Large Load Interconnection Intake

Large load interconnection intake that screens every request against headroom and offers a staged ramp the grid can serve now

See one case, screen by screen ↓
Watch with transcript →

Built forKey account managersTransmission plannersTariff analystsGrid connection directors

The Problem Today

Planners screen headroom last, weeks after a request arrives, and spend scarce study time on load that never builds.

17 GW
of one utility's 30 GW queue gone once requests carried a cost our estimate

Read and worked out by hand

  • Ramp
  • Site papers
  • Security
  • Tariff
  • Same site, three utilitiesRarely checked against other utilities' queues
  • Tariff terms in spreadsheetsA waiver for one becomes a fairness risk for all

The Solution

  1. Each request scoredReadiness checks on site control, security, permits and equipment
  2. Duplicates found elsewhereSame parcel, applicant family or ramp matched against a shared register
  3. Ramp drawn against headroomShortfall found by quarter; a staged ramp follows the upgrade dates
  4. The planner signs the offerThe analyst confirms the tariff terms; the planner signs the stages

Built-in controls

  • One tariff schedule for all customers
  • Nothing reserves capacity on its own
  • Each dollar and megawatt cites its source

What You Get

Projects that are ready get a staged yes sooner, and less stranded-cost risk falls on other customers.

  • Planners study real loadLess engineering time spent on speculative requests
  • One letter, each gap citedMissing evidence listed, each item with its tariff clause
  • A queue that holds upQueue order you can defend before the commission
In short

What is Large Load Interconnection Intake?

Large load interconnection intake is the work of taking a large-load connection request (a data center, hydrogen plant or industrial load asking for tens or hundreds of megawatts) and deciding whether it is real and what the network can serve before a costly study starts. Large Load Interconnection Intake does it with six agents that read the file, score readiness, look for the same site at other utilities, apply the large-load tariff and screen the ramp against substation headroom. The transmission planner signs each capacity offer.

How to choose AI solutions for utilities →

Updated

The problem

Large-load requests swamp planning before anyone knows which will build

Data centers, hydrogen electrolyzers and heavy industry ask for hundreds of megawatts at a time, often for the same parcel at two or three utilities at once, and with ramp schedules that run ahead of their own transformer orders. Each request arrives as an application form, a ramp schedule, a one-line diagram and a stack of land and finance documents. The key account manager chases what is missing by email, the tariff analyst works out the deposit, minimum bill and collateral by hand, and nobody checks as a routine whether the same site was asked of a neighboring utility.

Headroom is checked last. Transmission planning runs its screen only once the request is complete, weeks after it arrived, and the answer is usually a flat yes or no (“we can study 300 MW” or “not before 2030”) when a staged yes was available. Each speculative study uses planning engineers, the scarcest people in the utility, and each capacity reservation without collateral is stranded-cost risk carried by other customers. Tariff terms applied in spreadsheets are a non-discrimination risk in front of the commission.

typical30 → 13GWAEP Ohio's large-load queue, before and after its data center tariff billed at least 85 % of the capacity a customer claims
typical474.7GWin ERCOT's large-load queue by June 2026, 90 % of it data centers; in May more than 300 GW had no studies submitted
Where the screening days go on one large-load requestestimated
By hand31 days
With the solution1 day
  • Reading the application, ramp schedule and site and finance documents3 → 0.1 d
  • Readiness checks: site control, security, permits, equipment, water8 → 0.3 d
  • Checking for the same site at other utilities3 → 0.1 d
  • Deposit, minimum bill and collateral from the large-load tariff4 → 0.1 d
  • Headroom screen against the planning case and the capital plan10 → 0.3 d
  • Capacity offer, sign-off and study agreement draft3 → 0.2 d

Estimated split for one complete request, in calendar days, from complete to a screening decision: by hand (the sample utility's median was 31 days) and with the solution (the 1-day target).

