SystemNew Connections, Solar & EV Programs

Virtual Power Plant Management

Virtual power plant software that forecasts who will answer, keeps every owner's limit and counts only confirmed megawatts

See one case, screen by screen ↓
Watch with transcript →

Built forVPP operatorsControl-room supervisorsResource plannersProgram managers

The Problem Today

Operators add up nameplate kilowatts, the most each device could give, across device-maker portals. So the plant can come up short when the grid calls.

12.9%
of connected thermostats overrode an event, in one study published
23 h
to prepare, confirm and settle one dispatch event by hand our estimate

Added up by hand at every call

  • Batteries
  • Thermostats
  • EV chargers
  • Pumps
  • Limits broken at the peakA backup battery drained just before a storm
  • Value rebuilt in spreadsheetsBaselines, incentives and peaker value argued after the season

The Solution

  1. Each owner's limit checkedBackup reserve, comfort, medical list and EV ready-by, before any call
  2. Response forecast, device by deviceFrom weather, charge level, plug-in history and each home's habits
  3. The operator signs the planCall, forecast and held-back devices on one screen, then signals go
  4. Response confirmed liveTelemetry read through the window, and standby batteries released if it sags

Built-in controls

  • The medical priority list is never called
  • Owners' limits only the owner can change
  • Only telemetry-confirmed megawatts count

What You Get

Resource planners can count proven megawatts in the peak plan and weigh them against a new gas peaker.

40-60%
of a gas peaker's cost is a VPP's net cost for the same peak published
  • Capacity ready for the filingEach event measured against a baseline, with per-device evidence
  • Event reports, no spreadsheetsDelivered energy, incentives and value, per event
  • Enrollment where it pays mostZones ranked by the value of a kilowatt, campaigns drafted
In short

What is Virtual Power Plant Management?

Virtual power plant management software turns customer batteries, smart thermostats, EV chargers and pump stations into capacity the control room can call. Virtual Power Plant Management puts the whole fleet on one screen and forecasts how many devices will answer. It holds back each device whose owner's limit would be broken. It dispatches the rest once the VPP operator signs, and confirms each response from telemetry.

How to choose AI solutions for utilities →

Updated

The problem

Operators count a virtual power plant by its nameplate, so it can fall short at the peak

A virtual power plant (VPP) is a group of home batteries, smart thermostats, EV chargers and pumps. Customers and the utility already own these devices. When the grid needs extra power at the peak, the utility calls on them together, as one resource. To answer a call, the operator has to know how many megawatts the devices will really give. Today the devices sit in several device makers' clouds and in pump SCADA, the pumps' control system. So the operator adds up nameplate kilowatts across those portals. Nameplate is the most a device could give, and it does not say what will answer. Thermostat owners can override the call. EVs answer only if they are plugged in and charging. A battery is only worth what it holds above its owner's backup reserve.

So the operator cannot tell, before a call, which devices will answer. Getting it wrong costs twice. A plant that delivers too little loses the resource planner's trust. Its megawatts are not counted, and the utility buys a peaker instead, a gas plant that runs only at peak times. A plant that ignores an owner's limit causes an opt-out, a complaint or a news story. A battery runs flat before a storm. A home on the medical list gets hot. A nurse's car is not charged for the morning shift. After the season, delivered MW against a baseline, incentives and value against a peaker are all rebuilt in spreadsheets. So people argue over the business case, because nobody can show it.

typical12.9%of connected thermostats overrode an event in a published study, and the load reduction lost was of the same order
typical40-60%of a gas peaker's cost is a VPP's net cost for the same peak capacity
typical80-160GWof US virtual power plants called for by 2030, enough for 10 to 20 % of peak
Where one dispatch event's hours goestimated
By hand23 hours
With the solution2.5 hours
  • Finding what is online across device-maker portals and pump SCADA2 → 0.1 h
  • Checking owners' reserves, the medical list, opt-outs and EV ready-by times3 → 0.1 h
  • Forecasting response and building the dispatch list3 → 0.3 h
  • Confirming who answered, device by device4 → 0.5 h
  • Baselines, delivered energy and incentives after the event8 → 1 h
  • The event report for the planner and the program3 → 0.5 h

Estimated split for one evening event, from day-ahead preparation to a settled event report, in hours, by hand and with the solution.

