WorkflowField Service & Work Management

Work Package Preparation

Work package preparation that checks each permit, locate ticket and material against the day the crew will work

See one case, screen by screen ↓
Watch with transcript →

Built forWork plannersSchedulersCrew leadsControl room operatorsHeads of work planning

The Problem Today

Planners build each job pack by hand from six systems, and nobody checks it against the day the crew will work.

Pieces copied in by hand

  • Job plan
  • Drawings
  • Permits
  • Materials
  • Permits lapse before the jobValid when the pack was built, expired on the day
  • Customers told twiceOutage notices sent, then sent again

The Solution

  1. A pack put together in minutesScope, drawings, permits, materials, method and switching, in six tabs
  2. Each date checkedEach permit, locate ticket and delivery checked against the job day
  3. Short parts found elsewhereA kit missing at one depot, with a transfer from another proposed
  4. The crew lead acceptsThe planner releases it, with switching approved by the control room

Built-in controls

  • No agent buys parts or moves a job date
  • Each item in the pack cites its source
  • Permit extensions only under your own rule

What You Get

More crews start the work they were sent to, and fewer customers get a second outage notice.

  • Problems found before the dayEach pack checked again each night until the crew sets off
  • Crews briefed on the real siteSite hazards written into the method statement
  • Crew authorizations checkedEach person's authority to do switching checked for the job day
In short

What is Work Package Preparation?

It is software that builds the job pack a crew needs for planned work. The pack holds scope and steps, drawings, permits and notices, materials, the method statement and the isolation plan. The software tells the planner whether the pack is ready to schedule. Work Package Preparation uses seven agents to build the pack from the work request. It checks each dated item against the day the crew will work.

How to choose AI solutions for utilities →

Updated

The problem

Job packs are built by hand and never checked against the day of the work

Before a crew does planned work, a planner builds a job pack. The job might be replacing a pole, a 300 mm valve or a ring main unit (a switch unit on the underground power network). The pack holds everything the crew needs. It starts with the scope and steps from the standard job plan, the network diagram and a map extract. Then come the road opening permit, the customer notice and the locate ticket, a request to mark buried pipes and cables before digging. The materials from stores, the method statement and the risk assessment go in too. Last is the switching program, the steps the control room follows to make the work area safe. Each piece comes from a different system, and the planner copies, prints or attaches them one at a time.

Nobody checks the finished pack against the day the crew will actually work. A permit that was valid when the pack was built ends two days before the job. A joint kit reserved last week gets used on a fault. A locate ticket requested too early expires before the dig. The crew finds out at the 06:45 briefing and is sent home. The customers were warned they would lose power, all for nothing. In the US, the OSHA safety rule for power line work, 29 CFR 1910.269(c), puts a duty on the employer. It must give the person in charge all available information on site conditions. That person must brief the crew on hazards, procedures, energy source controls and protective gear before each job. A pack with a gap in it should not reach the crew.

typical14-17dayslife of a one-call locate ticket in Tennessee, Oklahoma and Nebraska. Request it too early and it runs out before the dig
Where the days go in building a job packestimated
By hand8 days
With the solution2 days
  • Matching the standard job plan and writing the scope1 → 0.1 d
  • Pulling drawings, the map extract and markups not yet added to the records1 → 0.1 d
  • Permits, locate requests and customer notices2 → 0.5 d
  • Materials and kitting across depots1.5 → 0.4 d
  • Method statement, risk assessment and switching program1.5 → 0.6 d
  • Checking dates and chasing what is missing1 → 0.3 d

Our estimate for one planned job, in working days, from approved request to a pack ready to schedule, by hand and with the solution.

How it works

An approved work request becomes a released work package, check by check

What comes in
Work request in5 sources · job plans, drawings, stock, permit rules
Agents at work
Job plan matcherscope + steps
Then
Drawings and GIS gatherer
Permit and consent checker
Kitting agent
Isolation planner
Then
Method statement writer
Then
Date checkeragainst the job day
A person decides
Work plannerfixes what is flagged and releases
What comes out
Six-tab job pack
Ready to schedule
Crew pack on the tablet
One case, step by step

Work package preparation for one ring main unit replacement

A utility has to replace an old 11 kV ring main unit with a condition score of 2 out of 10. One crew is booked for a Tuesday, 07:00 to 15:00. The work cuts power to 212 customers from 08:00 to 14:00. Two of them are on the priority services list, for customers who need extra help in an outage. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Approved for planning

    Each request arrives matched to a standard job plan

    Job plan matcher

    The head of work planning approved the work request for planning at 16:40. The Requests screen lists each request waiting for a pack: fault follow-ups, asset inspections, new connections, and water network and treatment jobs. Each one already shows its best standard job plan and a match score. For one LV cable fault, the best match is the plan for a straight joint in the sidewalk, version 3, at 97%. The roadway joint comes second at 71%.

