SystemFraud, Subrogation & Recovery

Contractor Fraud Detection

Contractor fraud detection after a storm: copied estimates and renamed contractors raised before payment

See one case, screen by screen ↓

Built forSIU managersCatastrophe claim leadsDesk adjustersField adjustersFraud analysts

The Problem Today

After a storm, roofers file look-alike estimates on hundreds of homes, and adjusters see one claim at a time.

+90%
rise in questionable roofing claims in one state, 2023 to 2024 published
30 days
before anyone notices the same estimate repeating our estimate

Read one claim at a time

  • Estimates
  • Pay forms
  • Roof size
  • Hail data
  • New name, same crewRenamed after an adjuster asks a question
  • Recovery means a lawsuitOnce paid, the money comes back only by suit

The Solution

  1. Each estimate readEstimates and pay forms from each claim in the storm’s footprint
  2. Look-alikes groupedWording and quantities fingerprinted; copied estimates cluster
  3. Checked against each roofBilled roof size against aerial measurements, and hail at each home
  4. The SIU manager holdsUnpaid claims held for re-inspection; large holds need a second signer

Built-in controls

  • Each cluster shows its evidence
  • Two names joined only on two document links
  • A business name alone raises no flag

What You Get

Storm payouts track the measured roof more closely, and a copied estimate caught before payment costs a re-inspection instead of a lawsuit.

  • Honest roofers keep movingOnly clustered claims are held; the rest pay on their clock
  • Renamed firms joined upPhone, mailbox and bank account tie two names as one
  • Referral drafted for the stateEach figure in the fraud unit referral is cited
In short

What is Contractor Fraud Detection?

Contractor fraud detection finds contractors who file copied or inflated estimates across many claims after a storm. Contractor Fraud Detection reads each contractor estimate, invoice and direction-to-pay form in the storm footprint, groups the look-alike estimates into clusters, joins business names that are one firm, and matches each cluster to its unpaid claims, so SIU sees the pattern before payment.

How to choose AI solutions for insurance →

Updated

The problem

After a storm, contractor fraud arrives as look-alike estimates

After a hail day, door-to-door roofers, tree crews and remediators sign up homeowners by the hundred. Direction-to-pay forms are signed at the door in the first days, and look-alike estimates follow: the same lines, the same quantities, the same notes, on homes of very different sizes, some outside the damaging hail altogether.

A desk adjuster sees one claim at a time, against the prompt-pay clock, and each estimate is plausible on its own. The pattern only shows across claims, weeks or months later, in a payments audit or an analyst’s spreadsheet of contractor names. By then the contractor has changed its business name, the money is paid, and recovery is a lawsuit.

typical+90%roofing questionable claims in one state, 2023 to 2024
typical+345%tree removal, mold remediation and debris removal questionable claims, same state and period
Where the days go before a copied-estimate cluster is seenestimated
By hand46 days
With the solution3 days
  • Noticing that estimates repeat across claims30 → 0.5 d
  • Listing the cluster's claims and payments5 → 0.5 d
  • Linking business names to one contractor5 → 0.5 d
  • Checking the hail at each address3 → 0.5 d
  • Writing the brief and the fraud unit referral3 → 1 d

Estimated split for one copied-estimate cluster after a hail storm, by hand and with the solution.

How it works

Contractor fraud screening across the storm footprint, each morning

What comes in
Evidence in5 sources · claims, estimates, direction-to-pay forms, roof measurements, hail data
Agents at work
Storm footprint checkerhail at the address
Estimate readerevery line, typos kept
Then
Fingerprinterwording and quantities
Then
Identity linkerone firm, two names?
Payment guardhold, pay or recover
Then
Brief and referral writercited, never sent
A person decides
SIU managerdecides every hold
What comes out
Similarity clusters
Holds before payment
Watch list and referral
One case, step by step

A hail storm, a forty-home cluster and a hold before the payment run

Hail to 2.75 in fell across Collin County, Texas. It is day 17 after the storm, and a payment run is due tomorrow. In this storm, one copied-estimate cluster of 40 homes billed $1,240,864. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Day 17, morning

    The whole storm on one field

    SIU manager

    The SIU manager opens the solution on the storm: 3,412 property claims in the footprint, 2,906 contractor estimates and invoices read, 1,118 direction-to-pay forms, 612 businesses named. Each bubble is a group of look-alike estimates, sized by homes. Five clusters sit right of the 0.85 similarity line: 97 homes, $1,917,928 not yet paid.

