WorkflowWater Operations

Lead Service Line Inventory

Lead service line inventory software that classifies every service line from its records — with the evidence the state will ask for

Meet the LCRI inventory deadline with evidence.

See one case, screen by screen ↓
targetUnder 4%of service lines left unknown by the 1 Nov 2027 baseline, down from 31% in the initial inventory
estimated$5.36Mof digging avoided — $5.62M for the field plan against $10.98M to dig every unknown, at Lumina's demo rates of $1,150 a dig and $140 a look
target38 of 38schools and childcare centres on lead or GRR lines put first in the replacement plan, all in program year 1
demo4 min 10sto read a box of 212 tap cards, 74 of them in pencil, and match 204 to their service lines
The problem

Why so many service lines are still “unknown”

Under the Lead and Copper Rule Improvements, every community water system must give its state a baseline service line inventory and a lead service line replacement plan by 1 November 2027. Each service line and connector has to sit in one of four categories — lead, galvanized requiring replacement, non-lead or lead status unknown — and a line can only be called non-lead when an evidence-based record, method or technique shows it. Systems serving more than 50,000 people post the inventory online, address by address.

The evidence exists, but it is on paper: tap cards back to 1921, about a third of them in pencil, building permits, main renewal as-builts, meter change notes and customer photos. Nobody can read them at scale, so lines stay unknown, every unknown address gets an “unknown but may be lead” letter, and the fallback is to dig — at Lumina's contract rates, $1,150 for a keyhole dig against $140 for a look in the curb box or meter pit. The GRR test is easy to miss as well: a galvanized line that ever sat downstream of lead must be replaced, even if the lead was later taken out.

typicalAbout 4Mlead service lines still in the ground across the US
demo31%of Lumina's 118,460 lines were unknown after its October 2024 initial inventory
Where one box of tap cards' hours goestimated
By hand40 days
With the solution1.5 days
  • Reading each card and typing it in, pencil included18 → 0.1 d
  • Matching each card to its service line and parcel, renumbered streets too8 → 0.1 d
  • Checking the readings nobody is sure of2 → 0.5 d
  • Putting each line in a category, with the GRR test6 → 0.5 d
  • Updating the service line layer and the inventory counts3 → 0.1 d
  • Deciding which lines still need a crew3 → 0.2 d

Estimated split for one box of about 200 tap cards, in working hours, by hand and with the solution. The 4 min 10 s read of box 14 was seen in the working solution; the other rows are our estimate.

How it works

How a service line gets its category

Seven agents read the records, classify every line and plan the field checks; the compliance manager confirms, the director signs.

What comes in
Records in5 kinds of record · tap cards back to 1921, pencil included
Agents at work
Records readerhandwriting read
Photo checker
Then
Record matcherrecord to line
Then
Material classifierfour categories
Then
Inspection planner
Notice writer
Submission builder
A person decides
Compliance managerconfirms non-lead; the director signs
What comes out
Every line classified
Field checks routed
Inventory and plan to the state
One case, step by step

One box of 1950s tap cards, from the records room to the state submission

Lumina Utilities' water system serves 412,000 people through 118,460 service lines. On Monday 12 October 2026 at 16:40, the records room scanned box 14: 212 Old Mill tap cards from 1956–1959. One of them belongs to 1418 Wexford Avenue. Here is what happens next, screen by screen, in the working solution.

  1. 01Tue 13 Oct · morning

    The service area as a parcel map, coloured by material

    Dana Whitlock · Compliance manager

    Dana owns the inventory, the replacement plan and the state submission. Her map shows Old Mill parcel by parcel — red for lead, orange for GRR, green for non-lead, grey hatching for unknown — over a system strip that reads 9,184 lead, 5,410 GRR, 94,316 non-lead and 9,550 unknown, 8.1% of all lines, with 384 days to 1 Nov 2027. In the rail, box 14 is waiting: 74 of its 212 cards are written in pencil, and 9 lines on these blocks have no other record.

    “Unknown isn't an answer the state will take in 2027 — and it's 9,550 front doors.”

  2. 02One parcel

    1418 Wexford Ave: unknown, predicted galvanized at 71%

    Material classifier

    Service line SL-031477, house built 1957. System side, owner side and connector are all unknown. The classifier predicts galvanized at 71%: the house was built before the 1986 lead ban, 5 of 7 known neighbours on this block face are galvanized, and the street was laid by J. Ferris's crew — whose card for this line is in box 14, scanned but not read.

