WorkflowCommercial Real Estate & Construction

Construction Draw Management

Construction draw management that proves every line before money moves

See one case, screen by screen ↓
Watch with transcript →

Built forLoan administratorsConstruction lendersDraw inspectorsTitle and escrow officers

The Problem Today

Administrators assemble each draw's invoices, waivers and inspection by hand while the contractor waits for cash.

5.5 days
lenders take to process one draw published
9.4 days
borrowers wait for a draw, as they see it published

Proof assembled by hand

  • Pay app
  • Invoices
  • Waivers
  • Inspection
  • Funded ahead of the sitePaid on the billed percentage before the inspector agrees
  • A missing or short waiverPaying without a valid one can cost the bank lien priority

The Solution

  1. The package read at oncePay application, invoices, waivers and title read once the package is complete
  2. Each line tied to its proofG703 lines tied to invoices, waivers and the inspector's report
  3. Billed against builtLines billed ahead of the inspection held until the site catches up
  4. The administrator signsAmount to fund and each holdback; above the limit an officer co-signs

Built-in controls

  • Waivers read against the state statute
  • Each holdback names the document that releases it
  • Each agent step and signature on the audit trail

What You Get

A complete package reaches a signed funding decision with each line proven and work not yet built held back.

  • Holdbacks in place of overfundingEach exception held at its amount until its document arrives
  • Budget kept in balanceContingency and interest reserve tested with each draw
  • Stored materials verifiedBill of sale and insurance naming the bank checked first
In short

What is Construction Draw Management?

Software that takes a construction loan draw from the borrower's request to a funded advance, with the pay application, invoices, lien waivers, inspection, budget and title date-down checked before money moves. Construction Draw Management adds six agents that read the package, tie each G703 line to its proof and recommend an amount with each holdback, for the loan administrator to decide and sign.

How to choose AI solutions for lending →

Updated

The problem

Each construction draw waits on proof assembled by hand

Every draw has to be proven before it is funded: the contractor's AIA G702 and its G703 continuation sheet, each subcontractor's invoice, a conditional lien waiver for this payment and an unconditional one for the last, the inspector's percent complete, the budget and change orders, and the title company's date-down. The construction loan administrator assembles that proof by hand, in spreadsheets and email, while the contractor and its subs wait for cash.

The risk sits in the lines nobody had time to check: a G703 that does not tie to the G702, framing billed ahead of what the inspector saw, a sub paid again before last month's payment is proven received, a waiver short of the payment or not on the state's statutory form. In Texas such a waiver is unenforceable. Funding a line ahead of the site, or paying without a valid waiver, is how a lender loses money and lien priority.

typical5.5dayslenders take to process a draw
typical9.4daysborrowers wait, as they experience it
typical5–7daysfor a draw reviewed by hand
Where a draw's business days goestimated
By hand5.5 days
With the solution1 day
  • Logging the package and chasing missing documents1 → 0.1 d
  • Tying G703 lines to the G702 and to invoices1 → 0.1 d
  • Checking lien waivers by party, amount and form1 → 0.1 d
  • Reconciling the inspection and stored materials1 → 0.2 d
  • Budget, in-balance and title date-down0.8 → 0.1 d
  • Recommendation, signatures and the borrower notice0.8 → 0.4 d

Estimated split for a typical draw on a mid-size construction loan, by hand and with the solution.

How it works

The draw review path: package, line proof, holdbacks and signature

What comes in
Draw package inThe draw package · pay app, invoices, waivers, inspection, title
Agents at work
Pay application readerG702 / G703 tie-out
Then
Invoice and waiver matcher
Inspection reconciler
Title date-down checker
Then
Budget and balance checker
Then
Funding recommenderamount + holdbacks
A person decides
Loan administratordecides and signs
What comes out
Signed funding
Holdbacks with releases
Borrower notice
One case, step by step

Draw 14 on a mixed-use construction loan: four exceptions, two signatures

A mixed-use project, 186 units over 14,200 sq ft of retail, sends Draw 14 for $4,384,970. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Start of the week

    What needs the administrator, on one screen

    Construction loan administrator

    The administrator runs 23 active construction loans, $412.6M committed. The home screen shows 8 draws in the queue for $12.4M, the oldest waiting 10 days on 3 missing waivers, and 7 open exceptions, including a lien affidavit and an out-of-balance loan the agents found on two other projects.

    Agents at work: the title date-down checker found a $48,200 lien affidavit, and the borrower was asked to bond around it.

  2. 02The queue

    Draws ranked by risk and days waiting

    Construction loan administrator

    Each draw shows the amount requested, when it arrived, its documents, inspection, waivers, exceptions and stage. Draw 14 has 51 of 51 documents in and 27 of 28 waivers, and is ready for review.

    The contractor's clock starts when the package is complete.