    “Over the line: estimates copied, not written. Under it: a company's own template, quantities follow each roof.”

  2. 0206:02 to 06:14

    This morning's run, step by step

    The agents

    The storm footprint checker tied 214 new claims to the storm’s hail. The estimate reader read 188 estimates and 61 direction-to-pay forms, 6,214 lines. The fingerprinter compared them with 2,718 earlier estimates and found a new cluster, 6 homes from another restoration firm at 0.89, and the payment guard found 4 payments in the largest cluster queued for tomorrow’s run, $92,420, with no acceptance letters sent yet.

    “Decide the cluster’s holds before tomorrow’s payment run.”

  3. 03One click

    Forty estimates from one template

    SIU manager

    The SIU manager opens the biggest bubble. It unfolds into its 40 estimates, 23 under one business name and 17 under a second, and the identical lines light up across the sheets. Of 34 lines, 29 are identical in wording and quantity on all 40, 3 are reworded, 2 appear on 2 homes only.

    The sheets are colored by business name, and still light as one.

  4. 04Next

    The same squares billed on each roof

    Fingerprinter

    34.67 SQ of roof is billed on all 40 homes. The aerial measurement reports put those roofs between 21.4 and 39.8 squares, median 27.9. Thirty-six roofs are smaller than billed and four are larger: nobody measured the quantity; it was pasted.

    “36 roofs smaller than billed · 4 larger: the quantity was not measured.”

  5. 05Next

    One homeowner’s estimate, word by word

    Estimate reader

    One couple’s estimate, with the copied sentences lit and the typos marked: the same two typos on each estimate, under both business names. The margin notes do the adjuster’s arithmetic: 34.67 SQ billed on a roof that measures 23.6 SQ; steep and high-roof charges on a one-story home of 5/12 pitch; 0.75 in of hail at the address.

    The estimate reader keeps each line exactly as written, typos included, and does not edit a figure.

  6. 06Who is behind them

    Two business names, one contractor

    Identity linker

    The second name was filed as an assumed name in Collin County a week after the storm, the day after a desk adjuster questioned an estimate under the first name billing 34.67 SQ on a 26.0 SQ roof. Five links join the two names, each from a document: the same phone, PO box, bank account on the direction-to-pay forms, estimator, and rep signature, a 100% stroke match on all 40 forms.

    Links only on a value found in a document, and a similar name does not count.

  7. 07Where the hail fell

    Twelve homes under damaging hail

    Storm footprint checker

    The storm map lays the cluster’s homes over the radar-estimated hail. Damaging hail starts at 1.00 in at the address; 12 of the 40 homes saw less, the couple’s home 0.75 in and others as little as 0.50 in. The other 28 saw 1.25 in or more.

    Reports the hail at the address and time. It does not say whether a roof was damaged.

  8. 08Before payment

    Forty claims, one decision

    Payment guard

    The claims list shows each claim in the cluster: roof measured and billed, hail at the home, payment and prompt-pay date. 31 are unpaid, billed $960,468.40. 9 were paid at actual cash value, $214,380, with $58,740 of depreciation still held; those go to recovery review. Three re-inspections are already in, from a field adjuster.

  9. 09Signed

    Hold and re-inspect 31 unpaid claims

    SIU manager

    The SIU manager signs the hold and sends it to the catastrophe claims manager to co-sign, since holds on more than 10 claims need that second signature. The 4 queued payments are pulled from tomorrow’s run, re-inspections are booked with an independent field adjusting firm over the next three days, and 31 reason letters are drafted to the insureds, rather than the contractor, to go out on co-signature.

    “We are re-inspecting your roof before we decide your claim … Your claim is not denied.”

