SystemWater Operations

Water Quality Compliance Monitoring

Water quality compliance monitoring that catches an exceedance the hour it happens and sees low chlorine two days ahead

See one case, screen by screen ↓
Watch with transcript →

Built forWater quality managersControl room operatorsCompliance officersWater samplersRegulator liaisons

The Problem Today

Analyzer, field and lab results sit in three systems, so low chlorine is found only when a sample fails.

43.2%
of US community water systems broke a standard in fiscal 2022 published
12 hours
before a lab result is noticed in the report, by hand our estimate

Three systems, three clocks

  • Analyzers
  • Lab reports
  • Field kits
  • Limits
  • Clocks start at the labThe repeat-sample clock runs from the result's release
  • Dose up, by-products upMore chlorine everywhere pushes up disinfection by-products

The Solution

  1. Each result on one mapAnalyzer readings, lab certificates and field kits, on one map
  2. Low chlorine forecast earlyDecay and water age show a dead-end street dropping below its limit
  3. Options side by sideBooster dose, flushing or waiting, each with its by-product effect
  4. The manager approvesThe control room applies the dose, and the compliance officer signs returns

Built-in controls

  • Agents never change a dose or a result
  • Limits changed only by two people
  • What was known, and when, on the record

What You Get

Fewer far-end samples fail on low chlorine, and notifications are drafted while the clock still has hours to run.

  • Exceedances opened on releaseA lab result outside a limit opens a case with its clock
  • Returns drafted as results landMonthly return and notifications, each number traced
  • Repeat samples on the routeAdded to the sampler's route before they leave the depot
In short

What is Water Quality Compliance Monitoring?

Water quality compliance monitoring software brings a drinking water utility's analyzer, laboratory and field results together. It checks each one against its license limits as it arrives. This solution puts each sampling point on one map. It opens an exceedance with its clock the minute a result is outside a limit. It also forecasts chlorine 48 hours ahead and drafts the returns. The water quality manager approves each action, and the compliance officer signs what goes to the regulator.

How to choose AI solutions for utilities →

Updated

The problem

Water quality results sit in three systems, so problems are found late

A water utility must keep its drinking water inside the limits set in its license. It checks this with results from three places, each on its own clock. Online analyzers report to the control room every 5 minutes. Samplers' field kits sync the same day. The laboratory releases certificates a day or more after the sample was taken. Nobody sees one picture of a sampling point against its license limits. So an exceedance, a result outside a limit, is noticed when someone reads the lab report. That is often the next working morning. By then the 24-hour clocks for repeat samples and for telling the regulator have been running since the result was released.

Low chlorine at the far end of the network is the hardest problem to see coming. Chlorine is added to keep the water safe, and it fades as the water travels. When a reservoir is held high for maintenance or demand drops, water sits longer in a dead-end pipe. The longer it sits, the more chlorine it loses. The first anyone knows of it is a routine sample that fails. That means a license breach, a notification, repeat sampling and sometimes advice to customers. Raising the dose everywhere is no answer either. It pushes up disinfection by-products such as TTHM nearer the works. The decision needs the chlorine level, the by-products and the cost on one screen.

typical43.2%of US community water systems violated at least one drinking water standard in FY2022
typical29.6%had a monitoring or reporting violation, and a missed or late sample counts on its own
Where an exceedance's first hours goestimated
By hand22 hours
With the solution2.1 hours
  • Noticing the result in the laboratory report12 → 0.1 h
  • Checking it against the license limit and the repeat-sample rule1 → 0.1 h
  • Pulling the analyzer trend, field record and nearby results2 → 0.2 h
  • Planning repeats at the site, upstream and downstream onto a route2 → 0.2 h
  • Drafting the regulator notification3 → 0.5 h
  • Compliance officer review and signature2 → 1 h

Estimated split for one bacteria detection at a routine sampling point, in hours from the laboratory releasing the result, by hand and with the solution.

