- Before
- Builds the balance once a year for the whole system. Then decides where crews go, using a figure whose doubt is shown only as one grade at the end. Cannot send a crew on a number nobody trusts.
- Now
- Opens a balance for each zone each month, with a band on each figure, ranked by certain loss. Sends survey and meter-test orders up to $25,000 from the same screen.
A month's water balance, from 2.1 million meter readings to a leak survey order
A utility serves one supply area, split into 18 district metered areas, or zones. One Tuesday at 06:12, the agents rebuild the balance. Here is what happens next in the working solution, screen by screen.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning
The balance opens as a waterfall chart, with an error band on each bar
Water loss managerThe water loss manager owns the balance, the leak survey budget and the annual audit. The home screen shows the standard water balance for the supply area. In all, 61.99 M m³ was put into supply and 45.51 M m³ was billed. Unbilled authorized use was 0.79 M m³, and apparent losses were 3.01 M m³. Real losses are what is left. Non-revenue water is 26.6% ± 1.2, worth $16.44M a year. That is $7.86M of leaks at production cost and $8.58M of unpaid use at retail price. Beside it, all 18 zones are ranked by the part of their real loss that is certain.
“Real losses are what is left once everything else is counted, so their band carries the doubt of every other figure.”
- 0206:12 · 41 s
From 2.1 million readings to 19 balances
Seven agentsThe meter data reconciler reads 2.1 million flows, taken every 15 minutes, from 4 production and 18 zone inlet meters. It fills three missing nights for one zone and applies each meter's tested error. The billing period aligner fits 1,084,212 reads to the 12-month period. It flags 1,910 estimated meters and 418 stuck ones. The water balance builder counts 412 hydrant permits, 96 mains-flushing jobs and the fire service log. The apparent loss estimator sizes meter under-reading from 2,412 bench tests. Then 19 balances are built, each with a 95% band.
Night-flow analyst: “16 zones agree within their band · two zones (−41% and −27%) do not: inlet meters in doubt”
- 03Ranked by likely value
The worst-looking zone, on a meter last tested years ago
Meter data reconcilerRanked by likely value, one zone comes first, with real losses of 32.6%. But its band is ± 12.1 pts, from 20.5% to 44.7%. That is because its mechanical inlet meter was last tested years ago. Night flow gives only 0.60 M m³ of real losses for the year, against 1.02 M m³ in the balance. The two are 41% apart. So the action offered is an inlet meter test, costing $3,200 and one day, before any survey.
“The band is ±12.1 pts, so most of this figure could be the inlet meter. A survey now could find nothing.”
- 04Ranked by certain loss
The leaking zone is at 31.0%, the highest loss that is certain
Water balance builderRanked by certain loss, a different zone comes first. It has 7,420 connections and 64 km of mains, and it took in 3.41 M m³. Its real losses are 1.06 M m³, or 31.0% ± 2.2, and the certain part is 28.8%. Its electromagnetic inlet meter was checked last month, so confidence is high. Its infrastructure leakage index (ILI), a standard leakage score, is 7.0. It loses 390 liters per connection a day, worth $1.25M a year.
“Certain real loss 28.8% is above the 20% trigger, and the band is within ±3 pts.”
- 05On the map
Eighteen zones, shaded by what is certain
Water loss managerThe zone map shades each district metered area by its certain real loss. The two zones with a band wider than ±6 pts are hatched. The map can also be shaded by likely loss or by band width. The leaking zone is the darkest, and its summary offers the leak survey.
- 06One night in June
Night flow agrees, up 58 m³/h since June
Night-flow analystMinimum night flow is the lowest flow into a zone, measured between 02:00 and 04:00. One night in June it jumped from 128 to 186 m³/h. That was minutes after a pump at the zone's booster station tripped and restarted, with a pressure surge from 58 to 81 m. No burst was reported. Counted up from the night flows, losses come to 1.02 M m³ for the year. That is within 4% of the balance's 1.06 M m³, and inside its band. At today's rate the zone is losing 1.36 M m³ a year.
Intervention planner: “The step test puts 86 of the 162 m³/h net night flow on one street: 19 km of mains, mostly 1950s cast iron.”
- 07Each day, 05:00
The daily night-flow watch, zone by zone
Network engineerEach morning the night-flow analyst checks all 18 zones and lists what changed. The leaking zone shows its jump. The doubtful zone's night flow is too low for its balance. A second doubtful zone has three missing nights, and a pump-station meter reading 6 to 9% above its pump curve. Another zone has crept up 0.12 m³/h a night since May. A burst elsewhere was repaired and verified. The network engineer has a step test booked in the creeping zone.
The night-flow analyst flags changes. It does not close a zone's alert.
- 08One click
A leak survey order, inside the manager's limit
Water loss managerThe water loss manager sends the survey from the balance screen. The order goes to the acoustic survey contractor under its framework contract. It covers 64 km of mains and 7,420 services, starting with the cast-iron street. The crew uses acoustic correlation and ground microphones over five nights, Thursday to Monday. It costs $19,840, or 64 km at $310, inside the manager's $25,000 limit.
Target: “net night flow 162 → 70 m³/h · 0.77 M m³ and $479K a year”
- 09Booked
The plan, ranked by certain water won back per dollar
Intervention plannerThe survey order moves to Booked. The plan lists each action with its water and value a year, cost, payback and owner. One action lowers night pressure from 71 to 55 m at a pressure reducing valve, for 0.31 M m³ and $192K a year. Another is the doubtful zone's meter test, done first. A third replaces 1,240 customer meters over 20 years old in another zone. The last is the burst, repaired and verified.
The intervention planner proposes. It does not send a crew or spend money.
- 10Signed the same day
The annual water audit, signed by the director
Director, water networkThe audit report writer drafts the annual water audit from the same figures. It shows the water balance in thousand m³ with its 95% bands. It lists the performance indicators with their data grades. Real losses are 255 liters per connection a day, the ILI is 4.9, and 15 of 18 zones have high confidence. A board note sums it up in plain words, with each figure cited. The water loss manager sends it to the director, who signs.
Board note: “Two zones show high losses we cannot yet trust, because their inlet meters are in doubt. We will test those meters before sending crews.”