WorkflowField Service & Work Management

Third-Party Damage Recovery

Third-party damage recovery that proves liability from the excavation ticket and bills every cable strike

Recover the cost of every cable strike, with liability proven from the ticket.

See one case, screen by screen ↓
demoAED 182,384invoiced for one cable and water main strike — 12 lines, each tied to its source document
demo40moutside the approved ticket area — the strike point measured from photo geotags and the fault distance
estimatedAED 9.6Mmore recovered a year, as recovery rises from 28 % to 66 % of damage cost
demo3strikesin 12 months by one contractor — flagged to damage prevention for a standby crew before its next dig
The problem

Why the cost of a cable strike stays on the work order

When an excavator cuts an 11 kV cable or a driver takes out a pole, the crew makes it safe and repairs it the same day. The cost lands on the work order — overtime and call-out on the timesheets, cable and joints on the stores issues, plant, traffic management, road reinstatement, lost water — and there it often stays. Building one claim means pulling all of that, plus the photos, the excavation ticket, the locate marks and the drawings, from five systems. So many small claims are never billed, and large ones wait weeks.

Then the contractor's insurer asks the first question it always asks: prove we were at fault. Show the ticket, the marks, the photos and the drawing. If the claims analyst cannot show the dig was outside the ticket, or that the asset was on the utility's own record, the claim stalls at disputed. Upgrades billed as repairs, or a shared pole billed in full, cost the whole invoice its credibility. And the contractor that struck three times this year gets the same routine locate on its next ticket, because claims and damage prevention do not share a list.

typical196,977damages to buried utilities analysed in CGA's DIRT report for 2024
typical24.5%of those damages caused by failure to notify before digging — no ticket at all
typical130poleshit by vehicles in a typical year on one island network
Where the days go from damage to invoiceestimated
By hand49 days
With the solution5 days
  • Crew report reaching claims and the claim opened5 → 0.1 d
  • Proving liability — ticket, marks, drawings, statements14 → 0.5 d
  • Chasing timesheets, stores issues, plant logs and subcontractor invoices18 → 1.5 d
  • Pricing on the rate schedule, betterment and joint-use splits4 → 0.2 d
  • Drafting the invoice, the insurer demand and the evidence5 → 0.2 d
  • Analyst approval and legal co-sign3 → 2.5 d

Estimated split for a typical excavation strike, in calendar days, by hand (about 7 weeks) and with the solution.

How it works

How a damage becomes a recovery

Six agents stack the evidence and cost and prove liability from the excavation ticket; the claims analyst signs.

What comes in
Damage in5 sources · crew report and photos, tickets and marks, work orders, police reports
Agents at work
Damage intake readerphotos, plate, site board
Then
Ticket liability checkerarea, dates, record
Cost builderevery line sourced
Then
Joint-use splitter
Invoice and demand drafter
Then
Recovery chaser30 · 60 · 90 days
A person decides
Claims recovery analystconfirms liability and signs
What comes out
Invoice to the party at fault
Demand to its insurer
Repeat damager flagged
One case, step by step

One cable strike, from the trench to a signed invoice

Lumina Utilities runs electricity and water across Al Safra. On Wednesday 7 October 2026 at 10:42, a 20-tonne tracked excavator laying a stormwater connection on Street 14 cuts 11 kV Feeder F07 and the 200 mm ductile iron water main beside it. Here is what happens next, screen by screen, in the working solution.

  1. 01Wed 7 Oct, 13:05

    The damage is reported from site, with what a claim needs

    Yousef Darwish · Cable jointing supervisor

    2,140 customers are off supply and 1,260 m³ of water is lost before the main is isolated. Once the area is safe, Yousef sends the damage report from his phone: excavation strike, 11 kV cable and water main, Sandline Civil Works on site, six photos. His note says the contractor dug past the end of their marks to reach the drain at Street 9. The checklist shows the site board and machine plate photographed, the statement taken and the make-safe time recorded.

    Damage intake reader: “Nothing missing for a ticket claim.”

  2. 02One minute later

    The claim opens and the agents start building it

    Damage intake reader and Ticket liability checker

    The intake reader opens DR-2026-0417 and takes the asset, the time (the trip time from the outage record), the place (photo geotags), the contractor from the site board, plate EX-20-4471 and Karim Haddad's statement. It records who was on site — it never names a party at fault. The liability checker finds ticket EXC-26-118402 for Sandline Civil Works, valid 1–14 October, and fixes the strike point from the photo geotags and the 412 m fault distance: they agree within 3 m.

