WorkflowWater Operations

Lead Service Line Inventory

Lead service line inventory software that classifies each service line from its records, with the evidence the state will ask for

See one case, screen by screen ↓
Watch with transcript →

Built forCompliance managersGIS analystsField crew leadsWater quality directors

The Problem Today

Decades of tap cards, many in pencil, are too many to read by hand, so service lines stay unknown and crews dig to find out.

~4M
lead service lines still in the ground across the US published

Paper records, read by hand

  • Tap cards
  • Permits
  • As-builts
  • Photos
  • Digging where a look will doA keyhole dig, when a look in the curb box would settle the line
  • The galvanized rule missedGalvanized pipe that was ever downstream of lead must be replaced

The Solution

  1. Each tap card readPencil included, each field kept with its crop and how sure the read is
  2. Matched and classifiedEach record tied to its line: lead, galvanized, non-lead or unknown
  3. Crews sent where it countsUnknowns ranked by how much a visit changes the answer, children first
  4. Confirmed, then signedA person confirms each non-lead line, and the director signs for the state

Built-in controls

  • Predictions steer crews, never the inventory
  • Health wording locked to the state's template
  • Each category cites its records

What You Get

Fewer lines stay unknown at the baseline, and the dig budget goes to the lines records cannot settle.

1.5 h
of card work per box of about 200 tap cards, down from 40 h our estimate
  • Fewer may-be-lead lettersA line settled from records no longer gets the unknown-line letter
  • Ready to post onlineInventory counts reconciled for the public map
  • Schools and childcare firstChildren's sites on lead or galvanized lines lead the plan
In short

What is Lead Service Line Inventory?

Lead service line inventory software helps a water system sort each service line and connector into the rule's four categories. The four are lead, galvanized requiring replacement, non-lead and lead status unknown. Each line carries the evidence behind its category. The software also builds the baseline inventory and replacement plan for the state. Lead Service Line Inventory does this with seven agents. They read the records, classify the lines, plan the field checks and draft the notices and submission. The compliance manager confirms, and the director of water quality signs.

How to choose AI solutions for utilities →

Updated

The problem

Utilities must prove what each service line is made of, but the proof is on paper

US water systems are required to find their lead pipes and plan to replace them. Under the Lead and Copper Rule Improvements (LCRI), each community water system owes its state two things by 1 November 2027. One is a baseline inventory of its service lines, the pipes that run from the main to each building. The other is a plan to replace the lead ones. A connector is the short pipe that can join the service line to the main. Each line and connector goes in one of four categories: lead, galvanized requiring replacement (GRR), non-lead or lead status unknown. A line counts as non-lead only when an evidence-based record, method or technique shows it. Systems serving more than 50,000 people post the inventory online, address by address.

The evidence exists, but it is on paper. Tap cards, filled in when each building was connected, go back to 1921, and about a third are in pencil. Then there are building permits, meter change notes and customer photos. There are also as-builts, the drawings of each main renewal as it was actually built. Nobody can read all of that by hand. So lines stay unknown, and each unknown address gets an “unknown but may be lead” letter. The fallback is to dig. At the sample utility's contract rates, a keyhole dig, a small hole down to the pipe, costs $1,150. A look in the curb box or meter pit costs $140. The GRR test is also easy to miss. A galvanized line that ever sat downstream of lead must be replaced, even if the lead was later taken out.

typicalAbout 4Mlead service lines still in the ground across the US
Where one box of tap cards' hours goestimated
By hand40 hours
With the solution1.5 hours
  • Reading each card and typing it in, pencil included18 → 0.1 h
  • Matching each card to its service line and parcel, renumbered streets too8 → 0.1 h
  • Checking the readings nobody is sure of2 → 0.5 h
  • Putting each line in a category, with the GRR test6 → 0.5 h
  • Updating the service line layer and the inventory counts3 → 0.1 h
  • Deciding which lines still need a crew3 → 0.2 h

Our estimate of where the working hours go for one box of about 200 tap cards, by hand and with the solution. The read of the box in 4 min 10 s was seen in the working solution. The other rows are our estimate.

