SearchField Service & Work Management

Asset Service History Search

Asset service history search that shows the technician what was done to an asset before they open the box

See one case, screen by screen ↓
Watch with transcript →

Built forField techniciansCrew leadsDispatchersAsset engineersMechanical technicians

The Problem Today

Technicians cannot see an asset's past jobs on site, so they reset a fault the last crew already diagnosed.

1.6
extra visits, on average, when a first visit fails published

History buried in old records

  • Work orders
  • Crew notes
  • Photos
  • Paper cards
  • Crews open boxes blindWet boxes and discharge are on record, but missing from the tablet
  • Parts not on the vanA depot trip for the parts that past jobs already used

The Solution

  1. Scan the tag, see its storyInstalls, faults, repairs, tests and parts on one timeline
  2. The repeat pattern foundFolded by season, the summer trips on one asset line up
  3. The past fix is foundThe crew note that named the cause, quoted with its photos
  4. The technician decidesParts held at the depot, and a spoken closeout becomes the signed record

Built-in controls

  • Each sentence links to the record it came from
  • No switching, isolation or earthing steps given
  • Each scan and answer kept on the audit trail

What You Get

Fewer repeat outages and customer minutes lost on the same asset, and fewer return visits.

8 → 1.5
crew hours on one repeat-fault visit, before and after our estimate
  • Hazards seen before openingEach job opens with past crews' hazards, each cited
  • The right parts on the vanVan list built from the parts past jobs used or named
  • Know-how kept on recordA crew lead's diagnosis stays findable after they retire
In short

What is Asset Service History Search?

Asset service history search is software that answers field technicians' questions about any asset's past jobs. It turns work orders, closeout notes, photos, inspections and the asset register into one cited life story per asset. Before opening the box, the technician knows what was done before, what failed and what fixed it.

How to choose AI solutions for utilities →

Updated

The problem

Crews cannot see an asset's history on site, so the same fault keeps coming back

Before or during a visit, a field technician needs to know an asset's past work, including which parts were used and what failed. The records exist as work orders, closeout notes, photos, inspections and the asset register. But they sit in forms and free-text fields. On a tablet the technician sees the open work order, and not the asset's story. Old closeout notes, photos and the paper cards from before the system change are close to impossible to search. So the crew cleans the cable box, dries it, resets it and leaves, and the fault comes back. On a ring main unit, a switching unit on the local network, each repeat trip cuts supply to every customer downstream.

The cause may already be written down. A crew lead once opened the box properly and named the fix in a closeout note. The follow-up job was cancelled, and the next two crews never saw the note. When that crew lead retires, the note is the only place the diagnosis survives. In 2025, AWWA, the American Water Works Association, found that 21% of water utility staff can retire within five years. The same history is also a safety record. A cable box last found wet with tracking is a known hazard, and so is a box where a survey heard electrical discharge. A crew that does not know opens it blind.

estimated$250-$500a truck rollwhat one utility dispatch costs, by a vendor's figure
typical13.8per 100,000line installer deaths per 100,000 workers, about four times the rate for all workers
Where the crew hours go on one repeat-fault visitestimated
By hand8.3 hours
With the solution1.5 hours
  • Finding the asset's past jobs in the work management system1 → 0.1 h
  • Reading old closeout notes, photos and paper cards1.5 → 0.2 h
  • Working out whether it is a repeat, and what was tried before2 → 0.3 h
  • Fetching parts that were not on the van2.5 → 0.5 h
  • Finding the hazards past crews recorded0.5 → 0.1 h
  • Writing up the closeout0.8 → 0.3 h

Estimated split for one investigation visit to a repeat fault, in crew hours, by hand and with the solution.

