WorkflowNew Connections, Solar & EV Programs

EV Charger Rebate and Make-Ready Processing

EV charger rebate and make-ready processing that pays each incentive for a charger proven to be there

See one case, screen by screen ↓
Watch with transcript →

Built forEV program analystsEV program managersMake-ready engineersLicensed electricians

The Problem Today

Analysts check each rebate by opening every PDF and phone photo by hand, so a missing item is found weeks later.

6-8 wks
to pay a charger incentive, as one utility says published

What the analyst checks by hand

  • Invoice
  • Photo
  • Permit
  • License
  • Serials read by zooming inPhone photos squinted at, or skipped
  • Trench paid on the estimateA trench longer than the site plan still passes

The Solution

  1. Each application readEight items to verify, such as invoice, permit, license and enrollment
  2. The nameplate photo checkedSerial checked against the invoice, approved list and network record
  3. Make-ready measured on planTrench and conduit measured on the site plan, and each estimate line checked
  4. The analyst decidesThe analyst approves rebates, and the manager signs make-ready and batches

Built-in controls

  • Nothing paid while an item is open
  • A mismatch shows what differs, never “fraud”
  • Bank details only from the payee register

What You Get

Complete rebates are paid sooner. Each incentive dollar reported to the regulator traces to a charger shown to be installed.

  • Installers told the same dayThe one missing item, what fixes it and the reply date
  • Reused photos caughtSerials that differ from the invoice are caught too
  • Ports tracked to the targetEnergized and under construction, against the goal
In short

What is EV Charger Rebate and Make-Ready Processing?

It is software that takes a utility's EV charger incentive from the application to a signed payment or commitment. The incentive might be a home charger rebate, a workplace charger incentive or make-ready funding for a fleet or public site. EV Charger Rebate and Make-Ready Processing opens each application as a checklist of the evidence it needs. Six agents then verify each item. The analyst decides each rebate, and the program manager signs commitments and payment batches.

How to choose AI solutions for utilities →

Updated

The problem

Rebates and make-ready estimates are checked by hand, so errors are found late

Utilities pay incentives to help customers put in EV chargers. A home customer can get a rebate for a Level 2 charger and the wiring and panel work behind it. A workplace, public or fleet site can get make-ready funding. That money pays for the electrical work that gets a site ready for chargers, such as trenching, conduit, switchgear and transformers. Before the utility pays, someone has to check the evidence. For each application, that means eight items of evidence. The first four are customer and premise, proof of purchase, an approved charger and the installation photo. The other four are the permit and final inspection, a licensed electrician, enrollment in managed charging, and the wiring and panel cost.

Today that check is done by hand, one file at a time. Each application is a portal form with 6 to 10 PDFs and phone photos. An analyst opens them one by one. To read a charger's serial number, the analyst zooms into a phone photo. It is the slowest step, and the one skipped when the queue is long. So a missing permit or a wrong photo is found two or three weeks after the application arrives. By then the installer has moved on, and the customer waits weeks for a $500 to $1,500 payment. Make-ready sites have the same gap. An engineer reads the site plan and the contractor's estimate side by side. A trench longer than the plan shows, or a cost above the limit for each port, passes unless someone measures it. That matters, because each incentive dollar is reported to the regulator against the program's target for ports.

typical6-8weeksto pay an EV charger incentive after the application is approved, as one utility tells its customers
typical4-6weeksfor a rebate check to arrive after final approval, in a state charger program's FAQ
Where a home charger rebate's days goestimated
By hand45 days
With the solution6.1 days
  • Waiting for an analyst to open the application14 → 0.5 d
  • Checking invoice, photo, approved list, permit and license by hand2 → 0.1 d
  • Asking the installer for what is missing and waiting for the reply14 → 3 d
  • Re-checking the reply and deciding5 → 0.5 d
  • Waiting for the payment batch and the payment10 → 2 d

Estimated split for a home charger rebate with one missing item, in calendar days, by hand and with the solution. A complete application skips the request rows.