How it works

Paper record to signed inventory, step by step, for each service line

What comes in
Records in5 kinds of record · tap cards back to 1921, pencil included
Agents at work
Records readerhandwriting read
Photo checker
Then
Record matcherrecord to line
Then
Material classifierfour categories
Then
Inspection planner
Notice writer
Submission builder
A person decides
Compliance managerconfirms non-lead; the director signs
What comes out
Every line classified
Field checks routed
Inventory and plan to the state
One case, step by step

A box of 1950s tap cards that settles one house's service line

A large utility's water system still had 31% of its service lines unknown after its first inventory. One afternoon, the records room scans a box of 212 tap cards from 1956 to 1959, for one older district. One of the cards belongs to a house built in 1957. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01The next morning

    The service area as a parcel map, colored by material

    Compliance manager

    The compliance manager owns the inventory, the replacement plan and the state submission. The map shows the district parcel by parcel: red for lead, orange for GRR, green for non-lead and gray hatching for unknown. A system strip counts every line. It reads 9,184 lead, 5,410 GRR, 94,316 non-lead and 9,550 unknown. The unknown lines are 8.1% of all lines. There are 384 days to 1 Nov 2027. In the side panel, the new box is waiting. Of its 212 cards, 74 are in pencil, and 9 lines on these blocks have no other record.

    9,550 lines still unknown · 384 days to the baseline inventory

  2. 02One parcel

    One 1957 house: unknown, predicted galvanized at 71%

    Material classifier

    The house's service line has three parts: the system side, the owner side and the connector. All three are unknown. The classifier predicts galvanized at 71%. The house was built before the 1986 lead ban, and 5 of 7 known neighbors on this block face are galvanized. The street was also laid by a crew whose card for this line is in the new box, scanned but not yet read.

    “A prediction stays out of the inventory: the line stays unknown until a record or a visit decides it.”

  3. 0308:08

    The box is read, pencil and all

    Records reader and Record matcher

    The compliance manager starts the read. The records reader reads all 212 cards, checks 31 crops twice and sends 3 to the hand-read queue. The record matcher ties 204 cards to service lines by address, tap date and card number. The other 8, on streets renumbered in 1961, go to the GIS analyst. Then the house's 1958 tap card opens on the map. City side reads “lead ¾” at 96%, owner side “galv ¾” at 91%, and the gooseneck connector “lead 18 in.”

    Remarks on the card: “house side galv. to cellar wall, owner to replace later”

  4. 0408:12 · 4 min 10 s later

    Unknown becomes galvanized requiring replacement

    Material classifier

    The as-built for the street's main renewal in August 1979 shows the city side replaced in copper. But the galvanized owner side had already sat downstream of lead for 21 years. So the house's line is GRR, at 94%. Seven lines change, 5 to GRR and 2 to lead, all at 90% or more, so they go straight into the inventory. Unknowns drop from 9,550 to 9,543.

    “2 lines read as copper → non-lead waits for the compliance manager · non-lead always needs a person”

  5. 05Before anything is confirmed

    Each reading on the card, beside the rule that decides it

    Compliance manager

    The evidence page shows the tap card, with a numbered note on each field it read and how sure it was. Tabs hold the as-built, the assessor record and field photos. The classification is given for each part of the line. The system side is non-lead, copper from the 1979 renewal. The connector is non-lead too, renewed in 1979. The owner side is galvanized, downstream of lead. The compliance manager can confirm, correct a reading or send the line for a field check. Here the manager also confirms two neighboring lines as non-lead. Both read “cop. ¾” on each side, matching the as-built. Unknowns fall to 9,541.

    “Rule: GRR is any galvanized line that ever was downstream of a lead line.”

