WorkflowNew Connections, Solar & EV Programs

Utility NOC Application Processing

Utility NOC application processing that checks each drawing against each asset buffer before a no-objection certificate is signed

See one case, screen by screen ↓
Watch with transcript →

Built forThird-party works officersGIS analystsProtection engineersWater network engineers

The Problem Today

Officers line up each no-objection request on the asset map by eye, and the drawings where clashes hide get skipped.

196,977
reports of damage to buried utilities in the US in 2024 published

Lined up and measured by eye

  • Site plan
  • Basement
  • Crane
  • Cable map
  • Conditions copied from old lettersWater clauses end up in letters about cables only
  • Sent back for clarificationEach return asks for one more change

The Solution

  1. Each drawing readBasement walls, piles, ramps, cranes and wells, taken from each drawing
  2. Laid on the asset mapParcel corners matched and the fit shown in meters. A poor fit goes to GIS
  3. Each clash measuredEach proposed work measured against each nearby cable, main and substation
  4. Engineers agree, officer signsOne condition per clash. Engineers agree on hard ones and an officer signs

Built-in controls

  • Unknown depth never clears an asset
  • Only approved clauses, versioned
  • The asset map is read, never edited

What You Get

Fewer cable and main strikes on approved sites, and building permits spend less time waiting on the utility.

  • One letter, each condition sourcedEach condition cites its clash, rule and drawing sheet
  • Officers spend their time decidingEach request opens already aligned, measured and drafted
  • Advice that clears the cableApplicants are told the set-back that would clear a clash
In short

What is Utility NOC Application Processing?

A no-objection certificate (NOC) is a utility's letter saying it has no objection to building, excavation or road works near its cables, mains and substations. Processing an NOC application is the review that decides whether to agree, and on what conditions. Utility NOC Application Processing does that review on the drawing itself. Agents lay the applicant's drawings over the asset map, find each clash with an asset buffer and draft the letter. Engineers concur on hard clashes and the officer signs.

How to choose AI solutions for utilities →

Updated

The problem

Utility officers still check building plans against buried cables and mains by eye

Anyone who builds, digs or works on a road near a utility's cables, pipes and substations needs the utility's permission first. That permission is a no-objection certificate, or NOC. At a busy utility, these requests arrive by the hundred each working day. For each one, a third-party works officer does the check by hand. They find the parcel on the GIS, the utility's digital map of its assets, and open the PDF site plan in another window. They line the two up on the parcel corners and measure the distance to each cable and main. On a 1:500 drawing, misreading 2 mm means a meter on the ground. That meter can be the difference between outside and inside a cable's buffer, the safe zone kept around it.

There is not enough time to check every drawing, so only the site plan gets checked. The clashes are usually in the basement, shoring and logistics drawings, and those are the sheets that get skipped. Examples are a secant pile wall beside an 11 kV cable, a dewatering well near a trunk main, and a crane jib over a substation. Conditions are copied from the last similar letter. So a water-main clause ends up in a letter about electricity only, and the trial-pit condition is missing where it matters. Applications go back for clarification and decisions slip past the deadline. Some sites with a valid approval still strike a cable. In one case reported by the UK's Health and Safety Executive (HSE), a breaker hit a live 11,000-volt cable and a worker died of burns.

typical196,977reports of damage to buried utilities analyzed for 2024. Top causes included “failed to maintain clearance” and “dug before potholing”, where potholing means digging a small test hole to find the line
typical29×the direct repair cost, roughly. That is the indirect and social cost of a strike on a buried utility, in a study of 3,348 strikes
Where an application's working days goestimated
By hand4.6 days
With the solution0.9 days
  • Checking the submission is complete and on the right coordinates0.6 → 0.1 d
  • Finding the parcel and lining the drawings up on the asset map1 → 0.1 d
  • Measuring each work against each cable, main and substation0.8 → 0.1 d
  • Drafting the conditions and the letter0.7 → 0.1 d
  • Engineer concurrence on hard clashes0.9 → 0.4 d
  • Returns for clarification0.6 → 0.3 d

How one application's working days are spent, by hand and with the solution. The totals are the sample utility's medians. A decision took 4.6 working days before and takes 0.9 since the agents went live. The split between steps is our estimate.