How it works

From a control-room call to a signed virtual power plant dispatch

What comes in
Fleet and call inThe enrolled fleet · batteries, thermostats, EVs, pump stations
Agents at work
Customer limits guardevery owner's limit
Then
Response forecaster
Dispatch planner
Then
Telemetry verifierconfirmed MW only
Then
Value and settlement analyst
Enrolment planner
A person decides
VPP operatorsigns every dispatch
What comes out
Megawatts delivered
Event report
Value vs a peaker
One case, step by step

A 25 MW call for the evening peak, dispatched and counted from telemetry

The utility runs a VPP program of 38,498 enrolled home batteries, smart thermostats and EV chargers from four device makers, plus four water pump stations. It is 36 °C on a Tuesday afternoon. Here is one evening event, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0116:42

    The control room calls for 25 MW at five

    Control-room shift supervisor

    The control room asks for 25.0 MW from 17:00 to 19:00. The evening peak is forecast at 4,812 MW. Only 4,790 MW is available, because a generating unit tripped at 15:55. One city transformer is forecast at 96 % at 18:00. The dispatch screen shows the call as a dashed line on a megawatt column. The forecast is stacked beneath it before anything is sent.

    The call: 25.0 MW from 17:00 to 19:00 · Confirm by 16:59

  2. 0216:43

    Each owner's limit checked: 3,013 devices held back

    Customer limits guard

    The guard checks all 38,498 devices against the limits their owners set and the program's rules. Of those, 672 batteries would reach their backup reserve before 19:00, and 318 homes are on the medical priority list. Another 1,904 thermostats rest after two event days, and 1,620 customers opted out of today. Of the cars, 82 leave before 19:30 and 36 are below 40 % charge. One pump station is held, because its reservoir is at 63 % against a 62 % floor.

    “Agents cannot change a limit. Only the owner can, in the utility's app.”

  3. 03One household

    One household: called, inside each of its limits

    Customer limits guard

    One home has a battery, a thermostat and an EV. Its limits are a 40 % reserve, comfort +2 °C and the car ready by 07:00. The battery gives 3.2 kW, falling from 71 % to a forecast 46 % at 19:00. The thermostat goes from 24 to 26 °C, and the car pauses until 19:00. Down the list, another household raised its reserve to 80 % for a storm warning. Its battery is at 84 %, so it is not called.

    “Only the owner can change this limit, in the utility's app.”

  4. 0416:44

    A forecast with its range, and a plan with a standby group

    Response forecaster and Dispatch planner

    The forecaster expects 26.1 MW, in a range of 24.9 to 27.3. There is a 92 % chance of covering 25.0 MW. Batteries give 12.9 MW, based on their charge and each owner's reserve. Thermostats give 7.0 MW, based on each home's habit of overriding. EV chargers give 4.7 MW from what is charging, and pumps 1.5 MW. The planner calls 17,125 devices and keeps 610 batteries on standby. It limits 140 batteries on one feeder to powering their own homes only, because voltage there is at 1.048 pu.

    Nothing has been sent. Signals go to 17,125 devices when the operations lead signs.

  5. 0516:58:30

    The operations lead signs, and the signals go out

    VPP operations lead

    The operations lead reviews the call, the devices called, the forecast, the held-back devices and the grid limits on one screen. Then the lead signs under the statement “I approve dispatch of this event as planned”. The planner sends signals to two battery clouds, a thermostat cloud, a charging network and three pump stations. By T+0:12, 2,914 batteries are discharging and 610 EV chargers have paused.

    “Signing sends the signals now. Any device whose owner changes a limit during the window is released at once. Above 40 MW, the control-room shift supervisor co-signs.”

