WorkflowField Service & Work Management

Third-Party Damage Recovery

Third-party damage recovery that proves liability from the excavation ticket and bills every cable strike

See one case, screen by screen ↓
Watch with transcript →

Built forClaims recovery analystsLegal counselField crewsDamage prevention teamsRevenue assurance leads

The Problem Today

Each claim needs evidence from five systems, so many strike costs are never billed.

196,977
damages to buried utilities reported in the US in 2024 published
7 weeks
from damage to invoice when a claim is built by hand our estimate

Evidence pulled by hand

  • Photos
  • Ticket
  • Drawings
  • Timesheets
  • Liability unprovenInsurers dispute a claim without the ticket and the drawing
  • Repeat damagers dig onClaims and damage prevention do not share a list

The Solution

  1. The crew reports from sitePhotos, geotags, site board and plate read. The claim opens on its own
  2. Liability provenThe strike point measured against the excavation ticket and drawings
  3. Each cost line sourcedLabor, parts and plant priced. A shared pole is billed for its share only
  4. Analyst and legal signThe invoice and the insurer demand go out once liability is confirmed

Built-in controls

  • No cost line billed without its source
  • Like-for-like repairs billed, upgrades left out
  • Named approvals set by claim amount

What You Get

More of each repair is paid for by whoever caused the damage, and less by the utility's customers.

  • Repeat strikers flaggedA standby crew and pre-dig meeting proposed for their next dig
  • Claims chased on a set clockReminders first, then a legal referral drafted for counsel
  • Time limits watchedA warning months before a claim's legal time limit runs out
In short

What is Third-Party Damage Recovery?

It means billing and pursuing the people and companies who damage a utility's assets for the cost of the repair. Examples are an excavator that cuts a cable or a driver who hits a pole. Third-Party Damage Recovery builds each claim from the crew's report. It proves liability from the excavation ticket or police report and prices each cost from the work order. Then it drafts the invoice and the insurer demand. The claims analyst confirms and signs.

How to choose AI solutions for utilities →

Updated

The problem

Utilities fix damage that others cause, but often never recover the cost

When someone else damages a utility's network, the utility can bill them for the repair. Say an excavator cuts an 11 kV cable, or a driver takes out a pole. The crew makes it safe and repairs it the same day, and the cost lands on the work order. There it often stays. Overtime and call-out sit on the timesheets, and cable and joints on the stores issues. Plant, traffic management, road reinstatement and lost water add to the cost. A claim also needs the photos, the excavation ticket (the permit to dig), the locate marks and the drawings. Pulling all of that from five systems is slow, so many small claims are never billed and large ones wait weeks.

When a claim does go out, the contractor's insurer always asks first for proof that its client was at fault. It wants the ticket, the marks, the photos and the drawing. Sometimes the claims analyst cannot show the dig was outside the ticket, or that the asset was on the utility's own record. Then the claim stalls as disputed. If upgrades are billed as repairs, or a shared pole is billed in full, the insurer doubts the whole invoice. The claims team and the damage prevention team also keep separate lists. So a contractor that struck three times this year gets the same routine locate on its next ticket.

typical196,977damages to buried utilities analyzed in CGA's DIRT report for 2024
typical24.5%of those damages caused by failure to notify before digging, with no ticket at all
typical130poleshit by vehicles in a typical year on one island network
Where the days go from damage to invoiceestimated
By hand49 days
With the solution5 days
  • Crew report reaching claims and the claim opened5 → 0.1 d
  • Proving liability: ticket, marks, drawings, statements14 → 0.5 d
  • Chasing timesheets, stores issues, plant logs and subcontractor invoices18 → 1.5 d
  • Pricing on the rate schedule, betterment and joint-use splits4 → 0.2 d
  • Drafting the invoice, the insurer demand and the evidence5 → 0.2 d
  • Analyst approval and legal co-sign3 → 2.5 d

Estimated split for a typical excavation strike, in calendar days, by hand and with the solution. By hand it takes about 7 weeks.

