WorkflowNew Connections, Solar & EV Programs

Large Load Interconnection Intake

Large load interconnection intake that screens each request against grid headroom and offers a staged ramp the grid can serve now

See one case, screen by screen ↓
Watch with transcript →

Built forKey account managersTransmission plannersTariff analystsGrid connection directors

The Problem Today

Planners only check grid capacity weeks after a request arrives, so they spend scarce study time on load that never builds.

17 GW
of one utility's 30 GW queue gone once requests carried a cost our estimate

Read and worked out by hand

  • Ramp
  • Site papers
  • Security
  • Tariff
  • Same site, three utilitiesRarely checked against other utilities' queues
  • Tariff terms in spreadsheetsA waiver for one customer is a fairness risk for all

The Solution

  1. Each request scoredReadiness checks on site control, security, permits and equipment
  2. Duplicates found elsewhereSame parcel, applicant family or ramp matched against a shared register
  3. Ramp drawn against headroomShortfall found by quarter, with stages that follow the upgrade dates
  4. The planner signs the offerThe tariff analyst confirms the terms and the planner signs the stages

Built-in controls

  • One tariff schedule for all customers
  • Nothing reserves capacity on its own
  • Each dollar and megawatt cites its source

What You Get

Projects that are ready get a staged yes sooner, and less stranded-cost risk falls on other customers.

  • Planners study real loadLess engineering time spent on speculative requests
  • One letter, each gap citedMissing evidence listed, each item with its tariff clause
  • A queue that holds upQueue order you can defend before the commission
In short

What is Large Load Interconnection Intake?

Large load interconnection intake is the first screen of a big connection request. The request might come from a data center, a hydrogen plant or an industrial site asking for tens or hundreds of megawatts. The screen decides whether the project is real and what the network can serve, before a costly study starts. Large Load Interconnection Intake does it with six agents. They read the file, score readiness, look for the same site at other utilities, apply the large-load tariff and screen the ramp against substation headroom. The transmission planner signs each capacity offer.

How to choose AI solutions for utilities →

Updated

The problem

Utilities spend weeks on big power requests before they know which ones are real

Data centers, hydrogen plants and heavy industry now ask utilities for hundreds of megawatts at a time. Before a utility pays for a costly study, it has to screen each request. Planners need to know whether the project is real and what it owes under the large-load tariff. That tariff is the special rate schedule for very big customers. Planners also need to know whether the substation has headroom, the spare capacity to carry the new load. Today each request arrives as an application, a ramp schedule, a one-line diagram and a stack of land and finance papers. The ramp schedule shows how much power the site needs each quarter. The key account manager chases missing papers by email. The tariff analyst works out the deposit, minimum bill and collateral in a spreadsheet. The same parcel is often filed at two or three utilities at once. Nobody routinely checks whether a neighboring utility has the same request. Ramp schedules also run ahead of the developers' own transformer orders.

Headroom is checked last. Transmission planning runs its screen only once the request is complete, weeks after it arrived. The answer is usually a flat yes or no, such as “we can study 300 MW” or “not before 2030”. That is the answer even when a staged yes was possible, with more power as planned upgrades come in. This matters because each study of a project that never builds uses planning engineers, the scarcest people in the utility. Each capacity reservation without collateral risks leaving other customers with the cost if the project walks away. And tariff terms worked out in spreadsheets risk treating customers unequally, a problem in front of the utility commission.

typical30 → 13GWin AEP Ohio's large-load queue, before and after its data center tariff, which billed at least 85 % of the capacity a customer claims
typical474.7GWof requests in the large-load queue of ERCOT, the Texas grid operator, by June 2026, 90 % of them data centers. In May, more than 300 GW had no studies submitted.
Where the screening days go on one large-load requestestimated
By hand31 days
With the solution1 day
  • Reading the application, ramp schedule and site and finance documents3 → 0.1 d
  • Readiness checks: site control, security, permits, equipment, water8 → 0.3 d
  • Checking for the same site at other utilities3 → 0.1 d
  • Deposit, minimum bill and collateral from the large-load tariff4 → 0.1 d
  • Headroom screen against the planning case and the capital plan10 → 0.3 d
  • Capacity offer, sign-off and study agreement draft3 → 0.2 d

Our estimate of where the calendar days go on one complete request, from complete to a screening decision. By hand, the sample utility's median was 31 days. With the solution, the target is 1 day.