    “Strike is 40 m outside the approved area — basis: outside ticket area”

  3. 0313:06

    Liability proven from the ticket, the drawings defence closed

    Ticket liability checker

    Seven tests, each with its record. The ticket approved 120 m × 3 m on the north verge of Street 14, plots 14-031 to 14-036, and was valid on the day. The strike is 40 m east of the area's east edge, at the Street 9 junction, where the trench was extended without a new ticket. As-built AB-SAF-2014-0219, issued with the ticket, shows F07 at that point at 0.9 m; it was struck at 0.85 m.

    Proposed basis: “Excavation outside the approved ticket area” — the analyst confirms it, not the agent.

  4. 04Thu 8 Oct, 03:10

    Every cost on the stack, with its source

    Cost builder

    Once the last joint is made, the cost builder reads the work orders: 3 timesheets and the switching log, 2 stores issues, the plant log, the Najm Traffic and Rimaal Paving invoices and the network flow record — 10 lines, AED 141,770. It adds overheads on labour at 70 % and stores handling at 15 % from the 2026 rate schedule, AED 40,614. The invoice total is AED 182,384, split into labour, materials, plant, road, lost water and overheads.

    Not billed: “Link box LB-4 upgrade, AED 4,180 — betterment, not like-for-like (rate schedule 4.5)”

  5. 0503:12

    The invoice, with a margin note on every line

    Invoice and demand drafter

    INV-TPD-26-0417 is drafted in the Lumina template, addressed to Sandline Civil Works LLC with a copy to its insurer. The opening paragraph states the basis: the excavator struck the cable and the main 40 metres outside the area approved by the ticket, and the cable is shown at that point on the drawing issued with it. Beside each of the 12 lines, a margin note names its source, and 14 items of evidence are attached.

    “Drafted by the invoice and demand drafter · every line tied to its source”

  6. 06The demand

    A demand the insurer can check line by line

    Invoice and demand drafter

    The letter to Saffron Gate Insurance, policy SGI-TPL-24-08812, sets out the strike, the 2,140 customers off supply and the water lost, and why liability rests with its insured. It asks for payment of AED 182,384, or the insurer's written position, within 30 days. Seven items are cited in the margin: the ticket, the crew photos, the supervisor's statement, the drawing, the outage record, the flow record and the contractor's insurance on file.

    The drafter never sends, and never threatens legal action.

  7. 07Tue 13 Oct, 09:41

    Hessa confirms liability and signs; legal co-signs

    Hessa Al Marzouqi · Claims recovery analyst

    Hessa confirms the liability basis at 09:41, and it is stamped on the invoice and the demand. She signs at 09:44. Because the claim is over AED 100,000, Rajiv Menon, legal counsel, co-signs at 09:47. The invoice goes to Sandline and the demand to Saffron Gate Insurance on day 6 of the claim, the evidence is frozen, and the first reminder is set for 12 November.

    “Sent 13 Oct, day 6. Invoice to Sandline, demand to Saffron Gate Insurance … First reminder on 12 Nov.”

  8. 08Before the next dig

    A third strike, flagged before Sandline digs again

    Faisal Rahman · Damage prevention coordinator

    This is Sandline's third strike in 12 months — DR-2025-1162, DR-2026-0318 and now DR-2026-0417, AED 341,334, of which AED 62,800 has been recovered. Sandline has a live ticket, EXC-26-119077 on Street 22, starting Sunday 18 October. A flag puts a standby crew and a pre-dig meeting on the contractor's next ticket; Faisal decides. Crestway Piling, with two strikes, is already booked for a 07:00 pre-dig meeting.

    Rule: “2+ strikes in 12 months → standby on next ticket”

  9. 09Another claim, same week

    A pole shared with a telecom operator, billed for Lumina's share only

    Joint-use splitter

    At 23:18 on Friday 9 October, a car hits steel pole P-RWD-118 on Al Rawdah Road. Police report TP-26-55120 finds the driver at fault. The pole is shared under JUA-2019-07: Lumina 60 %, Nexalink Telecom 40 %. Of the AED 25,600 pole cost, Lumina claims AED 15,360; Nexalink is told on 12 October, inside 10 working days, to bill its AED 10,240 itself. With Lumina's own conductor, plant, make-safe and overheads, the demand to the driver's insurer is AED 37,857 — under AED 100,000, so Hessa signs alone.

    The joint-use splitter never bills another owner's share.

  10. 10Every morning, 09:30

    The chase runs on its own clock

    Recovery chaser

    214 open recoveries are worth AED 5.70M, and 48 of them, AED 1.78M, are over 90 days. Today's chase sends 9 first reminders at 30 days and 6 second reminders at 60 days, copied to the insurer, proposes 2 payment plans, drafts 3 legal referrals — DR-2026-0318, Sandline, day 103, and two more — and flags one repeat damager. Nothing goes to court without legal counsel.

