WorkflowNew Connections, Solar & EV Programs

New Service Connection Processing

New service connection processing that books a crew as soon as a connection is ready

See one case, screen by screen ↓
Watch with transcript →

Built forConnections coordinatorsService plannersLine crew schedulersBuildersElectrical contractors

The Problem Today

The city's inspection result and the builder's payment land in different systems, so a ready connection waits until someone notices.

Typed again into four systems

  • Customer
  • Network map
  • Work orders
  • Inspection
  • The builder calls againCalls asking why no crew has come
  • A ready meter not billingRevenue is lost, and handovers and move-ins slip

The Solution

  1. Each request checkedThe form, load schedule, site plan and permit are read, and missing items listed
  2. Load sized, design signedThe load is worked out again, a service and transformer proposed, and a planner signs
  3. All systems watchedThe customer system, network map, work orders and city portals are read through the day
  4. Crew booked when readyOnce inspection passes and fees are paid, the first crew window is booked and the builder told

Built-in controls

  • No fee waived without the connections manager
  • One crew window a day kept free for outages
  • Builders hear only booked dates, in approved words

What You Get

A ready connection gets the first free crew window without waiting for someone to notice, so meters start billing sooner.

$186K
a year in status calls avoided, on sample volumes our estimate
  • Stalls seen in one placeEach step past its time limit is flagged before someone calls about it
  • Loads checked for plannersTransformer loading is shown with the new load beside it
  • A message at each milestoneBuilders see progress without having to call and ask
In short

What is New Service Connection Processing?

It is the work of taking a request for a new electric or water service from application to energized. The site might be a home, a commercial building, a subdivision or an EV charging site. The steps are completeness, design, fees, site ready, inspection, meter and energize. New Service Connection Processing runs each connection on one milestone rail. Six agents check, size, quote, watch, book and send messages, and people make the decisions.

How to choose AI solutions for utilities →

Updated

The problem

No one is watching for the moment a new connection is ready

Before anyone moves into a new home, shop, school or subdivision, the building needs a utility service. The builder asks for one by portal, email or paper. The request comes with a form, a site plan and vicinity map, an easement and a permit. It also has a load schedule, the list of electrical equipment the building will run. From there it passes through four separate systems: the customer system, the network map, work management and the city's inspection portal. The connections coordinator types the details into each one, emails a list of missing items, and chases every hand-off by hand.

The most common delay has nothing to do with engineering. A connection is ready for a crew once two things are true. The city has passed the inspection, and the builder has paid the balance. The city's release lands in one inbox, and the payment lands in the customer system. Nobody is watching for the moment both are true, so no crew gets booked. The meter is not billing, and the builder cannot hand over the keys. Then the calls start. “The inspector passed us, why is nobody coming?”

typical$9.54a call, the average cost of a customer call, measured by E Source across 15 utilities
typical3-4weeksquoted on some utilities' builder pages for the will-serve letter alone, the note saying the utility can serve the site. Others quote 5 to 10 business days.
Where the days go on one connection, in daysestimated
By hand51 days
With the solution34.5 days
  • Complete: the request read and the missing-item letter sent2 → 0.5 d
  • Design: the load schedule checked, the service and transformer sized and signed9 → 5 d
  • Fees: quote, service agreement, deposit and balance10 → 8 d
  • Site ready: easement, permit, meter base and pad15 → 14 d
  • Inspection: waiting for the city's release6 → 5 d
  • Energize: from ready to a crew on site9 → 2 d

The before figures are the sample district's median days at each milestone over the last 90 days, from the working solution. They leave out the meter test, which takes a median of 2 days. The after figures are our estimate with the solution, and the energize row is the design target. Most of the site-ready and fees time is the builder's own work, so it changes little.