How it works

Read, scored, checked for duplicates and drawn against substation headroom

What comes in
Requests in5 sources · application and ramp, site and finance documents, tariff, planning case, capital plan
Agents at work
Request readerfields + pages
Then
Readiness checker
Duplicate detector
Tariff terms checker
Then
Headroom screenerstaged ramp
Then
Study agreement drafternever sends
A person decides
Transmission plannersigns every capacity offer
What comes out
Signed staged offer
Study agreement
Missing-evidence letter
One case, step by step

A 300 MW data center request through large load interconnection screening

The utility has 14 open large-load requests, asking for 3,855 MW in total. Next to screen is a developer's request for 300 MW at a 230 kV substation. It has been complete for four days. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    Fourteen requests, 3,855 MW asked, 875 MW ready

    Large-load account manager

    The queue is ranked by readiness, in queue order under the large-load tariff. Seven requests score 70 or more, for 875 MW. Another 2,170 MW scores under 50, with no site control, no deposit or duplicates. The developer's data center campus asks for 300 MW by Q4 2028 and is waiting to be screened.

    Planning should not spend a month on a request before anyone knows it is real.

  2. 02One click

    The file read, checked and screened in about a minute

    Six agents

    The account manager presses Screen request. The request reader takes in 9 documents and 214 fields. The request is for 300 MW at the 230 kV substation, ramping from 60 to 150 to 300 MW by Q4 2028. The readiness checker finds 6 checks pass, 3 pending and 3 short. The duplicate detector, the tariff terms checker and the headroom screener follow, each step logged with its time.

    Readiness checker: “site option ends before the study does; letter of credit $20.0M; no air permit for backup generators”

  3. 03The headroom screen

    180 MW short in 2028, and a staged offer the network can serve

    Headroom screener

    On the 2028 summer peak case, rev. 3, the substation has 120 MW of headroom from Q2 2028. That already allows for a contracted hydrogen load and for the N-1 test, which assumes any one line or transformer is out. The ramp is 30 MW over headroom in Q2 2028 and 180 MW short from Q4 2028, hatched red on the chart. The screener proposes three stages that follow the capital plan. They are 120 MW now, 240 MW with a second line in Q3 2029, and 300 MW with a second autotransformer in Q3 2030.

    “The network cannot carry 300 MW in 2028. It can serve the ramp in three stages as the planned upgrades come in.”

  4. 04Another substation

    The same request, re-screened at a 345 kV substation

    Headroom screener

    Clicking a nearby 345 kV substation on the map re-screens the request there. It has 360 MW of headroom at the end of 2028, but requests ahead hold 350 MW. That leaves 10 MW free, and reaching it needs 18 km of new 345 kV line. Back at the first substation, an earlier 450 MW request missed its site-control date, so it holds no capacity. The developer's own transformer order covers 180 MW in 2028.

    “The developer's own transformer order covers 180 MW in 2028: the 300 MW step is ahead of its hardware.”

  5. 05Duplicate check

    Same parcel, same 300 MW, another utility

    Duplicate detector

    The shared large-load register shows a record for the same 212-acre parcel and 300 MW. It was filed earlier with a neighboring electric cooperative. The match scores 0.94, against a threshold of 0.85. The two site outlines differ by less than 20 meters. Yet Part 7 of the application, where the developer lists other requests, says “none”. The detector recommends asking for an explanation and keeping the request in screening.

    “The detector flags. It does not reject.”

  6. 06The scorecard

    58 of 100: real enough to study in stages

    Readiness checker

    The scorecard has twelve readiness checks and six tariff checks, each cited to its document and page. Site control is a purchase option on the parcel that expires before the facilities study ends. Financial security is a $20.0M letter of credit, against $65.7M needed for 300 MW, or $26.3M for a 120 MW first stage. Backup generation is 24 × 2.5 MW diesel sets, with no air permit filed.