How it works

Eight evidence items, read and checked before any incentive is paid

What comes in
Applications in8 pieces of evidence · invoice, photos, permit, license, site plan
Agents at work
Application readerevery value cited
Then
Photo readernameplate + fingerprint
Approved charger matcher
Then
Eligibility and incentive calculator
Make-ready cost reviewermeasured on the plan
Then
Installer request writerplain request, same day
A person decides
EV programme analystapproves, holds or asks
What comes out
Eligibility decision
Incentive calculated
Request to the installer
One case, step by step

A home charger rebate and a fleet make-ready depot, screen by screen

The utility's EV program has a $24.5M budget. Its regulator has set a target of 4,800 ports. This morning a customer's home charger rebate is first in the analyst's queue. Here is what happens next, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning

    One application, eight pieces of evidence

    EV program analyst

    An electrical contractor sent the application late yesterday. A licensed electrician installed a networked Level 2 charger at the customer's home. The application reader read the 7 documents overnight. The claim is a $500 charger rebate plus a $1,000 adder for the wiring and panel, $1,500 in all. The eight evidence items wait to be verified. The nameplate in the installation photo has not been read yet.

    “Nothing verified yet. Press Verify the evidence and the agents check all eight items while you watch.”

  2. 02One click

    The checklist ticks itself green

    EV program analyst

    The analyst presses Verify the evidence. The account is residential and has been active a long time. No charger rebate has been paid at this premise before. The invoice and its receipt show a purchase the week before, inside the 180-day window. The charger model is ENERGY STAR certified and networked. It is on the approved list that was in force on the purchase date.

    Approved charger matcher: never passes a near match or a version of the model with no network connection.

  3. 03Seconds later

    The serial on the nameplate is not the one invoiced

    Photo reader

    The photo reader finds the nameplate in the installation photo. It reads the model, which matches, and then the serial. The invoice gives a different serial, with four characters changed. The photo was also taken four days before this install. Its digital fingerprint matches an image the same installer already sent with another customer's application.

    The photo reader does not call a mismatch fraud. It reports what differs.

  4. 047 of 8 verified

    The network shows the charger is there, so the money is held while the right photo is requested

    Eligibility and incentive calculator

    The permit passed final inspection. The electrician's license was valid on the install date. The charger is enrolled in the utility's managed-charging program, which lets the utility time when chargers draw power. It reports the invoiced serial over the network. The wiring and panel lines come to $3,090 of eligible cost, so the adder is capped at $1,000. The $1,500 is held until item 4, the photo, is verified.

    “The photo shows another job, but the network confirms the invoiced charger is installed. Hold the $1,500 and ask for the right photo. Nothing is refused.”

  5. 05Same morning

    A plain request to the installer, sent by the analyst

    Installer request writer

    The request writer drafts a note to the electrician. It says seven of the eight items are verified. The serial in the photo differs from the one on the invoice and in the charger's network record. The note asks for a photo of the charger at this address, with the nameplate readable, within 14 days. The customer gets a copy in plain words. The analyst reads the note and sends it.

    To the customer: “Your rebate is approved in principle. We are waiting for one photo from your installer. You do not need to do anything.”

  6. 06A few minutes later

    Each open application as eight dots

    EV program analyst

    The evidence board shows the whole program the same way. Today 238 applications are waiting, 31 are ready to decide and 74 are waiting on the installer. Each one is a row of eight evidence dots. This application's row now reads “Photo requested from the installer · reply in 14 days”. Below it, two rows show red, one for a nameplate covered in glare and one for a stand-alone charger with no network connection.

  7. 07As replies arrive

    A reply is read the moment it arrives

    Photo reader

    Requests to installers lists what each installer has been asked for and the reply date. A request with no answer gets a reminder at day 10. This morning another installer sent two new photos for an earlier application. The photo reader read the nameplate again. The serial matched the invoice and the network record, and the item turned green.

  8. 08Make-ready

    72 feet of trench the site plan does not show

    Make-ready engineer

    A freight company's depot asks for 12 fleet ports. Of these, 10 are 19.2 kW Level 2 ports and 2 are 150 kW DC fast ports. The contractor's estimate bills 310 ft of trench at $220 a foot. The make-ready cost reviewer measured the route on the site plan in three runs of 64, 118 and 56 ft, 238 ft in all. The other eight lines of the estimate match the plan. The engineer accepts the adjustment.

    “72 ft more than the plan shows · $15,840 at $220 a foot.”

  9. 09Signed

    The commitment, at the per-port cap

    EV program manager

    After the adjustment the eligible cost is $412,800. The caps are $15,000 for each of the 10 Level 2 ports and $90,000 for each of the 2 DC fast ports. Together they set the incentive at $330,000. The new 750 kVA transformer and 85 ft of primary cable cost $186,500, and the utility pays for those itself. The load check shows 492 kW connected and a 360 kW managed peak. The transformer is good for about 712 kW. The program manager signs and sets a deadline to energize the site.

    “The commitment is paid against invoices at energization, measured again against the as-built.”