How it works

Results checked, chlorine forecast and actions approved, minute by minute

What comes in
Results in4 sources · analyzers, laboratory, field kits, hydraulic model
Agents at work
Results collectormatch · drift
Then
Limit checkerlimits · clocks
Residual forecaster48 h ahead
Then
Action plannerbooster · flush
Sampling scheduler
Then
Report writercited returns
A person decides
Water quality managerapproves the action
What comes out
Status by point
Alert with action
Return to the regulator
One case, step by step

A Tuesday morning's chlorine forecast, booster dose and signed notification

A utility supplies its network from two treatment works through four supply zones. It is a Tuesday in October, 07:10. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0107:10

    The day opens on the network, each point against its limits

    Water quality manager

    The water quality manager owns each exceedance on the network. The first screen is the map. It shows 26 sampling points with results in the last 24 hours and 38 analyzers reporting every 5 minutes. Each point's latest results are drawn as bars against its limits. Points near a limit pulse, and pipes are shaded by water age from 0 to 7 days. The watch list on the right already holds two items. One is a low chlorine forecast at a dead-end point. The other is a coliform bacteria result at a sampling kiosk.

    “This month so far: 642 of 642 samples taken on time · 617 of 618 results inside every limit”

  2. 02+36 h

    The forecast slid to tomorrow evening

    Water quality manager

    The time slider steps through Now, +12 h, +24 h, +36 h and +48 h, and redraws the chlorine bars from the forecast. At Wednesday 19:10 the bar at the dead end of one spur drops under its line. The analyzer there reads 0.24 mg/L now. The forecast is below the limit from Wednesday 07:00, with a low of 0.18 mg/L at 19:00.

    On the map: “Forecast 0.18 mg/L · below the 0.2 limit”, and the next routine sample is Thu 08:30.

  3. 03The reason

    Older water, and the decay rate on that spur

    Residual forecaster

    The reservoir feeding the spur has been held at 92 % since Friday for a pump overhaul. Demand is also down 11 % in the cooler weather. The 06:00 hydraulic run shows water age at the dead end rising from 6.0 days now to 7.2 days by Wednesday evening. On this spur chlorine decays at 0.225 per day. That rate is fitted from 41 grab samples and six weeks of the spur's analyzer (R² 0.91). Monday's grab sample already read 0.26 mg/L.

    “The next routine sample here is Thu 08:30: without an action it would be the first anyone knew.”

  4. 04Each far end

    Fourteen far-end points, ranked by their lowest forecast

    Residual forecaster

    The forecast covers each far-end point for the next 48 hours, with water age, decay per day and confidence. Only the dead-end point falls below 0.2. The next point up the spur (0.20) and the booster outlet (0.21) sit on the same spur. No other point needs action. The kiosk point's chlorine is normal at 0.46. Its problem is bacteria.

    “Alerts need a confidence of R² 0.80 or more.” Below that, the forecaster asks for a sample instead.

  5. 055 steps · 6.6 s

    A booster dose, a flush or doing nothing, side by side

    Action planner

    The planner finds what can act on the spur: the booster on standby, a hydrant and the routine sample. It models each option. A booster dose of +0.25 mg/L from 08:00 reaches the end at about 01:00 Wednesday. The low is then 0.39 mg/L, and TTHM rises by 3 to 55 µg/L against a limit of 80. It wastes no water and uses about 9 kg of hypochlorite a day. Flushing the hydrant sends 140 m³ to waste and needs a crew for 3 hours. Even then, chlorine stays below 0.2 from 07:00 to about 09:00 on Wednesday, until the fresh water reaches the end. Doing nothing leaves it below 0.2 for about two days.

    Do nothing: “The Thursday sample would likely read below 0.2 mg/L: a license breach, a notification to the regulator within 24 hours, repeat sampling and, if it persisted, advice to customers on the spur.”

  6. 06Approve

    The manager approves the booster dose, with a note to the control room

    Water quality manager

    The manager approves +0.25 mg/L at the booster from 08:00 today, until the reservoir is back to its normal level. A setpoint request goes to the control room operator, who applies it, with the note attached. The approval is recorded on the audit trail with the forecast it answers.