How it works

New service connection processing, from request to energized

What comes in
Requests inportal, email, paper · load schedule, site plan, permit
Agents at work
Application checkermissing items, cited
Then
Load and service sizer
Fee calculator
Then
Milestone watcherevery 15 minutes
Then
Energise scheduler
Status updater
A person decides
Connections coordinatorholds, exceptions, letters
What comes out
Missing-item list
Signed design
Energization booked
One case, step by step

A dental clinic's new service connection, stuck nine days at inspection

One utility district has 214 connections in progress. A dental clinic needs a 400 A, 120/208 V three-phase service before it opens. Here is one day in the working solution, screen by screen.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01First thing

    The morning starts on the milestone rail

    Connections coordinator

    Each connection is one row with eight stations: Applied, Complete, Design, Fees, Site ready, Inspection, Meter and Energize. Each station is updated from the source records. In all, 214 connections are active (176 electricity, 38 water), and 17 are stalled. A station turns amber past its time limit and red past twice that, so stalls stand out down a column. Above the rail, the energize gate counts 6 connections that are ready with no date. The oldest has waited 11 days.

    Energize gate: “Inspection passed + Fees paid + no hold · meter tested → Energization booked in the next crew slot”

  2. 02One press

    Six ready connections, booked in one go

    Energise scheduler

    One address passed inspection 11 days ago and its fees were paid long ago, yet it still had no energize date. All 9 lots in one subdivision phase passed 6 days ago. The coordinator presses Book all 6. The scheduler finds the first free window for the crew that covers each address. It allows for the notice the meter shop needs, and the count drops to 0.

    “6 energizations booked: 3 tomorrow, 1 on Monday, 2 on Tuesday · builders texted”

  3. 03The file

    The dental clinic has waited 9 days at Inspection

    Connections coordinator

    The connection file shows the request as the application checker read it. The builder and a licensed electrical contractor filed it, asking for service by the following Monday. The load works out at 96.4 kVA demand, or 268 A at 208 V. That is 67 % of 400 A, on a new 150 kVA pad-mount transformer. The fee calculator quotes $11,480 from the schedule of charges. The $6,620 deposit is paid, and $4,860 is due before energization.

    “Inspection for 9 days, threshold 5 · Final inspection requested · city inspector booked today · $4,860 balance due”

  4. 04Later that morning

    The city passes the inspection, and the builder pays

    Milestone watcher

    The watcher reads the city inspection portals every 15 minutes. At 09:58 the city portal shows that the permit's final electrical inspection passed. At 10:42 the builder pays the $4,860 balance by card on the portal. Both stations turn green, each with its own record.

  5. 05A minute later

    Energization books itself for Tuesday

    Energise scheduler

    The gate checks four things: inspection passed, fees paid, no holds, and the CT meter tested. A CT meter, used on larger services, needs 3 working days' notice for the meter shop. So the earliest date is the next Tuesday. The first free window is 08:00 to 10:00 on one line crew. The scheduler raises the work order and leaves all outage-response windows free.

  6. 06The same minute

    The builder gets the date without calling

    Status updater, to the builder

    The night before, the builder's project manager had asked when the clinic could be energized if the inspector passed it on Thursday. The status updater has reported each milestone since the request was complete. Now the project manager and the electrical contractor get the date by text.

    “Energization is booked for Tuesday, 08:00 to 10:00. Please have the main breaker off and someone on site.”

  7. 07New requests

    Nine new requests, read before they reach the coordinator

    Application checker

    Nine requests arrived since yesterday evening, with 33 files: 6 by portal, 2 by email and 1 on paper. The checker matches each address to the network map and to an account. It checks each load schedule against the floor plan. A laundry's schedule leaves out the six 9 kW dryers shown on its floor plan. A farm has no easement over the neighbor's field for the overhead line. A third address is the same site as a request already in progress, so the checker proposes merging the two.

    “Wrote 3 missing-item letters for your review · nothing is sent until you press Send”

  8. 08Design queue

    A load schedule that would overload the transformer

    Service planner

    A brewery taproom asked for 400 A. The load and service sizer works the schedule out again to the utility's service standard, which follows NEC Article 220. The result is 160.5 kVA, or 446 A at 208 V: 111 % of 400 A. The applicant counted the two 36 kW brew kettles at 65 %. They run together during a brew, so the standard counts them at 100 %. The existing transformer would run at 155 %, so the sizer proposes 600 A, CT metering and a new 225 kVA pad-mount.