  6. 06The hand-read queue

    Five pencil readings for a person to settle

    GIS analyst

    The GIS analyst keeps the service line layer and matches records to parcels. The records screen lists each batch: 61,412 tap cards, 18,930 permits, 2,214 as-builts, 6,118 work orders and 3,118 self-reports. Below it is the hand-read queue of readings below 85%, each with its crop and alternatives. On a 1941 card for another street, the owner side “w.i. 3/4” reads at 69%. The analyst picks from wrought iron ¾, galv. ¾ or w.l. ¾, and the line is re-classified from that choice.

    Pencil readings below 85%, each with its crop and the likely alternatives.

  7. 07The field plan for the next day

    Crews go where a visit changes the answer

    Field verification crew lead

    The inspection planner ranks the unknowns by visit value and builds the routes for three crews. Visit value weighs the chance a visit changes the answer and the neighbors it settles, with children first. Stop 1 is a childcare center, predicted lead at 52%, for a meter pit look. One address in another neighborhood gets a keyhole dig, because it settles 5 neighbors on its block. The 9 lines with a card in the new box were left off. Across all 9,550 unknowns, the plan is 1,968 curb box looks, 2,104 meter pit looks, 1,238 checked customer photos and 4,240 keyhole digs. At the sample rates, that costs $5.62M instead of $10.98M.

    “Visit value = chance a visit changes the answer × neighbors it settles × children first”

  8. 08In the self-reports

    A customer's photo points to lead and books a look

    Photo checker

    At 07:52, a customer sent a photo of the pipe at the meter. The magnet does not stick, and a scratch shows shiny silver. The photo checker reads it as likely lead, at 88%, and offers a meter pit look. At another address, a photo of copper pipe reads as non-lead evidence at 93%. A 2009 replumb permit gives it a second source, so it is ready for the compliance manager to confirm.

    “Book a meter pit look to confirm. A photo alone does not decide.”

  9. 09The letters

    Three letters, one per category, the health wording locked

    Notice writer

    The notice writer drafts 24,144 notices in three languages, to be mailed within 30 days of the baseline inventory. There is one letter for each category: lead, galvanized requiring replacement, and unknown but may be lead. Non-lead addresses get no letter. The letter to the 1957 house says what the line is and what the customer can do now. It also says the utility will replace both its part and theirs at no cost. Each letter waits for approval.

    “Wording from the state drinking water program's template, locked. The notice writer cannot edit it.”

  10. 10Signed

    The baseline inventory and replacement plan, signed for the state

    Director of water quality

    The submission builder checks the inventory against the rule and drafts the nine elements of the replacement plan. The plan replaces 1,460 lines a year, a rate of 10%. That is 12.3 per 1,000 connections, below the 39 that would allow a deferred deadline. So the deadline is November 1, 2037, with schools and childcare first. The director signs the inventory: 9,186 lead, 5,415 GRR, 94,318 non-lead and 9,541 unknown.

    Each non-lead line rests on a record or a visit, confirmed by a person.

Who it’s for

Compliance, GIS, field and the director behind one service line inventory

One service line, four seats: how each worked from paper records, and how each works now.

Compliance manager
Confirms each non-lead line
Before
Owns the inventory, the replacement plan and the state submission. Has 9,550 lines still unknown and 384 days to the baseline.
Now
Sees each line's category with its records and confidence. Confirms only what needs a person: each non-lead line and anything below 90%.
GIS analyst
Keeps the service line layer
Before
Scans boxes of tap cards and matches them to parcels by hand. Much of the evidence is a clerk's pencil note from the 1950s.
Now
Settles only the readings below 85% and the matches on renumbered streets, each with its crop alongside.
Field verification crew lead
Runs curb box, meter pit and keyhole visits
Before
Works through unknowns street by street, and wants to be sent where a dig changes something.
Now
Gets a route ranked by visit value, children first, with lines that have a record waiting left off. Digs only with a 72-hour locate ticket.
Director of water quality
Signs the inventory and plan for the state
Before
Signs what goes to the state drinking water program and onto the public map. Wants the record in hand behind each non-lead line.
Now
Signs a submission checked against the rule. Each non-lead line is backed by a record or visit and confirmed by the compliance manager.
The agents

Readers, a matcher and a classifier in lead service line inventory software

Seven agents read pencil tap cards and other records, classify every line and plan the field checks. The compliance manager confirms, and the director signs the state submission.