    “Real enough to study as a staged request. The full 300 MW in 2028 is not.”

  7. 07Tariff terms

    The large-load tariff applied line by line, for the staged offer

    Regulatory and tariff analyst

    The request is eligible, at 300 MW against the tariff's 75 MW threshold. The study deposit of $450,000 has been received. The tariff bills at least 80 % of contract capacity, at $11.40 per kW-month. For stage 1 that is a minimum bill of $1.09M a month. The guarantor is not rated investment grade, so security is 24 months of minimum bills. That is $26.3M before stage 1, and the developer is $6.3M short. The tariff analyst confirms the terms.

    “Staging cuts the security needed now from $65.7M to $26.3M; the rest is due 90 days before each later stage.”

  8. 08Signed

    The planner signs the staged offer

    Senior transmission planning engineer

    The account manager sends the staged offer to the planner with its basis. That basis is the 2028 summer peak case, rev. 3 (N-1), and the capital plan. A note says the developer asks for 300 MW by Q4 2028 and the substation has 120 MW. The planner signs. The signature does not reserve capacity by itself. Stage 1 is reserved once $26.3M of security is in place.

    Only megawatts shown in the planning case go into the offer.

  9. 09Missing evidence

    Four items, each with the clause that asks for it

    Large-load account manager

    The study agreement drafter has written a letter to the developer's project director. It asks for four items from the short and pending checks. The first is site control through the end of the study. The second is $26.3M of security for stage 1. The developer must also explain the request to another utility and file the air permit application for the backup generators. A reply is due in 30 days. The account manager reviews the letter and sends it.

    “Drafted by the study agreement drafter · the account manager reviews and sends · agents do not write to a developer.”

  10. 10Approved

    A study agreement for the staged scope, three signatures in order

    Director, grid connections

    The facilities study agreement is drafted from the utility's template and the signed offer. Each clause that differs from the request is marked. The request for 300 MW by Q4 2028 becomes 120 MW in Q2 2028, 240 MW in Q3 2029 and 300 MW in Q3 2030. Security needed before reservation falls from $65.7M to $26.3M. The planner signed first and the tariff analyst confirmed the terms. Now the director approves.

    “This agreement reserves no capacity by itself.”

Who it’s for

Account managers, planners, tariff analysts and the connections director

The same 300 MW request, seen from the four seats that screen, sign, price and approve it, before the agents and after.

Large-load account manager
Runs screening and writes to developers
Before
Carries 14 open requests for 3,855 MW. Takes a developer's call every hour asking when, and chases missing documents by email.
Now
Screens a complete request in one click and sees which are real from the readiness score. Sends a letter where each missing item cites its clause.
Transmission planner
Runs the planning case and signs capacity offers
Before
Studies the number the developer asked for, weeks after the request arrived. Will not promise a megawatt that is not in the planning case.
Now
Gets the ramp drawn against headroom from the planner's own case, with the stages tied to the capital plan. Signs the offer with its basis in view.
Regulatory and tariff analyst
Applies the tariff and answers the commission report
Before
Works out deposits, minimum bills and collateral in spreadsheets. Knows that a collateral waiver for one customer means a waiver for all.
Now
Confirms a calculation where each line cites its tariff clause. It covers the request as asked and as staged, on the same schedule for all customers.
Director, grid connections
Approves study agreements and owns the queue rules
Before
Owns a queue whose order has to survive a complaint to the commission.
Now
Sees megawatts asked against megawatts ready, by year and substation, and where the phantom load sits. Approves study agreements after the planner and the analyst.
The agents

The readiness, duplicate and headroom agents behind the large-load screen

Six agents read each large-load request, check its readiness and tariff terms, and screen it against network headroom. The transmission planner signs every capacity offer.

Request reader

Reads the application, ramp schedule, one-line diagram, site plan, site and finance documents and purchase orders. Extracts each field with its document and page: applicant, parcel, point of delivery, contract capacity, ramp by quarter, load factor, equipment, security and disclosures.