    “Booster to +0.25 mg/L from 08:00. Hold until the pump overhaul is closed and the reservoir is back below 80%. Call me if the outlet reads above 0.6.”

  7. 0707:31

    The control room confirms, and the forecast re-runs

    Control room operator

    The operator confirms the setpoint. Then the residual forecaster re-runs the forecast with the booster dose in it. At the dead end, the lowest residual is now 0.39 mg/L on Wednesday at 19:00. The next point up reads 0.44 and the booster outlet 0.45. To prove it, the sampling scheduler puts an extra grab sample on a sampler's route for Wednesday 10:00.

    Approvals: water quality manager “Approved 07:21” · control room “Confirmed 07:31” · sampler “On the route”

  8. 08Tomorrow, redrawn

    The dead-end point is back above its line

    Water quality manager

    Back on the map at +36 h, the dead-end bar reads 0.39 mg/L. The watch list marks the spur as fixed: “booster dose running”. The strip at the bottom now reads “0 breach forecast”. No sample failed, so there is nothing to notify.

    “Booster dose running from 08:00. Lowest forecast tomorrow now 0.39 mg/L (was 0.18).”

  9. 0905:52 → 05:55

    A coliform result, caught a minute after the lab released it

    Limit checker and Sampling scheduler

    Earlier that morning, the laboratory released a certificate for the kiosk sampling point. It showed 2 coliform bacteria per 100 mL, no E. coli and free chlorine of 0.46 mg/L. At 05:53 the limit checker opened the exceedance and started the 24-hour repeat clock. At 05:54 the sampling scheduler put three repeats first on a sampler's route, leaving 09:30. They are at the site, one point upstream and one downstream. At 05:55 the water quality manager was texted as on-call manager.

    Suggested cause: the sample tap in the kiosk was last disinfected in August, so “disinfect the tap before the repeat”.

  10. 10Signed

    The notification signed with 22 hours to spare

    Compliance officer

    The report writer drafted the notification at 06:30 from the exceedance record. It says what was found, where and when, and covers the certificate, the three repeats and the tap disinfection. The compliance officer reads it beside the minute-by-minute timeline. Then they sign and send it through the regulator portal, and the receipt is saved to the record.

    “You are sending this exceedance notification to the regulator as the compliance officer.”

Who it’s for

Water quality, control room, compliance and sampling on one Tuesday

The same Tuesday morning, seen by the five people who own it. Here is what their day looked like, and what it looks like now.

Water quality manager
Approves network actions
Before
Starts at 07:00 with yesterday's lab results and the analyzer trends. Finds out the far end was low only when a sample fails, and by then a notification to the regulator is due.
Now
Sees the dead-end point fall below 0.2 a day before it happens, with the reason, three options and the by-product effect of each. Approves the booster dose before 07:30.
Control room operator
Applies setpoints
Before
Runs pumps, reservoirs and the three chlorine booster stations, and wants the booster, the dose and the timing in writing.
Now
Gets a setpoint request with the booster, the dose, the start time, how long to hold it and the manager's note. Then confirms it on the same record.
Compliance officer
Signs returns and notifications
Before
Builds the monthly and quarterly returns and the regulator notifications by hand. Each number in a return has to trace to a lab certificate.
Now
Signs a notification drafted from the exceedance record. Also signs a monthly return drafted as results arrive, with each figure linked to its certificate or reading.
Water quality sampler
Takes routine and repeat samples
Before
Takes the routine samples on a set route, and needs any change to the plan on that route before leaving the depot.
Now
Finds the three repeats first on the route, ahead of 10 routine samples, leaving at 09:30. A note says to disinfect the tap first.
Regulator liaison
Handles audits and information requests
Before
Answers the regulator's notifications, audits and information requests. The question there is what the utility knew and when, down to the timestamp.
Now
Reads each exceedance minute by minute, from result released and exceedance opened to repeats planned, manager texted, notice drafted and signed. The times come from the laboratory system and the audit trail.
The agents

Agents that collect, check, forecast and draft for water quality

Six agents collect each result, check it against its limit and feed it into a 48-hour chlorine forecast. The water quality manager approves each action.