    “Match from the asset class, the defect in the request and the last three jobs on this asset · Job plan matcher”

  2. 0206:12

    Seven agents build the pack at 06:12

    Seven agents

    The agents put the pack together from the work request in 6 min 40 s, and the run log shows each step as it happens. The job plan matcher takes the ring main unit plan, version 4, at 96%. The drawings gatherer collects five sheets. The permit and consent checker finds four permits and notices. The kitting agent reserves 17 of 18 lines. The isolation planner drafts the switching program and sends it to the control room. Then the date checker tests nine dated items against the job day.

    “Date checker. Held 9 dated items against the job day. Road opening permit ends 2 days short. Joint kit order arrives after the job”

  3. 0309:05

    Six tabs and a date line, checked against the job day

    Work planner

    The pack opens as six tabs: Scope, Drawings, Permits, Materials, Method statement and Isolation plan. Each is marked ready, at risk, missing or waiting. Below them, a date line runs from today to past the job, with the job day marked. The road opening permit ends two days before the job, so its bar stops short. The planner's rule extends an existing permit automatically. So a request to extend it to three days after the job went to the highways department at 06:14. A decision is due a week before the job.

    9 of 12 ready · “3 to resolve before the crew sets off”

  4. 04Scope tab

    14 steps, three hold points and four authorizations checked

    Job plan matcher

    The scope comes from the ring main unit job plan: 14 steps and 26 crew hours. It runs from the pre-job briefing to marking up the as-built drawing and logging the SF₆ gas. Three hold points, where work must stop for a check, are marked. They are switching confirmation, proving dead and earthing, and signed tests before power goes back on. Each crew member's authorization is checked for the job day. The crew lead is authorized for 11 kV switching and earthing, and the jointer for HV jointing. Both are valid past the job.

    “Copied from the job plan; hold points cannot be removed”

  5. 05Materials tab

    Three joint kits short, and three at another depot

    Kitting agent

    The new ring main unit is reserved and will be on site the day before the job. But the home depot has no transition joint kits, and the purchase order arrives three days after the job. Another depot holds four with none reserved. The kitting agent proposes moving three on the Wednesday stores run, but it cannot do this alone. The planner approves, and the transfer arrives six days before the job.

    “Transition joint kits: none at the home depot; the order arrives three days after the job”

  6. 06Method statement

    The site's hazards, written into the method

    Method statement writer

    The method statement comes in the utility's template, with nine sections, as a draft for the crew lead to review. The writer adds what only this site shows. The joint bay is 14 m from a primary school entrance. So no vehicle moves during drop-off and pick-up, and a spotter stands at the gate. A 125 mm plastic gas main runs 0.6 m deep, 1.1 m from the bay. The crew digs by hand within 0.5 m of it.

    “Hold points are copied from the job plan and cannot be removed.”

  7. 07With the control room

    The authorized engineer approves the switching

    Control-room authorized engineer

    The isolation planner drafted the switching program from the network model. It closes the normal open point at the next ring main unit and opens the units on each side of the work. It locks off and tags both points of isolation, proves the equipment dead and applies earths E1, E2 and E3. The engineer sees the back-feed already checked, with the neighboring feeder carrying 186 A of 400 A. Both priority customers are listed for calls five days before the job. The engineer approves, or returns it with comments.

    The isolation planner does not issue a switching program. Only the control-room authorized engineer approves it.

  8. 08Approved · 09:12

    Who loses power, and who is called first

    Isolation planner

    The isolation plan shows the feeder during the work and the 212 customers off at the transformer: 197 homes and 15 businesses. The school stays on, fed from a neighboring transformer. Two priority services customers are listed by address. One uses a home oxygen concentrator and one has home dialysis. Each has a call booked and a generator offered. The planned outage letter to all 212 goes out five working days ahead.

    “Approved by the control-room authorized engineer · 09:12 · issue 1”

  9. 09Release

    Released to scheduling with one open condition, checked each night

    Work planner

    Eleven of 12 checks are ready. The permit extension is still open. So the planner releases the work order to the scheduler for the job day with one condition: the road opening permit must be extended. The answer is due a week before the job. If the highways department refuses, the date checker warns the planner and the scheduler that same night. That still leaves a week before the crew sets off.