  • Never edits the developer's numbers
  • Marks a field unreadable rather than guessing
Readiness checker

Scores 12 readiness checks out of 100, covering site control, security, land use, equipment, water, generation and disclosure. Flags dates that fall before the study ends.

  • Never accepts a document without a date and a signature
  • Never scores a request it has not fully read
  • Asks for missing evidence and never assumes it
Duplicate detector

Matches the parcel, site center, applicant family (parent companies included), megawatts, ramp and contact. Checks them against the utility's queue and the shared large-load register. Flags matches at 0.85 or above and compares them with the applicant's disclosure.

  • Never rejects a request. It flags and asks.
  • Never shares one developer's data with another
Tariff terms checker

Applies the large-load tariff to the request as asked and to any staged offer. Covers eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities. Each line cites its clause, and security held is shown against security needed.

  • Never waives or changes a tariff term
  • Treats all customers by the same schedule
Headroom screener

Draws the ramp against substation headroom, from the planning case in force (N-1) and the approved capital plan. Removes load held ahead in the queue and finds the shortfall by quarter. Proposes a staged ramp that follows the upgrade dates, and compares the nearest other substations.

  • Never reserves capacity
  • Each offer needs the transmission planner's signature
  • Never uses a planning case that is not in force
Study agreement drafter

Drafts the facilities study agreement from the utility's template and the signed offer, marking each clause that differs from the request. Also drafts the missing-evidence letter from the short and pending checks, each item with its clause.

  • Never sends anything to a developer
  • Never drafts a scope the planner has not signed
Transmission planner

Signs every capacity offer.

Ask in plain words

Large-load requests, substations and tariff terms, asked in plain words

Ask in plain words, or say what to change. Each answer points to the planning case, the register or the tariff it came from. These answers use the sample data.

Why can't this substation take 300 MW in 2028?

Because it has 120 MW for new load from Q2 2028. The 2028 summer peak case (rev. 3, N-1) gives the substation 135 MW on the existing network. A contracted hydrogen electrolyzer takes 15 MW of that from Q2 2028. The second line adds 120 MW in Q3 2029, and the second autotransformer adds another 100 MW in Q3 2030. The developer's 300 MW in Q4 2028 is 180 MW short. So the offer is staged: 120 MW now, 240 MW with the line, 300 MW with the autotransformer.

Has this site asked another utility for power?

Very likely. A register record shows the same parcel and 300 MW filed with a neighboring electric cooperative, a 0.94 match. Part 7 of the developer's application says “none”. The large-load tariff requires each such request to be disclosed. A request for an explanation has been added to the missing-evidence letter. On its own, the match is no reason to reject.

What security does the staged offer need?

$26.3M for stage 1. The tariff asks for 24 months of minimum bills unless the customer is rated investment grade. That is 120 MW × 80 % × $11.40 per kW-month × 24 = $26.27M. The developer holds a $20.0M letter of credit, so it is $6.3M short. At the full 300 MW it would need $65.7M. Security for stages 2 and 3 is due 90 days before each stage.

Which requests are really ready?

Seven of 14, for 875 MW of the 3,855 MW asked, with scores from 71 to 92. Three requests for 2,050 MW score under 45. They have no site control, no deposit or a duplicate elsewhere.

The screens

The large-load queue, the headroom chart and the signed staged offer

From the working solution, on its sample data. Pick one to see it large.

