WorkflowWater Operations

Water Safety Plan Management

Water safety plan software that checks each barrier against its own records every morning. A missed reservoir inspection raises the hazard's risk that day instead of at the audit

See one case, screen by screen ↓
Watch with transcript →

Built forWater safety plan leadsWater quality managersOperations managersReservoir inspectors

The Problem Today

The proof that each safety barrier works sits in five other systems, so a missed inspection stays hidden until the audit.

Proof kept in other systems

  • Inspections
  • Telemetry
  • Lab results
  • Work orders
  • Incidents skip the registerClosed incidents leave the hazard register as it was
  • Open hatch, still MediumA skipped hatch check leaves the rating unchanged

The Solution

  1. Each record matchedInspections, telemetry, lab results and alarms tied to their barrier
  2. Barriers checked each morningOverdue or out of limit turns it red, and due soon turns it amber
  3. Risk re-rated, work draftedLive rating beside the plan rating, with urgent work and extra sampling
  4. The plan lead confirmsEach re-rating kept or changed with a reason, and each version signed

Built-in controls

  • No agent takes water out of supply
  • Read-only on operational records
  • Each change logged: who, when, why, evidence

What You Get

The plan shown to the regulator is today's plan. It is kept current from the records instead of being rebuilt for each audit.

  • Audit pack built from recordsEvidence for the critical controls, already filed
  • Incidents change the planLessons become new causes, barriers or checks
  • Inspections count at onceAn accepted inspection turns its barrier green
In short

What is Water Safety Plan Management?

It is software that holds a drinking-water supplier's water safety plan and keeps it current. The plan lists each hazardous event from catchment to tap, its controls and the checks that prove them. Water Safety Plan Management draws each hazard as a bowtie. It feeds each barrier from its own inspection, telemetry, laboratory, alarm and work order records. So the plan's status is worked out from the records instead of typed in.

How to choose AI solutions for utilities →

Updated

The problem

A water safety plan is updated once a year, so it misses checks that fail in between

A drinking water supplier keeps a water safety plan. It lists each event that could make the water unsafe, from the catchment to the tap. It names a control for each one and shows proof that the control works. In many utilities the plan is a spreadsheet and a Word document, rebuilt once a year for the audit. The proof lives somewhere else. It sits in reservoir inspection records, chlorine analyzers, sample results, hatch alarms, work orders and customer complaints, each in its own system.

So a missed check stays hidden. Say a monthly hatch inspection is cancelled because the crew is sent to a burst main. Nothing raises it again, and the plan still rates the hazard Medium. Incidents and audit findings slip past the plan in the same way. The incident report closes, and the hazard register is not touched. Yet the WHO method asks for the plan to be revised after each incident. Service reservoirs, where treated water is stored, are where this goes wrong. In Alamosa, Colorado, in 2008, a breached storage reservoir made about 1,300 people ill.

typical1,300peopleestimated ill in Alamosa, Colorado, in 2008, after a breached storage reservoir let contamination into treated water
typical6yearsat most between reviews of each supply system's risk assessment, under the EU Drinking Water Directive 2020/2184
estimated3weeksto assemble the plan pack for the internal audit by hand, in the sample utility's own estimate
Where the audit pack's working days goestimated
By hand15 days
With the solution1 day
  • Collecting inspection, sampling and telemetry evidence for 86 critical controls5 → 0.1 d
  • Checking each control's status against its records3 → 0.1 d
  • Bringing incidents and audit findings into the hazard register2 → 0.2 d
  • Re-rating hazards and updating the risk table2 → 0.2 d
  • Writing the change log and the plan document2 → 0.1 d
  • Review and sign-off1 → 0.3 d

Estimated split, in working days, of the about 3 weeks the team spends building the internal audit pack, by hand and with the solution. The pack holds evidence for 86 critical controls, the change log and improvement actions.

How it works

Bowtie barriers checked against their own records each morning

What comes in
Records in5 sources · inspections, telemetry, lab results, alarms, work orders
Agents at work
Record matcherrecord → barrier
Then
Barrier watcher06:00 daily
Then
Risk re-raterlive rating
Incident analystlessons → plan
Then
Plan writerversion · audit pack
A person decides
Water safety plan leadconfirms each re-rating
What comes out
Updated risk ratings
Control verification evidence
Audit-ready plan
One case, step by step

One missed hatch inspection in a live water safety plan

A service reservoir built in 1964 holds 18 ML (million liters) in two cells and supplies 41,200 people. Its monthly hatch inspection was due the day before. Here is what happens on Monday morning, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0105:58

    The plan opens on the reservoir's bowtie

    Water safety plan lead

    The plan lead owns the plan's 312 hazardous events. One of them is microbial ingress at this reservoir, meaning germs getting into the treated water. It is drawn as a bowtie. On the left are four causes and nine preventive barriers. On the right are three consequences and six recovery barriers. The live risk is 5 · Medium, the same as plan v4.3. The first barrier, hatch seals and locks, reads “Due yesterday · grace to 06:00”.