    “The agent proposes, and only a planner signs. A signed design moves the connection to Fees.”

  9. 09The pattern

    Where the district's connections really wait

    Connections coordinator

    Over 90 days, the district energized 1,512 connections. Site ready is the longest milestone, at a median of 15 days, but that is the builder's work. The longest wait nobody was working on is the last one. The wait from ready to energized had a median of 9 days, and 9.2 over the last 12 weeks. Of all stalled days, 38 % were connections with inspection passed and fees paid but no crew date. Before milestone messages, builders and customers made 3.1 status calls per connection.

Who it’s for

Coordinator, planner, crew scheduler and builder on one service connection

The same connections, moved by four roles: a week by hand, and a week now.

Connections coordinator
Decides holds, exceptions and letters
Before
Owns 214 active connections, electricity and water, and takes 30 to 40 status calls a day. Half of them ask why nobody is coming after the inspector passed the job.
Now
Opens one rail where a stalled step stands out. Books each ready connection in one press, and sends missing-item letters the checker has already written.
Service planner
Signs each design
Before
Checks load calculations again by hand and looks up transformer loading on the network map. Wants the load calculation already checked, with the loading next to it.
Now
Gets each load line worked out to the utility's standard, with each difference from the applicant's numbers explained. Sees the transformer loading with the new load beside it.
Line crew scheduler
Owns the crew calendar
Before
Books meter sets and energizations into crew windows from emails and calls. Needs to hear once, and reliably, that a connection is really ready.
Now
Sees the gate's bookings marked on the calendar. They are made only when every condition is true, with outage-response windows left free. Can move any booking.
Builder's project manager
Runs six sites
Before
Calls for status because nobody says what moved. Needs a date more than a portal.
Now
Hears at each milestone: request complete, design signed and quoted, site ready, inspection passed, energization booked. Gets the date by text as soon as it is booked.
The agents

Agents that check, size, quote, watch and book a new service connection

The agents check, size, quote, watch and book each connection. The coordinator decides, and the planner signs.

Application checker

Reads each new-service request: the form, load schedule, site plan, vicinity map, easement and permit. Checks the address on the network map and the account, and looks for the same site already in progress. Writes the missing-item list in plain words, citing the page.

  • Never rejects a request
  • Never asks for an item the service standard does not require
  • Letters are sent only by a coordinator
Load and service sizer

Works out the demand load again from the load schedule, using the demand factors in the utility's service standard (which follow NEC Article 220). Proposes the service size, CT or self-contained metering, and the transformer, with its loading once the new load is added.

  • Never signs a design
  • Designs over 300 kVA flagged for the senior planner
  • Explains every difference from the applicant's own numbers
Fee calculator

Quotes the connection charge from the schedule of charges: design fee, line extension less the allowance, pad and riser, and meter. Tracks the deposit and the balance.

  • Never waives or discounts a charge
  • Fee changes need the connections manager
Milestone watcher

Reads the customer system, network map, work management, payments and the city inspection portals every 15 minutes. Moves each station on the rail and flags each step past its time limit.

  • Never moves a station without a source record
  • Cites the record on every station
Energise scheduler

Runs the energize gate. When the inspection has passed, the fees are paid, the meter is tested and there is no hold, it allows for the meter shop's notice. Then it books the first free two-hour window for the crew covering the address and raises the work order.

  • Never books over outage response
  • Never books with an open hold
  • Any booking can be moved by a coordinator
Status updater

Tells builders and customers what moved at each milestone, in approved wording. Answers “where is my connection?” with the facts from the rail.

  • Never promises a date the scheduler has not booked
  • Only approved wording
  • Quiet hours 20:00 to 07:30
Service planner

Signs each design.

Ask in plain words

Ask which connections are ready, and each answer points to its record

Ask about any connection, builder or crew window, or say what to change. Each answer points to its record. These answers use the sample district.

Which connections are ready but have no energize date?