    “3 legal referrals drafted … for Rajiv Menon” — a named person decides every referral and every write-off.

Who it’s for

Built for everyone who carries a damage claim.

The same strike, seen by the five people who own a piece of it — what their week looked like, and what it looks like now.

HA
Hessa Al MarzouqiClaims recovery analyst, Revenue Assurance & Claims · confirms liability and signs invoices up to AED 100,000
Claims recovery analyst
Before
Carries 214 open recoveries and builds each claim from five systems. “I know the strike was their fault. Proving it takes me six weeks of emails.”
Now
Opens a claim already built: the strike tested against the ticket, every cost line with its source, the invoice and the insurer demand drafted. She confirms the basis and signs.
RM
Rajiv MenonLegal counsel, claims division · co-signs claims over AED 100,000 and every legal referral
Legal counsel
Before
Owns anything that goes to court, and the disputes before it. “Their insurer's first letter always says: show me the ticket.”
Now
Co-signs a demand that already carries the ticket, the marks, the photos and the drawing, and decides the legal referrals the chaser drafts at 90 days.
YD
Yousef DarwishCable jointing supervisor, Al Safra depot · makes the site safe and reports the damage
Field crew
Before
Repairs the damage and takes the photos. “I take the photos. Then nobody asks me again until court.”
Now
Sends one report from his phone — photos, site board, plate, statement — and is asked only for what a claim of that type still needs.
MK
Mariam KhouryHead of Revenue Assurance & Claims · answers for every dirham written off
Head of Revenue Assurance & Claims
Before
Answers to the CFO for third-party damage. “We repair 1,180 damages a year and recover under a third of the cost.”
Now
Sees the recovery pipeline by stage and age, and approves every write-off herself — no claim is written off by an agent.
FR
Faisal RahmanDamage prevention coordinator · screens excavation tickets and books standby crews
Damage prevention coordinator
Before
Screens tickets without the claims history behind them. “If a contractor keeps hitting us, I want to know before their next dig.”
Now
Sees every contractor with two or more strikes in 12 months against its live tickets, and decides the standby crew and pre-dig meeting.
Built on the engine

6 agents. Each with one job, and hard limits.

Six agents stack the evidence and cost and prove liability from the excavation ticket; the claims analyst signs.

Damage intake reader

Reads the crew's damage report, photos with their time and geotags, the site board, the plate and any police or incident report, and opens the claim. It asks the crew for anything a claim of that type still needs.

  • Records facts with their source
  • Never assigns liability — it records who was on site
Ticket liability checker

Finds every ticket for the contractor on site within 250 m and 30 days, measures the strike point from photo geotags and fault distance, and tests it against the ticket: area, dates, method and marks. It checks that Lumina's as-built shows the asset where it was struck.

  • Proposes the basis — the analyst confirms it
  • Shows the tests that failed and the ones that passed
Cost builder

Pulls every cost booked to the damage work orders — timesheets, stores issues, plant logs, subcontractor invoices and lost water — and prices labour at grade rates, with overheads and stores handling from the rate schedule.

  • No line without a source document
  • Never bills betterment or planned work, and says why a line is left out
Joint-use splitter

Applies the joint-use agreement's split to shared poles and ducts, bills only Lumina's share and Lumina's own equipment, and drafts the notice to the other owner within the agreed time.

  • Never bills another owner's share
Invoice and demand drafter

Writes the invoice in the Lumina template with every line and its basis, and the demand to the insurer with the liability facts cited, with the evidence attached. Both stay drafts until signed.

  • Never sends
  • Never threatens legal action
Recovery chaser

Every morning sends reminders at 30 and 60 days, proposes payment plans within policy, drafts a legal referral at 90 days, warns 6 months before the 3-year limit and flags contractors with 2 or more strikes in 12 months to damage prevention.

  • Never refers to court or writes off — a named person does
Claims recovery analyst

Confirms liability and signs; legal co-signs over AED 100,000. The agents propose; a named person decides.

Ask in plain words

Ask about any claim, in plain words

Ask about any claim, its liability or its money — or say what to change. Every answer points to its records.

Why is Sandline liable for DR-2026-0417?

Because it dug 40 m outside its own ticket. Ticket EXC-26-118402 approved the north verge of Street 14, plots 14-031 to 14-036. The photo geotags and the 412 m fault distance put the strike at the Street 9 junction, and Sandline's supervisor says the trench was extended there to tie in to the drain. The cable was on drawing AB-SAF-2014-0219, issued with the ticket.