  6. 06T+1:30

    The stack fills to 26.4 MW, counted from telemetry

    Telemetry verifier

    The verifier confirms each device from the live readings its device and meter send. It lights each one on the field, one dot for 50 devices. The stack crosses 25.0 MW at T+1:08 and holds 26.4 MW at T+1:30. That is batteries 13.2, thermostats 7.1, EV chargers 4.6 and pumps 1.5. In all, 16,597 of 17,125 devices answered. The 528 that gave no response were inside the forecast margin.

    “26.4 MW holding: 105.6 % of the call, 0 customer limits overridden”

  7. 07Through to 19:00

    The event report: holding to the end, incentives queued

    Value and settlement analyst

    Overrides take some thermostats out, and 410 batteries reach their owners' reserves after 18:20. So the plan releases the 610 standby batteries at 18:20, and the forecast at 18:45 stays at 25.6 MW. The report shows 0 limits overridden and 0 complaints. Incentives due are estimated at $38,397. That covers 26.4 MWh from batteries at $1.00 per kWh, 10,812 thermostats held at $1.00 and 1,394 EVs paused at $0.85. The operations lead queues them for the program manager to approve when the event ends at 19:00.

    “Never pays. The program manager approves.”

  8. 08Two days out

    Thursday is 1.4 MW short, and a plan closes the gap

    Response forecaster

    The 7-day forecast puts Thursday at 38 °C, with a call very likely. It expects 23.6 MW at P50, the middle estimate. That is 1.4 MW under the 25.0 MW commitment, because 3,980 thermostats called on Tuesday and Wednesday rest on Thursday. The forecaster proposes two changes. One is to pre-charge 4,900 batteries to 100 % from midday solar (+1.6 MW). The other is to refill the held pump station's reservoir to 80 % overnight (+0.4 MW). Together they make 25.6 MW, with owners' reserves unchanged.

    “Thursday goes from 23.6 to 25.6 MW at P50.”

  9. 09The season

    41 MW counted in the plan, at 42 % of a peaker's cost

    Resource planner

    Across 23 events the VPP delivered an average 104.1 % of the call. The resource planner counts 41 MW of dependable capacity in this year's plan. A new gas peaker would cost $128 per kW-year and a utility-scale battery $90. The VPP program costs $54: incentives $31, device connections $14 and program $9. On 41 MW, that is $5.25M for a peaker against $2.21M for the VPP. The utility avoids $3.03M a year.

    Only megawatts proven from telemetry are counted in the plan.

  10. 10Next summer

    Growing from 41 to 60 MW, starting where a kilowatt is worth most

    Enrolment planner, for the program manager

    To reach the 60.0 MW target, the plan needs +3,850 batteries, +4,000 thermostats, +5,000 managed EV chargers and 2 more pump stations. The city zone comes first. A kW there is worth 1.8×, because it defers a $14M upgrade of the transformer forecast at 96 %. The planner drafts four campaigns, each with its MW and cost. One is a $500 battery bonus for 1,400 solar homes in that zone, worth +4.3 MW for $700K. Each campaign goes to the program manager or the resource planner to approve.

    “Proposes only. Never contacts customers without approval.”

Who it’s for

The operator, supervisor, planner and program manager behind each call

One evening dispatch, from the control-room call to the incentive approval, as four roles carry it before the solution and with it.

VPP operations lead
Signs each dispatch
Before
Answers each call from the control room by adding up devices across portals. What the lead needs to know is which devices will answer.
Now
Opens the call with the forecast, its range and each held-back device explained. Signs, then watches the stack fill as telemetry confirms each device.
Control-room shift supervisor
Issues the call and co-signs above 40 MW
Before
Balances the system and issues the VPP call, then can only hope the twenty-five megawatts show up at five.
Now
Before the signal goes, gets a dispatch with a 92 % chance of covering the call. Then sees confirmed megawatts against the call, live.
Resource planner
Counts VPP megawatts in the peak plan
Before
Counts VPP megawatts in the summer peak plan and the capacity filing, and can count only the megawatts that can be proven.
Now
Sees each event measured against a baseline, and a 7-day forecast to send to the plan. Gets a ledger of cost per kW-year against a peaker, ready for the filing.
Program manager
Owns enrollment, incentives and complaints
Before
Owns enrollment, incentives, complaints and device-maker contracts. Knows that one hot house on the evening news can stall enrollment for a year.
Now
Approves each event's incentives and the campaigns aimed where a kilowatt is worth most. Each owner's limits are kept on each dispatch.
The agents

Agents that guard limits, forecast response and confirm each megawatt

Before each dispatch, six agents protect owner limits, forecast response and plan the call. Then they verify it from telemetry. The VPP operator decides and signs.