Headroom and the staged offerThe network map with each substation's headroom ring, and the ramp plotted against headroom with the upgrades marked. It also shows the staged offer of 120 MW now, 240 MW in Q3 2029 and 300 MW in Q3 2030.
Agents at workThe run log in progress. The request reader, readiness checker, duplicate detector and tariff terms checker are done, and the headroom screener is at work. Each step shows its finding and time.
Compare another substationThe same request re-screened at a 345 kV substation: 360 MW of headroom, 350 MW held ahead, 10 MW free in 2028.
Send the offer to the plannerThe three stages with their basis (the planning case and the capital plan), and a note to the transmission planner.
The signed staged offerSigned by the transmission planner. Stage 1 needs $26.3M of security ($6.3M short) and brings $13.1M a year in minimum demand revenue from 2028, on the sample tariff.
The large-load queueFourteen open requests ranked by readiness, with megawatts, substation, capacity held, flags and next step. Megawatts asked against ready run across the top.
The readiness scorecardTwelve readiness checks, each cited to its document and page, and the score of 58 out of 100. It also shows a summary of the request and the documents read.
Duplicate checkThe request beside the matching register record, field by field, with the parcel overlay and the decision still open.
Tariff termsThe large-load tariff applied to the staged offer, each line cited to its clause. It shows security held against needed, and minimum demand revenue by year.
Missing-evidence letterThe drafted letter to the developer. It lists four items, each with the clause that asks for it, and a reply is due in 30 days.
Study agreementThe facilities study agreement for the staged scope, with the sign-off order and what changed from the request, clause by clause.
Pipeline and phantom loadMegawatts asked and ready by year, where the phantom load sits, and the quarterly large-load report for the commission.
Your rulesThe large-load tariff's terms and the queue dates as settings: eligibility, deposit, demand floor and charge, security, term and ramp. Each change is logged.
Governance

A large load interconnection queue the commission can audit

Each number cites its sourceEach check, dollar and megawatt cites its source. The source is a document and page, a tariff clause, or the planning case and its revision. The same holds on the scorecard, the tariff calculation and the offer.
The planner signs each capacity offerA capacity offer goes out only with the transmission planner's e-signature, with what the signature means recorded. The tariff analyst confirms the terms and the director approves the study agreement. Only the account manager writes to a developer.
Agents do not reserve capacityThe agents read, check, calculate and draft. They do not reserve capacity, waive a tariff term, reject a request or write to a developer. Even a signed offer reserves stage 1 only once its security is in place.
One schedule for all customersThe tariff terms checker applies the same large-load tariff to each request and cannot waive a term. So the deposit, minimum bill and collateral are worked out the same way for each developer.
Queue order you can defendQueue order follows the tariff's queue clause. When a site-control or deposit date is missed, a withdrawal notice is drafted for the account manager to review and send. Each change is logged.
One record for the commissionEach agent step and decision is in the audit trail. That includes who screened, who signed and when, and who recorded a duplicate decision and why. The commission's quarterly large-load report is drafted from the same records.
Configuration

Tariff terms, queue dates and the planning case are your settings

The large-load tariff, the queue dates, the ready line and the planning basis are all settings. Each change is logged in the audit trail.

SettingDefaultChoose from
Eligibility threshold75 MWNew or added load at one site, in MW, set from your large-load tariff
Study deposit$150,000 + $1,000 per MW requestedDollars per MW requested, on top of the fixed deposit
Billing demand floor and demand charge80 % · $11.40 per kW-monthShare of contract capacity billed at minimum, and the demand charge per kW-month
Security24 months of minimum billsMonths of minimum bills, unless the customer is rated investment grade
Site-control and deposit dates90 days · 30 daysDays from receipt. When a date is missed, a withdrawal notice is drafted for the account manager. On · Off
Ready line70 of 100Score at which a request counts as ready. Check weights: site control 20, security 20, disclosure 10, land use 10, equipment 10, water 10, generation 10, forms 10
Duplicate match threshold0.85Flag a register record at or above this score. The shared large-load register is read daily. On · Off
Planning case and criterion2028 summer peak · rev. 3 · N-1The case in use and its contingency test. Upgrade dates come from the approved capital plan for 2026 to 2031. When a request is above headroom, offer a staged ramp. On · Off
Connections

Applications, site papers, the tariff and the planning case it reads

Load request and ramp schedulethe application form, ramp by quarter, load factor and one-line diagram
Site control and financial securitypurchase options, rezoning, letters of credit, guarantor standing, purchase orders
Large-load tariffthe schedule in force and its earlier versions, with commission orders
Planning case and capital planheadroom by substation and quarter, with the approved upgrade dates
Shared large-load registerrequests filed with neighboring utilities, matched by parcel, site, applicant and MW
Study agreements and lettersyour study agreement template, missing-evidence letters and withdrawal notices
What it changes

