- Before
- Runs the incident from a whiteboard, a spreadsheet and a dozen email threads, and waits for someone to collate the results before she can decide the lift.
- Now
- Runs it from one board and one clock, signs every notice, and decides the lift the minute the criteria turn green. “I want to lift the notice the hour it is safe, not the evening after.”
One boil water notice, from a burst main to the lift
At 03:12 on Friday 9 October 2026, the 600 mm trunk main TM-14 bursts at Corran Road. Pressure in the Kestrel Rise zone of Lumina Water falls below 1.0 bar, and 6,412 properties — about 14,870 people — are about to be told to boil their water. Here is what happens next, screen by screen, in the working solution.
- 01Fri 03:12–04:10
The alarm is scored against the triggers
Trigger assessorThe burst alarm on TM-14 comes in at 03:12, with flow at the Hollins Edge outlet up 340%. By 03:19, pressure in KR-2 is below 1.0 bar at 6 of 11 loggers; the lowest is 0.3 bar at Larkfield. The trigger assessor scores it against Lumina's triggers and finds TR-3 met: below 1.0 bar for 51 minutes, with low points in the zone. Smaller alarms elsewhere stay on a watch list, not an incident.
“Trigger TR-3 met (below 1.0 bar for 51 minutes, low points in zone); precautionary notice advised” — a person decides.
- 02Fri 04:52–05:40
Helen decides the notice and tells the regulator
Helen Marsh · Water Operations Duty Manager, incident commanderAt 04:52 Helen declares Category 2 incident WQ-26-031 and decides a precautionary boil water notice. The notice writer has notice #1 drafted from template BW-1 by 05:02, in six channels and four languages. Helen phones inspector Daniel Price at the Water Quality Regulator at 05:31, 39 minutes after the decision, and notice #1 goes at 05:40: 5,204 texts, 1,108 voice calls, 3,980 emails, the website, social and Halden FM, and leaflets to all 6,412 doors by 11:00.
Report clock: phone within 1 hour · written report within 24 hours · daily update by 12:00 · closure within 20 working days.
- 03Fri 05:20–07:35
Priority households hear first
Marcus Obi · Customer care leadThe vulnerable customer coordinator matches the zone to the priority register: 212 households, 9 of them water-dependent, and 8 sensitive sites. Elmwood House care home is called at 06:05, Mr D. Kowalczyk on home dialysis at 06:20 in Polish, the schools by 07:14. Home dialysis patients get 48 litres of bottled water a day, the care homes two pallets. The last priority household is reached at 07:35 — 1 h 55 m after the notice, inside the 2-hour target.
Needs codes only — “Home dialysis · MD-02” — never medical detail.
- 04Fri 16:00 – Sat 11:45
Larkfield comes back with coliforms
Dr Samir Qadri · Water Quality ManagerThe sampling planner built plan SP-KR2-01 at 06:10: nine points, daily rounds, samplers and bottles booked. Round 1 at SP-04 Larkfield, the zone's low point, finds total coliforms 2 /100 ml, E. coli absent, free chlorine 0.18 mg/l. The results reader proposes a flush and three repeats; Samir agrees, Gary Fenton flushes hydrant H-2207, and the repeats upstream, at the point and downstream are all clean.
Results reader: authorised results only — it proposes the follow-up; the water quality manager decides.
- 05Tue 10:20
Four days under notice, one point to go
Helen Marsh · incident commanderThe board shows 4d 04:40 under notice. On the clear criteria grid, eight of nine points have three clean sets in a row; SP-04 has two, and its round 4 sample S-26-41187 is incubating at the Ashcombe laboratory, due 10:30. Turbidity, pressure and the repair are already green. Regulator update #4 is drafted and due at 12:00.
“Waiting for SP-04 Larkfield, round 4. Its third clean sample in a row is due from the Ashcombe laboratory at 10:30. Chlorine there must also reach 0.5 mg/l.”
- 0610:31
The last clean result arrives and the grid turns green
Results reader and Clear criteria trackerS-26-41187 is authorised by Ruth Okafor at 10:29: total coliforms and E. coli absent in 100 ml, chlorine 0.61 mg/l, turbidity 0.22 NTU. The tracker recounts: SP-04 now has rounds 2, 3 and 4 clean, so every line of rule LC-2 is met. It drafts the lift notice for 6,412 properties, the regulator letter and 212 lift calls, then stops and waits for two signatures.
“All clear criteria met at 10:31. Lift notice drafted for 6,412 properties. Nothing goes out until you and Samir sign.”
- 0710:32
The lift notice, already written
Notice writerThe lift notice is filled from template BW-L with the facts of this incident: safe to drink from 10:52, 31 samples at 9 points, Larkfield's third clear result. The health advice stays exactly as approved — run the cold kitchen tap for 2 minutes, empty ice trays and jugs, flush drinks machines before reopening. It is ready in English, Polish, Romanian and Portuguese, for six channels.
Health advice wording is locked to the approved template; the notice writer fills in facts only.
- 0810:41–10:44
Two signatures and public health agreement
Helen Marsh, Dr Samir Qadri and public healthDr Anya Kowal of the Halden Public Health Office agrees by phone at 10:41, recorded by Samir. Helen signs at 10:43; Samir signs on his phone at 10:44. Until all three are on the notice, the lift button stays disabled.
Nobody lifts alone: commander and water quality manager sign, public health is consulted.
- 0910:52 · lifted
Every channel at once, 21 minutes after the last clean sample
Helen Marsh · incident commanderHelen lifts the notice. Texts, voice calls, emails, the website, social and leaflets go to 6,412 properties at the same minute, and the 212 priority households are called with the lift script. The regulator reporter drafts the lift notification for Helen to submit. The whole incident ran 4 days 5 hours 12 minutes.
“Notice lifted at 10:52 · 21 minutes after the last clean result”
- 10After the lift
The closure report drafts itself from the log
Regulator reporterThe closure report is drafted from the append-only incident log: summary, timeline, 31 samples with no E. coli, customers and notices, cause and actions. The main, cast iron laid in 1962, cracked around a joint, most likely from ground movement after 41 mm of rain; Larkfield's positive points to an air valve chamber at H-2207 that floods in heavy rain. It is due to the regulator by Tue 10 Nov, with Samir as reviewer.
Proposed actions: raise and seal the chamber at H-2207 · add SP-04 Larkfield to routine sampling · survey TM-14 · a second pressure logger at Larkfield.