How it works

The crew's site report, built into a signed damage invoice

What comes in
Damage in5 sources · crew report and photos, tickets and marks, work orders, police reports
Agents at work
Damage intake readerphotos, plate, site board
Then
Ticket liability checkerarea, dates, record
Cost builderevery line sourced
Then
Joint-use splitter
Invoice and demand drafter
Then
Recovery chaser30 · 60 · 90 days
A person decides
Claims recovery analystconfirms liability and signs
What comes out
Invoice to the party at fault
Demand to its insurer
Repeat damager flagged
One case, step by step

A cable and water main strike, proven against the ticket and billed on day six

The utility runs electricity and water networks. One weekday at 10:42, a tracked excavator is laying a stormwater connection. It cuts an 11 kV feeder and the 200 mm ductile iron water main beside it. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Day 1, 13:05

    The damage is reported from site, with what a claim needs

    Cable jointing supervisor

    Supply is cut to 2,140 customers, and 1,260 m³ of water is lost before the main is shut off. Once the area is safe, the supervisor sends the damage report from a phone. It records an excavation strike on the 11 kV cable and water main, the contractor's crew on site and six photos. The note says the contractor dug past the end of their marks to reach a drain at a nearby junction. The checklist shows the site board and machine plate photographed, the statement taken and the make-safe time recorded.

    Damage intake reader: “Nothing missing for a ticket claim.”

  2. 02One minute later

    The claim opens and the agents start building it

    Damage intake reader and Ticket liability checker

    The intake reader opens the claim and takes the asset, the time and the place. The time is the trip time from the outage record, and the place comes from photo geotags. It also takes the contractor from the site board, the machine plate and the contractor supervisor's statement. It records who was on site and names no party at fault. Next, the liability checker finds the contractor's excavation ticket, valid on the day. It fixes the strike point from the photo geotags and the 412 m fault distance, and the two agree within 3 m.

    “Strike is 40 m outside the approved area · basis: outside ticket area”

  3. 0313:06

    Liability proven from the ticket, and the drawings defense closed

    Ticket liability checker

    The checker runs seven tests, each with its record. The ticket approved an area 120 m × 3 m on one verge of the street, and was valid on the day. But the strike is 40 m east of that area's east edge, at a side-street junction. There the trench was extended without a new ticket. The as-built drawing issued with the ticket shows the feeder at that point at 0.9 m deep. It was struck at 0.85 m.

    Proposed basis: “Excavation outside the approved ticket area”. Only the analyst can confirm it.

  4. 04Day 2, 03:10

    Each cost on the stack, with its source

    Cost builder

    Once the last joint is made, the cost builder reads the work orders. It finds 10 cost lines worth $141,770. They come from 3 timesheets, the switching log, 2 stores issues and the plant log. Others come from the traffic management and paving subcontractors' invoices and the network flow record. It then adds overheads of 70 % on labor and 15 % for stores handling, from the current rate schedule, $40,614 in all. The invoice total is $182,384, split into labor, materials, plant, road, lost water and overheads.

    Not billed: “Link box upgrade, $4,180: betterment and not like-for-like (rate schedule 4.5)”

  5. 0503:12

    The invoice, with a margin note on each line

    Invoice and demand drafter

    The invoice is drafted in the utility's template, addressed to the contractor with a copy to its insurer. Its opening paragraph states the basis. The excavator struck the cable and the main 40 meters outside the area the ticket approved. The cable is also shown at that point on the drawing issued with the ticket. Beside each of the 12 lines, a margin note names its source, and 14 items of evidence are attached.

    “Drafted by the invoice and demand drafter · each line tied to its source”

  6. 06The demand

    A demand the insurer can check line by line

    Invoice and demand drafter

    The letter goes to the contractor's liability insurer. It sets out the strike, the 2,140 customers cut off and the water lost, and why liability rests with the insurer's client. The letter asks for payment of $182,384, or the insurer's written position, within 30 days. Seven items are cited in the margin. They are the ticket, the crew photos, the supervisor's statement, the drawing, the outage record, the flow record and the contractor's insurance on file.