    “If it is refused, the date checker warns you and the scheduler the same night”

  10. 10The evening before

    The crew lead gets the whole pack on the tablet

    Crew lead

    The crew lead gets the crew pack the evening before. It has the cover sheet, five briefing points and the six sections behind them. The points cover the school entrance, the gas main and the three hold points. They also cover the 410 kg unit, lifted only by HIAB crane, and the priority customers already called. The crew lead asks whether the HIAB is booked for 06:30 or 07:00. The answer comes from the plant hire booking, and the crew lead accepts the pack.

    “06:30 at the depot, with a named driver · answered from the plant hire booking.”

Who it’s for

Planner, scheduler, crew lead, control room and head of work planning

The same job pack, seen by the five people who plan, schedule, switch, work and pay for it. Here is each one before the solution and with it.

Work planner
Builds and releases job packs
Before
Builds each pack by hand from the job plan library, the drawing store, GIS, the permit portal, the one-call center and stores. Can spend a day on a pack, then learn on the morning that the permit ran out.
Now
Opens a pack the agents built overnight and sees each dated item against the job day. Fixes only what is flagged, then releases it.
Scheduler
Fills each crew's week from the ready backlog
Before
Fills the week from packs that look ready and finds the gaps when a crew is sent home. If the packs were truly ready, the week would fill itself.
Now
Gets released packs with any open condition written on them. A readiness calendar marks the jobs that will fail before their day.
Crew lead
Briefs the crew and accepts the pack
Before
Reads the pack the evening before and hopes nothing is missing. One missing item means the crew is sent home and customers lose power for nothing.
Now
Gets the crew pack on the tablet with the briefing points, the hold points and the switching program. Asks questions, then accepts it.
Control-room authorized engineer
Approves each switching program
Before
Checks switching programs that arrive late and incomplete. Would rather spend the time on the isolation itself.
Now
Gets each program drafted from the network model, with the back-feed load checked and each priority customer listed. Approves or returns it.
Head of work planning
Owns called-off jobs and the ready backlog
Before
Owns the jobs that get called off and the backlog of ready work. Pays twice for each crew sent home.
Now
Sees which packs are fully ready a week ahead and why crews were sent home. Sees the ready backlog, and what sending crews home costs, worked out from the utility's own inputs.
The agents

Job plan, kitting, isolation and date agents behind each work package

Seven agents build each job pack and check it against the job day each night. The planner releases it and the control room approves the isolation.

Job plan matcher

Reads the work request, the asset record and the inspection notes. It scores each standard job plan for the asset class and the defect. It copies the best plan's steps, hold points, crew and hours into the pack.

  • Never edits a standard job plan
  • Shows its match score and the runner-up
  • Hold points are copied, never removed
Drawings and GIS gatherer

Pulls the current network diagram, a 1:500 map extract, cable records and the site layout for the asset. It searches for drawing markups within 50 m that are not yet in the records.

  • Never marks a drawing current when a newer markup exists
  • Read-only access to GIS
Permit and consent checker

Lists what the job needs: road opening permit, traffic management, locate ticket, customer notice, priority customer calls and landowner consent. It checks how long each one is valid against the job date. It asks for an extension when an existing permit ends early.

  • Never applies for a new permit without the planner
  • Extensions only while the planner's rule is on
  • Every date cites its permit
Kitting agent

Expands the job plan's materials list for the site. It checks each line by depot for the day before the job, including open purchase orders. It reserves what is there, and proposes a depot transfer or an approved substitute for anything short.

  • Never raises a purchase
  • Transfers need the planner
  • Substitutes only from the approved list
Isolation planner

Uses the network model to find the points of isolation, the earth points and the back-feeds that keep other customers on. It drafts the switching program in the control room's format. It counts the customers and priority customers who lose power.

  • Never issues a switching program
  • Only the control-room authorized engineer approves
  • Lists every priority customer affected
Method statement writer

Writes the method statement and risk assessment in the utility's template. That covers scope, access, hazards and controls, isolation, sequence, hold points, protective gear, emergency plans and waste. It adds site hazards from the drawings and the locate ticket, and writes five briefing points for the crew lead.

  • Never removes a hold point
  • Keeps it marked as a draft until the crew lead accepts
Date checker

Collects each dated item in a pack. That means permit windows, locate ticket life, notice deadlines, material arrival, approvals due, crew authorizations and plant hire. It compares each with the job date and the rules, flags any gap in days and runs again each night at 02:00.

  • Never moves a job's date
  • Warns the planner and the scheduler
Planner, control room and crew lead

Release, approve the isolation, accept.