How it works

From a scanned tag to a cited life story for one asset

What comes in
Asset history inThe asset's full record · work orders, crew notes, inspections, register
Agents at work
Tag and asset resolverone asset, never a guess
Then
History readerevery event cited
Then
Pattern finder
Cause and fix advisor
Parts checker
Then
Closeout writerback onto the story
A person decides
Field techniciandecides, and the crew lead approves
What comes out
Cited life story
Likely cause and fixes held
Parts reserved
One case, step by step

A ring main unit trips three summers running, and its service history shows why

The utility runs electricity and water networks. One 11 kV ring main unit at a secondary substation has tripped on earth fault on Way 2 three summers running. Each time, the 312 customers on its ring lose supply. A high-voltage field technician is sent to investigate. Here is the day, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0106:00

    Four jobs, each history read before the van leaves

    Dispatcher

    The dispatcher builds the technician's route. It covers the ring main unit at 08:30, a transformer at 13:45, a low-voltage pillar at 15:00 and a second ring main unit at 16:15. Each job's history is read by 06:00 and cached on the tablet. The van list is built from the parts each past job used or named. The termination kit is loaded. The 63 mm gland, breather and heater for the ring main unit are at the depot. So are a gasket kit for the transformer and anti-tamper bolts for the pillar.

    “Bushing gasket kit, 200 kVA · the transformer · named in a past note, not yet ordered”

  2. 0208:30

    The technician scans the tag on the switchgear

    HV field technician

    At the secondary substation, the technician points the tablet at the tag. It reads the unit's ID and matches it to one asset in the register. The match includes the ID the unit carried before the system change. Today's job, raised by the asset engineer, reads “Investigate repeat earth fault, Way 2 cable box”. A planned outage runs from 09:00 to 13:00.

    Tag and asset resolver: if two assets could match, it asks instead of guessing.

  3. 037.0 seconds later

    Seventeen years on one timeline

    History reader · Pattern finder

    The life story comes back, from commissioning to today. It holds 19 events from 14 records and 23 photos. They sit in five lanes: installs and jobs, faults, repairs, tests and inspections, and parts. One inspection found the ground around the plinth wet. A partial-discharge survey heard 14 dB ultrasonic at the Way 2 cable box and said “Monitor, resurvey in 12 months.” It was not resurveyed. The pattern finder joins the three faults with a red band.

    “Repeat found: 3 earth-fault trips · each one between June and August · all on the Way 2 cable box”. They came 383 and 343 days apart, with 148,200 customer minutes lost.

  4. 04One switch

    Fold by season, and the summers line up

    Pattern finder

    Fold by season redraws the timeline as years stacked over a single January-to-December line. The three trips, two in July and one in August, fall in the same summer column. A work-order list does not show this. It is the view that turns three call-outs into one pattern.

    “all 3 trips fall here”

  5. 05After the first trip, as written

    The crew that found the cause wrote it down

    Crew lead, since retired

    After the first trip, the crew re-terminated the Way 2 red phase and found the gland split. The record opens as it was written, with the quoted passage highlighted. It shows the crew, the times, the fault code and the photos of the split gland and the tracking. The follow-up job was cancelled as “merged with planned maintenance”. Since then, crews have dried the box and reset it.

    “Gland on the Way 2 cable box is split and water is getting in round the cable. Box wet inside, tracking on the red phase. Replace the cable box gland and fit a new breather. No 63 mm gland on the van.”

  6. 06Ranked

    The likely cause, and whether the fix held elsewhere

    Cause and fix advisor

    Water through the split Way 2 gland ranks High, on 5 records. A dead anti-condensation heater, found between the first and second trips, ranks Medium. Termination workmanship ranks Low. Way 2 was re-terminated after the first trip and tripped again 383 days later. The technician asks whether the gland and heater fix worked on other units of the same model. Nine had a wet cable box, and all nine had the same gland and heater fitted. None has tripped since, over at least 24 months each.

    “This unit is the tenth with the same story, and the only one where the gland job was cancelled.”

  7. 07Before the box is opened

    What past crews found inside, each with its record

    Cause and fix advisor

    Past visits recorded four hazards. At the last trip, the Way 2 cable box was wet with tracking on the red phase. The survey heard discharge at this box. SF6 gas pressure last read 1.29 bar, so the gauge must be checked before operating. Water stands at the plinth after rain. Beside the hazards are the past fixes and how long each held: 383 days, 343 days, and 87 days so far. The two fixes that were not done are listed too.

    “Prove dead and earth Way 2 to the approved procedure before opening, under the job's switching schedule. Switching is by control.”

  8. 0808:41

    The parts from the old note, reserved for approval

    Parts checker · Crew lead

    The gland, breather and heater are not on the van. The depot has 4, 6 and 2 of them. The technician reserves the three parts for today's job, to collect before 09:00. The crew lead approves at 08:43, and the parts are ready at the depot trade counter.