  10. 10Week 3

    The brief, and the fraud unit referral

    Brief and referral writer

    The week 3 storm fraud brief is drafted for the SIU manager to sign and send to catastrophe claims leadership, each figure linked to its source. Beside it, a draft referral to the Texas Department of Insurance, Fraud Unit, for both business names: 40 claims, 40 estimates, 40 forms, 5 link documents and 3 re-inspections attached, with its 30-day due date shown, for the fraud analyst to complete.

    Draft only: no agent sends a letter, a brief or a referral.

Who it’s for

Five people around one storm’s copied-estimate cluster

The same cluster, seen by the five people who carry it: their storm by hand, then with the solution.

SIU manager
Decides holds and referrals
Before
Gets one red-flag referral on one claim at a time, and hears about a contractor ring from a payments audit or a call from NICB.
Now
Sees the storm’s look-alike estimates as clusters each morning, with the evidence for each, and decides the holds before the payment run.
Catastrophe claims manager
Co-signs holds over 10 claims
Before
Runs the storm response (3,412 claims, 41 desk and 60 field adjusters) against the prompt-pay clock, with no view of which contractors’ claims belong together.
Now
Co-signs a hold that is a re-inspection with a written reason, inside each claim’s prompt-pay date, while the other claims are paid on time.
Desk adjuster
Sees cluster flags on each claim
Before
Approves contractor estimates one at a time against desk inspections; each one looks like a normal roof estimate.
Now
Sees on each claim whether its estimate is one of forty, with the roof measured against the squares billed and the hail at the home.
Fraud analyst
Builds contractor profiles and referrals
Before
Builds contractor profiles by hand and needs the document behind each link, or the referral comes back.
Now
Starts from five links, each with its document, a name-change timeline and a referral draft with the evidence attached.
Field adjuster
Re-inspects held roofs
Before
Re-inspects the roofs SIU holds, from a claim file that shows one estimate at a time.
Now
Goes out knowing the squares billed, the roof measured and the hail at the address, so a test square on the roof shows what a copied estimate hides.
The agents

An agent per check: storm footprint, estimate wording, identity, payment

Six agents read every estimate, fingerprint it and join the names; the SIU manager decides.

Storm footprint checker

Ties each new property claim to the catastrophe event, its date of loss and the radar-estimated hail size at the address, with a 2-mile buffer around the swath.

  • Never says whether a roof was damaged
  • Claims outside the footprint are still read
Estimate reader

Reads contractor estimates, invoices and direction-to-pay forms into lines (wording, quantity, unit, price) plus notes, signatures and the contractor’s phone, address, remit-to and bank details.

  • Keeps each line exactly as written, typos included
  • Never edits or rounds a figure
Fingerprinter

Fingerprints each estimate’s wording and line items, scores how alike each pair is, and clusters estimates across the storm.

  • Scores wording and quantities together; a shared price list or template alone never raises a cluster
  • Never flags on a name
  • Never calls a contractor fraudulent
Identity linker

Links business names that are one contractor by phone, address, bank account, estimator and signature, each with the document it came from.

  • Links only on a value found in a document, never on a similar name
  • Two links or more to name the same contractor
Payment guard

Finds open claims and queued payments in each cluster and recommends hold and re-inspect, pay, or recovery review, with each claim’s prompt-pay date.

  • Recommends only; never holds or stops a payment itself
  • Never lets a prompt-pay date pass without a reason letter, drafted 3 business days before
Brief and referral writer

Writes the weekly storm fraud brief and drafts fraud unit referrals, each figure cited to its source.

  • Drafts only; never sends anything
  • The SIU manager signs and sends
SIU manager

Decides; claims manager co-signs over 10.

Ask in plain words

A cluster, a renamed contractor or the prompt-pay clock, in plain words

The SIU team can ask about a cluster, a contractor, a line on the estimates or the prompt-pay clock in plain words. Each answer cites its source. These answers use the sample data.

Why do you say the two business names are one contractor?

Because five values from the documents match. Each estimate under the second name carries the first firm’s phone and remit-to PO box; the direction-to-pay forms pay the same bank account; the estimates are prepared by the same estimator; and the rep signature is the same image on all 40 forms. The second name was filed a week after the storm, the day after a desk adjuster questioned an estimate under the first.