Planning time on real megawatts, and first stages served sooner

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of capacity offers checked against headroom and the upgrade plan before a study starts
estimated
$13.1Ma year
estimated minimum-demand revenue from a 120 MW first stage, served two years sooner
served two years sooner
stage 1 of 3 energized early
target
1day
from a complete request to a screening decision, against 4 to 6 weeks by hand
By hand4 to 6 weeks
With agents1 day

“Demo” means seen in the working solution, on its sample utility data. “Target” means the design goal, measured in the live solution. “Estimated” means our own arithmetic, with the inputs shown. The $13.1M is 120,000 kW × 80 % × $11.40 per kW-month × 12, on the sample tariff. The split of days is our estimate around the sample utility's 31-day median from complete to screened. The 17 GW on the band is our estimate too: AEP Ohio's 30 GW queue before its data center tariff, less the 13 GW after. “Typical” means a published figure. Utility Dive and Enverus reported in Dec 2025 that AEP Ohio's queue fell from 30 GW to 13 GW after its data center tariff. ERCOT's 2026 interconnection and grid analysis update and Senate testimony put large-load requests at 474.7 GW by June 2026. About 90 % were data centers. For regulatory context, Texas SB 6 (2025) sets standards for new loads above 75 MW, including site control and disclosure of similar requests. Names on the screens are sample data.

Questions

Large load interconnection questions from connections and planning teams

What is large load interconnection intake?

Large load interconnection intake is the first screen of a big connection request. The request might come from a data center, a hydrogen plant or an industrial site asking for tens or hundreds of megawatts. The screen decides whether the project is real and what the network can serve, before a costly study starts. Large Load Interconnection Intake does it with six agents. They read the file, score readiness, look for the same site at other utilities, apply the large-load tariff and screen the ramp against substation headroom. The transmission planner signs each capacity offer.

How does it screen a data center request against substation headroom?

The headroom screener reads the planning case in force and the approved capital plan. It removes load held ahead in the queue. Then it plots the requested ramp against the substation's headroom quarter by quarter, with the upgrades marked. In the sample, the substation has 120 MW from Q2 2028, so a 300 MW ramp by Q4 2028 is 180 MW short. It can also re-screen the same request at another substation to compare.

What is a staged ramp offer?

When the ramp outruns the network, the screener proposes stages that follow the upgrade dates. The developer gets a staged yes in place of a plain no. In the sample, stage 1 is 120 MW on the existing network. It rises to 240 MW once the second line is in service in Q3 2029. The full 300 MW comes after the second autotransformer in Q3 2030. Security is recalculated for the first stage, $26.3M instead of $65.7M, and the offer goes to the planner to sign.

How does it find speculative and duplicate large-load requests?

The readiness checker scores 12 checks out of 100: site control, security, land use, equipment, water, generation and disclosure. A check passes only with a dated, signed document. The duplicate detector matches parcel, site, applicant family and megawatts against the shared large-load register. Then it compares any match with the developer's disclosure. It flags and asks, and it does not reject.

Does it apply our own large-load tariff?

Yes. The tariff terms checker applies your schedule to the request as asked and to any staged offer. It covers eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities, each line cited to its clause. The checker cannot waive or change a term, and your tariff analyst confirms the calculation.

Can an agent reserve capacity or turn a developer away?

No. The agents read, check, calculate and draft. They do not reserve capacity, waive a tariff term, reject a request or write to a developer. The transmission planner signs each capacity offer and the tariff analyst confirms the terms. The director approves the study agreement, and only the account manager sends anything.

Can we set our own queue rules and planning basis?

Yes. You set the eligibility threshold, deposit, billing demand floor, demand charge, security months, term and ramp. You also set the site-control and deposit dates, the ready line, the check weights and the duplicate match threshold. The planning case, the contingency test and who signs and sends are settings too. Each change is logged.

What do you need from us to run it on our own queue?

Your large-load tariff, application form, queue rules, planning case and study agreement template. The Agentic Solution Engine builds and deploys the solution from those. It goes live once each quality gate has passed. We will walk you through it on a sample of your own requests first.

Screen your own large-load requests
against your planning case.

We'll run Large Load Interconnection Intake on a sample of your own large-load requests, your tariff and your planning case.