    “The agent reserves. It does not order. Nothing leaves the store until the crew lead approves.”

  9. 0912:41

    A spoken closeout becomes the record

    Closeout writer

    The technician speaks the closeout at the substation, in 2 min 14 s. The gland was split, as the retired crew lead's note said. A new 63 mm brass gland and breather are fitted. The heater had no supply because the auxiliary fuse had gone, so both were replaced. The termination is sound. The closeout writer drafts the cause, work done and parts fitted. It adds the readings after the fix: IR 12 GΩ at 5 kV, PD ultrasonic 0 dB, TEV 7 dB and SF6 1.30 bar. It asks for the one reading that was missing.

    Asked for: “Heater current after the fix?” The technician: “Heater drawing 0.22 amps.”

  10. 1012:52 · Signed

    The fix joins the asset's story, so the next crew knows first

    HV field technician

    The technician signs the job as the person who did the work. The life story gains a new event: gland, breather and heater replaced. The old recommendation and the cancelled job are closed. The repeat is marked “fix fitted today, watch next summer”. The pattern finder checks it again once next summer is over.

    Only the technician who did the work signs the closeout.

Who it’s for

Five roles that read and write one asset's service history

One asset's history, from the dispatcher's 06:00 route to the asset engineer's repeat list, and how each role's day changes.

HV field technician
Scans, asks and signs closeouts
Before
Works four jobs a day across 11 kV substations, opening cable boxes and switchgear with the open work order and little else. Wants to know what has been done to a unit before opening it.
Now
Scans the tag and gets the asset's life story. It shows the repeat, the crew note that named the fix, the parts and the hazards, each line with its record. Speaks the closeout and signs it.
Crew lead
Approves plans and parts
Before
Attended the last trip, dried the box and fitted a temporary heater. Knows the crews keep resetting it, and that someone must have written down why.
Now
Approves the parts reserved at the depot and any change to the work plan, with the record that says why each part is needed.
Dispatcher
Builds routes and van lists
Before
Builds the route and the van list at 06:00. Loads the right parts the first time only when the history is known.
Now
Sends a route with each job's history read and cached on the tablet. The van list is built from the parts past jobs used or named.
Asset engineer
Raises investigations, owns repeat patterns
Before
Raises investigation jobs on repeat faults and owns the capital list. Does not put three trips on one unit down to bad luck, and treats them as a pattern.
Now
Sees five years of faults folded onto one year. There are 8 summer repeats, 612,400 customer minutes lost on repeat assets, and 5 fixes a crew named that were not done.
Mechanical technician, water
Maintains pumps at a pumping station
Before
Wrote two summers ago that a pump's drive-end bearing ran hot each summer on the wrong grease. The next crew regreased with standard grease, and it tripped again.
Now
The note sits on the pump's life story beside four summer bearing-temperature trips. High-temperature grease went in this summer, and the pump is watched next summer.
The agents

How the agents build an asset's history, and what each may not do

Six agents turn every past job into one cited life story. The technician decides and the crew lead approves.

Tag and asset resolver

Reads the scanned tag, QR code or typed name and finds the one asset it means in the register. That includes the IDs used before a system change.

  • Never guesses between two assets. Asks the technician
  • Each scan is logged with the technician and the time
History reader

Reads each work order, closeout note, photo and inspection for the asset and its connected parts. Builds the life story, with each event's date, who did the work and the record.

  • Quotes crew notes as written and never paraphrases them
  • A sentence with no record is removed
  • Contractor notes carry the contractor's name
Pattern finder

Finds repeats, meaning the same fault on the same part in the same season, in different years. It draws the band on the timeline and the season fold, and flags a fix named in a crew note whose follow-up job was cancelled.

  • Never calls a pattern on fewer than 3 faults
  • Runs nightly and on each scan
Cause and fix advisor

Ranks the likely causes by the records behind them and counts how many days each past fix held. It finds where the same fix worked on sister units of the same model, and lists the hazards past crews recorded, each with its record.

  • Never gives switching, isolation or earthing steps
  • Ends the hazards with the approved procedure and switching schedule
Parts checker

Lists the parts fitted or named on past jobs, with their stock codes. Checks the van first, then the depots in the order set in Settings.

