- Before
- Assembles the proof for every draw by hand, in spreadsheets and email, while the contractor calls for cash.
- Now
- Opens a draw already tied out line by line, with four exceptions and their sources; spends her time on the decision.
One draw, from complete package to funded
Larkspur Commons — a mixed-use project in Austin, 186 units over 14,200 sq ft of retail — sends Draw 14 for $4,384,970. Here is what happens next, screen by screen, in the working solution.
- 01Monday morning
Everything that needs her, on one screen
Marisol Vega · Construction loan administratorMarisol runs 23 active construction loans, $412.6M committed. Her home screen shows 8 draws in the queue for $12.4M, the oldest waiting 10 days on 3 missing waivers, and 7 open exceptions. The agents have already found a lien affidavit on Pecan Row and an out-of-balance loan on Bluffview Lofts.
Agents at work: “Title date-down checker — Pecan Row · lien affidavit found, $48,200 · borrower asked to bond around it.”
- 02The queue
Every draw ranked by risk and days waiting
Marisol Vega · Construction loan administratorEach draw shows what was requested, when it was received, its documents, inspection, waivers, exceptions and stage. Larkspur Commons Draw 14 from Ironbridge Builders has 51 of 51 documents in and 27 of 28 waivers, and is ready for review.
“The contractor's clock starts when the package is complete.”
- 03One click
“Start review” — six agents read 51 documents
The agentsThe pay application reader checks the G702 and G703: 20 lines, contract sum to date $50,048,900, the G703 ties to G702 line 4, retainage 10%. The invoice and waiver matcher ties 13 invoices and 27 waivers. The inspection reconciler compares Dale Whitcomb's report, the budget and balance checker runs the in-balance tests, and the title date-down checker reads Fairhaven's search to 9 Oct.
Every step is shown as it runs, with what it found.
- 041 min 24 s later
Four exceptions, each with its proof
Funding recommenderTwenty of 20 lines tied to their proof. Four exceptions, $782,750 held: framing billed ahead of the inspection, Brightline Electric's missing unconditional waiver for Draw 13, change order 8 not yet approved by the bank, and Pedernal Plumbing's conditional waiver $20,000 short. Each links to the page it came from. Recommended: $3,602,220.
“Recommended $3,602,220 · Funding recommender · needs a second signature.”
- 05Line 06-100
Billed 88 %, inspected 81 % — the gap is held
Inspection reconcilerThe G703 bills wood framing, Westfall Framing's line, to 88% ($6,116,000 of $6,950,000). The inspector certifies 81%: on Level 5 the east wing walls are framed but not sheathed and the roof trusses are on site, not set. The $486,500 billed ahead of the site is held — $437,850 net of retainage — until a later inspection certifies it. Every other line is within the 3-point tolerance, and the 212 stored windows are counted on site.
The inspection reconciler never changes a percentage the inspector certified.
- 06Waivers
A missing waiver and a short one
Invoice and waiver matcherEvery waiver is read for its type, amount, through date, signer and Texas statutory form. Brightline Electric's unconditional waiver for the $241,650 paid in Draw 13 has not arrived, so its $257,760 due this period, net of retainage, is held. Pedernal Plumbing's conditional waiver releases $176,605 against $196,605 due, so the $20,000 difference is held. One click asks Ironbridge for the 2 waivers.
“Rule: no new money to a party until its unconditional waiver for the last payment is in.”
- 07Budget
Still in balance, with the reserve to watch
Budget and balance checkerAfter the draw the undisbursed loan of $28,452,720 covers the cost to complete. Contingency after change order 8 would be $1,663,500 — 8.2% of the work left, above the 5% minimum. General conditions are 3.3 points ahead of the project, inside the 10-point limit. One to watch: the interest reserve has $1,157,600 left against $1,094,000 projected to mid-June 2027.
- 08The recommendation
From the request to the amount to fund
Funding recommenderHard costs of $3,992,730 after retainage plus $392,240 of soft costs make the $4,384,970 request. Four holds come off, each with the document that releases it, leaving $3,602,220 to fund through Fairhaven Title & Escrow, which issues the ALTA 33-06 date-down for the advance. The notice to the borrower is drafted and sent only when she signs.
- 09One more hold
She asks for $25,000 more, in plain words
Marisol Vega · Construction loan administratorThe inspector's report also notes three storefront units in retail bay C installed with cracked panes, at about $25,000 to replace. Marisol asks the assistant to hold it. A fifth holdback appears, released when the inspector confirms the units are replaced: fund $3,577,220, hold $807,750.
Activity: “Funding recommender added a $25,000 holdback for cracked storefront glass, retail bay C.”
- 10Signed · funded in a day
She signs; above her limit, the officer co-signs
Marisol Vega and Grant EllisonMarisol approves with the meaning of her signature — “Reviewed — fund as recommended”. The draw is above her $2,500,000 limit, so it goes to Grant Ellison, SVP construction lending, for a second signature before it is funded. Once he co-signs, $3,577,220 goes to Fairhaven Title for disbursement — one business day after the package was complete.
“Your signature, the time, the amount and every holdback are written to the audit trail and cannot be changed.”