    The drafter does not send, and does not threaten legal action.

  7. 07Day 6, 09:41

    The analyst confirms liability and signs, and legal co-signs

    Claims recovery analyst

    The analyst confirms the liability basis at 09:41, and it is stamped on the invoice and the demand. The analyst signs at 09:44. Because the claim is over $100,000, legal counsel co-signs at 09:47. On day 6 of the claim, the invoice goes to the contractor and the demand to its insurer. The evidence is frozen, and the first reminder is set for a month later.

    “Sent on day 6. Invoice to the contractor, demand to its insurer … First reminder set.”

  8. 08Before the next dig

    A third strike, flagged before the contractor digs again

    Damage prevention coordinator

    This is the contractor's third strike in 12 months, $341,334 in all, of which $62,800 has been recovered. It has a live ticket on another street, starting five days later. A flag puts a standby crew and a pre-dig meeting on that ticket, and the coordinator decides. A piling contractor with two strikes is already booked for a 07:00 pre-dig meeting.

    Rule: “2+ strikes in 12 months → standby on next ticket”

  9. 09Another claim, same week

    A pole shared with a telecom operator, billed for the utility's share only

    Joint-use splitter

    At 23:18 one night, a car hits a steel pole on a main road. The police report finds the driver at fault. The pole is shared with a telecom operator under a joint-use agreement, 60 % to the utility and 40 % to the operator. Of the $25,600 pole cost, the utility claims $15,360. Inside 10 working days, the operator is told to bill its $10,240 itself. The utility adds its own conductor, plant, make-safe and overheads. That makes the demand to the driver's insurer $37,857, under $100,000, so the analyst signs alone.

    The joint-use splitter does not bill another owner's share.

  10. 10Each morning, 09:30

    The chase runs on its own clock

    Recovery chaser

    There are 214 open recoveries worth $5.70M, and 48 of them, $1.78M, are over 90 days old. Today's chase sends 9 first reminders at 30 days and 6 second reminders at 60 days, copied to the insurer. It proposes 2 payment plans and flags one repeat damager. Three legal referrals are drafted, one of them the same contractor's earlier claim at day 103. Nothing goes to court without legal counsel.

    “3 legal referrals drafted … for legal counsel”. A named person decides each referral and each write-off.

Who it’s for

The analyst, counsel and crews who carry a third-party damage claim

One strike claim passes through five people, from the supervisor on site to legal counsel. Here is each one's week before and after.

Claims recovery analyst
Confirms liability, signs up to $100,000
Before
Carries 214 open recoveries and builds each claim from five systems. Knowing a strike was the contractor's fault is quick. Proving it takes six weeks of emails.
Now
Opens a claim already built. The strike is tested against the ticket, each cost line has its source, and the invoice and insurer demand are drafted. The analyst confirms the basis and signs.
Legal counsel
Co-signs large claims and legal referrals
Before
Owns anything that goes to court, and the disputes before it. Knows the insurer's first letter always asks for the ticket.
Now
Co-signs a demand that already carries the ticket, the marks, the photos and the drawing. Decides the legal referrals the chaser drafts at 90 days.
Cable jointing supervisor
Makes the site safe and reports the damage
Before
Repairs the damage and takes the photos, and then is not asked again until court.
Now
Sends one report from a phone, with photos, site board, plate and statement. Is asked only for what a claim of that type still needs.
Head of revenue assurance and claims
Answers for each dollar written off
Before
Answers to the CFO for third-party damage. More than a thousand damages are repaired a year, and under a third of the cost is recovered.
Now
Sees the recovery pipeline by stage and age, and approves each write-off. No agent writes off a claim.
Damage prevention coordinator
Screens tickets and books standby crews
Before
Screens tickets without the claims history behind them. Needs to know about a contractor that keeps hitting the network before its next dig.
Now
Sees each contractor with two or more strikes in 12 months against its live tickets, and decides the standby crew and pre-dig meeting.
The agents

Intake, liability, cost and chase agents that build each recovery

Six agents build the evidence, the cost and the liability case from the excavation ticket. The claims analyst signs.