  • Never orders. Reserves parts for the crew lead to approve
Closeout writer

Turns the technician's spoken closeout into a record of cause, work done, parts, readings and photos. It asks for any reading the history says should be proved, and links the record to the recommendation it closes.

  • Never closes a job. The technician signs
Field technician

Decides on site, and the crew lead approves plan and parts.

Ask in plain words

Asset service history search answers on a unit, a fix or a part

Ask about any asset, electricity or water, or say what to do with what you find. Each sentence carries the record it came from. A sentence with no record is not shown. These answers use the sample data.

What should I check before opening the Way 2 cable box?

Four things from past visits on this unit. The Way 2 box was wet with tracking on the red phase at the last trip. A survey heard discharge at this box. SF6 last read 1.29 bar, so check the gauge before operating. Water stands at the plinth after rain. Prove dead and earth Way 2 to the approved procedure, under the job's switching schedule. Switching is by control.

Has the gland and heater fix worked on other units of this model?

Yes. Nine other units of the same model had a wet cable box and had the gland and heater replaced. None has tripped since, over at least 24 months each.

Reserve the parts from the old crew note at the depot

The gland, breather and heater named in the two past notes are now reserved at the depot for today's job. I have sent them to the crew lead to approve. Nothing leaves the store until the crew lead does.

Which other assets on my patch repeat every summer?

Eight assets have 3 or more faults between June and August. Two are on your patch besides this unit, and both have a fix named in a crew note that was not done.

The screens

The life story, the season fold and the spoken closeout, screen by screen

From the working solution, on its sample data. Pick one to see it large.

The asset's life storyOne ring main unit from commissioning to today in five lanes. A repeat band runs across three summer trips, beside the cited answer and how it was built.
Scan or askPoint the tablet at the tag on the switchgear, pump or valve, or ask. Today's route sits underneath.
Fold by seasonEvery year stacked on one January-to-December line, so the three trips line up in the summer column.
The record, as writtenThe first trip's fault work order and closeout, with crew, times, photos and parts, and the quoted passage highlighted.
Ask about any assetA cited answer across the work orders, and a table of the nine sister units and their trips since the fix, with the records cited.
Before you open the boxPast fixes and how long each held, the parts against the van, and the hazards past crews found, ending with the approved procedure.
Reserve partsThe three parts named in the two past notes, reserved at the depot for the crew lead to approve.
Spoken closeoutThe voice note, its transcript and photos, the drafted record and the reading the closeout writer asked for.
The fix on the storyToday's repair added to the life story, and the repeat marked as fix fitted, watch next summer.
Today's jobsThe route, what each job's history says, and the van list built from the parts past jobs used or named.
Repeat patternsFive years of faults folded onto one year, for electricity and water assets, with each repeat's status.
A water assetA pump at a pumping station, with four summer bearing-temperature trips and the crew note that named the grease.
SettingsThe repeat rule, the answer rules, what the tablet keeps offline, and who does what.
Governance

Cited records, quoted crew notes and no switching steps on live networks

Each sentence has its recordEach line of the life story and each sentence of an answer opens the work order, note, inspection or photo it came from. Answers are checked sentence by sentence. A sentence with no record is removed before it is shown.
Crew notes quoted as writtenWhat a crew wrote is shown as they wrote it, with the passage highlighted in the original record. Contractor notes carry the contractor's name.
No switching stepsThe solution gives no switching, isolation or earthing steps. Hazards end with the approved procedure and the switching schedule for the job. Switching stays with control.
Parts are reserved and never orderedThe parts checker reserves at the depot and does nothing more. Nothing leaves the store until the crew lead approves the reservation.
The technician signs the closeoutThe closeout writer drafts the record and asks for missing readings. Only the technician who did the work signs. Only then does the record join the asset's life story.
Scans and answers on the recordEach scan, answer, reservation, approval and signature is written to the audit trail, with who and when. Contractors can scan and read only the assets they are sent to.
Configuration

Repeat rules, citations and offline settings for your network

The settings cover what counts as a repeat, how answers are written, what is shown about hazards and what the tablet keeps offline.