    The work order: “Monthly hatch inspection cancelled: crew diverted to a 12-inch burst”

  2. 0206:00

    The morning check reads each record and each clock

    Record matcher and Barrier watcher

    The record matcher reads 2,914 new records: 41 inspections, 2,806 telemetry readings, 58 laboratory results, 6 alarms and 3 complaints. The barrier watcher checks 1,148 barrier clocks and 412 limits. With no inspection record by its due date, the hatch barrier turns red. Four days earlier, one hatch opened from 14:12 to 14:19 with no work permit or keyholder visit matched. So the hatch alarm turns amber. Outlet chlorine has fallen from 0.62 to 0.41 mg/L in three days, so the outlet analyzer turns amber too.

    “Hatch seals and locks: failing” · “Due yesterday, no record.”

  3. 0306:04

    The live risk rises from 5 to 15, and waits for the plan lead

    Risk re-rater

    One critical preventive barrier is failing and one is weakened. So the risk re-rater steps the likelihood from 1 to 3, and the dial swings to 15 · High. The plan still says 5 · Medium, because only the plan lead can change it. The re-rater drafts the response. It asks for an urgent hatch inspection today at P1, the top priority, and daily outlet sampling until the hatch barrier is restored. It also drafts a message to the operations manager and the Head of Drinking Water Quality.

    Left unticked: “Take cell 2 out of supply as a precaution. Not advised: outlet samples clear, chlorine above alarm”

  4. 0407:12

    Rating confirmed, response raised in one step

    Water safety plan lead

    The plan lead confirms the interim rating of 15 · High, and the urgent hatch inspection is raised at P1. At 07:40 the operations manager assigns a reservoir inspector. At 09:55 the sampling coordinator's first daily sample is taken at the outlet. Each new record joins the feed beside the bowtie.

    “Interim rating 15 · High confirmed · urgent inspection raised · daily sampling at the reservoir”

  5. 0511:40

    On the roof: an 8 mm gap in a hatch seal

    Service reservoir inspector

    The inspection record arrives from the roof. The hatch seal has perished on the hinge side, leaving an 8 mm gap. There are bird droppings on the outer rim, none inside cell 2. The seal is replaced, the hatch relocked and four photos attached. The record matcher ties it to the hatch barrier at 99 %. It also explains the alarm four days earlier.

    “Also explains: the hatch contact event four days ago. A perished seal lets the hatch lift in wind”

  6. 0611:42

    Barrier restored, risk back to Medium, plan updated

    Plan lead and Plan writer

    Once the plan lead accepts the inspection as evidence for the hatch barrier, the barrier turns green. The likelihood returns to 1 and the live risk to 5 · Medium. The seal finding stays on the hazard. A minute later the plan writer adds the change to plan v4.4. The writer also proposes an improvement action: seal condition checks and spare seals at the 9 reservoirs whose hatches are over 30 years old.

    No barrier turns green without a record that proves it.

  7. 07The lesson

    A cancelled inspection becomes a rule for each site

    Incident analyst

    The incident analyst opens an incident, “Critical inspection cancelled and not re-raised”. It proposes two changes for the plan lead to accept or reject. One is a new rule for all 86 critical barriers. The other changes the hatch check on 46 reservoirs. A hatch seal marked “fair” at an inspection would then trigger a seal replacement within 30 days. The analyst only proposes. The plan lead decides what reaches the hazard register.

    New rule: “A cancelled inspection on a critical barrier is re-raised within 24 hours, on any site”

  8. 08Plan v4.4

    The plan document writes its own change log

    Plan writer

    Draft v4.4 follows the plan's 11 modules, from the team to revision after incidents. It replaces v4.3, approved earlier in the year. It lists 14 changes since v4.3, each with who, when, why and the evidence. The reservoir hazard reads 5 · Medium, with an interim 15 · High from 06:00 to 11:42 that day. The hatch barrier was restored by the morning's inspection.

    Sign-off: “Drafted by Plan writer · Reviewed by the water safety plan lead · Approved by the Head of Drinking Water Quality: waiting”

  9. 09Signed

    Version 4.4 approved, with the meaning of the signature

    Head of Drinking Water Quality

    The Head of Drinking Water Quality signs and chooses the meaning: “I approve this plan as the current water safety plan”. Version 4.3 stays readable. The audit pack follows from the same records. It holds the plan document, an evidence index for the 86 critical barriers, the change log, the improvement plan and incident learning.