Six connections have passed inspection and paid in full, with no crew date. The oldest has been ready 11 days. Next is a subdivision phase with all 9 lots ready for 6 days, then a school annex at 4 days. The gate can book all 6 now: 3 tomorrow, 1 on Monday and 2 on Tuesday.

Why is the dental clinic's connection stalled?

Two things. The final electrical inspection has waited 9 days, past the 5-day limit. And $4,860 of the $11,480 charge is still due. The meter is tested and there are no holds. As soon as both clear, the gate will book the next CT window.

Is the brewery taproom's service sized right?

No. Worked out to the utility's standard, the demand is 160.5 kVA, or 446 A at 208 V. That is 111 % of the 400 A asked for. Kettles that run together count at 100 %, while the applicant used 65 %. The existing transformer would run at 155 %, so the proposal is 600 A with a new 225 kVA pad-mount. The service planner signs.

Set the inspection stall threshold to 4 days

Done. Inspection now counts as stalled after 4 days, and red after 8. Today that adds no new connection, because the dental clinic was already flagged at 9 days. The change is on the record under your name.

The screens

The milestone rail, the energize gate and the crew calendar

From the working solution, on its sample data. Pick one to see it large.

Connections in flightAll connections on one milestone rail, with stalled steps standing out and the energize gate counting ready connections with no date.
Six booked in one pressThe ready connections booked into the next crew windows, the builders texted, and the count back to 0.
The connection fileThe rail, the request as read, the documents and their checks, the fee quote and each event in order, each from a source record.
The energize gate firesInspection passed and balance paid. Once both are true, a window is found, energization booked and the builder told, with times, under the row.
Energize calendarTwo-hour windows per crew, the gate's bookings marked, and one window a day per crew kept for outage response.
Customer updatesA builder's thread with a message at each milestone, status questions answered from the rail, and the milestones that send a message.
New requests, checkedNine new requests read in full and sorted into complete, missing items or duplicate, with missing-item letters written for review.
Service designThe load schedule worked out line by line, the service and transformer proposed with its loading, and the planner's decision.
Where connections waitMedian and 90th-percentile days at each milestone, weekly ready-to-energized time against the target, and the longest waits now.
Connection rulesThe energize gate's mode and conditions, the meter shop notice, the time limits, who decides, and the systems read every 15 minutes.
Governance

Signed designs, stations tied to records, and the record behind each new connection

Every station cites its recordEach station on the rail links to the record that moved it: the inspection release, the payment receipt, the design signature or the work order. Without a record, a station does not move.
The gate books only when every condition is trueThe inspection has passed and the fees are paid in full. The meter is assigned and tested. There is no safety, easement or credit hold. A coordinator can switch the gate to “Propose, I confirm” or Off, and can move any booking.
A named planner signs each designThe load and service sizer proposes, and the service planner signs. Designs over 300 kVA need the senior planner too. A signed design is what moves a connection to Fees.
No charge waived by an agentThe fee calculator quotes from the schedule of charges and does not waive or discount anything. Fee changes need the connections manager.
Outage response comes firstEach crew keeps one window a day for outage response, and the gate does not book it. Nothing is booked after 15:00 on Fridays.
Approved wording, and each change on the recordBuilders hear only approved wording, only between 07:30 and 20:00, and only dates that are booked. Each agent step, booking and rule change is on the record with who made it and when.
Configuration

The energize gate, the time limits and who decides on each connection

The connections team sets what the agents may do on their own, when a step counts as stalled, and who decides.

SettingDefaultChoose from
Energise gateBook automaticallyBook automatically · Propose, I confirm · Off
Book when all are true4 conditionsInspection passed (city release, or water backflow test) · fees paid in full · meter assigned and tested · no safety, easement or credit hold
Notice the meter shop needsCT meter: 3 working daysSelf-contained meter: 1 working day · CT meter: 3 working days
Never bookOutage-response windowsOutage-response windows · after 15:00 on Fridays
When a step counts as stalledInspection: 5 daysDays per milestone: Complete 3 · Design 10 · Fees 14 · Site ready 21 · Inspection 5 · Meter 3 · Energise 2. Red at twice the number
DesignsService plannerService planner, plus the senior planner over 300 kVA
Holds and exceptionsConnections coordinatorConnections coordinator · fee changes: connections manager · crew calendar: line crew scheduler
Message wordingCustomer communications teamApproved wording per milestone · quiet hours 20:00 to 07:30
Connections