How it works

From arrival to a signed letter: each step of a utility application

What comes in
Applications inThe day's applications · form, parcel plan, site, basement, shoring and logistics drawings
Agents at work
Intake checkerpack complete?
Then
Drawing readerwalls · piles · cranes
Plan alignerfit to the parcel
Then
Clash finderbuffers · distances
Then
Conditions writerone per clash
Clock keeperthe decision clock
A person decides
NOC officerengineers concur · officer signs
What comes out
Signed letter with conditions
Clarify notice
Inside the standard
One case, step by step

A tower site with five clashes, and a letter signed on time

A developer wants to build a residential tower beside an 11 kV cable, a trunk main and a substation. It has two basements, a ground floor and 14 floors above. The developer's engineering consultant sent the no-objection application through the portal on a Monday at 09:14. The utility has 2 working days to decide, so the clock runs to Wednesday at 09:14. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Tuesday, 10:40

    Fourteen applications, each on its own clock

    Third-party works officer

    The officer's queue shows 14 applications, out of 165 for the whole team. Each one is a bar from the day it arrived to its 2-working-day deadline. The agents' recommendation sits beside it: 9 no objection, 3 with conditions, 1 clarification and 1 objection. Two have under 5 hours left. One is a pump house upgrade with an objection proposed. The other is a housing project waiting for the water network engineer.

    “Bar = received → due · line = now · dot = agents finished”

  2. 02Opened

    The site plan, laid over the utility's assets

    Third-party works officer

    The officer opens the tower application. The applicant's site plan A-101 rev C fills the screen. Drawn over it are the utility's 132 kV, 11 kV and LV cables, the trunk and distribution mains and a substation, each with its buffer. Five numbered clashes are hatched in red. On the right, the no-objection letter is already drafted, with 22 h 34 m left on the clock.

    “Aligned to the parcel plan · 4 corners · fit 0.12 m”

  3. 03Monday, 09:16 · 52 s

    Reading the drawing: the agents' run, replayed

    Intake checker, Plan aligner and Clash finder

    The six agents started two minutes after the application arrived. First, the intake checker found all 6 files in 3.1 s. Next, the plan aligner placed A-101 on the parcel using the four corners on the parcel plan. Then the clash finder measured 8 assets within 30 m and found 5 clashes, while the letter waited for its results. The officer can replay the run step by step.

    Clash finder: “11 kV cable at 0.8 m from the north wall (buffer 2.0 m). Trunk main under the plant crossing. Substation access and oversail. LV under storage.”

  4. 0421.4 s

    Each element read, with its sheet and grid

    Drawing reader

    The drawing reader read 4 drawings and 23 elements. Shoring plan S-110 rev A shows the north wall as secant piles Ø750 at 650 mm centers, running 46 m along the boundary. The pile toe, the bottom of each pile, is at −14.0 m. Four dewatering wells draw the water down to −9.5 m. Each reading cites its sheet and grid, with how confident the reader is.

    Not in the submission: “Rig type and expected vibration not stated.” The letter sets a vibration limit (C1) instead of asking for it.

  5. 05Clash 1

    The basement wall is 0.8 m from the 11 kV cable

    Clash finder

    The north basement wall runs inside the cable's 2.0 m excavation buffer, set by the utility's HV cable rule. According to the as-built record, the map of what was actually laid, the cable is 1.0 m deep. The wall goes down to −14.0 m. The clash shows its drawing, S-110 rev A at grid A to E/1. It links straight to the condition it creates.

    “Letter: C1 · Trial pits required · needs the network protection engineer”

  6. 06In section

    What is underground, from the as-built and the shoring plan

    Network protection engineer, HV cables

    The section along the street shows the cable 1.0 m deep with its 2.0 m buffer on each side. It also shows the secant piles down to −14.0 m and the dewatering drawdown to −9.5 m. The clash finder lists what it measured. The wall face is 0.8 m from the cable, and 46 m of wall is inside the buffer. It also lists 5 trial pits at 10 m centers.