    “A prediction never goes in the inventory: the line stays unknown until a record or a visit decides it.”

  3. 0308:08

    Box 14 is read, pencil and all

    Records reader and Record matcher

    Dana starts the read. The records reader reads all 212 cards, checks 31 crops twice and sends 3 to the hand-read queue. The record matcher ties 204 to service lines by address, tap date and card number; 8 on streets renumbered in 1961 go to Marcus. Card T-1958-0412, dated 14 May 1958, opens on the map: city side “lead ¾” read at 96%, owner side “galv ¾” at 91%, gooseneck “lead 18 in.”

    Remarks on the card: “house side galv. to cellar wall — owner to replace later”

  4. 0408:12 · 4 min 10 s later

    Unknown becomes galvanized requiring replacement

    Material classifier

    As-built W-79-031 shows the Wexford Ave main renewal of August 1979 replaced the city side in copper. But the galvanized owner side had already sat downstream of lead for 21 years, so 1418 Wexford Ave is GRR at 94%. Seven lines change — 5 to GRR, 2 to lead — all at 90% or more, so they go straight into the inventory. Unknowns drop from 9,550 to 9,543.

    “2 lines read as copper → non-lead waits for Dana · non-lead always needs a person”

  5. 05Before anything is confirmed

    Every reading on the card, beside the rule that decides it

    Dana Whitlock · Compliance manager

    The evidence page shows the tap card with a numbered note on every field it read and how sure it was, tabs for the as-built, the assessor record and field photos, and the classification by side: system side non-lead, copper from the 1979 renewal; connector non-lead, renewed 1979; owner side galvanized, downstream of lead. Dana can confirm, correct a reading or send the line for a field check. She also confirms 1411 and 1420 Wexford Ave as non-lead — “cop. ¾” on both sides, agreeing with the as-built — and unknowns fall to 9,541.

    “Rule: GRR is any galvanized line that ever was downstream of a lead line.”

  6. 06The hand-read queue

    Five pencil readings for a person to settle

    Marcus Oyelaran · GIS analyst

    Marcus keeps the service line layer and matches records to parcels. His records screen lists every batch — 61,412 tap cards, 18,930 permits, 2,214 as-builts, 6,118 work orders and 3,118 self-reports — and the hand-read queue: readings below 85%, each with its crop and alternatives. On card T-1941-0310 for 1315 Pruitt Ave, the owner side “w.i. 3/4” reads at 69%; he picks wrought iron ¾, galv. ¾ or w.l. ¾, and the line is re-classified from his choice.

    “Half our evidence is a pencil and a 1958 clerk.”

  7. 07The field plan for Wed 14 Oct

    Crews go where a visit changes the answer

    Rosa Delgado · Field verification crew lead

    The inspection planner ranks the unknowns by visit value and builds the routes for Rosa's three crews. Stop 1 is 1309 Pruitt Ave, Little Acorns Childcare — predicted lead at 52%, a meter pit look. 612 Ardent St in Kessler Park is a keyhole dig because it settles 5 neighbours on the 600 block. The 9 Wexford Ave lines with a card in box 14 were left off. Across all 9,550 unknowns the plan is 1,968 curb box looks, 2,104 meter pit looks, 1,238 checked customer photos and 4,240 keyhole digs: $5.62M instead of $10.98M.

    “Visit value = chance a visit changes the answer × neighbours it settles × children first”

  8. 08In the self-reports

    A customer's photo points to lead — and books a look

    Photo checker

    At 07:52, Evelyn Tran at 2207 Hollis St sent a photo of the pipe at her meter: the magnet does not stick, the scratch is shiny silver. The photo checker reads it as likely lead at 88% and offers a meter pit look. At 508 Linwood Ave a copper pipe reads at 93% as non-lead evidence; with a 2009 replumb permit as a second source, it is ready for Dana to confirm.

    “Book a meter pit look to confirm — a photo alone never decides”

  9. 09The letters

    Three letters, one per category, the health wording locked

    Notice writer

    The notice writer drafts 24,144 notices, mailed within 30 days of the baseline inventory, in English, Spanish and Vietnamese: lead, galvanized requiring replacement, and unknown but may be lead. Non-lead addresses get no letter. The letter to 1418 Wexford Ave says what the line is, what the customer can do now and that Lumina will replace both its part and theirs at no cost. Each letter waits for approval.