Customer system, network map, work management and city inspection portals

Service requestsrequest form, load schedule, site plan and vicinity map, easement, permit, by portal, email or paper
Customer systemaccounts, fees, service agreements and payments
Network mapfeeders, transformers and their loading
Work managementwork orders, crews and the meter shop
City inspection portalsinspection releases from each city served
Builder portal, text and emaildocuments and replies in, milestone messages out
What it changes

New service connection results for builders and crews

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
connections left waiting after the inspection passes and the fees are paid, the design goal
Ready, no date
in the sample district, before and after the gate
demo
$186K
a year in status calls avoided on sample volumes, with half the calls answered by milestone messages
Calls today$373K a year
With milestone messages$186K
target
2days
from ready to energized, against a median of 9.2
Median today9.2 days
With the gate2 days

“Demo” means seen in the working solution, on its sample district data. “Target” means the design goal, measured in the live solution. “Estimated” means our arithmetic on sample inputs. We multiplied 12,600 connections a year by 3.1 status calls and $9.54 a call, which gives $373K. Half of that, $186K, is avoided by milestone messages. The split of days is our estimate from the sample's milestone medians. “Typical” means published figures. E Source found $9.54 a call across 15 utilities. Utility builder pages quote anywhere from 5 to 10 business days to 3 to 4 weeks for a will-serve step. The service standard's demand factors follow NEC Article 220, as context only. Names on the screens are sample data.

Questions

Connection teams' questions on new service connection processing

What is new service connection processing?

It is the work of taking a request for a new electric or water service from application to energized. The site might be a home, a commercial building, a subdivision or an EV charging site. The steps are completeness, design, fees, site ready, inspection, meter and energize. New Service Connection Processing runs each connection on one milestone rail. Six agents check, size, quote, watch, book and send messages, and people make the decisions.

How does new service connection software for utilities work?

The milestone watcher reads the customer system, network map, work management, payments and the city inspection portals every 15 minutes. It updates each station from its source record, and a step past its time limit stands out. The energise scheduler waits until the inspection has passed, the fees are paid, the meter is tested and nothing is on hold. Then it books the next crew window, and the status updater tells the builder.

Does it check the load calculation and size the service?

Yes. The load and service sizer works out the load schedule again with the utility's own demand factors. In the working solution, that is a service standard that follows NEC Article 220. It explains each difference from the applicant's numbers and shows the transformer loading with the new load. In the sample case a 400 A request came out at 446 A, so it proposed 600 A and a new 225 kVA pad-mount. The planner signs.

How does it reduce status calls from builders and customers?

The status updater sends an approved message at each milestone. These are request complete, design signed and quoted, site ready, inspection passed and balance due, energization booked, and energized with the first bill date. It also answers status questions with the facts from the rail. In the sample week, it answered 141 of 186 status questions, and 45 went to a coordinator.

Does it work for water service connections too?

Yes. Water services run on the same rail. For water, the inspection station is the backflow test. A water crew's turn-on windows sit on the same calendar as the line crews' windows.

Who signs a design, approves a fee change or moves a booking?

People do. Agents do not reject a request, sign a design, waive a charge, book over outage response or promise a date that is not booked. The planner signs each design, and the connections manager approves fee changes. The coordinator decides holds and exceptions, and can move any booking or switch the gate to “Propose, I confirm”.

Can we set our own stall thresholds and rules?

Yes. The gate mode and conditions and the meter shop notice are settings. So are the windows the gate leaves alone and the time limit for each milestone. The approvers and the message wording are settings too, and each change is on the record.

What does a utility hand over to get this running?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These are your service standard, schedule of charges, builder guide and a sample of connections in progress. It goes live once every quality gate has passed. We will walk you through it on your own connections first.

Start with connections
you have in flight today.

We'll run New Service Connection Processing on a sample of the connections you have in progress.