- Before
- Reviews 40 to 60 closeouts each morning before planning the week. Can't plan next month from a history that just says fixed.
- Now
- Opens 46 jobs already checked and accepts the 29 clean ones in one click. Works through the 17 with gaps, each gap shown with its photo, note or timesheet line.
One overnight fuse job, checked at closeout, screen by screen
At 02:14 one night, 23 properties on one street lose power. A two-person crew, a crew lead and a lineworker, find a blown low-voltage (LV) fuse on phase L2 at a pole-mounted transformer. They restore power at 04:40 and close the job from the van at 05:10. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01The next morning
The morning starts with a checklist of closed jobs
Maintenance plannerForty-six jobs closed since 18:00 the evening before, across the electricity and water depots. All were checked by 07:05. Each is a row with six marks and a quality score, worst first. The marks are codes, time, parts, photos, readings and follow-up. Of these, 29 are clean and ready to accept in one click. The other 17 have 21 gaps between them. The overnight fuse job sits at the top, with a score of 58.
“46 closed since 18:00 · 29 clean · 17 for you · 21 gaps”
- 02One click
The crew's notes, read against the codes
Notes reader and coderThe crew lead's note reads: “L2 LV fuse blown at PMT. Bird strike on LV mains span to the next pole, remains at base. Replaced fuse, supply restored 04:40, all 23 on. Crossarm at the cutouts is cracked, wants changing.” Failure mode and activity are coded, but the cause is blank. Notes in the margin tie each sentence to what it shows. Three flag gaps: the missing cause, a fuse-link not on the parts list and a defect not raised. The fourth matches the fault record.
“Cause is blank. The notes name a bird strike. Suggested cause: External, wildlife contact.”
- 033.8 seconds later
Four photos, read the way the planner would read them
Photo readerPhoto 1 shows the blown L2 fuse-link. In photo 2, a new fuse-link has a readable label, “100A gG 415V”, but it is not on the parts list. The third photo catches the crossarm at the cutouts with a crack about 40 cm long. The last one reads 239.4 V between L2 and neutral after power came back. The crew's van issued one LV fuse-link 100 A gG at 03:58. The job's parts list has only four cable ties.
The photo reader does not book a part. Below 0.85 confidence it asks instead of proposing.
- 04Planned vs actual
The lineworker's hours were worked but never booked
Labour and materials reconcilerThe timesheets show the crew lead and the lineworker on the job from 02:40 to 06:10, 3.5 hours each. Only the crew lead's 3.5 hours are booked. The plan for a standard LV fuse job is 4.0 hours, so 7.0 hours worked is 75 % over plan. That is outside the ±25 % tolerance, so the work management supervisor sees it too. The closeout summary is already written: issue, diagnosis, action and parts.
“The lineworker worked 3.5 h on this job and it is not booked.”
- 05Each step, timed
How this job was checked
Six agentsThe run trace shows each agent's work. The closeout checker applied the rules for Corrective · LV fuse operation in 0.4 s. The notes reader matched “bird strike on LV mains” to the wildlife-contact cause at 0.93 confidence. The follow-up finder found no open work on the pole and drafted “Replace LV crossarm”, P3, 2 × 3.0 h. The repeat failure watcher found three LV fuse operations on the same transformer in seven months.
“Score 58 / 100 · the planner decides: accept, or send back with the gaps”
- 06The history
The third fuse operation, and the first with a cause
Repeat failure watcherThe transformer is a 200 kVA, 11 kV / 415 V unit feeding 23 properties. Its L2 fuse blew twice before in the past seven months. Both jobs closed before closeouts were checked, so they had no cause and no parts. Today's closeout is the first to give a cause: a bird strike on the span to the next pole. The watcher suggests a wildlife guard on that span for the reliability engineer, fitted when the crossarm is changed.
“Repeat failure · three LV fuse operations in 7 months”
- 07Three decisions
A part proposed, a cause accepted and work raised
Maintenance plannerThe planner adds the fuse-link for the crew to confirm. The line goes on the parts list as proposed, linked to photo 2 and the van-stock issue. The planner accepts the suggested cause, External, wildlife contact. Then the planner approves the follow-up. “Replace LV crossarm” is raised as a new work order on the same pole, due within 28 days.
“Follow-up raised · Replace LV crossarm”
- 08Sent back
Back to the crew with the exact gaps
Maintenance plannerTwo items go to the crew lead in the crew app and by text. One asks them to book the lineworker's hours, +3.5 h. The other asks them to confirm the LV fuse-link 100 A gG used. Each item comes with its evidence: the photo, the timesheet line and the note.
“When the crew replies the checks run again; nothing is booked until they confirm.”
- 09From the van
Confirmed from the van
Crew leadOn the phone, the crew lead sees the planner's request. It shows the timesheet line for the lineworker's hours, and photo 2 with the van issue. Two taps on Yes, and the job shows confirmed at 07:52. The checks run again on the reply, and each gap on the job is closed.
“4 jobs sent back in the last 24 hours · 3 confirmed · median reply 47 minutes”
- 10Clean history
The part is on the job and the stock list goes to stores
Labour and materials reconcilerOn planned vs actual, the fuse-link line now reads confirmed. Three more parts seen but not booked overnight are still open: two 150 mm repair clamps, a spindle seal kit and four ABC connectors. With the fuse-link, that makes four lines and $412.80. The stock adjustment list goes to the electricity and water stores. The transformer's history now reads: LV fuse operated · external, wildlife contact · replaced LV fuse-link 100 A gG · 7.0 h · follow-up raised. Over six weeks, the sample has 412 of 2,214 closeouts with a blank cause code and 128 jobs with a part seen but not booked. Parts worth $11,170 are now on the right job, and 141 defects had no follow-up raised.
Our estimate from sample inputs: $262,392 a year of parts put back on the right job and asset.