Ask in plain words

Questions on a job pack's permits, parts and dates, with the source

Planners ask about any job pack, permit or material, or say what to change. Each answer points to its source. These answers use the sample data.

What could stop the ring main unit job on its day?

Three things, and two are already in hand. The road opening permit ends two days before the job. A request to extend it to three days after the job went to the highways department at 06:14. A decision is due a week before the job. The home depot has no transition joint kits, and the purchase order arrives three days after the job. Another depot holds 4. The switching program is with the control room, due two working days before the job.

Move the joint kits from the other depot

Done. One transfer moves 3 transition joint kits to the home depot on the Wednesday stores run, arriving six days before the job. The Materials tab is ready. The purchase order stays open to restock the other depot.

Which jobs in the next three weeks will fail before their day?

Five of 41, from last night's check. A road job's permit ends three days before its date. Chamber lids arrive on the day of another job. The ring main unit job's permit ends two days before. A street job has no lane closure booked. A pump station job has a confined-space certificate that ends too soon.

Make permits stay valid two days after the job

Done. A permit must now be valid from the day before the job until 2 days after it, so a one-day slip does not cancel it. When the 13 permits are checked again, one more comes up short. It is a lane closure that ends one day after its job. Its extension is drafted for you to send.

The screens

The six-tab job pack, the date line and the switching approval

From the working solution, on its sample data. Pick one to see it large.

The job packSix tabs, each ready, at risk, missing or waiting. The date line checked against the job day, the 12-item checklist and the planner's other packs.
Work requestsRequests approved for planning, each matched to a standard job plan with its score and the runner-up.
Agents at workSeven agents put the pack together step by step, and the date checker tests each dated item against the job day.
Scope and authorizationsFourteen steps with three hold points copied from the job plan, and each crew member's authorization checked for the job day.
MaterialsEighteen lines checked by depot. A shortage with its order date, and a transfer from another depot waiting for the planner.
Method statementThe method statement in the utility's template, with the site's hazards added and the hold points that cannot be removed.
Control-room approvalThe switching program step by step, with the back-feed load checked, for the control-room authorized engineer to approve or return.
The isolation planThe feeder during the work, the switching steps, the customers who lose power and the priority services customers to call.
Release to schedulingThe pack released with one open condition, and what happens if it is refused.
The crew packWhat the crew lead gets on the tablet: the cover sheet, briefing points, the six sections and answers to the crew lead's questions.
Readiness calendarThree weeks of electricity and water jobs colored by readiness and checked overnight, with the jobs that will fail before their day marked.
PerformancePacks fully ready a week ahead, crews sent home by cause, days to ready, the ready backlog and what sending crews home costs.
Planning rulesThe date-check rules, what the agents may do on their own and who decides.
Governance

Release, switching approval and the trail behind work package preparation

Nothing reaches the schedule unreleasedA pack goes to scheduling only when the work planner releases it, and any open condition goes with it. The crew lead accepts the pack before the job.
Switching stays with the control roomThe isolation planner drafts and sends. Only the control-room authorized engineer approves or returns a switching program. The approver, the time and the program's issue are recorded.
No agent buys parts or moves a dateAgents do not raise a purchase, move a job's date or remove a hold point. Depot transfers and substitute equipment need a named person.
Extensions only under your ruleAn extension of an existing permit goes out automatically only while the planner's rule is on, and in the planner's name. New permits always wait for the planner.
Each item cites its sourceEach date and line in the pack links to where it came from. That might be the permit, the purchase order, the depot stock record, the standard job plan or the switching program.
Each step on the activity trailEach agent step and each decision is recorded with its time. That includes who approved a request, released a pack, or approved a transfer or a program. Each pack is checked against its job date again each night.
Configuration

Permit, materials and notice rules, checked against each pack nightly

The utility sets how long a permit must last past the job and when materials must be on site. It also sets how much notice customers get, and what the agents may do on their own.