SettingDefaultChoose from
Faults needed for a repeat32 · 3 · 4. Counted on the same part, in different years
Season window3 months2 months · 3 months. Faults this close in the calendar count as one season
Look back10 years5 years · 10 years · Whole life. How far back the pattern finder reads
Fix named, never doneOnFlags a crew recommendation whose follow-up job was cancelled
Every sentence citedAlwaysA sentence with no record is removed before it is shown. Crew notes are quoted as written, and contractor notes are named
HazardsOnEnd with the approved procedure, and never give switching steps
OfflineOnLife stories for every job on the route, cached on the tablet by 06:00
LanguagesEnglish + a second languageEnglish · English + a second language. Notes are shown as written, with a translation
Connections

Crew notes, paper cards and work orders behind the asset history

Work-order historythe work orders in the work management system, back to its start, 1,284,000 in the sample
Closeout notes and photostyped and spoken notes with the crew's words kept, and photos read for what they show
Inspection findingssubstation, line, pump and valve inspections and partial-discharge surveys
Asset registerelectricity and water assets with model, site, install date and the IDs used before a system change
Scanned paper cardsthe history from before the work management system, read from scans
Van and depot stockwhat is on the van and at each depot, checked in the order you set
What it changes

Repeat faults, return visits and known hazards on screen

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
50%
fewer repeat faults on the same asset, because the fix goes to the cause
Reset and leave3 trips
Fixed at the causetarget ½
typical
1.6visits
more when a first visit fails, at $200 to $300 a dispatch
Failed first visitFixed first time
target
100%
of jobs open with the asset's known hazards on screen, cited
every job, before the box is opened

The tag “demo” means seen in the working solution, on its sample network data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate of the crew-hours split for one repeat-fault visit. Its sums give the 8 hours by hand and the 1.5 with the solution. “Typical” means a published figure. Aberdeen Group first-time-fix research, via Retriever and Kerridge, found 1.6 additional visits when a first visit fails. It puts a dispatch at $200 to $300. Both figures come from a secondary source. BLS figures, via Relia, show 13.8 line installer deaths per 100,000, about four times the rate for all workers. “Estimated” also marks vendor figures. S&C Electric, via Ventavid, puts a utility truck roll at $250 to $500. Workforce context: AWWA, 2025. The utility, its sites, assets, records, equipment makes and contractor in the worked example are sample data. Names on the screens are sample data.

Questions

Questions field service teams ask about asset service history search

What is asset service history search?

Asset service history search is software that answers field technicians' questions about any asset's past jobs. It turns work orders, closeout notes, photos, inspections and the asset register into one cited life story per asset. Before opening the box, the technician knows what was done before, what failed and what fixed it.

How does asset service history search work for field technicians?

The technician scans the tag, or types or asks about the asset. Agents match the tag to one asset and read its records into a timeline. They find any repeat pattern, rank the likely causes and show how long past fixes held. They check the parts against the van and list known hazards. Each line opens the record it came from, and the technician decides what to do.

Does it work for water assets as well as electricity?

Yes. The same life story works for pumps, valves, hydrants and boreholes as for ring main units and transformers. In the sample, a pump at a pumping station shows four summer bearing-temperature trips and the crew note that named high-temperature grease.

How does it find repeat faults?

The pattern finder groups faults by asset, part and season. By default, a repeat needs at least 3 faults on the same part, in the same 3-month window, in different years. It looks back 10 years. It also flags a fix named in a crew note whose follow-up job was cancelled or not raised.

Can it read old records and paper cards?

Yes. It reads scanned paper cards from before the work management system. The tag and asset resolver matches assets to the IDs they carried before a system change. So a unit's early history sits on the same timeline.

Does it give switching or isolation instructions?

No. It gives no switching, isolation or earthing steps. It lists the hazards past crews recorded, each with its record, and ends with the approved procedure and switching schedule for the job.

Can the agents order parts or close a job on their own?

No. The technician decides on site. The crew lead approves changes to the work plan and each parts reservation, and the asset engineer decides on replacement. Agents reserve parts but do not order them. They draft closeouts but do not close a job. Only the technician who did the work signs.

Which records do we need to hand over to start?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These include your work-order history, closeout notes, inspection records, asset register and procedures. It goes live once each quality gate has passed. We will walk you through it on your own assets first.

Search the history
of your own assets.

We'll run Asset Service History Search on a sample of your own work orders and closeout notes.