    “Wording from the State Drinking Water Program's template, locked — the notice writer cannot edit it.”

  10. 10Signed

    The baseline inventory and replacement plan, signed for the state

    Priya Nandakumar · Director of water quality

    The submission builder checks the inventory against the rule and drafts the nine elements of the replacement plan: 1,460 replacements a year at 10%, 12.3 per 1,000 connections — below the 39 that would allow a deferred deadline — so the deadline is 31 Dec 2037, with schools and childcare first. Priya signs 118,460 lines: 9,186 lead, 5,415 GRR, 94,318 non-lead and 9,541 unknown.

    “If we say non-lead, I want the record in my hand.”

Who it’s for

Built for everyone who owns the inventory.

The same service line, seen by the four people who answer for it — what their month looked like, and what it looks like now.

DW
Dana WhitlockCompliance manager, lead and copper programme · confirms every non-lead line
Compliance manager
Before
Owns the inventory, the replacement plan and the state submission, with 9,550 lines still unknown and 384 days to the baseline.
Now
Sees each line's category with its records and confidence, and confirms only what needs a person: every non-lead line and anything below 90%.
MO
Marcus OyelaranGIS analyst · keeps the service line layer and matches records to parcels
GIS analyst
Before
Scans boxes of tap cards and matches them to parcels by hand. “Half our evidence is a pencil and a 1958 clerk.”
Now
Settles only the readings below 85% and the matches on renumbered streets, each with its crop beside him.
RD
Rosa DelgadoField verification crew lead, 3 crews · curb box, meter pit and keyhole visits
Field crew lead
Before
Works through unknowns street by street. “Send me where the dig changes something, not down every street.”
Now
Gets a route ranked by visit value, children first, with lines that have a record waiting left off and digs only with a 72-hour locate ticket.
PN
Priya NandakumarDirector of water quality · signs the inventory and plan for the state
Director of water quality
Before
Signs what goes to the State Drinking Water Program and onto the public map. “If we say non-lead, I want the record in my hand.”
Now
Signs a submission checked against the rule, every non-lead line backed by a record or visit and confirmed by Dana.
Built on the engine

7 agents. Each with one job, and hard limits.

Seven agents read the records, classify every line and plan the field checks; the compliance manager confirms, the director signs.

Records reader

Reads tap cards, permits, as-builts and work orders, pencil handwriting included, and returns every field with its read confidence and the crop it came from.

  • Never infers a material the record does not state
  • Below 85% read confidence, a person checks the crop
Record matcher

Ties each record to a service line by address, tap date, card number and old street names, using the parcel register and the 1961 street renumbering.

  • Never matches on address alone on a renumbered street
  • Ambiguous matches go to the GIS analyst
Photo checker

Reads customer photos of the pipe at the meter, with the magnet and scratch answers, and says what the pipe most likely is and how sure it is.

  • Never decides non-lead from a photo alone
  • Asks for a better photo instead of guessing
Material classifier

Combines every record into the rule's categories for the system side, the owner side, the connector and the whole line, applying the GRR test every time, and predicts unknowns from build year, neighbours, crew and card batch.

  • Non-lead only with an evidence-based record and a person
  • Lead or GRR applied automatically only at 90% confidence or more
  • A prediction never enters the inventory
Inspection planner

Ranks unknowns by visit value — the chance a visit changes the answer, the neighbours it settles and children first — chooses curb box, meter pit or keyhole dig, and builds the crews' routes.

  • Never books work on private property without consent
  • Never plans more than crew capacity
  • Skips lines with a record waiting
Notice writer

Drafts the annual and post-inventory notices by category and language from the state's template.

  • Never edits the required health wording
  • Nothing is mailed without approval
Submission builder

Builds the baseline inventory file, the connector counts, the nine replacement plan elements and the public map, and reconciles every count.

  • Never submits — the director of water quality signs
  • Counts must reconcile to the line
Compliance manager

Confirms every non-lead line. The agents propose; a named person decides.

Ask in plain words

Ask about any line, street, record or crew

Ask in plain words — an address, a district, tomorrow's routes — or say what to change. Every answer points to its records.

Why is 1418 Wexford Avenue galvanized requiring replacement?

Its 1958 tap card reads “lead ¾” on the city side and “galv ¾” on the owner side. The 1979 Wexford main renewal replaced the city side with copper, but the galvanized pipe had already sat downstream of lead for 21 years — and the rule counts any galvanized line that ever was downstream of lead. So it is GRR at 94%, and on the replacement list.