Results collector

Reads the online analyzers every 5 minutes, the laboratory certificates on each release and the samplers' field kits on each sync. It matches each result to its sampling point, parameter, unit and time, and converts units. It also flags an analyzer that drifts more than 0.05 mg/L from the latest grab sample.

  • Never edits or deletes a laboratory result
  • Never fills a gap with an estimate
Limit checker

Compares each new result with its limit and alert level in license Schedule 2. When a result is outside a limit, it opens an exceedance. It starts the repeat-sample and notification clocks and texts the on-call manager. At alert level, it adds the point to the watch list.

  • Never closes an exceedance
  • Limits change only in Settings, with a second person
Residual forecaster

Updates after each hydraulic model run and each new chlorine result. It fits how fast chlorine decays on each supply path, from the last 90 days of grab samples and analyzers. It takes water age for the next 48 hours from the hydraulic model. Then it forecasts free chlorine at each point with a confidence band, including any approved action.

  • Never changes a dose or a setpoint
  • A low-confidence forecast asks for a sample instead of an action
Action planner

Steps in for a forecast or a real breach. It finds the boosters, hydrants and routine samples that can act on that supply path. It models each option's effect on chlorine and on the running averages of the TTHM and HAA5 by-products. It also weighs water to waste, crew time and cost. Then it recommends one with its reasons and drafts the setpoint request.

  • Never sends a setpoint. A person approves each action
  • Each recommendation shows its by-product effect
Sampling scheduler

Keeps the sampling plan (1,488 samples at 186 points this month). It adds repeat and extra samples and puts them on the samplers' routes.

  • Never removes or moves a required sample outside its window
Report writer

Drafts the monthly return as results arrive. It covers samples scheduled and taken, results by parameter, results outside a limit with the actions taken, and preventive actions. It also drafts a notification for each exceedance from its record.

  • Never submits to the regulator. The compliance officer signs
  • Each figure cites its result
Water quality manager

Approves, and the compliance officer signs.

Ask in plain words

Questions about a sampling point, a result or the monthly return

Ask about any sampling point, result, forecast or return, or say what to schedule. Each answer points to its certificate, reading or model run. These answers use the sample data.

Why will the dead-end point fall below 0.2 tomorrow?

Because the water there is getting older. The reservoir is held at 92% for a pump overhaul and demand is down 11%. So water age at the dead end rises from 6.0 to 7.2 days by Wednesday evening. Chlorine decays at 0.225 per day on that spur (R² 0.91), and Monday's sample was already 0.26 mg/L. The forecast is 0.19 mg/L from Wed 07:00 and 0.18 at 19:00, below the 0.2 minimum.

Schedule a booster dose on the spur

Prepared for you to approve: +0.25 mg/L at the booster from 08:00. Water reaches the dead end in about 17 hours, so the forecast low becomes 0.39 mg/L instead of 0.18. TTHM there rises about 3 µg/L to 55, well inside the 80 limit. I cannot change a setpoint. You approve, and the control room operator applies it.

What do we owe the regulator for the coliform at the kiosk?

Two things are due within 24 hours of the lab result at 05:52: three repeat samples and a notification. The repeats, at the site, upstream and downstream, are first on the sampler's route, leaving at 09:30. The notification is drafted for the compliance officer to sign. E. coli was not detected and chlorine was normal, so the sample tap is the likely cause.

How are we doing against the limits this month?

This month so far, 642 of 642 samples were taken on time, and 617 of 618 results are inside all limits. The one outside is the coliform detection at the kiosk. Lowest chlorine so far is 0.26 mg/L at the dead end of the spur. One breach is forecast for tomorrow, at the same point.

The screens

The network map, the chlorine forecast and the exceedance timeline

From the working solution, on its sample data. Pick one to see it large.

