- Before
- Tracks around 60 open bound risks in a spreadsheet and finds out a subjectivity has lapsed when she happens to open the file.
- Now
- Watches every subjectivity count down on one board and releases chasers the agents have already drafted, quoting the slip.
One bound risk, from a lapsed subjectivity to a signed clearance
Monday 12 October, London time. A new slip is bound at 15:40, and at 17:00 the signed Statement of Values for Harwell Quay Container Terminal falls due. Here is the afternoon, screen by screen, in the working solution.
- 0115:40
A new slip, read as it is bound
Slip readerJames Whitlock binds Dunmore Port Authority — property damage and business interruption, GBP 180,000,000, Marlowgate Specialty 17.5% lead. In 6.1 seconds the slip reader lifts out three subjectivities word for word and turns “within 14 days of inception” into Sun 15 Nov 17:00. The flood defence plan has no date and no consequence, so it is flagged and a date query to the broker is drafted.
“S3 has no date and no consequence. The Contract Certainty Code asks for both.”
- 0216:58
Every bound risk on one board, counting down
Hannah Mercer · Contract-certainty analystHannah opens the board: 18 bound risks in four lanes — subjectivities open, wording in draft, wording agreed, certain. Each card carries a ring per subjectivity that empties as its deadline nears. October stands at 88.6% certain at inception against a 95% target: 62 of 70, with 8 not certain. Harwell Quay’s signed SOV has 1 minute 38 seconds left.
“Next deadline 17:00 · Harwell Quay · signed SOV — …by 17:00 London time on 12 October 2026, failing which Underwriters reserve the right to amend terms…”
- 03Looking ahead
What will lapse this week, lit up
Hannah Mercer · Contract-certainty analystShe drags the look-ahead to +7 days. Everything that stays on time greys out; what will lapse by then stays lit, beside the two already overdue at Orrin Valley Foods and Brannock Mining. The filter chips keep the count: 2 subjectivities overdue, 4 risks lapsing within 7 days, 1 subjectivity with no date on the slip.
- 0417:00
The deadline passes, and the chaser drafts itself
Chaser writerThe Harwell Quay ring hits zero and the card turns red. In the chaser rail the agents work in view: deadline reached, placement inbox searched — only a draft SOV of 2 October, unsigned and undated — S1 quoted from MRC page 4, a draft to Callum Reeve at Fenwick Hale & Partners copied to James, and escalation set for Wednesday 14 October 17:00.
“Drafted in 4.4 s by 4 agents … Waiting for Hannah to release — nothing is sent without a person.”
- 05Released
Hannah releases it — nothing reaches the broker without her
Hannah Mercer · Contract-certainty analystThe chaser quotes the subjectivity exactly as the slip has it, says what Marlowgate holds and what is missing, and states that if the signed SOV is not received by 17:00 on Wednesday, James Whitlock will review terms as the slip allows. Hannah reads it and releases it. Two minutes later Callum replies: “Apologies — signed SOV attached.”
- 0617:02
The reply, matched to the subjectivity
Document matcherThe document matcher matches the attachment to S1: signed and dated 12 October by the insured’s CFO, TIV US$1,187,400,000 — 1.1% above the draft, inside the slip’s 10% tolerance. The survey report from Halden Risk Engineering, received 8 October with 4 recommendations and none critical, is matched to S2. Both are marked ready to clear; neither is cleared by an agent.
Agents read and draft. Only James Whitlock clears subjectivities and agrees wordings.
- 07Signed
The underwriter clears both, with a signature
James Whitlock · Class underwriter, Property D&FJames sees each subjectivity in the slip’s own words beside the evidence that meets it, and signs. The meaning of his signature is recorded with it: the subjectivity is met as worded on the slip. Harwell Quay moves right, to wording in draft.
“Signed by James Whitlock · Class underwriter · meaning: the subjectivity is met as worded on the slip · 12 Oct 17:02”
- 08Wording v2
The wording, against the slip, clause by clause
Aisha Bello · Wordings specialistThe wording checker lined up the broker’s 38-page v2 with the slip — 41 clauses — and found two material mismatches: a maximum indemnity period of 18 months where the slip agreed 12, and the LMA5394 Communicable Disease Endorsement missing from the endorsement schedule. Aisha sends both margin notes to the broker. The wording cannot be agreed until v3 arrives.
“The wording gives 6 months more business interruption cover than the slip agreed.”
- 09Every morning, 06:00
The certainty rate, every morning, named
Rob Keane · Head of Underwriting OperationsThe certainty reporter counts every incepted risk under Marlowgate’s definition and shows where certainty slips — by class, broker and underwriter. Pemberly Sutton is at 8 of 10 this month, Tolland Marsh at 83.3%. The eight risks incepted without an agreed contract are listed with their owner and reason, and Rob signs and exports the audit-ready report.