Which unknowns should the crews check tomorrow?

Tomorrow's Old Mill route has 12 stops, led by 1309 Pruitt Ave — Little Acorns Childcare (predicted lead 52%, children first). The next stops are where a visit would change the answer most, each settling 2–5 neighbours on its block face. The 9 Wexford lines with a card in box 14 are left out: a record beats a dig.

Show unknown lines near schools and childcare

Old Mill Elementary is GRR and first in the replacement plan; Little Acorns Childcare is unknown and stop 1 on tomorrow's route. System-wide, all 38 schools and childcare centres on lead or GRR lines are in program year 1.

Add a rule: a customer photo read as non-lead needs a second source

Done. A customer photo read as non-lead now waits for a second source — a permit, a tap card or a crew visit — before it reaches Dana. Today that holds 2 self-reports: 508 Linwood Ave already has its 2009 replumb permit, 3340 Northgate Dr its 2004 build permit. The rule is in Settings and on the audit trail.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The parcel material mapEvery parcel coloured by its service line material, the system counts, the days to 1 Nov 2027, and box 14 waiting to be read.
An unknown line1418 Wexford Ave before the read: unknown on every side, predicted galvanized at 71%, and why.
Reading box 14The agents read 212 tap cards step by step while the 1958 card for 1418 Wexford Ave opens on the map.
Unknown to GRRBox 14 read in 4 min 10 s: 1418 Wexford Ave is galvanized requiring replacement at 94%, and 2 non-lead lines wait for a person.
The evidence pageThe tap card with a note on every reading, the classification by side, the rule that decides it and the run log.
Records and the hand-read queueEvery batch of cards, permits, as-builts, work orders and self-reports, and the pencil readings below 85% for a person to settle.
Field checksUnknowns ranked by visit value with method and crew, tomorrow's route, and the plan for all 9,550 unknowns against digging every one.
Customer self-reportsCustomer photos with the magnet and scratch answers and the photo checker's verdict — a photo can point to lead, never decide non-lead.
The inventoryEvery line in the rule's four categories, unknowns burning down to the deadline, what each classification rests on, and every district.
The submissionThe baseline inventory checked against the rule, the nine plan elements, the replacement rate and deadline, and children first.
Sign and submitThe counts the director signs for the State Drinking Water Program and the public inventory.
Customer noticesThree letters, one per category, in three languages, with the state's health wording locked.
Your rulesConfidence thresholds, the locked non-lead rule, the field plan and who confirms and signs.
Governance

Built for the state's review: cited, confirmed, signed.

Every category cites its recordsEach classification links to the tap card, as-built, permit, photo or visit behind it, with the crop of every handwritten reading and how sure the reader was.
Non-lead always needs a personThe rule allows non-lead only from a record, method or technique, so the setting is locked: a non-lead line needs an evidence-based record and the compliance manager's confirmation.
Only sure answers apply on their ownLead or GRR goes into the inventory automatically only at 90% confidence or more; below that the change waits for the compliance manager. Handwriting below 85% goes to the GIS analyst with its crop.
Predictions steer crews, never the inventoryPredicted material ranks the field plan, but the line stays unknown until a record or a visit decides it — the inventory shows only what the state will see.
Locked health wording, approved mailingsThe health effects text comes from the State Drinking Water Program's template and the notice writer cannot edit it. Nothing is mailed without approval.
The director signs; every step is on the trailAgents never submit to the state, never change a threshold and never book work on private property without consent. Every read, match, change of category, confirmation and signature is on the audit trail, and every settings change is saved as a new version.
Configuration

Your programme's rules, not ours

How sure the agents must be, how the crews are planned and who confirms and signs are settings Lumina decides — every change saved as a new version and on the audit trail.