Records reader

Reads tap cards, permits, as-builts and work orders, pencil handwriting included, and returns each field with its read confidence and the crop it came from.

  • Never infers a material the record does not state
  • Below 85% read confidence, a person checks the crop
Record matcher

Ties each record to a service line by address, tap date, card number and old street names. Uses the parcel register and the 1961 street renumbering.

  • Never matches on address alone on a renumbered street
  • Ambiguous matches go to the GIS analyst
Photo checker

Reads customer photos of the pipe at the meter, with the magnet and scratch answers. Says what the pipe most likely is and how sure it is.

  • Never decides non-lead from a photo alone
  • Asks for a better photo instead of guessing
Material classifier

Combines all records into the rule's categories for the system side, the owner side, the connector and the whole line. Applies the GRR test each time. Predicts unknowns from build year, neighbors, crew and card batch.

  • Non-lead only with an evidence-based record and a person
  • Lead or GRR applied automatically only at 90% confidence or more
  • A prediction never enters the inventory
Inspection planner

Ranks unknowns by visit value: the chance a visit changes the answer, the neighbors it settles, and children first. Chooses a curb box look, meter pit look or keyhole dig, and builds the crews' routes.

  • Never books work on private property without consent
  • Never plans more than crew capacity
  • Skips lines with a record waiting
Notice writer

Drafts the annual and post-inventory notices by category and language from the state's template.

  • Never edits the required health wording
  • Nothing is mailed without approval
Submission builder

Builds the baseline inventory file, the connector counts, the nine replacement plan elements and the public map, and reconciles each count.

  • Never submits. The director of water quality signs.
  • Counts must reconcile to the line
Compliance manager

Confirms every non-lead line.

Ask in plain words

Questions about a lead service line, a street, a record or a crew

Ask in plain words (an address, a district, tomorrow's routes) or say what to change. Each answer points to its records.

Why is this 1957 house galvanized requiring replacement?

Its 1958 tap card reads “lead ¾” on the city side and “galv ¾” on the owner side. The 1979 main renewal replaced the city side with copper. But the galvanized pipe had already sat downstream of lead for 21 years. The rule counts any galvanized line that ever was downstream of lead. So it is GRR at 94%, and on the replacement list.

Which unknowns should the crews check tomorrow?

Tomorrow's route in the district has 12 stops. It starts with a childcare center, predicted lead at 52%, because children come first. The next stops are where a visit would change the answer most. Each settles 2 to 5 neighbors on its block face. The 9 lines with a card in the new box are left out, because a record beats a dig.

Show unknown lines near schools and childcare

The district's elementary school is GRR and first in the replacement plan. The childcare center is unknown and stop 1 on tomorrow's route. Across the system, all 38 schools and childcare centers on lead or GRR lines are in program year 1.

Add a rule: a customer photo read as non-lead needs a second source

Done. A customer photo read as non-lead now waits for a second source before it reaches the compliance manager. That source can be a permit, a tap card or a crew visit. Today the rule holds 2 self-reports. One already has its 2009 replumb permit, and the other its 2004 build permit. The rule is in Settings and on the audit trail.

The screens

The parcel material map, the evidence page and the signed submission

From the working solution, on its sample data. Pick one to see it large.