  10. 10The weekly batch

    Each dollar points at a charger that exists

    EV program manager

    The payment batch holds 212 rebates worth $268,750. The batch checks run before the program manager signs. No charger is paid twice across the utility's programs. All 8 items are verified on all 212 rebates. Payees come from the payee register and never from an application. This morning's home rebate is not in the batch, because one item is open. The ports chart shows 2,946 energized and 1,212 in construction, against the regulator's 4,800.

    “Nothing is paid while an item is open. Each hold names its evidence.”

Who it’s for

Program analysts, engineers, installers and customers on one rebate

One rebate and one depot pass through five people. Here is the week for each of them, by hand and with the agents.

EV program analyst
Decides rebates up to $5,000
Before
Works 50 to 70 home and workplace applications a day, each with 6 to 10 documents and photos. Zooms into phone photos to read serial numbers.
Now
Opens each application as a checklist that ticks itself green. Sees which item is red and why, and sends the drafted request the same morning.
EV program manager
Owns the budget and the regulator's port target
Before
Signs make-ready commitments and payment batches. Reports ports and spend to the regulator, where each dollar has to point at a charger that exists.
Now
Signs a batch whose checks show no charger paid twice and no rebate paid with an item open. Sees ports energized against the 4,800 target.
Make-ready engineer
Reviews site plans, load and estimates
Before
Reads a site plan PDF and a contractor's estimate side by side for each fleet and workplace site. A trench of 310 feet on the estimate can be 238 on the plan.
Now
Gets each estimate line compared with the measured plan, the per-port cap applied and the load checked against the transformer. Accepts or rejects each adjustment.
Licensed electrician
Installs chargers and submits rebates
Before
Installs 6 to 8 home chargers a week and submits the rebate for each customer. If something is missing, hears about it a month after sending.
Now
Hears the same morning which item is missing, what fixes it and when the reply is due. The reply is read the moment it arrives.
Customer
Bought a home charger for a first EV
Before
Bought a home charger for a first EV. The installer said the rebate would take care of itself.
Now
Gets a plain note saying the rebate is approved in principle and the utility is waiting for one photo from the installer. The customer does not need to do anything.
The agents

Photo, charger and make-ready agents that check each rebate

Six agents read the documents and the charger's nameplate in the photo, check the rules and draft requests. The EV program analyst decides.

Application reader

Reads the application form, invoice, receipt, permit and inspection record, license and enrollment. Pulls out each line, model, serial, date and amount, with the page and position it came from.

  • Never changes a submitted value
  • Cites page and position for each value
  • Reports an unreadable field instead of guessing it
Photo reader

Finds the charger and its nameplate in each installation photo and reads the model and serial. Compares them character by character with the invoice and with the serial the charger reports over the network. Checks the photo date, and fingerprints the image against all photos sent in the last 3 years.

  • Never passes an unreadable nameplate, and says why (glare, distance or angle)
  • Never calls a mismatch fraud. Reports what differs
  • Reports and never decides
Approved charger matcher

Looks each model up on the version of the approved list in force on the purchase date. A listed model is ENERGY STAR certified, networked and ready for managed charging. If a model is not listed, it names the closest listed model and how the two differ.

  • Never passes a near match or a version of the model with no network connection
Eligibility and incentive calculator

Applies the version of the program rules in force. The premise must be residential, on the utility's service and with no charger rebate in 5 years. The purchase must fall inside 180 days and the final inspection must pass. The license must be valid on the install date, and the charger must be enrolled in managed charging. Then it calculates the incentive, with the adder capped at $1,000.

  • Never pays above a cap or outside the window
  • Never pays with an item open
Make-ready cost reviewer

Measures trench, conduit and feeder lengths on the site plan. Counts ports, pads and foundations, and compares each estimate line with them. Applies the per-port caps, and checks connected load and the managed peak against the transformer rating.

  • Never commits money
  • Never changes the site host's estimate. Only flags it
Installer request writer

Drafts the request to the installer. It says what is verified, the one thing that is not and the exact evidence that fixes it, with a reply date 14 days out. Also drafts a plain note telling the customer whether they need to do anything.

  • Never sends without the analyst
  • Never asks for evidence the rules do not require
  • Never accuses. Describes what differs
EV programme analyst

Decides, and the manager signs batches.

Ask in plain words

What analysts ask about a rebate, a nameplate photo or a make-ready site

Ask about an evidence item, a photo, a charger or a make-ready site, or ask for a request to an installer. Each answer cites the document, the photo or the rule. These answers use the sample data.