    A basement inside the buffer means trial pits before the first pile.

  7. 07The letter

    One condition per asset affected, each with its rule and drawing

    Conditions writer

    The letter has six conditions plus three standard ones. C1 asks for trial pits at 10 m centers along the 11 kV cable and hand digging within 0.5 m. It also asks for a utility standby while piling within 3 m, and caps vibration at the cable at 10 mm/s. C2 asks for a crossing slab designed for 45 t over the 600 mm trunk main, with vibration and settlement monitoring. C3 to C6 keep the substation open, stop loads swinging over it, protect the LV cables and disconnect the water service. Each margin note names the clash, the rule, the drawing and the library clause.

    For information: “A 132 kV circuit runs 24 m north, outside its 10 m buffer. No work within 10 m of it without a new application.”

  8. 08Advice

    What the consultant could change, tested on the plan

    Third-party works officer

    The officer drags the wall set-back to 1.2 m. Now the cable sits 2.0 m from the wall, outside its buffer, and shows as cleared. The basement would lose about 55 m² per level. When asked, the assistant adds this to the letter as advice to the consultant. The drafted conditions stay until the consultant resubmits.

    The consultant learns exactly what to change in one letter, instead of over three returns in three weeks.

  9. 09Tuesday, 11:32 · signed

    Two engineers concur, the officer signs

    Two engineers and the officer

    On Monday, the clock keeper had asked both engineers. The network protection engineer concurs, or formally agrees, on C1 and C4 at 11:18. At 11:24 the water network engineer concurs on C2. The officer signs, and the letter goes to the consultant. It lists its conditions and the drawings it covers, and it is valid for 12 months.

    “Issued to the consultant · 21 h 42 m inside the 2-working-day standard”

  10. 10Elsewhere in the queue

    A notice, and an objection only the head may make

    Intake checker and Clash finder

    Two other applications stop short. An office project's shoring plan S-201 is drawn on a local site grid, with a best fit of 6.8 m against a 0.5 m limit. It also gives no pile toe level. So the agents stopped and drafted a clarification notice, and the clock pauses once it is sent. At the pump house, the new foundation is 0.3 m from a joint bay of a 132 kV circuit. The utility's rule keeps 3.0 m clear there. No condition can make that safe.

    “3 h 25 m left on the 2-working-day standard · only the head of Third-Party Works may object”

Who it’s for

Officer, GIS, engineers and the consultant on one utility application

The same tower application through five hands: the day before the agents, and the day now.

Third-party works officer
Signs and issues the letter
Before
Handles 14 applications a day, each on a 2-working-day clock. Spends more time lining up drawings on the map than deciding anything.
Now
Opens each application already aligned, measured and drafted, checks the overlay and the clashes, and signs.
GIS analyst
Fixes alignment and records
Before
Fixes parcel coordinates and checks whether a cable is really where the map shows it. Half the drawings arrive on a local grid and have to be shifted by hand.
Now
Gets only the drawings that do not fit the parcel. A fit worse than 0.5 m stops the check and comes to a GIS analyst.
Network protection engineer
Signs off on HV clashes
Before
Must concur, or formally agree, on each application that touches an HV buffer. Wants trial pits before any pile when a basement is inside the buffer.
Now
Is asked to concur on hard clashes with an HV cable, with the section, the measurements and the drafted condition in view.
Water network engineer
Signs off on mains of 450 mm and above
Before
Protects the trunk mains. A 600 mm main under a site entrance needs a crossing slab and someone watching the vibration.
Now
Concurs on the crossing-slab condition with the 45 t plant load, the vibration limit and the settlement points already written in.
Applicant's consultant
Submits for the developer
Before
Submits the application for a developer client. Wants to hear exactly what to change in one go, instead of through three returns in three weeks.
Now
Gets one letter with a condition per asset, each naming its drawing and grid, and advice on the set-back that would clear the cable.
The agents

Drawing, alignment and clash agents for third-party works approval

Six agents read the drawings, find the clashes and draft the conditions. Engineers concur and the no-objection officer signs.