How it works

Read, scored, checked for duplicates and drawn against substation headroom

What comes in
Requests in5 sources · application and ramp, site and finance documents, tariff, planning case, capital plan
Agents at work
Request readerfields + pages
Then
Readiness checker
Duplicate detector
Tariff terms checker
Then
Headroom screenerstaged ramp
Then
Study agreement drafternever sends
A person decides
Transmission plannersigns every capacity offer
What comes out
Signed staged offer
Study agreement
Missing-evidence letter
One case, step by step

A 300 MW data center request through large load interconnection screening

The utility carries 14 open large-load requests for 3,855 MW. A developer's request for 300 MW at a 230 kV substation, complete for four days, is next to screen. Here is what happens, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    Fourteen requests, 3,855 MW asked, 875 MW ready

    Large-load account manager

    The queue is ranked by readiness, in queue order under the large-load tariff. Seven requests score 70 or more, for 875 MW; 2,170 MW scores under 50, with no site control, no deposit or duplicates. The developer's data center campus asks 300 MW by Q4 2028 and is waiting to be screened.

    Planning should not spend a month on a request before anyone knows it is real.

  2. 02One click

    The file read, checked and screened in about a minute

    Six agents

    The account manager presses Screen request. The request reader takes 9 documents and 214 fields: 300 MW at the 230 kV substation, ramp 60 → 150 → 300 MW by Q4 2028. The readiness checker finds 6 pass, 3 pending and 3 short. The duplicate detector and the tariff terms checker follow, then the headroom screener, each step logged with its time.

    Readiness checker: “site option ends before the study does; letter of credit $20.0M; no air permit for backup generators”

  3. 03The headroom screen

    180 MW short in 2028, and a staged offer the network can serve

    Headroom screener

    On the 2028 summer peak case, rev. 3 (N-1), the substation has 120 MW for new load from Q2 2028, after a contracted hydrogen load. The ramp is 30 MW above headroom in Q2 2028 and 180 MW short from Q4 2028, hatched red on the chart. The screener proposes three stages that follow the capital plan: 120 MW now, 240 MW with a second line in Q3 2029, 300 MW with a second autotransformer in Q3 2030.

    “The network cannot carry 300 MW in 2028. It can serve the ramp in three stages as the planned upgrades come in.”

  4. 04Another substation

    The same request, re-screened at a 345 kV substation

    Headroom screener

    Clicking a nearby 345 kV substation on the map re-screens the request there: 360 MW of headroom at the end of 2028, but 350 MW held by requests ahead, so 10 MW free, and 18 km of new 345 kV line to reach it. An earlier 450 MW request at the first substation missed its site-control date, so it holds no capacity. The developer's own transformer order covers 180 MW in 2028.

    “The developer's own transformer order covers 180 MW in 2028: the 300 MW step is ahead of its hardware.”

  5. 05Duplicate check

    Same parcel, same 300 MW, another utility

    Duplicate detector

    The shared large-load register shows a record for the same 212-acre parcel and 300 MW, filed earlier with a neighboring electric cooperative: a 0.94 match against a threshold of 0.85. The two site outlines differ by less than 20 meters. The developer's disclosure in Part 7 of the application says “none”. The detector recommends asking for an explanation and keeping the request in screening.

    “The detector flags. It does not reject.”

  6. 06The scorecard

    58 of 100: real enough to study, staged

    Readiness checker

    Twelve readiness checks and six tariff checks, each cited to its document and page. Site control: a purchase option on the parcel that expires before the facilities study ends. Financial security: a $20.0M letter of credit against $65.7M needed for 300 MW, or $26.3M for a 120 MW first stage. Backup generation: 24 × 2.5 MW diesel sets, air permit not filed.

    “Real enough to study as a staged request, not as 300 MW in 2028.”