The parcel material mapEach parcel colored by its service line material, with the system counts and the days to 1 Nov 2027. The new box waits to be read.
An unknown lineThe 1957 house before the read: unknown on each side, predicted galvanized at 71%, and why.
Reading the boxThe agents read 212 tap cards step by step while the house's 1958 card opens on the map.
Unknown to GRRThe box read in 4 min 10 s. The house is now galvanized requiring replacement at 94%, and 2 non-lead lines wait for a person.
The evidence pageThe tap card with a note on each reading, the classification by side, the rule that decides it and the run log.
Records and the hand-read queueEach batch of cards, permits, as-builts, work orders and self-reports, and the pencil readings below 85% for a person to settle.
Field checksUnknowns ranked by visit value, with method and crew, tomorrow's route, and the plan for all 9,550 unknowns against digging every one.
Customer self-reportsCustomer photos with the magnet and scratch answers and the photo checker's verdict. A photo can point to lead but cannot decide non-lead.
The inventoryAll lines in the rule's four categories, unknowns falling toward the deadline, what each classification rests on, and each district.
The submissionThe baseline inventory checked against the rule, the nine plan elements, the replacement rate and deadline, and children first.
Sign and submitThe counts the director signs for the state drinking water program and the public inventory.
Customer noticesThree letters, one per category, in three languages, with the state's health wording locked.
Inventory rulesConfidence thresholds, the locked non-lead rule, the field plan and who confirms and signs.
Governance

Cited records and a signed submission in lead service line inventory software

Each category cites its recordsEach classification links to the tap card, as-built, permit, photo or visit behind it. Each handwritten reading shows its crop and how sure the reader was.
Non-lead always needs a personThe rule allows non-lead only from a record, method or technique. So this setting is locked. A non-lead line needs an evidence-based record and the compliance manager's confirmation.
Only sure answers apply on their ownLead or GRR goes into the inventory on its own only at 90% confidence or more. Below that, the change waits for the compliance manager. Handwriting read below 85% goes to the GIS analyst with its crop.
Predictions steer crews, never the inventoryPredicted material ranks the field plan. But the line stays unknown until a record or a visit decides it. So the inventory shows only what the state will see.
Locked health wording, approved mailingsThe health effects text comes from the state drinking water program's template, and the notice writer cannot edit it. Nothing is mailed without approval.
The director signs; each step is on the trailAgents do not submit to the state, change a threshold or book work on private property without consent. Each read, match, change of category, confirmation and signature is on the audit trail. Each settings change is saved as a new version.
Configuration

Confidence thresholds and sign-off in the lead service line inventory

How sure the agents must be, how crews are planned, and who confirms and signs are settings the utility decides. Each change is saved as a new version and logged on the audit trail.

SettingDefaultChoose from
Apply lead or GRR automatically at90%Adjustable. Below it, the change waits for the compliance manager
Non-lead needs a person and an evidence-based recordOn, lockedLocked. The rule allows non-lead only from a record, method or technique
Hand-read below85%Adjustable. Readings below it go to the GIS analyst with the crop
Put predictions in the inventoryOffOff: a prediction only steers the field plan and the line stays unknown · On
Visit value weights0.6 · 0.3 · 0.1Chance of change · neighbors settled · schools and childcare
Visits per crew per day26Adjustable, with 3 crews
Keyhole digs need a locate ticketOn72 hours ahead, checked by the planner · Off
Confirms classifications · signs the submissionCompliance manager · director of water qualityCompliance manager approves; director of water quality signs
Connections

Tap cards, permits, as-builts and the service line layer it reads

Tap cardsrecords room scans back to 1921, pencil included, read field by field
Building permitsthe county permit office feed, with dated replumbs and build years
Main renewal as-builtsengineering vault scans showing services renewed to the curb stop
Meter change work ordersdaily from the work management system
Customer self-reportsphotos of the pipe at the meter, magnet and scratch test, from the web form and app
Service line layer and parcel registerthe GIS layer, parcels and the 1961 street renumbering, plus the nightly public map
What it changes