Customer limits guard

Before each dispatch, holds back any device whose owner's limit would be broken in the window. Limits include backup reserve, comfort offset and indoor ceiling, the medical priority list, rest days, opt-outs, EV ready-by and minimum charge. Also keeps the reservoir floor. During the event, releases any device approaching its limit.

  • Never overrides a customer limit
  • Never calls a home on the medical priority list
  • Cannot edit limits. Only owners can
Response forecaster

Estimates, device by device, the chance it answers a call and its kW for the window. Works from weather, state of charge, plug-in history and each home's override habit. Rolls it up to MW per resource, with low, middle and high cases (P10, P50 and P90).

  • Each number carries its range
  • Never counts nameplate as capacity
Dispatch planner

From the eligible devices and the forecast, picks a set whose low case (P10) covers the call. Holds 10 % of eligible batteries on standby and plans standby releases through the window. Presents the plan for the operator's signature.

  • Never sends a dispatch without the operator's signature
  • Never exceeds a feeder limit
Telemetry verifier

Reads device and meter telemetry every 2 seconds during an event. Confirms each response, computes delivered MW and flags devices that did not respond. Asks the planner for standby when the forecast drops under the call.

  • Never counts an unconfirmed device
Value and settlement analyst

After each event, computes delivered energy per device against its 10-day baseline. Also computes incentives due at the program's rates and peak energy avoided. Keeps the season ledger against the resource-plan cost of a peaker.

  • Never pays. The program manager approves
Enrolment planner

Compares dependable MW with the plan target. Ranks zones by the value of a kW, from grid constraints and growth. Proposes enrollment targets and campaigns with their MW and cost.

  • Proposes only
  • Never contacts customers without approval
VPP operator

Signs each dispatch, and the supervisor co-signs above 40 MW.

Ask in plain words

Questions put to the virtual power plant

Ask about the fleet, a dispatch, a customer's limits or the value, or say what to change. Answers point to the telemetry, the limits and the plan behind them. These answers use the sample data.

Will we hold 25 MW until 19:00?

Yes, at 25.6 MW at 18:45, with the standby release. Thermostat overrides are forecast to take 0.8 MW by 19:00. That is in line with the 12.9 % override habit of these homes. Also, 410 batteries reach their owners' reserves after 18:20. The plan releases the 610 standby batteries at 18:20.

Why were 672 batteries held back?

Each would have reached its owner's backup reserve before 19:00. Most owners set 50 % or more. One household raised its reserve to 80 % yesterday after the storm warning, with its battery at 84 % charge. These batteries are not called, and no reserve is changed.

Get Thursday back above 25 MW

Thursday is forecast at 23.6 MW, because 3,980 thermostats rest after two event days and one pump station may stay under its reservoir floor. Two changes bring it to 25.6 MW without touching any customer limit. One pre-charges 4,900 batteries to 100 % from midday solar (+1.6 MW). The other refills that reservoir overnight (+0.4 MW). The plan is applied and the water utility notified.

What does this plant cost against a peaker?

$54 per kW-year, against $128 for a new gas peaker. That is 42 %. On the 41.0 MW counted in the resource plan, it avoids $3.03M a year. Incentives are the largest part, $31 of the $54. Published studies put VPPs at about 40 to 60 % of the cost of a peaker or battery.

The screens

The dispatch stack, one household and the value against a peaker

From the working solution, on its sample data. Pick one to see it large.