Which line gives the copying away?

The quantities. Line 2 bills 38.00 squares of shingles and line 5 212 LF of drip edge on all 40 homes, yet the measurement reports put the roofs between 21.4 and 39.8 squares. Four of the forty roofs are larger than the 34.67 squares billed for tear-off: the number was pasted without a measurement. Wording alone would not be enough, since many roofers share a price list, so the fingerprint looks at wording and quantity together.

Can we hold the 31 without missing the prompt-pay clock?

Yes, if each hold is a re-inspection with a reason letter. Texas gives 15 business days from the items asked for to accept or reject, and 5 business days from acceptance to pay. The 4 payments queued for tomorrow ($92,420) have no acceptance letter yet, so they can be pulled. The earliest date among the 31 is the day after, on 2 claims; their letters go today.

Is the roofer with 31 look-alike estimates copying too?

No. That roofer’s 31 estimates share a company template, so the wording is alike, but the quantities follow each roof: shingles from 18.2 to 41.6 squares, drip edge from each eave length. Together they score 0.62, well under the 0.85 line. The fraud analyst cleared it last week. A firm’s own template is not a copied estimate.

The screens

Screens from the storm: similarity field, overlaid estimates, hail map

From the working solution, on its sample data. Pick one to see it large.

The similarity fieldThe storm’s contractors as bubbles by how alike their estimates are, sized by homes, with the similarity line and dollars not yet paid.
This morning's runEach agent’s step: 214 new claims, 6,214 estimate lines, a new cluster and tomorrow’s queued payments.
Forty estimates laid over each otherOne cluster unfolded into its 40 estimates, colored by business name, with the 29 identical lines lit on each sheet.
Roof measured against squares billedOne bar per home, smallest to largest: 34.67 SQ billed on roofs from 21.4 to 39.8 SQ.
One estimate, word by wordCopied sentences lit, typos marked, and margin notes on squares, steep-roof charges, hail and the direction to pay.
Signatures laid over each otherForty contractor signatures on the direction-to-pay forms are one image; the forty homeowner signatures are all different.
Two business names, one contractorFive identity links, each from a document, and the estimates by day against the name change.
The storm mapRadar-estimated hail bands with each home in the cluster, and the 12 under damaging hail listed with the hail at each address.
The cluster's claimsRoof measured and billed, hail at the home, payment, prompt-pay date and a recommendation on each claim.
Hold and re-inspectThe hold, payments pulled, re-inspections booked and the reason letter, signed and sent to co-sign.
Contractor watch listContractors whose estimates crossed the line in this storm or an earlier one, with evidence, status and owner.
Weekly storm fraud briefDrafted, cited and ready to sign, with the draft referral to the state fraud unit beside it.
Storm settingsThe similarity line, smallest cluster, hail threshold, footprint buffer, hold authority, prompt-pay guard and the people.
Governance

Evidence first, then a signed hold: contractor fraud detection controls

Each cluster shows its evidenceEach identical line, each identity link and each document behind it, with its page. Open any link to see the value on both businesses’ documents.
Agents recommend, a person decidesThe SIU manager decides each hold. Holds on more than 10 claims are co-signed by the catastrophe claims manager.
A hold is a re-inspection, inside the clockNo agent holds or stops a payment. A hold is a re-inspection with a written reason, and the reason letter is drafted 3 business days before each prompt-pay date.
No flag on a name aloneA cluster needs wording and quantities alike. A business name, a price list or a company template alone does not raise one.
Two document links to join two namesTwo businesses are named one contractor only on two links or more, each a value found in a document. A similar name does not count.
Each step on the audit trailEach view, hold, release and referral is on the audit trail with who and when, and each settings change is versioned and replayed on the last three storms.
Configuration

Contractor fraud settings: similarity line, hail threshold and who may hold

The similarity line, the hail threshold, who may hold and the prompt-pay guard are settings, each change versioned.