  7. 07Tariff terms

    The large-load tariff applied line by line, for the staged offer

    Regulatory and tariff analyst

    Eligible at 300 MW against the 75 MW threshold; study deposit of $450,000 received; billing demand floor 80 % of contract capacity at $11.40 per kW-month, a $1.09M minimum bill a month for stage 1. Security is 24 months of minimum bills because the guarantor is not rated investment grade: $26.3M before stage 1, so the developer is $6.3M short. The tariff analyst confirms the terms.

    “Staging cuts the security needed now from $65.7M to $26.3M; the rest is due 90 days before each later stage.”

  8. 08Signed

    The planner signs the staged offer

    Senior transmission planning engineer

    The account manager sends the staged offer to the planner with its basis, the 2028 summer peak case rev. 3 (N-1) and the capital plan, and a note: the developer asks 300 MW by Q4 2028; the substation has 120 MW. The planner signs. The signature reserves no capacity by itself: stage 1 is reserved when $26.3M of security is in place.

    Only megawatts shown in the planning case go into the offer.

  9. 09Missing evidence

    Four items, each with the clause that asks for it

    Large-load account manager

    The study agreement drafter has written the letter to the developer's project director from the short and pending checks: site control through the end of the study, security of $26.3M for stage 1, an explanation of the request to another utility, and the air permit application for the backup generators, with a reply due in 30 days. The account manager reviews it and sends it.

    “Drafted by the study agreement drafter · the account manager reviews and sends · agents do not write to a developer.”

  10. 10Approved

    A study agreement for the staged scope, three signatures in order

    Director, grid connections

    The facilities study agreement is drafted from the utility's template and the signed offer, with each clause that differs from the request marked: 300 MW by Q4 2028 becomes 120 MW in Q2 2028, 240 MW in Q3 2029 and 300 MW in Q3 2030; security before reservation falls from $65.7M to $26.3M. The planner signed first, the tariff analyst confirmed the terms, and the director approves.

    “This agreement reserves no capacity by itself.”

Who it’s for

Account managers, planners, tariff analysts and the connections director

The same 300 MW request from the four seats that screen, sign, price and approve it, before the agents and after.

Large-load account manager
Runs screening and writes to developers
Before
Carries 14 open requests for 3,855 MW, takes a developer's call every hour asking when, and chases missing documents by email.
Now
Screens a complete request in one click, sees who is real by readiness score, and sends a letter in which each missing item cites its clause.
Transmission planner
Runs the planning case and signs capacity offers
Before
Studies the number the developer asked for, weeks after it arrived, and will not promise a megawatt that is not in the planning case.
Now
Gets the ramp drawn against headroom from the planner's own case, with the stages tied to the capital plan, and signs the offer with its basis in view.
Regulatory and tariff analyst
Applies the tariff and answers the commission report
Before
Works out deposits, minimum bills and collateral in spreadsheets, knowing that a collateral waiver for one customer means a waiver for all.
Now
Confirms a calculation in which each line cites its tariff clause, for the request as asked and as staged, on the same schedule for all customers.
Director, grid connections
Approves study agreements and owns the queue rules
Before
Owns a queue whose order has to survive a complaint to the commission.
Now
Sees asked against ready megawatts by year and substation, where the phantom load sits, and approves study agreements after the planner and the analyst.
The agents

The readiness, duplicate and headroom agents behind the large-load screen

Each large-load request is read, checked for readiness and tariff terms and screened against network headroom by six agents; the transmission planner signs every capacity offer.

Request reader

Reads the application, ramp schedule, one-line diagram, site plan, site and finance documents and purchase orders, and extracts each field (applicant, parcel, point of delivery, contract capacity, ramp by quarter, load factor, equipment, security, disclosures) with its document and page.

  • Never edits the developer's numbers
  • Marks a field unreadable rather than guessing
Readiness checker

Scores 12 readiness checks (site control, security, land use, equipment, water, generation, disclosure) out of 100, and flags dates that fall before the end of the study.