The network mapEach sampling point with its latest results drawn as bars against its limits. Also shown are water age on the pipes, the watch list and what the agents did since 05:00.
The forecast on the mapSlid to Wednesday 19:10, the dead-end point's chlorine bar drops below the 0.2 mg/L line before any sample has failed.
A sampling pointThirty days of grab samples and analyzer readings, and the forecast with its band. Beside them are water age, the decay fit and the reason it will fall below the limit.
The chlorine forecastEach far-end point ranked by its lowest residual in the next 48 hours, with water age, decay per day, confidence and the action.
Options comparedA booster dose, a flush or doing nothing, with the effect on residual, TTHM, water to waste, crew and cost, and the planner's steps.
Approve the booster doseThe water quality manager approves, with a note to the control room. The approval is recorded with the forecast it answers.
Confirmed and re-forecastApproved, confirmed by the control room, an extra sample on the route, and the forecast re-run with the dose in it.
Tomorrow, redrawnWith the booster dose running, the dead-end point's forecast for tomorrow evening is 0.39 mg/L and the spur is marked fixed.
An exceedance, minute by minuteA coliform result from release to repeats, the 24-hour clock, the repeat samples and the regulator notification drafted beside it.
Sign and sendThe compliance officer signs and sends the notification through the regulator portal, with the receipt saved to the record.
The sampling planThe month's samples by day and zone, today's four routes and the repeat and extra samples the scheduler added.
Returns and notificationsThe monthly return drafted as results arrive, by parameter, with each figure linked to its certificate.
SettingsLimits and alert levels, the forecast, clocks and approvals, the connected sources and the people who decide.
Governance

Two-person limits and cited results in water quality compliance software

Each figure traces to its resultEach number on screen and in a return links to its source. The source may be the analyzer and its reading time, the laboratory certificate, the field record or the hydraulic model run.
Named people decide and signThe water quality manager approves each booster dose, flush and extra sample. The control room operator applies the setpoint. Each return and notification sent to the regulator is signed by the compliance officer.
Agents never touch a dose or a resultNo agent changes a dose, a setpoint, a limit or a laboratory result. No agent closes an exceedance or submits to the regulator. A gap in the data stays a gap and is not filled with an estimate.
Limits are versioned, changed by two peopleLimits and alert levels come from license Schedule 2, now at version 7. Each change in Settings is versioned and needs a second person.
A forecast shows its confidenceEach forecast carries its confidence. Below R² 0.80 the forecaster asks for a sample instead of proposing an action. Each recommendation shows its effect on disinfection by-products.
What you knew, and whenEach result released, exceedance opened, repeat planned, approval, setpoint confirmation and submission is on the audit trail with its time. That answers the regulator's question of what you knew and when.
Configuration

License limits, forecasts and approvers in water quality compliance

Limits, alert levels, the forecast, the clocks and who approves are all settings. Each is versioned and changed by two people.

SettingDefaultChoose from
Free chlorine minimum and alert level0.20 mg/L · alert at 0.30 mg/LAlert level stepped up or down; limits for every parameter from license Schedule 2, version 7
Forecast horizon48 hours24 hours · 48 hours · 72 hours
Forecast runsHourlyEvery 30 minutes · Hourly · Every 6 hours. It also runs after every hydraulic run and new result
Minimum confidence to alertR² 0.80Stepped up or down. Below it, the forecaster asks for a sample instead
Repeat samples after a coliform detection3 within 24 hoursLicense rule: at the site, upstream and downstream
Regulator notificationCompliance officerCompliance officer · Regulator liaison. Sent within 24 hours of the laboratory result, signed by the compliance officer
Approves network actionsWater quality managerWater quality manager · Duty water quality scientist. Covers booster doses, flushing and extra sampling
Text the on-call managerOnOn · Off. Applies to any bacteria detection or a breach forecast within 24 hours
Connections

Analyzers, the laboratory system, field kits and the hydraulic model

Online analyserschlorine, turbidity, pH and conductivity, every 5 minutes
Laboratory systemresults and certificates as the laboratory releases them
Field kitsreadings from the samplers' tablets on each sync
Hydraulic modelwater age at each point, from the daily 06:00 run and on demand
Work ordersopen network work, such as a pump overhaul or a mains repair
Licence limits and sampling planlimits and alert levels by parameter, sampling points and routes
What it changes