  3. 03One click

    Start review: six agents read 51 documents

    The agents

    The pay application reader checks the G702 and G703: 20 lines, contract sum to date $50,048,900, the G703 ties to G702 line 4, retainage 10%. The invoice and waiver matcher ties 13 invoices and 27 waivers. The inspection reconciler compares the inspector's report, the budget and balance checker runs the in-balance tests, and the title date-down checker reads the title search since the last draw.

    Each step is shown as it runs, with what it found.

  4. 041 min 24 s later

    Four exceptions, each with its proof

    Funding recommender

    Twenty of 20 lines tied to their proof. Four exceptions, $782,750 held: framing billed ahead of the inspection, the electrical sub's missing unconditional waiver for Draw 13, change order 8 not yet approved by the bank, and the plumbing sub's conditional waiver $20,000 short. Each links to the page it came from. Recommended: $3,602,220.

    Recommended $3,602,220 by the funding recommender; needs a second signature.

  5. 05The framing line

    Billed 88%, inspected 81%: the gap is held

    Inspection reconciler

    The G703 bills the framing sub's wood framing line to 88% ($6,116,000 of $6,950,000). The inspector certifies 81%: on Level 5 the east wing walls are framed but not sheathed, and the roof trusses are on site but not set. The $486,500 billed ahead of the site is held, $437,850 net of retainage, until a later inspection certifies it. The other lines are within the 3-point tolerance, and the 212 stored windows are counted on site.

    The inspection reconciler never changes a percentage the inspector certified.

  6. 06Waivers

    A missing waiver and a short one

    Invoice and waiver matcher

    Each waiver is read for its type, amount, through date, signer and Texas statutory form. The electrical sub's unconditional waiver for the $241,650 paid in Draw 13 has not arrived, so its $257,760 due this period, net of retainage, is held. The plumbing sub's conditional waiver releases $176,605 against $196,605 due, so $20,000 is held. One click asks the contractor for both.

    Rule: no new money to a party until its unconditional waiver for the last payment is in.

  7. 07Budget

    Still in balance, with the reserve to watch

    Budget and balance checker

    After the draw the undisbursed loan of $28,452,720 covers the cost to complete. Contingency after change order 8 would be $1,663,500, 8.2% of the work left and above the 5% minimum. General conditions are 3.3 points ahead of the project, inside the 10-point limit. To watch: $1,157,600 left in the interest reserve against $1,094,000 of projected interest.

  8. 08The recommendation

    From the request to the amount to fund

    Funding recommender

    Hard costs of $3,992,730 after retainage plus $392,240 of soft costs make the $4,384,970 request. Four holds come off, each with the document that releases it, leaving $3,602,220 to fund through the title and escrow company, which issues the ALTA 33-06 date-down for the advance. The borrower notice is sent only once the administrator signs.

  9. 09One more hold

    A $25,000 hold, asked for in plain words

    Construction loan administrator

    The inspector's report also notes three storefront units in retail bay C installed with cracked panes, at about $25,000 to replace. The administrator asks the assistant to hold it. A fifth holdback appears, released when the inspector confirms the units are replaced: fund $3,577,220, hold $807,750.

    Activity: the funding recommender added a $25,000 holdback for cracked storefront glass, retail bay C.

  10. 10Signed, funded in a day

    Above the administrator's limit, the officer co-signs

    Administrator and lending officer

    The administrator approves with the meaning of the signature: Reviewed, fund as recommended. Above the $2,500,000 limit, the draw goes to the senior construction lending officer for a second signature, and then $3,577,220 goes to the title company for disbursement, one business day after the package was complete.

    The signature, the time, the amount and each holdback are written to the audit trail and cannot be changed.

Who it’s for

Four roles that review, inspect and sign a construction draw

The same draw, seen by the four people who carry it: their month by hand, then with the solution.

Construction loan administrator
Signs draws to $2.5M
Before
Assembles the proof for each draw by hand, in spreadsheets and email, while the contractor calls for cash.
Now
Opens a draw already tied out line by line, four exceptions sourced, and spends the time on the decision.
Construction lending officer
Second signature to $10M
Before
Co-signs each draw above $2.5 million and wants to see what was held and why, on one page.
Now
Sees each holdback with its reason and release on one screen, then adds the second signature.
Draw inspector
Certifies percent complete
Before
Counts what is built, not what is billed, and then the report is checked against the G703 by hand.
Now
The certified percentages are what the draw is funded on, line by line, and the inspector's notes become holdbacks.
Construction loan administration manager
Sets the rules
Before
Answers for how long draws take and for any line funded ahead of what the inspector saw.
Now
Sets tolerances, limits and waiver rules once, and sees each project's progress, draws and holds against plan.
The agents

Pay application, waiver and inspection agents in construction draw management

Before money moves, each G703 line is tied to its invoice, waivers and inspection; the loan administrator decides and signs.