SettingDefaultChoose from
Apply lead or GRR automatically at90%Adjustable — below it, the change waits for the compliance manager
Non-lead needs a person and an evidence-based recordOn, lockedLocked — the rule allows non-lead only from a record, method or technique
Hand-read below85%Adjustable — readings below it go to the GIS analyst with the crop
Put predictions in the inventoryOffOff: a prediction only steers the field plan and the line stays unknown · On
Visit value weights0.6 · 0.3 · 0.1Chance of change · neighbours settled · schools and childcare
Visits per crew per day26Adjustable — 3 crews: Rosa Delgado, Theo Banks, Amaya Ruiz
Keyhole digs need a locate ticketOn72 hours ahead, checked by the planner · Off
Confirms classifications · signs the submissionDana Whitlock · Priya NandakumarCompliance manager approves; director of water quality signs
Connections

Works with the records a water system already keeps

Tap cardsrecords room scans back to 1921, pencil included, read field by field
Building permitsthe county permit office feed, with dated replumbs and build years
Main renewal as-builtsengineering vault scans showing services renewed to the curb stop
Meter change work ordersdaily from the work management system
Customer self-reportsphotos of the pipe at the meter, magnet and scratch test, from the web form and app
Service line layer and parcel registerthe GIS layer, parcels and the 1961 street renumbering, plus the nightly public map
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
Under 4%
of service lines left unknown by the 1 Nov 2027 baseline, down from 31%
Initial inventory31% unknown
With agentsunder 4%
estimated
$5.4M
of digging avoided: crews visit where it changes the answer, not every unknown
Dig every unknown$10.98M
Field plan$5.62M
target
38 of 38
schools and childcare centres on lead or galvanized lines lead the replacement plan
All 38 in year 1
children first

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate: digging avoided uses Lumina's demo contract rates ($1,150 a keyhole dig, $140 a curb box or meter pit look; 4,240 digs and 5,310 looks or checked photos for 9,550 unknowns), and the hours split is our estimate · “typical” = published figures (EPA, 2025 update to the 7th Drinking Water Infrastructure Needs Survey — about 4 million lead service lines). Regulatory context: EPA LCRI fact sheet EPA 816-F-24-019 (2024: baseline inventory and replacement plan due 1 Nov 2027). Lumina Utilities and the people, streets, schools and records named on this page are fictional — characters and sample data in the working solution.

Questions

What water utilities ask us about service line inventories.

What is lead service line inventory software?

Software that helps a water system put every service line and connector in one of the rule's four categories — lead, galvanized requiring replacement, non-lead or lead status unknown — with the evidence behind each, and build the baseline inventory and replacement plan for the state. Lead Service Line Inventory adds seven agents that read the records, classify the lines, plan the field checks and draft the notices and submission; the compliance manager confirms and the director of water quality signs.

How does it classify service line material from tap cards and permits?

The records reader reads tap cards, permits, as-builts and work orders field by field, pencil included, keeping the crop and a read confidence for each. The record matcher ties each record to its service line, and the material classifier decides the system side, owner side, connector and whole line, citing every record. In the demo, one 1958 card and a 1979 as-built turned 1418 Wexford Ave from unknown to GRR at 94%.

How does it handle galvanized requiring replacement (GRR)?

The classifier applies the GRR test on every line: a galvanized line that is, or ever was, downstream of lead — or sits downstream of an unknown — is GRR. That is how 1418 Wexford Ave is GRR even though its city side was renewed in copper in 1979: the galvanized owner side sat below lead for 21 years.

Does it put predicted material into the inventory?

No. Unknown lines are shaded on the map by predicted material and confidence, from build year, neighbours, the crew that laid the street and the card batch, but by default a prediction only steers the field plan. The line stays unknown until a record or a visit decides it.

How does it decide which unknown service lines to field-verify?

The inspection planner ranks unknowns by visit value — the chance a visit changes the answer, the neighbours it settles and children first — picks a curb box look, meter pit look or keyhole dig, and builds routes within crew capacity. Lines with a record waiting are never sent. In the demo the plan costs an estimated $5.62M against $10.98M to dig every unknown.

Does it prepare the LCRI baseline inventory, replacement plan and customer notices?

Yes. The submission builder checks the inventory against the rule, drafts the nine replacement plan elements, tests eligibility for a deferred deadline and prepares the public map, and the notice writer drafts the letters for each category from the state's template. Nothing is submitted or mailed until a named person approves or signs.

Do people stay in control of the inventory?

Yes. Non-lead always needs an evidence-based record and the compliance manager's confirmation, lead or GRR applies on its own only at 90% confidence or more, and handwriting below 85% goes to the GIS analyst. Agents never submit to the state, never change a threshold and never book work on private property without consent; the director of water quality signs.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your tap card layouts, permit and work order exports, service line layer and state template — and it goes live once every quality gate has passed. We will walk you through it on a box of your own tap cards first.

See it on
your tap cards.

We'll run Lead Service Line Inventory on a box of your own tap cards and one district of your service line layer.