Fewer unknown lines and less digging before the baseline is due

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
Under 4%
of service lines left unknown by the 1 Nov 2027 baseline, down from 31%
Initial inventory31% unknown
With agentsunder 4%
demo
$5.4M
of digging avoided in the sample: crews go only where a visit changes the answer
Dig every unknown$10.98M
Field plan$5.62M
demo
38 of 38
schools and childcare centers in the sample on lead or galvanized lines lead the replacement plan
All 38 in year 1
children first

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our own estimate. Digging avoided uses the sample utility's contract rates: $1,150 a keyhole dig and $140 a curb box or meter pit look. For 9,550 unknowns, the plan has 4,240 digs and 5,310 looks or checked photos. The hours split is our estimate for one box of about 200 tap cards. “Typical” means a published figure. EPA's 2025 update to the 7th Drinking Water Infrastructure Needs Survey counts about 4 million lead service lines. For regulatory context, the EPA LCRI fact sheet EPA 816-F-24-019 (2024) sets 1 Nov 2027 for the baseline inventory and replacement plan. Names on the screens are sample data.

Questions

LCRI compliance software questions on categories, GRR and the 2027 deadline

What is lead service line inventory software?

Lead service line inventory software helps a water system sort each service line and connector into the rule's four categories. The four are lead, galvanized requiring replacement, non-lead and lead status unknown. Each line carries the evidence behind its category. The software also builds the baseline inventory and replacement plan for the state. Lead Service Line Inventory does this with seven agents. They read the records, classify the lines, plan the field checks and draft the notices and submission. The compliance manager confirms, and the director of water quality signs.

How does it classify service line material from tap cards and permits?

The records reader reads tap cards, permits, as-builts and work orders field by field, pencil included. It keeps the crop and a read confidence for each field. The record matcher ties each record to its service line. Then the material classifier decides the system side, owner side, connector and whole line, citing each record. In the sample data, one 1958 card and a 1979 as-built turned one house from unknown to GRR at 94%.

How does it handle galvanized requiring replacement (GRR)?

The classifier applies the GRR test to each line. A galvanized line is GRR if it is, or ever was, downstream of lead, or if it sits downstream of an unknown. That is why the 1957 house is GRR, even though its city side was renewed in copper in 1979. Its galvanized owner side sat below lead for 21 years.

Does it put predicted material into the inventory?

No. Unknown lines are shaded on the map by predicted material and confidence. The prediction uses build year, neighbors, the crew that laid the street and the card batch. But it only steers the field plan. The line stays unknown until a record or a visit decides it.

How does it decide which unknown service lines to field-verify?

The inspection planner ranks unknowns by visit value: the chance a visit changes the answer, the neighbors it settles, and children first. It picks a curb box look, meter pit look or keyhole dig, and builds routes within crew capacity. Lines with a record waiting are left off. In the sample data, the plan costs an estimated $5.62M, against $10.98M to dig every unknown.

Does it prepare the LCRI baseline inventory, replacement plan and customer notices?

Yes. The submission builder checks the inventory against the rule and drafts the nine replacement plan elements. It tests whether a deferred deadline applies and prepares the public map. The notice writer drafts the letters for each category from the state's template. Nothing is submitted or mailed until a named person approves or signs.

Which changes can the agents make without a person?

Only lead or GRR at 90% confidence or more goes into the inventory on its own. Non-lead always needs an evidence-based record and the compliance manager's confirmation. Handwriting below 85% goes to the GIS analyst. Agents do not submit to the state, change a threshold or book work on private property without consent. The director of water quality signs.

What records do we need to start?

Your tap card layouts, permit and work order exports, service line layer and state template. The Agentic Solution Engine builds and deploys the solution from those. It goes live once each quality gate has passed. We will walk you through it on a box of your own tap cards first.

Try lead service line inventory software
on a box of your own tap cards.

We'll run Lead Service Line Inventory on a box of your own tap cards and one district of your service line layer.