Which claims are over 90 days unpaid?

48 claims, AED 1.78M, are over 90 days; 22 of them are already with legal. The largest not yet referred is DR-2026-0318, Sandline Civil Works, AED 96,150, day 103 — the demand to Saffron Gate Insurance has had no answer since 14 Aug.

How was the Nexalink share of the Al Rawdah pole worked out?

Pole P-RWD-118 is shared under JUA-2019-07: replacing a shared pole is borne 60 % by Lumina and 40 % by Nexalink, and each owner bills the party at fault for its own share. Of the AED 25,600 pole cost, Lumina bills AED 15,360; Nexalink was told on 12 Oct to bill its AED 10,240 itself. The police report finds the driver at fault.

Flag every contractor with two strikes this year for a standby

Done for the two that qualify. Sandline Civil Works has 3 strikes in 12 months and a live ticket starting Sun 18 Oct; Crestway Piling has 2 and was flagged in September. Faisal Rahman in damage prevention now sees both on their next tickets and decides the standby.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The claim stackThe evidence on the left, the cost stacked by dirhams in the middle with what is not billed and why, and liability from the excavation ticket on the right.
Agents building the claimThe run log, step by step: the crew report read, the ticket found, the strike point fixed, 40 m outside the approved area.
The damage report from siteThe crew's phone report beside what the intake reader took from it — asset, time, place, contractor, machine, ticket and statement, each with its source.
Liability from the ticketThe ticket's approved area, the marks, the recorded cable and the strike point drawn to scale, the ticket timeline and seven tests.
The invoiceINV-TPD-26-0417 for AED 182,384, with a margin note naming the source of each line, and the approvals it needs.
The demand to the insurerThe demand to Saffron Gate Insurance, with the liability facts and the seven records cited in the letter.
Signed and sentLiability confirmed, the analyst's signature and the legal co-sign, sent on day 6 with the first reminder set.
A joint-use poleA vehicle hit on a shared pole: liability from the police report, Lumina's 60 % of the pole and the joint owner's share left out.
A strike with no ticketA piling rig strikes a 300 mm water main with no excavation ticket within 250 m in 30 days; the main is on the plot drawing.
ClaimsEvery damage to a Lumina asset by someone else, with the party, the liability basis, the amount, the stage and the day.
The recovery pipelineOpen recoveries by stage and value, aging by days since the damage, and today's chase of reminders, payment plans and legal referrals.
Repeat damagersContractors by strikes in the last 12 months, cost and recovery, their live tickets and the standby flags for damage prevention.
Your rulesThe damage rate schedule, overheads, stores handling, lost water price, like-for-like billing and the approvals.
Governance

Built to stand up to the insurer: sourced, signed, on the record.

No source, no billEvery cost line carries its source document — the timesheet, stores issue, plant log, subcontractor invoice or flow record — and a line without one cannot be billed. Click a line and its source opens.
The analyst confirms liabilityThe ticket liability checker proposes a basis and shows every test it ran, passed and failed, with the as-built check on the claim. The claims recovery analyst confirms the basis before it is stamped on the invoice and the demand.
Named approvals by amountThe analyst signs up to AED 100,000. Legal counsel co-signs above that, and every legal referral. Write-offs need the head of revenue assurance and claims; no claim is written off by an agent.
Agents read, build and draftThe agents read work orders, tickets and drawings; they cannot change a work order or a ticket, send an invoice, refer a claim to court or write one off.
Like-for-like, and each owner's shareOnly like-for-like repair is billed: upgrades fitted during a repair are shown as betterment and left out. On a shared pole, only Lumina's share under the joint-use agreement is claimed, and the other owner is told.
Every step on the recordEach agent step and each decision — who confirmed the basis, who signed, who co-signed — is recorded with its time. The evidence is frozen when the invoice is sent, and drivers' names and plates stay with the claim and the people on it.
Configuration

Your rate schedule and your rules, not ours

Rates, approvals, clocks and liability rules are settings, chosen by the claims team. Every change is versioned and on the record.