SettingDefaultChoose from
Similarity line — clusters at or above it are raised to SIU0.850.70 – 0.95
Smallest cluster raised5 homes3 · 5 · 8 homes
Name the same contractor when2 links or more2 · 3 links or more
Damaging hail at the address1.00 in0.75 · 1.00 · 1.25 in
Footprint buffer2 miles1 · 2 · 5 miles
Co-signature for a hold on more than10 claims5 · 10 · 25 claims
Reason letter drafted before each prompt-pay deadline3 business days2 · 3 · 5 business days
Weekly brief to catastrophe claims leadershipMonday 08:00Monday 08:00 · Friday 16:00
Connections

Connected to the claims system, roof measurements and weather data

Your claims systemnew claims in the storm footprint, payments and re-inspection booking
Contractor estimates and invoiceseach line, read as written
Direction-to-pay and assignment-of-benefits formssigner, bank details and the date signed
Aerial roof measurementsthe squares measured, against the squares billed
Weather event dataradar-estimated hail at each address and time
Business filingsassumed names and registrations behind each contractor
What it changes

Copied estimates held before payment by contractor fraud detection

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

demo
$1.02M
of the sample storm's 40-home copied-estimate cluster raised while still unpaid
31 of 40 claims
unpaid when raised
demo
Day 17
after the sample storm, clusters flagged while claims are still open, months before a payments audit
Payments audit≈ 6 months
With agentsday 17
typical
+90%
roofing questionable claims in one state, 2023 to 2024
20232024

“demo” = seen in the working solution, on its sample storm data · “target” = the design goal, measured in the live solution · “estimated” = our estimate, the by-hand days for one copied-estimate cluster in the chart above · “typical” = published figures (NICB presentation to the South Carolina Insurance Rate Review Ad Hoc Committee, Jun 2025: roofing questionable claims up 90% and tree removal, mold remediation and debris removal up 345%, 2023 to 2024). Regulation is named as context: Texas Insurance Code ch. 542 and §701.051. Names on the screens are sample data.

Questions

Contractor fraud detection: what catastrophe claims teams ask

What is contractor fraud detection for catastrophe claims?

Contractor fraud detection finds contractors who file copied or inflated estimates across many claims after a storm. Contractor Fraud Detection reads each contractor estimate, invoice and direction-to-pay form in the storm footprint, groups the look-alike estimates into clusters, joins business names that are one firm, and matches each cluster to its unpaid claims, so SIU sees the pattern before payment.

How does it tell a copied estimate from a contractor's own template?

It scores wording and quantities together. A roofer’s own template with measured quantities scores low: in the working solution, one roofer’s 31 estimates share wording but follow each roof, and score 0.62. The same estimate pasted onto another home scores near 1.00, whatever business name is on top.

Can it see the same contractor under a new business name?

Yes. The fingerprint matches on wording and quantities, so a renamed firm’s estimates still cluster. The identity linker then joins the names by phone, address, bank account, estimator and signature, each link a value found in a document, with two links or more needed.

Does it stop or deny payments?

No. The payment guard recommends hold and re-inspect, pay, or recovery review for each claim. The SIU manager decides each hold, the catastrophe claims manager co-signs holds on more than 10 claims, and a hold is a re-inspection with a written reason; the letter tells the insured their claim is not denied.

How does it handle the prompt-pay clock?

Each claim shows its prompt-pay date, and the reason letter for a hold is drafted 3 business days before it. In the working solution the rules are Texas Insurance Code ch. 542; the lead time is a setting.

Does it file the fraud unit referral?

It drafts it, with the estimates, forms, link documents and re-inspections attached and the 30-day due date shown. A fraud analyst completes it and a person sends it; no agent sends a letter, a brief or a referral.

Which trades and forms does it cover?

Roofing, tree and debris, water and mold, and gutters, fences and windows. It reads estimates, invoices and direction-to-pay and assignment-of-benefits forms, together with aerial roof measurements and weather event data.

Can we try it on a storm we have already paid out?

Yes. The Agentic Solution Engine builds and deploys it from your requirements and documents: your claims manual, your estimate and form formats and the claims from a past storm. It goes live once each quality gate has passed, and we will walk you through it on one of your own storms first.

Replay your last storm
through contractor fraud detection.

We'll run Contractor Fraud Detection on the estimates from one of your own past storms.