Pay application reader

Reads the AIA G702 and G703, or the lender's own form, recomputes each column and checks that the continuation sheet ties to the summary, billed change orders are approved and retainage matches the loan agreement.

  • Never alters a submitted figure; it reports the difference
  • Cites page and cell for each value
Invoice and waiver matcher

Ties each subcontractor invoice to its G703 line, and reads each waiver's type, amount, through date, signer and statutory form: the conditional waiver for this payment and the unconditional one for the last.

  • Never accepts a waiver that is not on the statutory form
  • A missing unconditional for the last payment always holds new money
Inspection reconciler

Compares the inspector's percent complete and stored-materials count with what is billed, line by line, and holds lines beyond the tolerance at the difference, net of retainage.

  • Never changes a percentage the inspector certified
  • The tolerance comes from Settings
Budget and balance checker

Tests the budget lines, change orders, contingency, interest reserve and the in-balance requirement after the draw.

  • Never moves money between budget lines
  • Out of balance stops the recommendation
Title date-down checker

Reads the title company's date-down for liens, judgments and notices recorded since the last draw.

  • Never recommends funding past a recorded lien
Funding recommender

Turns the findings into a recommended amount and a holdback for each exception with the document that releases it, routes draws above the administrator's limit to a second signer and drafts the borrower notice.

  • Never approves or moves money
  • Each holdback names its release
Loan administrator

Decides and signs; officer co-signs above the limit.

Ask in plain words

Asking the assistant about a draw, a G703 line or a lien waiver

Ask about a draw, a line, a waiver or a test, or say what to hold. Each answer points to its source. These answers use the sample data.

Why is the framing line held back?

The contractor billed wood framing to 88%, $6,116,000 of $6,950,000, with $973,000 this period. The inspection certifies 81%, since on Level 5 the east wing walls are framed but not sheathed and the roof trusses are not yet set. The $486,500 billed ahead of the site is held, $437,850 after retainage, until a later inspection certifies it.

Which subcontractors are missing lien waivers?

Two of the 14 parties are holding money: the electrical sub, whose unconditional waiver for the $241,650 paid in Draw 13 has not been received ($257,760 held), and the plumbing sub, whose conditional waiver for Draw 14 reads $176,605 against $196,605 due ($20,000 held). The other 26 waivers are on the Texas statutory forms and match.

Is the project still in balance after this draw?

Yes. After funding, the undisbursed loan covers the cost to complete. Approving change order 8 takes contingency to $1,663,500, 8.2% of the $20,362,340 still to build and above the 5% minimum. One to watch: the interest reserve has $1,157,600 left against $1,094,000 of projected interest.

Hold $25,000 for the cracked storefront glass in retail bay C

Added. The inspector found three storefront units with cracked panes in retail bay C, about $25,000 to replace. The recommendation is now $3,577,220, with $807,750 held in 5 holdbacks, released when the inspector confirms the units are replaced.

The screens

Draw queue, line evidence, waivers and the signing screen

From the working solution, on its sample data. Pick one to see it large.

HomeDraws in the queue, the oldest waiting, open exceptions, projects to watch and what the agents are doing.
The draw queueDraws ranked by risk and days waiting, with documents, inspection, waivers, exceptions and stage.
Agents at workEach agent's step in view: pay application tied out, invoices and waivers matched, inspection compared.
Exceptions and the recommendationFour exceptions with their amounts and sources, the recommended amount and what is held back.
One line, all its proofThe G703 line, the inspector's passage, the invoice and both waivers, and why the line is held.
Inspection against the requestInspected against billed percent per line, framing floor by floor, stored materials and the inspector's notes.
Lien waivers by partyWaivers by party, amount against payment due, statutory form, and the two that hold money.
Budget and in-balanceBudget lines through this draw, the in-balance tests, contingency and the interest reserve runway.
The funding decisionFrom the request to the amount to fund, each hold with its release and the drafted borrower notice.
Holdbacks and activityEach holdback with its evidence and release, and each agent step and upload on the activity trail.
Approve and signThe meaning of the signature, the signer, and the second signature above the administrator's limit.
The project dashboardCertified percent complete against plan, funded to date, retainage, interest reserve and the draw history.
Draw rulesTolerances, retainage, contingency, waiver forms, stored materials, change-order and approval limits, all as settings.
Governance

Holdbacks, signatures and the audit trail in construction draw management

Each exception cites its sourceEach exception links to the page it came from (inspection report, G703 line, waiver, change order) and to the amount held for it.
The administrator decides and signsThe agents recommend; the construction loan administrator decides and signs with the meaning of the signature, and above $2,500,000 a construction lending officer co-signs.
Each holdback names its releaseA holdback is released by the document that clears it (a waiver, a later inspection, a change-order approval) or with a reason and a second person.
Waivers read against the statuteWaivers are checked against the state's statutory form, and no party receives new money until its unconditional waiver for the last payment is in.
Certified numbers stay certifiedThe agents do not alter the contractor's submitted figures or the inspector's certified percentages, move money between budget lines or fund past a recorded lien.
Each step on the audit trailEach agent step, upload, holdback and signature is recorded with who, what and when. A signed decision cannot be changed, and changes to the rules are versioned.
Configuration

Inspector tolerance, retainage, waiver forms and signing limits per draw

The rules each draw is checked against are settings, versioned and on the audit trail.