    “Plan v4.4 approved by the Head of Drinking Water Quality · v4.3 kept read-only”

  10. 10The last 12 months

    Plan health, month by month

    Head of Drinking Water Quality

    Today 99.5 % of barriers carry current evidence, 1,142 of 1,148. Since the daily check went live, it finds failing critical barriers in a median of 0.6 days. Last month they were restored in a median of 1.2 days, against 142 days for the 23 found at the annual review. Over the year, hazards rated Very high fell from 4 to 2.

    “60 failing barriers found in 12 months; 21 on storage, 14 of them hatch, vent or roof checks”

Who it’s for

Plan lead, head of quality, operations, inspector and sampling

One missed hatch inspection touches five jobs, from the plan lead at the bowtie to the inspector on the roof. Here is each one's year, before and after.

Water safety plan lead
Confirms each re-rating
Before
Owns 312 hazardous events and 1,148 barriers across two treatment works and 46 service reservoirs and towers. The plan says the hatch is checked monthly, but nothing flagged it when the check was missed.
Now
Opens the hazard that changed overnight and sees the record that changed it, with the response already drafted. Confirms the new rating or keeps the old one with a reason.
Head of drinking water quality
Approves each plan version
Before
Is the regulator's contact and approves a plan rebuilt once a year. Would rather show the regulator today's plan than the one from the spring review.
Now
Signs each version with its change log and evidence, and approves improvement actions over $100,000.
Operations manager
Dispatches inspections and repairs
Before
Runs 19 reservoirs, the field inspectors and the response crews. Can get someone to a site today, once told which check and which site.
Now
Gets the urgent inspection raised with its priority and site. Decides with the control room whether a cell comes out of supply. That decision is not an agent's.
Service reservoir inspector
Checks hatches, vents, roofs and cells
Before
Makes 11 reservoir visits a week and finds the problem on the roof. Until now, the plan only found out at the audit.
Now
The inspection record and photos turn the barrier green the moment they are accepted, and the finding stays on the hazard.
Sampling and laboratory coordinator
Runs 640 samples a week
Before
Schedules the samples and reports failures within the hour. One coliform at a reservoir outlet changes the whole week.
Now
Sees daily outlet sampling proposed in the response while a storage barrier is red, and each check on the calendar.
The agents

Matcher, watcher, re-rater, analyst and plan writer on each hazard

Each morning, five agents check each barrier against its records and re-rate the hazard. The water safety plan lead confirms, and the Head of Drinking Water Quality signs.

Record matcher

Reads inspection records, telemetry, laboratory results, alarm events and complaints. Attaches each one to the barrier it verifies, with a confidence and the line of the record that proves the match.

  • Never edits a source record
  • Below 80 % confidence a person decides
  • Each match quotes the record
Barrier watcher

Each day at 06:00, and on each alarm, checks each barrier's verification clock and monitoring limits. Sets each barrier green, amber or red. Red means overdue past grace or out of limit. Amber means due within 7 days, trending to a limit, or backed up by an unexplained event.

  • Never marks a barrier restored without a record that proves it
  • Explains every status change
Risk re-rater

Recalculates the likelihood of each hazard from its barriers' status, using the step rules in Settings. Shows the live rating beside the plan rating. For High or Very high, drafts the response: urgent work, extra sampling and who to tell.

  • Never changes the plan rating. The water safety plan lead confirms
  • Never takes a reservoir out of supply
Incident analyst

Reads incidents, near misses and audit findings and finds the hazards they touch. Proposes new causes, barriers, check frequencies or rules, with the evidence.

  • Proposes only, and never edits the hazard register
  • Never proposes a change without a record behind it
Plan writer

Keeps the plan document, change log and evidence index current in the utility's template, following the WHO modules. Drafts each version and the audit pack.

  • Never approves a version. The Head of Drinking Water Quality signs
  • Marks drafts as draft
Plan lead, Head of DWQ and operations

Confirm, sign, dispatch the fix.

Ask in plain words

What the plan lead asks about a hazard, a barrier or the next version

The plan lead asks about a hazard, a barrier or a record in the plan, or says what to change. Each answer points to its records. These answers use the sample data.

Why did this reservoir go to High this morning?