Damage intake reader

Reads the crew's damage report, the photos with their time and geotags, the site board, the plate and any police or incident report. Opens the claim and asks the crew for anything a claim of that type still needs.

  • Records facts with their source
  • Never assigns liability. It records who was on site
Ticket liability checker

Finds each ticket for the contractor on site within 250 m and 30 days. Measures the strike point from photo geotags and fault distance. Tests it against the ticket's area, dates, method and marks. Checks that the utility's as-built drawing shows the asset where it was struck.

  • Proposes the basis, and the analyst confirms it
  • Shows the tests that failed and the ones that passed
Cost builder

Pulls each cost booked to the damage work orders. These are timesheets, stores issues, plant logs, subcontractor invoices and lost water. Prices labor at grade rates, with overheads and stores handling from the rate schedule.

  • No line without a source document
  • Never bills upgrades (betterment) or planned work, and says why a line is left out
Joint-use splitter

Applies the joint-use agreement's split to shared poles and ducts. Bills only the utility's share and its own equipment. Drafts the notice to the other owner within the agreed time.

  • Never bills another owner's share
Invoice and demand drafter

Writes the invoice in the utility's template, with each line and its basis. Writes the demand to the insurer with the liability facts cited and the evidence attached. Both stay drafts until signed.

  • Never sends
  • Never threatens legal action
Recovery chaser

Each morning, sends reminders at 30 and 60 days and proposes payment plans within policy. Drafts a legal referral at 90 days. Warns 6 months before a claim's legal time limit runs out. Flags contractors with 2 or more strikes in 12 months to damage prevention.

  • Never refers to court or writes off. A named person does
Claims recovery analyst

Confirms liability and signs, and legal co-signs over $100,000.

Ask in plain words

Third-party damage recovery answers on liability, shares and aging claims

Ask about any claim, its liability or its money, or say what to change. Each answer points to its records. These answers use the sample data.

Why is the contractor liable for this strike?

Because it dug 40 m outside its own ticket. Its ticket approved one verge of the street. The photo geotags and the 412 m fault distance put the strike at a side-street junction. Its supervisor says the trench was extended there to tie in to the drain. The cable was also on the as-built drawing issued with the ticket.

Which claims are over 90 days unpaid?

48 claims, worth $1.78M, are over 90 days, and 22 of them are already with legal. The largest not yet referred is the same contractor's earlier claim, $96,150, at day 103. The demand to its insurer has had no answer for two months.

How was the telecom operator's share of the shared pole worked out?

The pole is shared under a joint-use agreement. Replacing a shared pole is paid 60 % by the utility and 40 % by the telecom operator. Each owner bills the party at fault for its own share. Of the $25,600 pole cost, the utility bills $15,360. The operator was told to bill its $10,240 itself. The police report finds the driver at fault.

Flag each contractor with two strikes this year for a standby

Done for the two that qualify. The excavation contractor has 3 strikes in 12 months and a live ticket starting in five days. A piling contractor has 2 and was flagged last month. The damage prevention coordinator now sees both on their next tickets and decides the standby.

The screens

The claim stack, the ticket test and the insurer demand on screen

From the working solution, on its sample data. Pick one to see it large.