SettingDefaultChoose from
Inspector variance tolerance3 pointsStep up or down, one point at a time
General conditions ahead of the project10 points5 · 10 · 15 points
Retainage10% throughout10% throughout · 10% to 50% complete, then 5% · 5% throughout
Minimum contingency5% of remaining hard cost3% · 5% · 7.5% of remaining hard cost
Waiver formsTexas statutory forms (§53.284)Texas (§53.284) · California (§§8132–8138) · Arizona (§33-1008)
Stored materialsOn site or bonded warehouseOn site or bonded warehouse · On site only · Not funded until installed
Change orders the bank must approveAbove $100,000 or 25 daysAbove $100,000 or 25 days · Above $50,000 · Every change order
Construction loan administrator signs alone up to$2,500,000$1,000,000 · $2,500,000 · $5,000,000
Connections

Pay applications, lien waivers, inspections and title records a draw runs on

Pay applicationsAIA G702 and G703, or your own draw request form
Invoicescontractor, subcontractor and soft-cost invoices
Lien waiversconditional and unconditional, progress and final
Inspection reportspercent complete per line, photos, stored-materials count
Loan budgetbudget lines, change orders, contingency, interest reserve
Title and county recordsthe date-down and liens recorded since the last draw
What it changes

Construction draw review time and holdbacks, before and after

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1day
from a complete package to a signed decision
By hand5–7 days
With agents≈ 1 day
target
100%
of lines tied to invoice, waivers and inspection before money moves
20 of 20 lines
on every draw
typical
5.5days
lenders take to process a draw today
TodayWith agents

“demo” = seen in the working solution, on its sample loan data · “target” = the design goal, measured in the live solution · “estimated” = our estimate · “typical” = published figures (Rabbet construction loan administration survey: 5.5 business days lender-reported, 9.4 borrower-experienced; Land Gorilla: 5–7 days by hand; MightyBot on G703 lines that do not tie to the G702; Tex. Prop. Code §§53.281–53.284 on statutory waiver forms). Names on the screens are sample data.

Questions

Construction draw management software questions from loan administrators

What is construction draw management software?

Software that takes a construction loan draw from the borrower's request to a funded advance, with the pay application, invoices, lien waivers, inspection, budget and title date-down checked before money moves. Construction Draw Management adds six agents that read the package, tie each G703 line to its proof and recommend an amount with each holdback, for the loan administrator to decide and sign.

How does it track lien waivers?

The invoice and waiver matcher reads each waiver's type, amount, through date, signer and statutory form, for this payment and the last. A missing unconditional waiver for the last payment holds the party's new money, and a waiver short of the payment due is held at the difference. One click drafts the request to the contractor.

What happens when a line is billed ahead of the inspection?

The inspection reconciler compares the inspector's certified percent with the billed percent on each G703 line. A line further ahead than the tolerance (3 points by default) is held at the difference, net of retainage, and released when a later inspection certifies the work.

Does it check that the loan stays in balance?

Yes. After each draw the budget and balance checker tests that undisbursed loan funds cover the cost to complete by budget line, that contingency stays above the minimum share of remaining hard cost, that general conditions are not ahead of the project and that the interest reserve runs to completion. Out of balance stops the recommendation.

Does the AI change the contractor's numbers or the inspector's percentages?

No. The agents report differences. They do not alter a submitted figure or a certified percentage, do not move money between budget lines and never recommend funding past a recorded lien.

Who signs the funding amount, and who can release a holdback?

The construction loan administrator decides and signs with the meaning of the signature, and a construction lending officer co-signs above the administrator's limit; the agents only recommend. A holdback is released only by its document, or with a reason and a second person.

Can we set our own tolerances, approval limits and waiver rules?

Yes. The inspector tolerance, general conditions limit, retainage, minimum contingency, statutory waiver forms by state, lower-tier supplier threshold, stored-materials rule, change-order limit and approval limits are all settings, versioned and on the audit trail.

What does a lender provide to run it on its own draws?

Your credit policy, loan agreement and a sample of past draw packages. The Agentic Solution Engine builds and deploys it from those requirements and documents, and it goes live once each quality gate has passed.

Run construction draw management software
on your own past draw packages.

We'll run Construction Draw Management on a sample of your own past draw packages.