Intake checker

Checks that each application is complete and on the right coordinates before anyone reads it. That covers the form, the parcel plan, and the site, basement, shoring and logistics drawings. If anything is missing, it drafts a clarification notice that says exactly what to add.

  • Never rejects an application. It drafts a notice for the officer
  • Pauses the clock only when the officer sends the notice
Drawing reader

Reads each sheet for the parcel boundary, how far the basement reaches and how deep it goes, and the pile type and depth. It also reads ramps and entrances, the site fence line, the crane position and jib, dewatering wells and storage areas.

  • Records no dimension the drawing does not show, and lists it as missing
  • Each element cites sheet, revision and grid
Plan aligner

Matches the parcel corners on the drawing to the parcel plan coordinates, places the drawing on the asset map and reports the fit in meters.

  • Stops when the fit is worse than 0.5 m and hands it to the GIS analyst
  • Never edits the asset map
Clash finder

Draws a buffer around each asset within 30 m of the site, using the utility's rules. It checks each proposed work against those buffers, measures the closest distance and compares depths. It grades each one as hard, access, oversail, soft, clear or action.

  • Unknown depth never clears. The asset is marked for a trial pit
  • Shows the rule and the measurement for each clash
Conditions writer

Drafts the no-objection letter. For each clash it picks the approved clause for that asset and work. It fills in the asset, grid and measurement, and cites the rule and sheet. Then it adds the standard conditions.

  • Only clauses from the approved library
  • Never signs or issues. The letter stays a draft until an officer signs
Clock keeper

Counts working hours from receipt. It asks the named engineer to concur on any hard clash with an HV cable or a main of 450 mm or more. At 4 hours left it warns the officer and offers to reassign.

  • Cannot extend a clock or issue a letter
NOC officer

Engineers concur on hard clashes, and the officer signs.

Ask in plain words

Plain-word answers on an application, a clash or a condition

Ask in plain words, or say what to change. Each answer points to the drawing, the section or the rule behind it.

Why does the tower need trial pits?

The north basement wall sits 0.8 m from the 11 kV cable, inside its 2.0 m excavation buffer. On the shoring plan, secant piles Ø750 run along the boundary for 46 m, down to −14.0 m. The utility's as-built record puts the cable 1.0 m deep. The utility's HV cable rule asks for trial pits before any piling inside the buffer, so condition C1 asks for them at 10 m centers.

Which of my applications could miss the 2-day standard?

Two have less than 5 hours left. The pump house has an objection proposed and is waiting for the head of Third-Party Works, with 3 h 25 m left. The housing project is waiting for the water network engineer on a 450 mm main, with 4 h 32 m left.

Advise the consultant how to clear the cable clash

If the north wall moves 1.2 m south, the cable sits 2.0 m from the wall face, outside its buffer. Condition C1 is then no longer needed. The basement loses 1.2 m along 46 m, about 55 m² per level. This advice is added to the letter. The conditions stay as drafted until the consultant resubmits.

Use a 3 m buffer for 11 kV cables beside basements deeper than 6 m

Done. New rule: “11 kV cable beside a basement deeper than 6 m → 3.0 m buffer.” Your 14 open applications were checked again. The tower is already a clash, and none of the others changes. The rule applies to new applications from now on, and you can change it in Settings.

The screens

The plan over the assets, the clash in section and the drafted letter

From the working solution, on its sample data. Pick one to see it large.