The monthly hatch inspection was missed. It was due yesterday. Its work order was cancelled the day before, when the crew went to a burst main, and nothing raised it again. Four days ago one hatch opened for seven minutes with no permit. Its seal was already marked “fair” last month. Outlet samples are still clear. Likelihood went from 1 to 3, so the live risk rose to 15 · High against the plan's 5.

Which critical barriers are overdue right now?

Five checks are past due, and four are on critical barriers. Hatch seals and locks at this reservoir have been overdue since 06:00 today. At a water tower, hatch seals and locks are 8 days overdue, chased twice. A filter turbidity calibration at a treatment works is 11 days late. The 14 backflow device tests are 5 days late. A nitrate trend review is 6 days overdue, though it is not critical.

Re-raise any cancelled critical inspection within 24 hours

Done. New rule: “When a work order for a critical barrier's check is cancelled, raise a replacement within 24 hours and tell the operations manager.” It covers all 86 critical barriers and would have caught yesterday's cancelled inspection. You can change it in Settings.

Draft the change log for plan version 4.4

Drafted, with 14 changes since v4.3. The newest is the reservoir hazard. It went to an interim 15 · High this morning and back to 5 after the hatch inspection, with the seal improvement action added. Each entry carries its evidence. It is on The plan for the Head of Drinking Water Quality to approve.

The screens

The bowtie, the response, the hazard register and plan health

From the working solution, on its sample data. Pick one to see it large.

The catchment-to-tap bowtieOne hazardous event as a bowtie. Causes and preventive barriers are on the left, consequences and recovery barriers on the right. The live risk dial sits in the middle, with the records feeding it beside.
After the 06:00 checkThe hatch barrier red, the alarm and outlet chlorine amber and the live risk at 15 · High. The response is drafted for the water safety plan lead to confirm.
Response raisedThe interim rating confirmed, the urgent inspection raised at P1, the inspector assigned and the first daily outlet sample in.
The inspection record arrivesThe perished hatch seal, its photos, and what the record proves, explains and changes if it is accepted as evidence.
Barrier restoredThe hatch barrier green, the live risk back to 5 · Medium, the change written into plan v4.4 and an improvement action proposed.
Learning from incidentsIncidents, near misses and audit findings, each with the plan changes the incident analyst proposes for the plan lead to accept or reject.
The plan documentThe draft version module by module, each change since the last version with who, when and why, and the sign-off panel.
Approve and signThe Head of Drinking Water Quality signs the version and chooses the meaning of the signature.
The hazard registerAll 312 hazardous events by stage. The rating in the plan sits beside the live rating from today's barrier status, with their failing barriers.
Barrier checksEach check that proves a barrier works on a six-week calendar: done, due, overdue and cancelled work orders.
Evidence inEach record matched to the barrier it proves as it arrives, with its confidence. Below 80 % a person decides.
Plan healthBarriers with current evidence, failing barriers found and days to restore. Hazards by live risk band, and where failing barriers were found.
Risk and check rulesThe risk matrix and its bands, how a failing barrier moves the rating, check frequencies and grace, and who decides.
Governance

Proved barriers, confirmed ratings and signed water safety plan versions

Each barrier status shows its recordGreen, amber or red is set from records instead of typed in. Each status names the record that set it: the inspection ID, the telemetry tag, the sample number or the work order.
A person confirms each re-ratingThe live rating moves with the barriers, but the plan rating changes only when the water safety plan lead confirms. Keeping the old rating needs a reason, kept in the change log.
The Head of Drinking Water Quality signs each versionA plan version needs the Head of Drinking Water Quality's signature with its meaning recorded. Improvement actions over $100,000 need the same approver.
Read-only on operational recordsThe agents read inspection, telemetry, laboratory and incident records and do not write to them. The utility's records stay within its own environment.
No agent takes water out of supplyTaking a reservoir cell out of supply is a decision for the operations manager with the control room. No agent makes it. The response only proposes it, with the reason for or against.
Versioned, with each change on the recordEach change to the plan is in the change log with who, when, why and the evidence. Each version is kept. When v4.4 is approved, v4.3 stays readable.
Configuration

Risk matrix, step rules and check frequencies in the safety plan

The water quality team chooses how the plan rates risk, how often each barrier is checked and who decides. These are settings.