The dispatch stackThe call from the control room, with the forecast and its range stacked under the call line. It also shows the device field, every customer limit kept and the run log.
Sign the dispatchThe call, devices called, forecast, held-back devices and grid limits on one screen, signed under “I approve dispatch of this event as planned”.
Devices respondingThe stack fills in color as telemetry confirms each device, with the response curve drawing megawatts against time.
The call met26.4 MW holding at T+1:30 from 16,597 confirmed devices: 105.6 % of the call, 0 customer limits overridden.
The event reportDelivered against the call, with the standby release and the forecast to 19:00. It shows each resource's response, customers' limits kept and incentives due.
Customer limitsThe limits kept on today's event and each household's status. They cover reserves, the medical priority list, rest days, opt-outs, EV ready-by and the reservoir floor.
One householdOne household's limits, what its battery, thermostat and car did in the event, and each agent's step.
The fleetMegawatts available now in eight zones, with each resource enrolled, online and forecast. Each device connection shows its protocol and heartbeat.
The capacity forecastSeven days of megawatts expected to answer, by hour, with Thursday's gap and the plan that closes it.
The season's events23 calls, each with the megawatts called and delivered, the share of the call and the peak energy avoided.
Value against a peakerThe yearly cost of a kilowatt of peak capacity, against a gas peaker and a battery. Beside it are the ledger and the season by month.
EnrollmentThe path from 41 to 60 MW by resource, where a kilowatt is worth most by zone, and the campaigns proposed for approval.
Program rulesWhen to dispatch, the standby group, how delivered megawatts are counted and the customer protections agents cannot change.
Governance

Signed dispatches and protected customers in virtual power plant software

Each dispatch is signedThe VPP operator signs each dispatch, with the call, the forecast and the plan attached. The signature sits under the statement “I approve dispatch of this event as planned”. Above 40 MW, the control-room shift supervisor co-signs. Nothing is sent until the operator signs.
Customer limits the agents cannot changeBackup reserves, comfort limits, opt-outs and EV ready-by times are the owner's own settings. Only the owner changes them, in the utility's app. A device whose owner changes a limit during the window is released at once.
Homes on the medical priority list are not calledHomes with life-support or medical equipment are left out of each call, whatever its size. The setting stays on. The limits guard checks the priority register before each dispatch.
Only confirmed megawatts countDelivered MW come from device and meter telemetry, and an unconfirmed device is not counted. Each event report shows the baseline method and each home's 10 most recent like days. The report can be exported with per-device evidence.
Incentives and campaigns need approvalThe settlement analyst computes incentives but does not pay them. Each event's incentives and each enrollment campaign need the program manager's approval. The resource planner approves the megawatts counted in the plan.
Kept for auditDevice lists, customer limits and meter data are kept for audit. Each agent step and each person's decision is on the activity trail with its time. That includes who issued the call, who signed and who released standby.
Configuration

Virtual power plant settings: dispatch threshold, standby and protections

The utility chooses the settings for its program. They set when to dispatch, how much standby to keep, how customers are protected and who signs.

SettingDefaultChoose from
Dispatch only when the forecast covers the call90 % or more85 % or more · 90 % or more · 95 % or more. This is the chance that delivered MW reach the call
Standby group10 % of eligible batteries5 % · 10 % · 15 %. The share kept back to replace devices that drop out
Count delivered megawatts fromDevice and meter telemetryDevice and meter telemetry · Meter telemetry only. Unconfirmed devices are never counted
Battery backup reserveOwner's setting · floor 20 %Owner's setting · floor 20 % · Owner's setting · floor 30 %
Rest after event days in a rowAfter 2 daysAfter 2 days · After 3 days, added after an earlier event
EV chargersMinimum 40 % chargeMinimum 40 % · Minimum 50 % charge. The ready-by time is always honored
Reservoir floor for pump shifting62 %60 % · 62 % · 65 %. The water utility keeps the reservoir above it through the window
Co-sign dispatches above 40 MWControl-room shift supervisorEither of the two control-room shift supervisors
Connections