  • Never accepts a document without a date and a signature
  • Never scores a request it has not fully read
  • Asks for missing evidence; never assumes it
Duplicate detector

Matches parcel, site centroid, applicant family (including parent companies), megawatts, ramp and contact against the utility's queue and the shared large-load register, flags matches at or above 0.85 and compares them with the applicant's disclosure.

  • Never rejects a request: it flags and asks
  • Never shares one developer's data with another
Tariff terms checker

Applies the large-load tariff for the request as asked and for any staged offer: eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities, each line cited to its clause, with security held against needed.

  • Never waives or changes a tariff term
  • Treats all customers by the same schedule
Headroom screener

Draws the ramp against substation headroom from the planning case in force (N-1) and the approved capital plan, removes load held ahead in the queue, finds the shortfall by quarter and proposes a staged ramp that follows the upgrade dates; compares the nearest alternative substations.

  • Never reserves capacity
  • Each offer needs the transmission planner's signature
  • Never uses a planning case that is not in force
Study agreement drafter

Drafts the facilities study agreement from the utility's template and the signed offer, marking each clause that differs from the request, and drafts the missing-evidence letter from the short and pending checks, each with its clause.

  • Never sends anything to a developer
  • Never drafts a scope the planner has not signed
Transmission planner

Signs every capacity offer.

Ask in plain words

Large-load requests, substations and tariff terms, asked in plain words

Ask in plain words, or say what to change. Each answer points to the planning case, the register or the tariff it came from. These answers use the sample data.

Why can't this substation take 300 MW in 2028?

Because it has 120 MW for new load from Q2 2028. The 2028 summer peak case (rev. 3, N-1) gives the substation 135 MW on the existing network, and a contracted hydrogen electrolyzer takes 15 MW from Q2 2028. The second line adds 120 MW in Q3 2029 and the second autotransformer another 100 MW in Q3 2030. The developer's 300 MW in Q4 2028 is 180 MW short, so the offer is staged: 120 MW now, 240 MW with the line, 300 MW with the autotransformer.

Has this site asked another utility for power?

Very likely. A register record shows the same parcel and 300 MW filed with a neighboring electric cooperative: a 0.94 match. The developer's application, Part 7, says “none”, and the large-load tariff requires each such request to be disclosed. An explanation has been added to the missing-evidence letter; it is not a reason to reject on its own.

What security does the staged offer need?

$26.3M for stage 1. The tariff asks for 24 months of minimum bills unless the customer is rated investment grade: 120 MW × 80 % × $11.40 per kW-month × 24 = $26.27M. The developer holds a $20.0M letter of credit, so it is $6.3M short. At the full 300 MW it would need $65.7M. Security for stages 2 and 3 is due 90 days before each stage.

Which requests are really ready?

7 of 14, for 875 MW of the 3,855 MW asked, with scores from 71 to 92. Three requests for 2,050 MW score under 45, with no site control, no deposit or duplicates elsewhere.

The screens

The large-load queue, the headroom chart and the signed staged offer

From the working solution, on its sample data. Pick one to see it large.

Headroom and the staged offerThe network map with each substation's headroom ring, the ramp plotted against the substation's headroom with the upgrades marked, and the staged offer: 120 MW now, 240 MW in Q3 2029, 300 MW in Q3 2030.
Agents at workThe run log in progress: request reader, readiness checker, duplicate detector and tariff terms checker done, the headroom screener at work, each step with its finding and its time.
Compare another substationThe same request re-screened at a 345 kV substation: 360 MW of headroom, 350 MW held ahead, 10 MW free in 2028.
Send the offer to the plannerThe three stages with their basis, the planning case and the capital plan, and a note to the transmission planner.
The signed staged offerSigned by the transmission planner, with stage 1 security of $26.3M ($6.3M short) and $13.1M a year in minimum demand revenue from 2028, on the sample tariff.
The large-load queueFourteen open requests ranked by readiness (megawatts, substation, capacity held, flags and next step) with asked against ready across the top.
The readiness scorecardTwelve readiness checks, each cited to its document and page, the score of 58 out of 100, a summary of the request and the documents read.
Duplicate checkThe request beside the matching register record, field by field, with the parcel overlay and the decision still open.
Tariff termsThe large-load tariff applied to the staged offer, each line cited to its clause, security held against needed and minimum demand revenue by year.
Missing-evidence letterThe drafted letter to the developer: four items, each with the clause that asks for it, reply due in 30 days.
Study agreementThe facilities study agreement for the staged scope, the sign-off in order and what changed from the request, clause by clause.
Pipeline and phantom loadMegawatts asked and ready by year, where the phantom load sits and the quarterly large-load report for the commission.
Your rulesThe large-load tariff's terms and the queue dates (eligibility, deposit, demand floor and charge, security, term and ramp), each a setting, each change logged.
Governance

