- Before
- Reads 30 to 200 pages per request, hunting for the page that proves each criterion, though the answer is usually in the chart.
- Now
- Opens each request as a checklist with the passages already quoted; in the sample data, reviews average 11 minutes this week, down from 44 earlier in the year.
A knee replacement through prior authorization automation, decided on day 3
A surgeon’s office asks the health plan to authorize a right total knee arthroplasty for a 67-year-old Medicare Advantage HMO member. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Friday, 14:20
186 pages in, a checklist out
Intake agent · Chart readerThe request arrives by provider portal: CPT 27447, M17.11, inpatient at a regional medical center, with 186 pages of records. The intake agent confirms eligibility and that inpatient surgery needs prior authorization, picks the plan’s knee replacement medical policy and starts the standard 7-day clock. The chart reader sorts the pages into 23 documents and marks 2 duplicate pages.
“How this checklist was made”: 5 agents · 2 min 40 s, each step with what it found and how long it took.
- 02Monday morning
The request opens as the policy’s checklist
UM nurseThe nurse does not open a pile of pages. The seven criteria of the medical policy open instead, six already ticked with the quoted passage and its page chip, and the clock ring in the header: 4 d 4 h left, due Friday at 14:20. The approve button reads Approve · 1 open until the last box is ticked.
- 03Criterion 1
Each tick lands on the page that proves it
Criteria matcherThe nurse clicks criterion 1, advanced osteoarthritis on standing X-ray. The chart opens at page 41, the radiology report, with the sentence highlighted. The strip above shows all 186 pages, with the evidence pages lit green.
“Severe medial compartment joint space loss, bone-on-bone, with osteophytes. Kellgren-Lawrence grade 4.” p. 41
- 04Criterion 5
One box open, and why
Criteria matcher · History agentAt least 6 weeks of supervised physical therapy within the past 12 months: not found in 186 pages, with the searches listed. Page 14 says the member “completed a course of PT” at an outside clinic, and the history agent finds 12 visits approved and billed over seven weeks. The therapy happened; the notes are what is missing.
The matcher does not tick a criterion without a quoted passage; a paid claim alone does not close it.
- 05One click
A pre-filled fax that asks for exactly that
Missing-records agentRequest from provider turns the open row into a fax to the surgeon’s office: member, request number, the criterion and three named documents (the therapy clinic’s initial evaluation, visit notes covering at least 6 weeks, and the discharge summary), with a reply-by time 48 hours before the decision is due, so there is time left to decide. The nurse can edit any line.
The agent drafts; nothing goes to the provider until the nurse sends it.
- 0609:52 sent · 10:31 reply
The right pages the first time, and the box ticks
Missing-records agent · Chart readerThe nurse sends it by fax and portal at 09:52; the clock keeps running. At 10:31 a 14-page fax from the surgeon’s orthopedic practice is matched to the request by request number and member. The record grows to 200 pages, and criterion 5 ticks on pages 187 and 199, marked new · received 10:31.
“12 supervised visits over 7 weeks. Plateaued; pain 7/10 on walking.” p. 187, 199
- 0710:36 · day 3 of 7
Seven of seven, approved in one click
UM nurseThe button now reads Approve · 7 of 7 met. The nurse signs: “I reviewed each criterion and its record, and approve this request.” The authorization is valid for three months, and the approval notice to the member and the surgeon lists each criterion with its page.
- 08Expedited · 72 h
A contradicted criterion goes to the physician
Physician reviewerAnother member’s inpatient rehabilitation admission after a stroke is a different case: criterion 2, an intensive program of about 3 hours of therapy a day, is contradicted by the PT note on page 48, while the OT note on page 57 records 90 minutes over two sessions. A nurse cannot deny. The physician reviewer sees both passages, a draft denial notice that names the criterion and the page, and the choice to approve, call the treating physician peer-to-peer, or sign.
“The criteria matcher does not weigh the two; it shows both.”
- 09Each quarter
Each decision against its clock, and the public report
UM supervisorThe supervisor sees decisions on time day by day across all UM nurses (3 decisions after their clock in six weeks, all standard) and last quarter at 99.1 % of standard requests within 7 days and 98.6 % of expedited within 72 hours. The prior authorization metrics the plan must post each year sit underneath, ready to export.