Why is the installation photo red?

The nameplate in the photo shows a serial four characters different from the invoice. The photo was taken four days before this install. It is the same image the installer sent for another customer. Under rule §6, such a photo does not show this installation, so item 4 stays open.

Was the charger actually installed?

Very likely, yes. The charger is enrolled in managed charging and reports the invoiced serial over the network. The final inspection also passed. So the invoice is right and the photo is from another job. I would hold the $1,500 and ask the electrician for the right photo, rather than refuse. The request is drafted.

What did the trench review find at the fleet depot?

The contractor's estimate bills 310 ft of trench at $220 a foot. On the site plan, the route measures 64, 118 and 56 ft, 238 ft in all. So line 3 is $15,840 over. After the adjustment the eligible cost is $412,800. The per-port caps, $15,000 for each of 10 ports plus $90,000 for each of 2, set the incentive at $330,000.

Which installers have sent reused photos?

One installer this month, twice. This application used a photo from an earlier one, and a second application did the same the month before. That earlier request was answered with a correct photo and paid. This installer's applications are complete the first time 81% of the time, against 92% for the best installer. I would send them the photo guidance.

The screens

The evidence checklist, the nameplate read and the make-ready review

From the working solution, on its sample data. Pick one to see it large.

The evidence checklistOne rebate application. The installation photo with its nameplate read in place, the eight evidence items with their sources, the incentive and the agents' run.
The installation photoThe charger's nameplate, enlarged, before the agents verify the evidence.
Agents at workCustomer and premise, proof of purchase and approved charger are verified while the photo reader reads the nameplate.
What the Photo reader readThe nameplate serial against the invoice, a photo date before the install, and the same image on another application.
Request to the installerThe drafted request naming the one item that does not match, with the plain-words note to the customer.
The evidence boardEach open application as eight evidence dots, filtered by ready, does not match, waiting on the installer and make-ready.
Requests to installersWhat each installer has been asked for, the reply date, and the reminder at day 10.
Make-ready site reviewThe site plan with the trench route measured, and each estimate line compared with the plan.
Sign the commitmentEligible cost, the incentive at the per-port cap, the utility-side work and the energization date, signed by the program manager.
Budget and portsPorts toward the regulator's target, the budget paid and committed, what the checks held back, and the payment batch with its checks.
InstallersEach installer's applications, first-time-complete rate, photo issues, reused photos and median days to pay.
Approved chargersThe approved models, photos read this month, and models seen on invoices that cannot be paid.
Program rulesIncentives and caps, the evidence each program requires, photo checks, clocks and approvals.
Governance

Held payments and signed batches in EV charger rebate processing

Each item cites its evidenceEach checklist item links to the records it was checked against. They include the invoice line, the receipt and the part of the photo used. They also include the approved list in force on the purchase date, the inspection record, the license register, the network record and the rule version.
Agents check; people decide and signAgents read, compare, calculate and draft. They do not send a request, approve, commit or pay. The analyst approves or holds rebates up to $5,000. The program manager approves above that and signs each make-ready commitment and payment batch.
Nothing paid with an item openA rebate with an open item stays out of the batch. Paying anyway is an override. It needs the program manager and a recorded reason, and the analyst cannot do it alone.
A difference is shown, never called fraudA serial that differs, or a photo already sent for another job, is shown as what differs. The evidence sits beside it. The request names the one thing that fixes it, and people decide what it means.
Checks on each payment batchThese checks run before the batch is signed. No charger is paid twice across the utility's programs. Each rebate has all 8 items verified. Payees come from the payee register, and bank details are never taken from an application. Recent bank changes are confirmed by phone.
Versioned rules, each step on the recordA rule change is saved as a new version. It applies to applications received after it. Each agent step and each human decision is recorded with its time. Photos are kept with their fingerprint.
Configuration

Incentives, caps, evidence and approvals for each charger rebate

Incentives, caps, evidence, photo checks, clocks and approvals are settings the program controls. Each change is saved as a new rule version.

