- Before
- Reviews 6 to 10 investigations a week. Most are built from records pulled by hand and settle on the first cause that looks right.
- Now
- Opens the fishbone with each cause's records, for and against, and the CAPA tied to it, then signs.
One filling nozzle on Line 1 starts putting too little in each vial
Plant 3 fills 20 mg vials of a sterile product on Line 1, an aseptic filling line. At the morning in-process check, nozzle 4 starts filling light, putting too little product in each vial. This is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning
The board opens on a fishbone
QA leadThe QA lead approves root causes and CAPAs for Plant 3. The board shows 10 open investigations on their 30-day clocks. One of the four awaiting approval is open on screen, a filter integrity test failure on Line 2. It is laid out as a fishbone, a diagram that sorts possible causes into six groups, or bones. Each bone carries what the agents found. A why chain, asking why at each step, runs down to the system cause. That cause is an earlier CAPA that changed only the Line 1 batch record.
Proposed root cause: “Filter tested while still warm from the hot water flush” · Method, 82 % · QA decides
- 02The in-process check
Nozzle 4 is filling light, reported from the board
InvestigatorAt the in-process weight check, 4 of 5 vials from filling nozzle 4 weigh 1.95 to 1.98 g. The limit is 2.00 to 2.10 g, and the other seven nozzles are in range. Minutes later the line stops, and the production supervisor reports it in one sentence, with the area and the time.
Clock keeper: “Minor: each light vial rejected by 100 % weighing” · clock started, due in 30 days.
- 03The agents start
Each bone checked, the machine bone last
Evidence gathererThe agents read the records for the event window, bone by bone. Method is clear, because the recipe audit trail shows the fill recipe verified that morning at 2.02 mL on all 8 pumps. The check-weigher passed its daily check, so Measurement is clear. Environment shows bulk solution at 20.6 to 20.9 °C and no alarms. Material and People are clear too. The machine bone fills last, from the maintenance records.
“Evidence gatherer · Filler manual · section 9.2: seal change due at 1,500 h”
- 04Root cause proposed
A worn tip seal, with what argues against it
Root-cause analystA work order shows the nozzle set has run 1,840 operating hours. The filler manual (§9.2.3) says to replace the tip seals every 1,500 hours. On top of that, the last nozzle inspection was postponed. The analyst proposes a worn tip seal on nozzle 4, at 76 % confidence. It also lists the evidence against. No drip-back has been seen yet, and engineering inspects that afternoon. Pump 4 could also give the same signal.
Why chain: “Why not changed? The plan counts months instead of hours, and the last inspection was deferred.”
- 05The CAPA
The CAPA aims at the cause, on each line
Root-cause analystThe first action replaces all 8 tip seals on Line 1, because every seal has the same 1,840 hours. Lines 1, 2 and 4 will change tip seals by operating hours, as Line 3 already does. Postponing a nozzle inspection will need QA review. The check-weigher will alert when one nozzle drifts 1 % from the others. Raising the nozzle 4 dose by 0.06 mL is shown struck out, with the reason.
Not proposed: “Moves the number back but leaves the worn seal in place. The drift would return, and the other seven seals have the same hours.”
- 06The evidence
Twelve sources, each fact with its passage
Evidence gatherer and similarity finderEach finding is a card with its source and a tag: key finding, contributing, pattern, ruled out or argues against pump. The check-weigher data shows only nozzle 4 drifting, from 2.05 g to 1.99 g, with 1,212 vials rejected low. The similarity finder flags an earlier deviation. On Line 3 the same seal wore out at 1,710 hours, and its CAPA changed the Line 3 plan only.
“This is a repeat. Lines 1, 2 and 4 use the same nozzle set.”
- 07Ranked causes
Four causes, weighed for and against
Root-cause analystThe analyst ranks four causes. A worn tip seal on nozzle 4 comes first, at 76 %. Piston wear on dosing pump 4 is next, at 17 %. Against it are a recent weight check that passed at 2.021 mL and a piston replaced earlier in the year. A recipe dose not reloaded is at 5 %, because a recipe error would move all nozzles together. Last, a check-weigher reading low is at 2 %, and is ruled out.
Against a recipe error: “A recipe error would move all nozzles at once.”
- 08The report
The investigation report, drafted and cited
Report writerThe report writer drafts the investigation report in the plant template, with a citation on each claim. It covers the summary, the event and immediate actions, data reviewed, root cause, product impact and the CAPA plan. On product impact, no light vial reached the batch. The check-weigher weighs each vial, and it rejected all 1,212 below 2.00 g.
“Draft v1 · written by the report writer · each claim cited”
- 09Review and approve
The QA lead signs, with the meaning of the signature
QA leadThe QA lead reviews the root cause, the product impact and the CAPA plan on one screen. That plan has 5 actions and an effectiveness check. Then the QA lead signs with user ID and password. The signature states its meaning, “I approve the root cause and the CAPA plan”.
Agents propose. Only named people move a deviation to CAPA or Closed.
- 10Signed · day 0 of 30
Four CAPAs open, each with an owner and a date
CAPA ownerThe deviation moves to CAPA, and four actions open. The CAPA owner takes the seal changes, and the microbiology lead takes the QA review of postponed inspections. A third owner has the drift alert. The effectiveness check is set. It expects no single-nozzle drift above 1 % on Lines 1 to 4 in the next 90 days.
“Signed. Deviation moved to CAPA · 4 actions opened”