How much warning before chlorine falls, and how fast a breach is notified

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
48h
warning before chlorine falls below 0.2 mg/L at the far end of the network
forecast 48 h ahead
decay rates + water age
target
0
breaches from low residual or a missed 24-hour repeat-sample clock: the design goal
target
< 1hour
from a lab or analyzer result to a person deciding; today it is the next working day
Todaynext day
With agents1 minute to alert

“Demo” means seen in the working solution, on its sample network data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate of desk practice, including the split of hours and the 12 hours to notice a lab result by hand. “Typical” means published figures. In FY2022, 43.2 % of US community water systems broke at least one standard. That figure comes from the EPA National Enforcement and Compliance Initiative on drinking water. In the same year, 29.6 % had a monitoring or reporting violation. Regulatory context: WHO Guidelines for Drinking-water Quality (at least 0.2 mg/L free chlorine at the point of delivery). The US rules are 40 CFR 141.72 and 40 CFR 141 Subpart Y (repeat samples within 24 hours). The Stage 2 Disinfectants and Disinfection Byproducts Rule sets TTHM at 80 µg/L. Names on the screens are sample data.

Questions

Water quality compliance software questions from drinking water teams

What is water quality compliance monitoring software?

Water quality compliance monitoring software brings a drinking water utility's analyzer, laboratory and field results together. It checks each one against its license limits as it arrives. This solution puts each sampling point on one map. It opens an exceedance with its clock the minute a result is outside a limit. It also forecasts chlorine 48 hours ahead and drafts the returns. The water quality manager approves each action, and the compliance officer signs what goes to the regulator.

How does chlorine residual forecasting work?

The residual forecaster fits how fast chlorine decays on each supply path. It uses the last 90 days of grab samples and analyzers. It takes water age at each point for the next 48 hours from the hydraulic model. In the sample network it forecast 0.18 mg/L at a dead-end point for Wednesday evening, below the 0.2 limit. A reservoir held high for pump work had pushed water age to 7.2 days. Each forecast shows its confidence, and approved actions are fed back into it.

How does it catch a water quality exceedance the hour it happens?

The results collector reads the laboratory certificates on each release and the analyzers every 5 minutes. The limit checker compares each result with its limit straight away. In the sample case the lab released a coliform result at 05:52. The exceedance was opened at 05:53 with its 24-hour clock. Three repeats were on a route at 05:54, and the on-call manager was texted at 05:55.

Does it handle repeat sampling after a coliform detection?

Yes. The sampling scheduler adds three repeat samples within 24 hours (at the site, upstream and downstream) and puts them first on that day's route. It does not remove or move a required sample outside its window.

Can it prepare regulatory water quality reports and notifications?

The report writer drafts the monthly return as results arrive. It also drafts a notification for each exceedance from its record. Each figure links to its laboratory certificate or analyzer reading. The agent does not submit anything. The compliance officer signs and sends.

Can an agent change a booster dose or a setpoint?

No. The action planner compares a booster dose, flushing and an extra sample and recommends one. It does not send a setpoint. The water quality manager approves each action and the control room operator applies it. No agent changes a dose, a limit or a laboratory result.

Can we set our own limits, alert levels and approvers?

Yes. All of these are settings: limits and alert levels per parameter, the forecast horizon and how often it runs. So are the minimum confidence to alert, who approves network actions, who signs notifications and when the on-call manager is texted. Each change is versioned and needs a second person.

What do you need from our lab and control room to start?

The Agentic Solution Engine builds and deploys it from your requirements and documents. Those are your license limits, sampling plan, analyzer and laboratory feeds and hydraulic model. It goes live once every quality gate has passed. We will walk you through it on a sample of your own results first.

Forecast the far end of your network
from your own results and limits.

We'll run Water Quality Compliance Monitoring on a sample of your own results, limits and sampling plan.