The claim stackThe evidence on the left and the cost in the middle, stacked by dollars, with what is not billed and why. Liability from the excavation ticket is on the right.
Agents building the claimThe run log, step by step. The crew report is read, the ticket found and the strike point fixed, 40 m outside the approved area.
The damage report from siteThe crew's phone report beside what the intake reader took from it. Asset, time, place, contractor, machine, ticket and statement each show their source.
Liability from the ticketThe ticket's approved area, the marks, the recorded cable and the strike point drawn to scale. Below are the ticket timeline and seven tests.
The invoiceThe invoice for $182,384, with a margin note naming the source of each line, and the approvals it needs.
The demand to the insurerThe demand to the contractor's insurer, with the liability facts and the seven records cited in the letter.
Signed and sentLiability confirmed, the analyst's signature and the legal co-sign, sent on day 6 with the first reminder set.
A joint-use poleA vehicle hit on a shared pole. Liability comes from the police report, and the utility bills its 60 % of the pole, leaving out the joint owner's share.
A strike with no ticketA piling rig strikes a 300 mm water main with no excavation ticket within 250 m in 30 days. The main is on the plot drawing.
ClaimsEach damage to a utility asset by someone else, with the party, the liability basis, the amount, the stage and the day.
The recovery pipelineOpen recoveries by stage and value, aging by days since the damage, and today's chase of reminders, payment plans and legal referrals.
Repeat damagersContractors by strikes in the last 12 months, cost and recovery, their live tickets and the standby flags for damage prevention.
SettingsThe damage rate schedule, overheads, stores handling, lost water price, like-for-like billing and the approvals.
Governance

Sourced lines, confirmed liability and named sign-offs on each claim

No source, no billEach cost line carries its source document. That is the timesheet, stores issue, plant log, subcontractor invoice or flow record. A line without one cannot be billed. Click a line and its source opens.
The analyst confirms liabilityThe ticket liability checker proposes a basis. It shows each test it ran, passed and failed, with the as-built check on the claim. The claims recovery analyst confirms the basis before it is stamped on the invoice and the demand.
Named approvals by amountThe analyst signs up to $100,000. Legal counsel co-signs above that, and co-signs each legal referral. Write-offs need the head of revenue assurance and claims. No agent writes off a claim.
Agents read, build and draftThe agents read work orders, tickets and drawings. They cannot change a work order or a ticket, send an invoice, refer a claim to court or write one off.
Like-for-like, and each owner's shareOnly like-for-like repair is billed. Upgrades fitted during a repair are shown as betterment and left out. On a shared pole, only the utility's share under the joint-use agreement is claimed, and the other owner is told.
Each step on the recordEach agent step and each decision is recorded with its time. That includes who confirmed the basis, who signed and who co-signed. The evidence is frozen when the invoice is sent. Drivers' names and plates stay with the claim and the people working on it.
Configuration

Rate schedule, approval limits and liability rules for damage claims

Rates, approvals, clocks and liability rules are settings. The claims team chooses them. Each change is versioned and on the record.

SettingDefaultChoose from
Overheads on labor70%60% · 70% · 80%. Covers supervision, vehicles at depot, training and administration
Stores handling on materials15%10% · 15% · 20%
Lost water, at production cost$8.50 / m³$8.50 / m³ · $9.20 / m³
Claims recovery analyst signs up to$100,000$50,000 · $100,000 · $250,000. Legal co-signs above the limit
Write-offsHead of revenue assurance and claimsHead of revenue assurance and claims · Legal counsel. No agent writes off a claim
Follow-up clock after the invoice due date30 · 60 · 90 daysFirst reminder 14 or 30 days · second, copied to the insurer, 45 or 60 days · legal referral draft 90 or 120 days
Limitation warning6 months before6 months · 12 months before the claim's legal time limit runs out
Liability rulesAll onOutside the ticket area (5 m tolerance) · no ticket within 250 m in 30 days · expired or not yet valid. Mechanical digging in the hand-dig zone · marks not respected · asset on the utility's record before claiming
Connections

Tickets, as-builts and work order costs behind each damage recovery claim

Crew damage reportsthe report from site, geotagged photos, site board, plate and statements
Excavation tickets and locate marksapproved area, dates, method, contractor and the marks laid
As-built drawingswhere the cable or main is recorded, and at what depth
Work order coststimesheets, switching logs, stores issues, plant logs and subcontractor invoices
Outage and network flow recordstrip time, customers off, customer minutes, water lost and fault distance
Police reports and agreementspolice collision reports, joint-use agreements and contractor insurance on file
What it changes