A large load interconnection queue the commission can audit

Each number cites its sourceEach check, dollar and megawatt cites its document and page, the tariff clause, or the planning case and its revision, on the scorecard, the tariff calculation and the offer alike.
The planner signs each capacity offerA capacity offer goes out only with the transmission planner's e-signature, its meaning recorded. The tariff analyst confirms the terms, the director approves the study agreement, and only the account manager writes to a developer.
Agents do not reserve capacityThe agents read, check, calculate and draft. They do not reserve capacity, waive a tariff term, reject a request or write to a developer, and even a signed offer reserves stage 1 only once its security is in place.
One schedule for all customersThe tariff terms checker applies the same large-load tariff to each request and cannot waive a term, so the deposit, minimum bill and collateral are calculated the same way for each developer.
Queue order you can defendQueue order follows the tariff's queue clause. A missed site-control or deposit date drafts a withdrawal notice for the account manager to review and send, and each change is logged.
One record for the commissionEach agent step and decision (who screened, who signed and when, who recorded a duplicate decision and why) is in the audit trail, and the commission's quarterly large-load report is drafted from the same records.
Configuration

Large-load tariff terms, queue dates and the planning case, as settings

The large-load tariff, the queue dates, the readiness line and the planning basis are settings, and changes are logged in the audit trail.

SettingDefaultChoose from
Eligibility threshold75 MWNew or added load at one site, in MW — set from your large-load tariff
Study deposit$150,000 + $1,000 per MW requestedDollars per MW requested, on top of the fixed deposit
Billing demand floor and demand charge80 % · $11.40 per kW-monthShare of contract capacity billed at minimum, and the demand charge per kW-month
Security24 months of minimum billsMonths of minimum bills, unless the customer is rated investment grade
Site-control and deposit dates90 days · 30 daysDays from receipt; when a date is missed, draft a withdrawal notice for the account manager — On · Off
Ready line70 of 100Score at which a request counts as ready; check weights: site control 20, security 20, disclosure 10, land use 10, equipment 10, water 10, generation 10, forms 10
Duplicate match threshold0.85Flag a register record at or above; the shared large-load register is read daily — On · Off
Planning case and criterion2028 summer peak · rev. 3 · N-1The case in use and its contingency; upgrade dates from the approved capital plan 2026–2031; offer a staged ramp when a request is above headroom — On · Off
Connections

Applications, site papers, the tariff and the planning case it reads

Load request and ramp schedulethe application form, ramp by quarter, load factor and one-line diagram
Site control and financial securitypurchase options, rezoning, letters of credit, guarantor standing, purchase orders
Large-load tariffthe schedule in force and its earlier versions, with commission orders
Planning case and capital planheadroom by substation and quarter, with the approved upgrade dates
Shared large-load registerrequests filed with neighboring utilities, matched by parcel, site, applicant and MW
Study agreements and lettersyour study agreement template, missing-evidence letters and withdrawal notices
What it changes

Planning time on real megawatts, and first stages served sooner

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of capacity offers checked against headroom and the upgrade plan before a study starts
estimated
$13.1Ma year
estimated minimum-demand revenue from a 120 MW first stage, served two years sooner
served two years sooner
stage 1 of 3 energized early
target
1day
from a complete request to a screening decision, against 4–6 weeks by hand
By hand4–6 weeks
With agents1 day