SettingDefaultChoose from
Overheads on labour70%60% · 70% · 80% — supervision, vehicles at depot, training and administration
Stores handling on materials15%10% · 15% · 20%
Lost water, at production costAED 8.50 / m³AED 8.50 / m³ · AED 9.20 / m³
Claims recovery analyst signs up toAED 100,000AED 50,000 · AED 100,000 · AED 250,000 — legal co-signs above the limit
Write-offsMariam KhouryMariam Khoury · Rajiv Menon — no claim is written off by an agent
Follow-up clock after the invoice due date30 · 60 · 90 daysFirst reminder 14 or 30 days · second, copied to the insurer, 45 or 60 days · legal referral draft 90 or 120 days
Limitation warning6 months before6 months · 12 months before the 3 years run out
Liability rulesAll onOutside the ticket area (5 m tolerance) · no ticket within 250 m in 30 days · expired or not yet valid · mechanical digging in the hand-dig zone · marks not respected · asset on Lumina's record before claiming
Connections

Works with the records a damage claim already runs on

Crew damage reportsthe report from site, geotagged photos, site board, plate and statements
Excavation tickets and locate marksapproved area, dates, method, contractor and the marks laid
As-built drawingswhere the cable or main is recorded, and at what depth
Work order coststimesheets, switching logs, stores issues, plant logs and subcontractor invoices
Outage and network flow recordstrip time, customers off, customer minutes, water lost and fault distance
Police reports and agreementstraffic police reports, joint-use agreements and contractor insurance on file
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

estimated
AED 9.6M
more recovered a year, as recovery rises from 28% to 66% of damage cost
TodayAED 7.1M
With agentsAED 16.7M
target
Every
contractor with 2 or more strikes in 12 months gets a standby crew on its next dig
2 of 2 flagged
repeat damagers this year
target
5days
from damage to invoice, not 7 weeks, with the evidence still fresh
Today7 weeks
With agents≤ 5 days

“demo” = seen in the working solution, on its sample data · “estimated” = our arithmetic on the demo utility's inputs: 1,180 damages a year at AED 21,400 average cost, 28 % recovered today against a 66 % target, and the split of days from damage to invoice · “typical” = published figures: CGA DIRT 2024 (196,977 damages; failure to notify 24.5 %); about 130 poles hit by vehicles a year on Oahu (Hawaiian Electric via the Star-Advertiser). Legal context: UAE Civil Transactions Law Art. 298 (3-year limit for claims). Lumina Utilities, the people, contractors, insurers, streets and records named on this page are fictional — characters and sample data in the working solution.

Questions

What claims and revenue assurance teams ask us.

What is third-party damage recovery?

Third-party damage recovery is billing and pursuing the people and companies who damage a utility's assets — an excavator that cuts a cable, a driver who hits a pole — for the cost of the repair. Third-Party Damage Recovery builds each claim from the crew's report, proves liability from the excavation ticket or police report, prices every cost from the work order and drafts the invoice and the insurer demand. The claims analyst confirms and signs.

How does third-party damage recovery software work for utilities?

Six agents work on each claim. The intake reader opens it from the crew's report and photos; the liability checker tests the strike against the ticket and the as-built drawings; the cost builder prices every line from the work orders on your rate schedule; the joint-use splitter applies shared-pole agreements; the drafter writes the invoice and demand; and the recovery chaser follows up on a 30, 60 and 90-day clock.

How does it prove liability for a cable strike?

It finds every ticket for the contractor on site within 250 m and 30 days, fixes the strike point from photo geotags and the fault distance, and tests it against the ticket's approved area, dates, method and marks. It also checks that the asset was on your as-built record at that point, which closes the “it was not on the drawings” defence. The analyst confirms the basis.

Does it bill betterment or costs it cannot prove?

No. Every line must carry a source document — a timesheet, stores issue, plant log, subcontractor invoice or flow record — and upgrades fitted during the repair are shown as betterment and left out. In the sample claim, a link box upgrade of AED 4,180 is shown struck out with its reason, and customer minutes are reported to the regulator, not billed.

Can it handle joint-use poles shared with a telecom operator?

Yes. The joint-use splitter applies the agreement's split, claims only your share and your own equipment, and drafts the notice to the other owner within the agreed time. In the sample, Lumina claims 60 % of a AED 25,600 pole and Nexalink Telecom is told to bill its 40 % itself.

Does it stop repeat damagers?

It flags every contractor with two or more strikes in 12 months to damage prevention, against its live excavation tickets, so a standby crew and a pre-dig meeting can be booked before the next dig. The damage prevention coordinator decides the standby.

Do people stay in control of what is sent and written off?

Yes. The agents read, build and draft; they never send an invoice, refer a claim to court or write one off. The analyst confirms liability and signs up to AED 100,000, legal counsel co-signs above that and every legal referral, and write-offs need the head of revenue assurance and claims.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your damage rate schedule, approval limits, joint-use agreements, invoice and letter templates and a sample of past claims — and it goes live once every quality gate has passed. We will walk you through it on your own damage claims first.

See it on
your damage claims.

We'll run Third-Party Damage Recovery on a sample of your own cable strikes and pole hits.