Plan over assetsThe applicant's site plan over the cables, mains and substations, with a buffer around each and the clashes numbered. The agents' run and the draft letter are on the right.
Applications on their clocksEach application as a bar from receipt to its 2-working-day deadline, with the agents' recommendation and who it is waiting for.
Read the drawingThe agents' run replayed. The drawing is aligned to the parcel, the clash finder measures each asset, and the letter waits for its conditions.
What the drawings sayEach sheet with the elements read from it, their sheet and grid references, and what is not in the submission.
A hard clashThe north basement wall 0.8 m from the 11 kV cable, with the rule, the depth, the drawing and the condition it creates.
In sectionCable depth from the as-built, its buffer, the secant piles and the dewatering drawdown, with each measurement listed.
The no-objection letterSix conditions and three standard ones, each tied in the margin to its clash, rule, drawing and library clause.
Test a set-backMove the north wall 1.2 m and the cable clears its buffer: advice the officer can send with the letter.
Concurred and signedBoth engineers' concurrences, the officer's signature and the letter issued inside the standard.
Returns and objectionsA clarification notice for a drawing on a local grid, and an objection only the head of Third-Party Works may make.
The conditions libraryThe only clauses the letter may use, each with its rule, version and how often it was used.
InsightsWorking days to a decision against the standard, clashes found by asset and strikes on sites holding an approval, month by month.
Buffers and approversBuffers by asset class, who must agree, the clock and the checks.
Governance

Concurrence, approved clauses and a named signer on each utility application

Each condition cites its clash, rule and drawingEach condition in the letter carries the number of its clash and the utility rule it rests on. It also names the drawing sheet and grid it applies to. Pointing at a clash lights its condition, and the other way round.
A named officer signs each letterAgents read, measure and draft. They do not sign or issue. Some clashes need the named engineer to concur before the letter can be signed. These are hard clashes with an HV cable or a main of 450 mm or more.
Unknown depth never clears an assetWhere an asset's depth is not on record, the clash finder does not mark it clear. It becomes a trial-pit condition instead. Each clash shows the rule and the measurement behind it.
The fit is shown, and a bad fit stops the checkEach overlay shows how well the drawing fits the parcel. A fit worse than 0.5 m stops the check and goes to a GIS analyst. A shoring plan drawn on a local site grid is one example.
Only approved clauses, versionedThe letter may use only the clauses in the conditions library. Each clause is tied to a rule and versioned, and shows how often it has been used. Only the head of Third-Party Works may object to an application.
Each step on the activity trailEach reading, measurement, draft, concurrence request and signature is recorded with who did it and when. The trail runs from the drawing reader's first sheet to the officer's signature. The asset map is read and never edited.
Configuration

Buffers, approvers and the clock for each utility application

The buffer around each asset class, who must agree, the clock and the checks are settings chosen by Third-Party Works.

SettingDefaultChoose from
Buffers by asset11 kV cables 2.0 m, no structure within 0.5 m132 kV 10.0 m · 33 kV 3.0 m · 11 kV 2.0 m · LV 1.0 m. Trunk mains ≥ 450 mm 5.0 m · distribution mains 3.0 m · substation access 3.0 m. Each is tied to its rule
A hard clash with an HV cable (11 kV and above)Named network protection engineerNamed engineer · Any network protection engineer. They concur before the letter can be signed
A clash with a main of 450 mm or moreNamed water network engineerNamed engineer · Any water network engineer. They concur before the letter can be signed
Decision standard2 working days2 working days · 3 working days · 5 working days, counted from receipt on the portal
Warn the officer4 hours left4 hours left · 8 hours left. The clock keeper warns and offers to reassign
Search zone around the site30 m20 m · 30 m · 50 m. Assets inside it are measured
Stop when the drawing does not fit the parcel0.5 m0.3 m · 0.5 m · 1.0 m. A worse fit goes to a GIS analyst
Read and check every application on arrivalOnOn · Off. When off, the officer starts the agents from the plan
Connections

Portal, drawings, parcel plans and the asset layers behind each review

No-objection applicationsthe application form and its files, as they arrive on the portal
Applicant's drawingssite, basement, shoring and logistics plans, in PDF and CAD
Parcel plansparcel boundaries and corner coordinates
GIS asset layerscables, mains, substations and services, with depth, size and as-built reference
Standard conditionsthe approved clauses, each tied to a rule and versioned
Rules and standardsthe utility's buffer and concurrence rules, national codes and safe-dig guidance
What it changes