Device clouds, meters and pump SCADA a virtual power plant runs on

Battery and thermostat cloudsdevice-maker clouds over IEEE 2030.5 and OpenADR 2.0b, with a heartbeat every 60 seconds
EV charging networksmanaged charging over OCPP 2.0.1, with plug-in state and ready-by times
Pump station SCADAwater pump stations and reservoir levels over DNP3
Smart meter telemetrymeter readings to confirm each response and build each home's baseline
Control-room callsdispatch signals and calls from the control room, with the window and the megawatts
Weather and market datatemperature and solar forecasts, peak energy prices and the avoided cost of a peaker
What it changes

Megawatts delivered and cost against a peaker, for virtual power plants

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of the megawatts called (the design goal), forecast before the signal goes and confirmed from telemetry
typical
40-60%
of a gas peaker's cost for the same peak capacity
Gas peaker100%
Virtual power plant40-60%
target
0
customer limits overridden, the design goal. Any device whose backup reserve, comfort limit or EV ready-by a call would break is held back
Each one held back
to keep its owner's limits

“Demo” means seen in the working solution, on its sample fleet and events. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate, for one evening dispatch event from day-ahead preparation to a settled event report. “Typical” means published figures. Brattle published Real Reliability: The Value of Virtual Power in 2023. It puts VPP net cost at about 40 to 60 % of a gas peaker or utility battery. The US DOE report Pathways to Commercial Liftoff: Virtual Power Plants (2023) calls for 80 to 160 GW by 2030. That is 10 to 20 % of peak. Energy Policy (2021) found a 12.9 % thermostat override rate. Names on the screens are sample data.

Questions

What utilities ask before running virtual power plant software

What is virtual power plant management software?

Virtual power plant management software turns customer batteries, smart thermostats, EV chargers and pump stations into capacity the control room can call. Virtual Power Plant Management puts the whole fleet on one screen and forecasts how many devices will answer. It holds back each device whose owner's limit would be broken. It dispatches the rest once the VPP operator signs, and confirms each response from telemetry.

How does a VPP forecast how many devices will respond?

The response forecaster estimates, device by device, the chance it answers and its kW for the window. It works from weather, state of charge, plug-in history and each home's override habit. It rolls that up to megawatts per resource, with low, middle and high cases (P10, P50 and P90). In the sample event, that was 26.1 MW, in a range of 24.9 to 27.3. There was a 92 % chance of covering the 25 MW call. Nameplate is not counted as capacity.

Does it drain customers' backup batteries or call medical customers?

No. The customer limits guard holds back any battery that would reach its owner's backup reserve. It leaves homes on the medical priority list out of each call. It also keeps comfort limits, rest days, opt-outs, EV ready-by times and minimum charge. In the sample event it held back 3,013 devices and overrode none.

How are delivered megawatts measured and verified?

The telemetry verifier counts only devices confirmed by device and meter telemetry. It reads them every 2 seconds during an event. After the event, delivered energy is measured against each home's 10-day baseline. The event report can be exported with per-device evidence.

How does it show the value of a VPP against a gas peaker?

The value and settlement analyst keeps a ledger of the yearly cost of a kilowatt of peak capacity. In the sample season the VPP program costs $54 per kW-year, against $128 for a new gas peaker. That is 42 %, or $3.03M a year avoided on 41 MW. The ledger downloads for the capacity filing.

Which devices and protocols does it work with?

In the working solution, home battery clouds connect over IEEE 2030.5 and OpenADR 2.0b. A thermostat cloud uses OpenADR 2.0b, an EV charging network uses OCPP 2.0.1 and water pump stations use DNP3. Smart meter telemetry confirms each response.

Who has to sign before a dispatch or an incentive payment goes out?

The VPP operator signs each dispatch before any signal is sent. Above 40 MW, the control-room supervisor co-signs. Agents do not change a customer's limit, pay incentives or contact customers. The program manager approves incentives and campaigns, and the resource planner approves the megawatts counted in the plan.

What do we hand over to run it on our own fleet?

Your program rules, incentive rates, device connections and a sample of past events. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own fleet first.

Forecast your next peak call
on your own enrolled fleet.

We'll run Virtual Power Plant Management on a sample of your own enrolled devices and past events.