- Before
- Carries 214 open recoveries and builds each claim from five systems. Knowing a strike was the contractor's fault is quick. Proving it takes six weeks of emails.
- Now
- Opens a claim already built. The strike is tested against the ticket, each cost line has its source, and the invoice and insurer demand are drafted. The analyst confirms the basis and signs.
A cable and water main strike, proven against the ticket and billed on day six
The utility runs electricity and water networks. One weekday at 10:42, a tracked excavator is laying a stormwater connection. It cuts an 11 kV feeder and the 200 mm ductile iron water main beside it. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Day 1, 13:05
The damage is reported from site, with what a claim needs
Cable jointing supervisorSupply is cut to 2,140 customers, and 1,260 m³ of water is lost before the main is shut off. Once the area is safe, the supervisor sends the damage report from a phone. It records an excavation strike on the 11 kV cable and water main, the contractor's crew on site and six photos. The note says the contractor dug past the end of their marks to reach a drain at a nearby junction. The checklist shows the site board and machine plate photographed, the statement taken and the make-safe time recorded.
Damage intake reader: “Nothing missing for a ticket claim.”
- 02One minute later
The claim opens and the agents start building it
Damage intake reader and Ticket liability checkerThe intake reader opens the claim and takes the asset, the time and the place. The time is the trip time from the outage record, and the place comes from photo geotags. It also takes the contractor from the site board, the machine plate and the contractor supervisor's statement. It records who was on site and names no party at fault. Next, the liability checker finds the contractor's excavation ticket, valid on the day. It fixes the strike point from the photo geotags and the 412 m fault distance, and the two agree within 3 m.
“Strike is 40 m outside the approved area · basis: outside ticket area”
- 0313:06
Liability proven from the ticket, and the drawings defense closed
Ticket liability checkerThe checker runs seven tests, each with its record. The ticket approved an area 120 m × 3 m on one verge of the street, and was valid on the day. But the strike is 40 m east of that area's east edge, at a side-street junction. There the trench was extended without a new ticket. The as-built drawing issued with the ticket shows the feeder at that point at 0.9 m deep. It was struck at 0.85 m.
Proposed basis: “Excavation outside the approved ticket area”. Only the analyst can confirm it.
- 04Day 2, 03:10
Each cost on the stack, with its source
Cost builderOnce the last joint is made, the cost builder reads the work orders. It finds 10 cost lines worth $141,770. They come from 3 timesheets, the switching log, 2 stores issues and the plant log. Others come from the traffic management and paving subcontractors' invoices and the network flow record. It then adds overheads of 70 % on labor and 15 % for stores handling, from the current rate schedule, $40,614 in all. The invoice total is $182,384, split into labor, materials, plant, road, lost water and overheads.
Not billed: “Link box upgrade, $4,180: betterment and not like-for-like (rate schedule 4.5)”
- 0503:12
The invoice, with a margin note on each line
Invoice and demand drafterThe invoice is drafted in the utility's template, addressed to the contractor with a copy to its insurer. Its opening paragraph states the basis. The excavator struck the cable and the main 40 meters outside the area the ticket approved. The cable is also shown at that point on the drawing issued with the ticket. Beside each of the 12 lines, a margin note names its source, and 14 items of evidence are attached.
“Drafted by the invoice and demand drafter · each line tied to its source”
- 06The demand
A demand the insurer can check line by line
Invoice and demand drafterThe letter goes to the contractor's liability insurer. It sets out the strike, the 2,140 customers cut off and the water lost, and why liability rests with the insurer's client. The letter asks for payment of $182,384, or the insurer's written position, within 30 days. Seven items are cited in the margin. They are the ticket, the crew photos, the supervisor's statement, the drawing, the outage record, the flow record and the contractor's insurance on file.
The drafter does not send, and does not threaten legal action.
- 07Day 6, 09:41
The analyst confirms liability and signs, and legal co-signs
Claims recovery analystThe analyst confirms the liability basis at 09:41, and it is stamped on the invoice and the demand. The analyst signs at 09:44. Because the claim is over $100,000, legal counsel co-signs at 09:47. On day 6 of the claim, the invoice goes to the contractor and the demand to its insurer. The evidence is frozen, and the first reminder is set for a month later.
“Sent on day 6. Invoice to the contractor, demand to its insurer … First reminder set.”
- 08Before the next dig
A third strike, flagged before the contractor digs again
Damage prevention coordinatorThis is the contractor's third strike in 12 months, $341,334 in all, of which $62,800 has been recovered. It has a live ticket on another street, starting five days later. A flag puts a standby crew and a pre-dig meeting on that ticket, and the coordinator decides. A piling contractor with two strikes is already booked for a 07:00 pre-dig meeting.
Rule: “2+ strikes in 12 months → standby on next ticket”
- 09Another claim, same week
A pole shared with a telecom operator, billed for the utility's share only
Joint-use splitterAt 23:18 one night, a car hits a steel pole on a main road. The police report finds the driver at fault. The pole is shared with a telecom operator under a joint-use agreement, 60 % to the utility and 40 % to the operator. Of the $25,600 pole cost, the utility claims $15,360. Inside 10 working days, the operator is told to bill its $10,240 itself. The utility adds its own conductor, plant, make-safe and overheads. That makes the demand to the driver's insurer $37,857, under $100,000, so the analyst signs alone.
The joint-use splitter does not bill another owner's share.
- 10Each morning, 09:30
The chase runs on its own clock
Recovery chaserThere are 214 open recoveries worth $5.70M, and 48 of them, $1.78M, are over 90 days old. Today's chase sends 9 first reminders at 30 days and 6 second reminders at 60 days, copied to the insurer. It proposes 2 payment plans and flags one repeat damager. Three legal referrals are drafted, one of them the same contractor's earlier claim at day 103. Nothing goes to court without legal counsel.
“3 legal referrals drafted … for legal counsel”. A named person decides each referral and each write-off.