- Before
- Carries 12 renewals in the next 120 days on reminders, with no warning of the one about to miss its date.
- Now
- Sees each renewal's projected landing every morning, and accepts a tested recovery plan seven weeks before expiry.
A food account's renewal, pulled back from six days past expiry
A food and cold-storage account renews on a set date. Its program is $539,400 across property, general liability (GL), auto, umbrella and cyber. It is a Monday, 50 days before expiry. Here is what happens next in the working solution, screen by screen.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Monday morning
Twelve renewals against one expiry line
Account managerThe account manager opens the runway. It holds 12 renewals in the next 120 days, worth $3,017,700 of premium, each opened at 120 days. Each renewal is a row on a shared scale, so all the expiry dates line up on one red line. The diamond on each row is where that renewal will bind at today's pace, which can differ from the plan. Seven replies came in overnight and are not in the forecast yet.
“Each runway starts 120 days out on the left. Its expiry sits on the shared red line, with 20 days of overrun on the right.”
- 02One click
The overnight replies move the markers
Pace forecasterThe account manager applies the overnight replies. The Pace forecaster reads seven market replies and two client emails, and updates where each renewal will land. A logistics account's incumbent offer is in at +2.9%. That is inside the trigger, so the account renews. The food account slides from 4 days to spare to 6 days past its expiry, and turns red.
“Forecast updated · the food account now lands 6 days past expiry.”
- 0350 days out
Why it lands there, in plain arithmetic
Account managerThe account page shows the full runway with its nine milestones. The exposure update came in 28 days late, and the incumbent's offer two days after that. Anyone can check the landing date as a chain of steps. Submissions go out, then the markets take 30 days to quote. Comparing and negotiating takes 7, the proposal 3, client review 13, and binding and issuing binders 7. That puts the bind 6 days after expiry.
“The marker is where this renewal binds at its current pace. It is not the plan.”
- 04On file before submissions
The remarket decision and the reasons behind it
Account executiveThe account executive has to decide whether to remarket. The incumbent's property offer is up 25.0%. That is 9.5% in rate and 16.4% in insured values, which rise to $79.6M with a new building. Six peer food and cold-storage renewals in the book fell a median 3.8%. The umbrella carrier offers only $5M of the expiring $10M umbrella. So the account executive recorded the decision to remarket property, split the umbrella, and renew GL, auto (counter at $124,050) and cyber.
“Recorded before the first submission went out.”
- 05One click
A recovery plan, tested against the pace model
Pace forecasterThe account manager asks for a recovery plan. The agents read the two survey requests. They find the incumbent's last loss-control report and the process safety file, and check the client's calendar. Then they test three changes. First, send the report and the new building's file to the two property markets that asked, saving 8 days. Second, book the sign-off meeting with the client, saving 6 days. Third, ask the incumbent for a 30-day extension as a backstop.
Both markets accept a survey under 18 months old, and the report is 13 months old. The forecaster proposes and does not change a milestone date.
- 06Accepted the same morning
Back inside the expiry line
Account managerThe account manager accepts the plan. Market turnaround drops to 22 days and client review to 7. The marker slides back across the red line, to 8 days to spare. That is a day ahead of the planned bind. The extension request stays as a safety net. It is used only if the quotes slip again, and only with the service team lead's approval.
“Plan accepted · documents sent to both property markets · sign-off meeting booked.”
- 07Same morning
Eight submissions, and each reply read
Quote reader & coverage matcherEight submissions went out on the market plan the account executive approved. One market declined, as ammonia refrigeration is outside its appetite. An excess market quoted $5M xs $5M at $38,600, meaning $5M of cover above the first $5M, on the same terms as the layer below. A wholesaler sent $231,500 for property, but only as an indication, a rough price that cannot be bound. The Quote reader marked it so. The two property markets that asked for the survey now show documents sent, with quotes due.
“Indications are marked and cannot be selected for binding.”
- 08Drafted
The client messages, drafted and chased
Data refresherEach request to the client sits in one ledger. The exposure update from the controller has been chased three times at two-week intervals. Loss runs are due from four carriers, and the new building's documents from the plant engineer. This client's past renewals ran at 1.2× and 1.4× the planned time, and 2.2× so far this year. The forecast uses the median, 1.4×, so the 9 client days still ahead become 13. A message to the plant engineer is drafted and waits for the account manager.
“First message to this contact: needs your approval.”
- 09Draft 2
A proposal that shows what does not match
Quote reader & coverage matcherThe renewal proposal sets the expiring program, $539,400, against the best terms so far. Three property quotes are still pending. Four margin notes quote the exact wording. The wholesaler's figure is an indication and cannot be bound as a quote. Its spoilage sublimit is $250,000 against an expiring $1,000,000. It adds an ammonia contamination exclusion. And the umbrella drops to $5M unless the excess layer is placed.
A proposal goes to the client only when each coverage difference against the expiring program is resolved or explained.
- 10The book
The whole book, and the decisions behind it
Service team leadThe book keeps each remarket decision with its reason, who made it and when. All 12 renewals in the window were opened at 120 days. Before the runway, renewals started a median 64 days out. Two still land late at today's pace, and were flagged 34 to 50 days before expiry. The book also shows where renewals slip. The exposure update slips most, a median 11 days late in the sample book. Market quotes, the incumbent offer and client sign-off follow.