SettingDefaultChoose from
Home charger rebate and adders$500 · adder up to $1,000Charger rebate, wiring and panel adder, and a $500 bonus for income-qualified customers, each edited as a new rule version
Make-ready caps$15,000 a Level 2 port · $90,000 a DC fast portCustomer-side work measured on the site plan · DC fast means 150 kW or more
Serial must agree three waysOnOn · Off · photo, invoice and the charger network's enrollment record
Reused-photo checkLast 3 yearsLast 12 months · Last 3 years · Last 5 years
Purchase window180 daysSet in steps of 30 days, counted from the invoice date to a complete application
One home charger rebate per premiseEvery 5 yearsEvery 5 years · Every 3 years · Once
Installer reply window14 days10 days · 14 days · 21 days · one reminder at day 10
Analyst approves aloneUp to $5,000Up to $2,500 · Up to $5,000 · Up to $10,000 · make-ready commitments and overrides always go to the program manager
Connections

Invoices, nameplate photos, permits and site plans the rebate checks use

Installer portal and paper applicationsthe application form, documents and photos, as submitted
Invoices and receiptseach line with brand, model, serial and amount
Installation photosthe charger on the wall, the nameplate and the breaker
Permits, inspections and licencesbuilding department records and the electrical license register
Approved list and charger networkthe approved chargers by version, and managed-charging enrollment records
Site plans and contractor estimatesplan sheets, estimate lines, load and the account and premise register
What it changes

Rebates paid in days, and make-ready commitments on measured plans

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of incentives paid for a charger whose model and serial agree across photo, invoice and network record
8 of 8 items verified
before any payment
demo
$15,840
of trench billed above the site plan, caught on the sample depot before money was committed
Billed310 ft
Measured on the plan238 ft
target
5days
to pay a complete rebate, against the 6 to 8 weeks utilities publish today
Typical today6 to 8 weeks
Target5 days

“Demo” means seen in the working solution, on its sample program data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate of where the days go. “Typical” and “published” mean published figures. Moreno Valley Utility's EV incentive application says payment comes “within 6-8 weeks of application approval”. The PowerUpRI FAQ gives 4 to 6 weeks from final approval. Names on the screens are sample data.

Questions

EV charger rebate and make-ready processing questions from program teams

What is EV charger rebate and make-ready processing software?

It is software that takes a utility's EV charger incentive from the application to a signed payment or commitment. The incentive might be a home charger rebate, a workplace charger incentive or make-ready funding for a fleet or public site. EV Charger Rebate and Make-Ready Processing opens each application as a checklist of the evidence it needs. Six agents then verify each item. The analyst decides each rebate, and the program manager signs commitments and payment batches.

How does it verify an EV charger rebate application?

It checks eight items. First come customer and premise, proof of purchase and a charger on the approved list. Then come the model and serial in the installation photo, the permit and final inspection, and a licensed electrician. Last come managed-charging enrollment and the cost of the wiring and panel. Each item ticks green with its source, or turns red with what does not match. The incentive is calculated under the program's rule version. Nothing is paid while an item is open.

How does it catch a wrong or reused installation photo?

The photo reader reads the model and serial off the charger's nameplate. It compares them character by character with the invoice and with the serial the charger reports over the network. The photo date is checked against the install date. The image is fingerprinted against all photos sent in the last 3 years. In the sample case the photo came from another job, but the network confirmed the invoiced charger. So the payment was held and the right photo requested.

How does it review make-ready cost estimates?

The make-ready cost reviewer measures trench, conduit and feeder lengths on the site plan. It counts ports, pads and foundations, compares each estimate line and applies the per-port caps. Connected load and the managed peak are checked against the transformer too. On the sample fleet depot, the reviewer found 310 ft of trench billed against 238 ft on the plan. That was $15,840 over, caught before the commitment was signed.

Does it help report ports and spend to the regulator?

Yes. Budget and ports shows ports energized and in construction against the regulator's target. It also shows the budget paid and committed by sub-program, and what the checks held back. The quarterly regulator report is exported from the same screen, with ports, spend and the evidence for each incentive.

Who approves a rebate, and who signs make-ready money?

The analyst approves or holds rebates up to $5,000 and sends each request. The program manager approves above that and decides overrides. The program manager also signs each make-ready commitment and payment batch. Agents read, compare, calculate and draft. They do not send a request, approve, commit or pay.

Can we set our own incentives, caps and evidence rules?

Yes. Incentive amounts and caps, the evidence each program requires, the photo checks and the purchase window are all settings. So are the limit of one rebate per premise, the installer reply window and the approval limits. A change is saved as a new rule version and applies to applications received after it.

What does it need from our EV program to start?

We start from your program rules, approved charger list and application forms, plus a sample of past applications and make-ready sites. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own applications first.

Run your own rebates through
EV charger rebate and make-ready processing.

We'll run EV Charger Rebate and Make-Ready Processing on a sample of your own rebate applications and make-ready sites.