“demo” = seen in the working solution, on its sample utility data · “target” = the design goal, measured in the live solution · “estimated” = our arithmetic, inputs shown ($13.1M = 120,000 kW × 80 % × $11.40 per kW-month × 12, on the sample tariff; the days split is our estimate around the sample utility's 31-day median from complete to screened) · “our estimate” on the band: 17 GW = AEP Ohio's 30 GW queue before its data center tariff, less the 13 GW after · “typical” = published figures (Utility Dive / Enverus, Dec 2025: AEP Ohio's queue fell from 30 GW to 13 GW after its data center tariff; ERCOT interconnection and grid analysis update and Senate testimony, 2026: 474.7 GW of large-load requests by June 2026, about 90 % data centers). Regulatory context: Texas SB 6 (2025) sets standards for new loads above 75 MW, including site control and disclosure of similar requests. Names on the screens are sample data.

Questions

Large load interconnection questions from connections and planning teams

What is large load interconnection intake?

Large load interconnection intake is the work of taking a large-load connection request (a data center, hydrogen plant or industrial load asking for tens or hundreds of megawatts) and deciding whether it is real and what the network can serve before a costly study starts. Large Load Interconnection Intake does it with six agents that read the file, score readiness, look for the same site at other utilities, apply the large-load tariff and screen the ramp against substation headroom. The transmission planner signs each capacity offer.

How does it screen a data center request against substation headroom?

The headroom screener reads the planning case in force and the approved capital plan, removes load held ahead in the queue and plots the requested ramp against the substation's headroom quarter by quarter, with the upgrades marked. In the sample case the substation has 120 MW from Q2 2028, so a 300 MW ramp by Q4 2028 is 180 MW short. It can re-screen the same request at another substation for comparison.

What is a staged ramp offer?

Where the ramp outruns the network, the screener proposes stages that follow the upgrade dates instead of a plain no. In the sample that is 120 MW on the existing network, 240 MW when the second line is in service in Q3 2029 and 300 MW after the second autotransformer in Q3 2030. The security is recalculated for the first stage ($26.3M instead of $65.7M) and the offer goes to the planner to sign.

How does it find speculative and duplicate large-load requests?

The readiness checker scores 12 checks out of 100 (site control, security, land use, equipment, water, generation and disclosure) and passes a check only with a dated, signed document. The duplicate detector matches parcel, site, applicant family and megawatts against the shared large-load register and compares them with the developer's disclosure. It flags and asks; it does not reject.

Does it apply our own large-load tariff?

Yes. The tariff terms checker applies your schedule (eligibility, study deposit, minimum demand, security, term, exit fee and direct-assigned facilities) for the request as asked and for any staged offer, each line cited to its clause. It cannot waive or change a term, and your tariff analyst confirms the calculation.

Can an agent reserve capacity or turn a developer away?

No. The agents read, check, calculate and draft; they do not reserve capacity, waive a tariff term, reject a request or write to a developer. The transmission planner signs each capacity offer, the tariff analyst confirms the terms, the director approves the study agreement and only the account manager sends.

Can we set our own queue rules and planning basis?

Yes. The eligibility threshold, deposit, billing demand floor, demand charge, security months, term and ramp, site-control and deposit dates, the ready line and check weights, the duplicate match threshold, the planning case and contingency criterion, and who signs and sends are all settings, and each change is logged.

What do you need from us to run it on our own queue?

Your large-load tariff, application form, queue rules, planning case and study agreement template. The Agentic Solution Engine builds and deploys the solution from those requirements and documents, and it goes live once each quality gate has passed. We will walk you through it on a sample of your own requests first.

Screen your own large-load requests
against your planning case.

We'll run Large Load Interconnection Intake on a sample of your own large-load requests, your tariff and your planning case.