SettingDefaultChoose from
Risk matrix5 × 5, likelihood × consequenceBands: Low 1 to 4 · Medium 5 to 9 · High 10 to 15 · Very high 16 to 25. Click any cell to change its band
When a critical preventive barrier fails+2 likelihoodAny other preventive barrier +1 · amber with an unexplained event +0, flagged · recovery barrier: readiness flag, likelihood unchanged
Hatch and vent security checksMonthlyGrace 7 days · critical barriers until 06:00 the next day · 92 barriers
Reservoir outlet samplingWeeklyGrace 0 days · critical barriers until 06:00 the next day · 46 barriers
Cell isolation drillYearlyGrace 30 days · critical barriers 14 days · 31 barriers
Confirm a re-ratingWater safety plan leadChange: choose from the water quality team
Approve a plan versionHead of Drinking Water QualityAlso approves improvement actions over $100,000. Taking a reservoir cell out of supply stays with the operations manager and the control room, and is never an agent's call
Plan review triggersOnWithin 30 days of a red critical barrier · after any incident at Medium or above. Re-check within 15 minutes after any alarm on a critical barrier. Daily outlet sampling while a storage barrier is red
Connections

Inspection records, telemetry, lab results, work orders and incidents

Inspection recordsreservoir hatch, vent, roof and site checks, with their photos
Telemetry and alarmschlorine analyzers, hatch contacts, access logs and their alarm events
Laboratory resultsoutlet and final water samples: coliforms, E. coli, chlorine, bromate
Work ordersplanned inspections, urgent jobs and cancellations
Customer complaintstaste, odor and discolored water contacts, by zone
Incidents and audit findingsincidents, near misses and internal audit findings, and the hazard register they change
What it changes

Failing barriers found sooner with water safety plan software

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
24hours
to flag a failing barrier on a critical control, instead of waiting for the annual review
Found at the annual reviewup to a year
Found by the 06:00 checkwithin 24 h
target
100%
of control measures with current verification evidence, ready for the regulator on any day
Every barrier
proved by its own record
target
1day
to an audit-ready plan pack, against about 3 weeks by hand
By hand≈ 3 weeks
With agents1 day

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means the sample utility's own estimate of about 3 weeks for the audit pack, and our split of those days. “Typical” means published figures. In Alamosa, Colorado, in 2008, a breached storage reservoir left about 1,300 people estimated ill, according to the state public health report. Context: WHO Water safety plan manual, 2nd ed. (2023). The EU Drinking Water Directive 2020/2184 requires the risk assessment of each supply system to be reviewed at least every 6 years. Names on the screens are sample data.

Questions

Water safety plan software questions from drinking water quality teams

What is water safety plan software?

It is software that holds a drinking-water supplier's water safety plan and keeps it current. The plan lists each hazardous event from catchment to tap, its controls and the checks that prove them. Water Safety Plan Management draws each hazard as a bowtie. It feeds each barrier from its own inspection, telemetry, laboratory, alarm and work order records. So the plan's status is worked out from the records instead of typed in.

How does a live water safety plan work?

Each day at 06:00, and on each alarm, the barrier watcher checks each barrier's verification clock and monitoring limits. A barrier turns red when its check is overdue past its grace or its monitoring is out of limit. The risk re-rater then raises the hazard's live rating that morning. The water safety plan lead confirms the new rating and the response. The plan document, change log and evidence update as the fix is recorded.

How does it keep the plan audit-ready?

The plan writer keeps the plan document, change log and evidence index current as changes are accepted. The audit pack is built from the same records. It holds the plan, an evidence index for each critical barrier, the change log, the improvement plan and incident learning. The target is an audit-ready pack in 1 day, against about 3 weeks by hand.

Does it revise the plan after an incident?

Yes. The incident analyst reads incidents, near misses and audit findings. It proposes new causes, barriers, check frequencies or rules, each with its evidence. This follows the WHO step of revising the plan after an incident. The analyst only proposes, and the water safety plan lead accepts or rejects each change.

Can an agent change a risk rating or take a reservoir out of supply?

No. The agents read records and do not write to them. The plan rating changes only when the water safety plan lead confirms. Each version needs the Head of Drinking Water Quality's signature, with its meaning recorded. Taking a reservoir cell out of supply stays with the operations manager and the control room.

Can we use our own risk matrix and check frequencies?

Yes. All of these are settings: the risk matrix and its bands, and how much a failing barrier moves the likelihood. So are the check frequency and grace for each barrier type, the approvers and the plan review triggers.

What records does it need?

The hazard register and control procedures you already have, plus the records that prove each control works. Those are inspection records, telemetry and alarm events, laboratory results, work orders, customer complaints, incidents and audit findings.

Can it start from our existing plan and hazard register?

Yes. The Agentic Solution Engine builds and deploys it from your current water safety plan, hazard register and control procedures. It also uses a sample of inspection and sampling records. It goes live once each quality gate has passed. We will walk you through it on your own plan first.

Run your own water safety plan
against this morning's records.

We'll run Water Safety Plan Management on a sample of your own hazards, inspections and sample results.