Damage recovery rates, days to invoice and repeat strikers flagged

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

demo
$9.6M
more recovered a year in the sample, as recovery rises from 28% to 66% of damage cost
Today$7.1M
With agents$16.7M
target
Every
contractor with 2 or more strikes in 12 months gets a standby crew on its next dig
2 of 2 flagged
repeat damagers this year
target
5days
from damage to invoice, down from 7 weeks, with the evidence still fresh
Today7 weeks
With agents≤ 5 days

“Demo” means seen in the working solution, on its sample data. “Target” is the design goal, measured in the live solution. “Estimated” is our estimate of how the days from damage to invoice split for a typical excavation strike. Those days add up to the 7 weeks by hand. “Typical” means published figures. The CGA DIRT report for 2024 counts 196,977 damages, 24.5 % of them from failure to notify. About 130 poles a year are hit by vehicles on Oahu, from Hawaiian Electric via the Star-Advertiser. The utility, its contractors, insurers, streets and records in the worked example are sample data. Names on the screens are sample data.

Questions

Third-party damage recovery, answered for claims and revenue teams

What is third-party damage recovery?

It means billing and pursuing the people and companies who damage a utility's assets for the cost of the repair. Examples are an excavator that cuts a cable or a driver who hits a pole. Third-Party Damage Recovery builds each claim from the crew's report. It proves liability from the excavation ticket or police report and prices each cost from the work order. Then it drafts the invoice and the insurer demand. The claims analyst confirms and signs.

How does third-party damage recovery software work for utilities?

Six agents work on each claim. First, the intake reader opens it from the crew's report and photos. Next, the liability checker tests the strike against the ticket and the as-built drawings. The cost builder prices each line from the work orders on your rate schedule. The joint-use splitter applies shared-pole agreements. Then the drafter writes the invoice and demand. Last, the recovery chaser follows up on a 30, 60 and 90-day clock.

How does it prove liability for a cable strike?

It finds each ticket for the contractor on site within 250 m and 30 days. It fixes the strike point from photo geotags and the fault distance. Then it tests that point against the ticket's approved area, dates, method and marks. It also checks that the asset was on your as-built record at that point. That answers the “it was not on the drawings” defense. The analyst confirms the basis.

Does it bill betterment or costs it cannot prove?

No. Each line must carry a source document, such as a timesheet, stores issue, plant log, subcontractor invoice or flow record. Upgrades fitted during the repair are shown as betterment and left out. In the sample claim, a $4,180 link box upgrade is struck out with its reason. Customer minutes are not billed. They are reported to the regulator.

Can it handle joint-use poles shared with a telecom operator?

Yes. The joint-use splitter applies the agreement's split and claims only your share and your own equipment. It drafts the notice to the other owner within the agreed time. In the sample, the utility claims 60 % of a $25,600 pole, and the telecom operator is told to bill its 40 % itself.

Does it stop repeat damagers?

It flags each contractor with two or more strikes in 12 months to damage prevention, against its live excavation tickets. That way a standby crew and a pre-dig meeting can be booked before the next dig. The damage prevention coordinator decides the standby.

Can the agents send an invoice or write off a claim?

No. The agents read, build and draft. They do not send an invoice, refer a claim to court or write one off. The analyst confirms liability and signs up to $100,000. Legal counsel co-signs above that and co-signs each legal referral. Write-offs need the head of revenue assurance and claims.

What do we provide so it bills on our own rates?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These include your damage rate schedule, approval limits, joint-use agreements, invoice and letter templates and a sample of past claims. It goes live once each quality gate has passed. We will walk you through it on your own damage claims first.

Bill your own cable strikes
with third-party damage recovery.

We'll run Third-Party Damage Recovery on a sample of your own cable strikes and pole hits.