SettingDefaultChoose from
Permits stay valid after the job1 daySet in days, so a one-day slip does not cancel a permit
Materials on site1 working day1 working day · 2 working days before the job, at the depot or on site
Locate request timing2 days · 14-day lifeRequested 2 working days before the ticket must be valid. The one-call center sets a ticket life of 14 days
Notice to customers5 working daysFor planned outages. Priority customers are also called 3 working days before
Switching approval due2 working daysBefore the job, so the crew has the approved program
Nightly re-check02:00 dailyEvery pack in the next three weeks
Extend an existing permit when it ends before the jobOnOn · Off. Sent in the planner's name. New permits always wait for the planner
Reserve stock for released packsOnOn · Off. Transfers and substitutes still need a person, and purchases always do
Connections

Job plans, drawings, permits, stores and the network model behind a pack

Work requests and work ordersrequests approved for planning from asset inspection, faults, new connections and water networks
Standard job plansapproved plans with steps, hold points, crew, hours and materials list: 214 in the sample
Drawings and GISnetwork diagrams, map extracts, cable records, site layouts and drawing markups
Permit and clearance rulesroad opening permits, lane closures, one-call locate tickets, landowner consents and customer notices
Material catalogue and storesstock by depot, reservations, open purchase orders and approved substitutes
Network model and priority servicespoints of isolation, back-feeds, customer counts and priority services customers
What it changes

Fewer crews sent home and more packs ready before the job day

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of packs checked for isolation, locate ticket and crew authorizations before the crew sees them
Every pack
checked nightly until the crew sets off
demo
$1.05Ma year
in crew days no longer lost to crews sent home, on the sample's figures: 80% fewer, at $2,150 a crew day
Sent home today612 a year
With the date check≈ 122
target
2days
from approved request to a pack ready to schedule, down from 8
By hand8 days
With agents≈ 2 days

“demo” means seen in the working solution, on its sample utility's data. “target” means the design goal, measured in the live solution. “estimated” means worked out from the utility's own inputs. The $1.05M figure is a large utility's yearly stand-downs (crews sent home) × $2,150 a crew day × 80% fewer. The split of a pack's days is our estimate. “typical” means published figures. A one-call locate ticket lasts 14 to 17 days (Tennessee 811, OKIE811, Nebraska). Regulatory context: OSHA 29 CFR 1910.269(c) job briefing and (m)(3) de-energizing. UK street-works permit schemes require 3 days, 10 days or 3 months' notice by works category. Names on the screens are sample data.

Questions

What planners and control rooms ask about work package preparation

What is work package preparation software for utilities?

It is software that builds the job pack a crew needs for planned work. The pack holds scope and steps, drawings, permits and notices, materials, the method statement and the isolation plan. The software tells the planner whether the pack is ready to schedule. Work Package Preparation uses seven agents to build the pack from the work request. It checks each dated item against the day the crew will work.

How does it check a job pack against the job day?

The date checker collects each dated item. That means permit windows, locate ticket life, notice deadlines, material arrival, approvals due, crew authorizations and plant hire. It compares each with the scheduled date and your rules. Anything that does not cover the day is flagged with the gap in days. Each pack in the next three weeks is checked again at 02:00 each night.

Does it apply for permits and locate tickets on its own?

Only where your rule allows. Say an existing permit ends before the job and automatic extensions are on. The permit and consent checker then asks for the extension in the planner's name and logs it. New permits always wait for the planner. Customer notices are drafted and scheduled, so they can be stopped before they go out.

How does it handle switching programs and isolation?

The isolation planner drafts the switching program from the network model, with the points of isolation, back-feeds and earths. It counts the customers and priority services customers who lose power. It sends the draft to the control room. Only the control-room authorized engineer approves or returns it. The agent does not issue one.

Does it work for water jobs as well as electricity?

Yes. The same planning board takes water network and treatment requests alongside electricity work. Examples are a seized valve on a 300 mm trunk main or a leaking non-return valve at a pump station. They have their own job plans, permits, materials and crews on the readiness calendar.

What does it save a utility?

Mainly the cost of crews sent home because something was missing or had run out. We used sample inputs for a large utility, where 4.2% of planned jobs were called off. Each lost crew day costs $2,150. That covers a crew of four, vehicles and plant hire, the customer notice sent again and the planner's rework. An 80% cut would avoid an estimated $1.05M a year. In the sample's first eight weeks, the date checker found 186 problems before the day. Crews sent home fell from 11.8 a week to 2.6. And 94% of packs were fully ready a week before the job, against a target of 95%. The design goal is a pack ready to schedule in 2 days instead of 8.

Can an agent order parts, move a job date or issue switching?

No. Agents read, draft, reserve and propose. The work planner releases each pack to scheduling and approves depot transfers. A design engineer approves substitute equipment. The control-room authorized engineer approves switching, and the crew lead accepts the pack. Agents do not buy, move a job date or remove a hold point.

Which planning documents does it learn from?

Your standard job plans, permit and notice rules, method statement template and a sample of past work requests. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own planned work first.

Test work package preparation
against your own planned work.

We'll run Work Package Preparation on a sample of your own work requests and standard job plans.