Asset protection results: strikes avoided and decisions inside the standard

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of applications checked against every asset buffer, on the drawing itself
demo
$1.0M
a year in cable and main strikes avoided (24 strikes × $42K, the sample's figure)
Strikes on approved sites today64 a year
Missed clash or condition24 avoided
target
1day
to a decision, down from 4.6, inside the decision standard the utility sets
Decided on day 1
of a 2-working-day clock

“Demo” means seen in the working solution, on its sample data. “Target” means the design goal, measured in the live solution. “Estimated” means our arithmetic on the sample utility's figures. The sample utility has 64 cable and main strikes a year on sites holding an approval. Of those, 24 were traced to a clash not caught or a condition not written. Each strike costs $42K on average, for repair, outage response, lost water and claims handling. The split of working days is also our estimate. “Typical” means published figures. The CGA DIRT report for 2024 counts 196,977 damages. HSE HSG47, Avoiding danger from underground services, case study 1, tells of a breaker that hit a live 11,000-volt cable. A worker died of burns. A University of Birmingham study of 3,348 strikes on buried utility assets found indirect and social costs about 29 times the direct cost. HSG47 also advises against power tools within 500 mm of a service's indicated line. Names on the screens are sample data.

Questions

Utility NOC application processing questions from third-party works teams

What is utility NOC application processing?

A no-objection certificate (NOC) is a utility's letter saying it has no objection to building, excavation or road works near its cables, mains and substations. Processing an NOC application is the review that decides whether to agree, and on what conditions. Utility NOC Application Processing does that review on the drawing itself. Agents lay the applicant's drawings over the asset map, find each clash with an asset buffer and draft the letter. Engineers concur on hard clashes and the officer signs.

How does it check a developer's drawings against our cables and mains?

The drawing reader reads the site, basement, shoring and logistics drawings. It picks out walls, piles, depths, ramps, site fencing, cranes and dewatering wells, citing sheet and grid. The plan aligner places the drawing on the asset map from the parcel plan's corners and reports the fit. The clash finder draws each asset's buffer by your rules. It then measures each proposed work against it, in plan and in depth.

How does it help prevent cable and main strikes?

Each application is checked against each buffer within the search zone. That includes the basement, shoring and crane drawings that get skipped when time is short. A clash becomes a specific condition, such as trial pits, hand digging, a standby, a vibration limit or a crossing slab. An asset whose depth is unknown is not cleared. On the sample utility's figures, we estimate about $1.0M a year in strikes avoided. That is 24 strikes traced to a missed clash or condition, at an average of $42K each.

Does it write the no-objection conditions itself?

The conditions writer drafts one condition per clash, using only approved clauses from your conditions library. It fills in the asset, grid and measurement and cites the rule and drawing. Then it adds the standard conditions and keeps the letter a draft. No clause comes from outside the library, and the agent does not sign or issue.

What happens when a drawing is incomplete or on the wrong coordinates?

The intake checker drafts a clarification notice that says exactly what to add. Sometimes a drawing does not fit the parcel within the fit limit, which is 0.5 m for the sample utility. Then the check stops and goes to a GIS analyst. The clock pauses only when the officer sends the notice. The agents do not reject an application.

Who can object, concur or sign?

Each letter is signed by a named officer. A hard clash with an HV cable needs a network protection engineer to concur. A clash with a main of 450 mm or more needs a water network engineer to concur. Only the head of Third-Party Works may object. The clock keeper cannot extend a clock or issue a letter.

Can we set our own buffers, approvers and service standard?

Yes. You set the buffers and no-structure zones by asset class, who must concur and the decision standard (2, 3 or 5 working days). You also set when to warn the officer, the search zone around the site and the fit limit. Whether each application is checked on arrival and the unknown-depth rule are settings too.

What do we provide to set it up?

You provide your buffer rules, standard conditions, letter template, asset layers and a sample of past applications. The Agentic Solution Engine builds and deploys the solution from those documents. It goes live once each quality gate has passed. We will walk you through it on your own applications first.

Try utility NOC application processing
on a sample of your own applications.

We'll run Utility NOC Application Processing on a sample of your own applications and asset layers.