- Before
- Spends a day proving each certificate and five minutes deciding the advance. Has fourteen borrowers, with nine certificates due in the month’s first two weeks.
- Now
- Rebuilds each certificate from the borrower’s reports in under two minutes, with each difference tied to its line. Spends the time on the decision.
Borrowing base verification of one monthly certificate and its seven reports
A borrower sends certificate 41 with seven reports and asks for a $1,150,000 advance. Here is the morning it arrives, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01The morning it arrives
The certificate as the borrower submitted it
Collateral analystThe analyst opens the borrowing base as a waterfall chart. Gross receivables of $14,862,410 step down by the three kinds of ineligible invoices the borrower deducted. Those are invoices over 90 days, foreign invoices with no credit insurance and invoices to affiliates. Certified excess availability of $2,094,528 covers the $1,150,000 asked. It sits $94,528 above the $2,000,000 trigger for weekly reporting.
“line 23 of the certificate · not yet tied to a single report”
- 02One click
The analyst clicks “Rebuild from the reports”
Collateral analystThe analyst rebuilds the certificate from the borrower’s own reports. They are the aging, payables aging, trial balance, lockbox statement, stock report and shipping log. Six agents work in the rebuild log. Each ineligible the certificate left out lands in the waterfall as its own red step.
New red step: “Concentration over 20%: $445,000 not on the certificate” · found by Eligibility tester
- 03The last red step
Cross-aged: $174,200 not on the certificate
Eligibility testerOne customer owes $362,900, and $188,700 of it is over 90 days, or 52%. The credit agreement has a cross-aging rule. When more than 50% of a customer’s balance is over 90 days old, the whole balance is ineligible. The certificate took out only the past-due part. So the other $174,200 is added, linked to the aging and the clause.
- 04The rebuild done
$815,000 available, against $2,094,528 certified
Availability recommenderAfter 1 minute 52 seconds, both waterfalls run through the warehouse rent reserve, the revolver and the letters of credit. The rebuilt borrowing base is $16,628,340, with excess availability of $815,000. The advance bar says to hold $335,000.
“6 of 6 steps not on the certificate · $1,279,528 of availability”
- 05Behind the first bar
The aging is $243,450 above the ledger
Aging and ledger tie-outThe analyst clicks gross receivables. The trial balance opens at account 1200, accounts receivable, trade, at $14,618,960. The aging totals $14,862,410. The difference is three invoices to one customer, dated in the month’s last days. The shipping log shows those goods leaving the next week.
- 06Side by side
Each line tied to a source
Collateral analystThe tie-out puts the certificate beside the recalculated figure. All 23 lines are tied to the aging, ledger, lockbox, inventory or agreement. The certificate is over-stated by $1,279,528, with five differences in receivables and one in inventory. The run shows what each agent read and found. Each difference links to the documents behind it.
- 07Against last month
Eleven invoices, re-dated
Aging change detectorThe aging change detector compares this month’s aging with last month’s, invoice by invoice. Last month, 11 invoices to one customer sat in the 61 to 90 day column. In the month’s last week, credit memos canceled them. Within days they were re-issued with no new shipment. By their first dates they are 94 to 110 days old, so $281,630 is ineligible.
“11 invoices moved from 61 to 90 days to current”
- 08The decision
Fund $815,000, hold $335,000, order a field exam
Collateral analystThe decision walks from the certified figure to the recalculated one, a step per difference. Below $2,000,000 of availability, the borrower must certify weekly. A fixed charge coverage test also starts to apply, and at 1.12x against a 1.00x minimum it passes. The analyst orders a targeted field exam of the re-dated and pre-billed invoices, at the borrower’s cost.
- 09Two minutes apart
Approved by the analyst, co-signed and booked
Portfolio managerThe analyst approves with a password. The signature records its meaning: the certificate is tied out, and the advance is limited to the recalculated availability. The differences are over $250,000, so the portfolio manager co-signs on mobile two minutes later. Loan operations books the 2 pm wire. The borrower notice lists all six differences.
Decided in 38 minutes of review, under an hour against about a day by hand.
- 10Over the year
The borrower over twelve months
Head of business creditThe borrower’s page shows certified against recalculated availability, month by month. Over the year, availability falls and the gap between the two figures grows. Beside it are the certificate history, a timeline of field exams, appraisals and amendments, and dilution. Certificates 30 to 38 were replayed when the borrower moved to the solution.