inspection export holds the TMF index and each document's metadata, QC record and audit trail. It goes to the clinical trial manager for approval. The inspector gets read-only access for 30 days.
Agent steps and signatures on the audit trailEach agent step, filing, assignment, reminder and signature is recorded with who, what and when. Nothing reaches a site until a person presses Send. The record is kept for 25 years after the trial ends.
Configuration

What files on its own in the eTMF check, and who signs the rest

You set the filing structure, the confidence for automatic filing, the QC sample, the timeliness target and who approves what. The expected-document rules come from your own TMF plan.

SettingDefaultChoose from
TMF structureTMF Reference Model v3.3.1TMF Reference Model v3.3.1 · TMF Reference Model v3.2.0 · Company TMF index 2026
File automatically at90% confidenceRaise or lower it. Below it, a QC reviewer confirms the filing
QC sample of automatic filings10% sample, checked every week10% sample · 5% sample · 20% sample · Every document
Always QC critical documentsOnConsent forms, delegation logs, ethics approvals, IP accountability logs
Timeliness target30 days from document date to filed30 days · 14 days · 60 days
QC sign-offTMF leadTMF lead · Named QC reviewer · Any QC reviewer
Inspection export approverClinical trial managerClinical trial manager · TMF lead
Who may mark a document “not required”TMF leadTMF lead · Clinical trial manager
Connections

Site portals, vendor drops, CRA email and the TMF plan it reads

Site upload portaldocuments sent by sites, filed or held for QC as they arrive
Vendor file dropdocuments from CROs and vendors, such as a vendor qualification audit
CRA emaildocuments sent in by monitors, such as a visit follow-up letter
TMF Reference Modelzones, sections and artifacts, or your own company TMF index
TMF plan and SOPsthe expected-document rules, their deadlines and the timeliness target
Site milestones and staff directoryactivation, first patient, visits, staff changes and who is on each site team
What it changes

Inspection readiness with a daily eTMF quality check

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1.6days
median to file a document, against a 30-day target
Filed by day 2
was 38 days by hand
target
33of 46
sites to be inspection-ready in every zone, from 11
sites ready for an inspection
target
94%
smaller filing backlog as the goal, from 4,820 documents to 310
By hand4,820 waiting
With agents310 waiting

“Demo” means seen in the working solution, on its sample study data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate. “Typical” means published figures, here Regulation (EU) 536/2014, Art. 57 and 58, on what a TMF holds and keeping it at least 25 years. Named as context: TMF Reference Model v3.3.1, the ICH E6(R3) rules on trial records, and the NIAID/DAIDS TMF oversight measures of completeness, timeliness and quality. Names on the screens are sample data.

Questions

eTMF quality check questions from TMF and clinical operations teams

What is an eTMF quality check?

It is a review of the electronic trial master file (eTMF) for the three things inspectors look at: completeness, timeliness and quality. The eTMF Quality Check solution runs it each day, in place of a review once a quarter. Four agents file each document to the TMF Reference Model and work out what each site should have by today. They score each zone at each site on a heatmap, for the TMF lead to confirm and sign.

How does it know which documents a site should have?

The completeness checker applies the expected-document rules from your TMF plan to each site's milestones. Those include activation, first patient, visits, amendments, IP shipments and kit expiry. It also uses events it reads inside documents, such as a staff change recorded in a monitoring visit report. Documents that are not due yet show as hatched, so they do not count as missing. A red cell is a real gap.

How does it measure TMF timeliness?

It compares each filed document's days from document date to filing with your timeliness target. The default is 30 days, or you can choose 14 or 60. The heatmap switches between completeness and timeliness. Each late filing is listed with its days, like a Form FDA 1572 filed 94 days after signing on the sample study.

Does the AI file documents without a QC review?

Only above the confidence you set (90% by default), and only when the date and signature checks pass. Anything lower goes to a QC reviewer, who confirms with an electronic signature. So do all consent forms, delegation logs, ethics approvals and IP accountability logs. A weekly sample of automatic filings, 10% by default, is checked as well.

Can an agent drop a document from the list or write to a site on its own?

No. The agents file, score and draft. A QC reviewer confirms low-confidence filings and signs. Only a person can mark a document “not required”, with a reason and approval. Nothing is sent to a site until a person presses Send. An inspection export needs the clinical trial manager's approval.

Can we use our own TMF index and TMF plan?

Yes. Documents can be filed to TMF Reference Model v3.3.1, v3.2.0 or your company TMF index. The expected-document rules, deadlines, gap owners and reminders come from your TMF plan and SOPs. Gap owners and reminders are set by zone.

What does an inspector get?

A read-only copy of the TMF for the study or a site. It holds the index and each document's metadata, QC record and audit trail. It also lists the open gaps with their owners. The clinical trial manager approves it first, and the inspector's access lasts 30 days.

What do we hand over to start?

Your TMF plan, TMF index, site milestones and a sample of trial documents. The Agentic Solution Engine builds and deploys it from your requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own documents first.

Score one study’s TMF
with a daily eTMF quality check.

We'll run eTMF Quality Check on a sample of your own trial documents, TMF plan and site milestones.