Connection Application Status Assistant

Connection application status, answered like a parcel tracker, with the step, who holds it, the expected date and what is still missing

See one case, screen by screen ↓
Watch with transcript →

Built forDevelopersElectrical contractorsConsultant engineersConnection coordinatorsContact center agents

The Problem Today

Applicants can't read a status code, so they phone, and coordinators answer the same question all day.

Looked up across four places

  • Application
  • Design team
  • Notices
  • Guides
  • Notices no one can readApplicants cannot tell the item, the standard or where to send it
  • Utility delays seen lastThe developer often learns first, by calling

The Solution

  1. Ask in plain wordsFrom the portal, by email or through the contact center
  2. Status read like a trackerSteps done, the step now, who holds it, since when, and the date
  3. Missing item made plainWhich document, to what standard, uploaded and checked in the answer
  4. The coordinator acceptsOne click accepts the checked document and restarts the utility's clock

Built-in controls

  • Answered only to people on the application
  • Dates and requirements change only by people
  • Each fact cites its record

What You Get

Missing documents come back sooner, so fewer energization dates slip, and coordinators answer only questions that need a person.

  • Warned before a clock runs outTeam leads alerted ahead on steps the utility holds
  • One answer, any channelContact center agents see the tracker the applicant sees
  • Fewer repeat callsEach reminder names the document and carries the upload
In short

What is Connection Application Status Assistant?

A connection application status assistant answers where-is-my-application questions in plain words. It answers developers, builders, installers and consultant engineers. Connection Application Status Assistant shows the steps done, the step now, who holds it and since when. It gives the expected date with its basis. When the step is waiting on the applicant, it says exactly which document is missing and what it must show.

How to choose AI solutions for utilities →

Updated

The problem

Applicants cannot see where their connection application stands

Developers, builders, installers and consultant engineers apply to the utility for new power and water connections. While they wait, they keep asking the same three things. They want to know where the application is, what happens next and what is still needed from them. The portal shows only a status code, and the code does not say what it means. So they phone and email the connection coordinators. A coordinator looks up each question across the application system, the design team's queue and the deficiency notices, the documents that list what is missing. Then the coordinator answers by hand. At the sample utility, coordinators took 2,940 status calls in one month. Two months after launch, that fell to 1,130. That is about $207K a year of calls avoided, at $9.54 a call.

Missing documents are the other half of the problem. A deficiency notice is a PDF attached to an email. The applicant often cannot tell which item is wanted, to what standard, or where to send it. Before launch, the median wait for a missing document was 12.4 days. All that time the design clock sat paused. The energization date, the day the supply is switched on, moved a working day for each day of waiting. When the utility's own design or survey team falls behind, the developer usually finds out first, by calling.

typical$9.54average cost of a utility contact center call, in a 15-utility benchmark
typical~15%lower customer satisfaction for each extra contact about the same issue
typical90+%of interconnection applications received arrive deficient, by the US Department of Energy's count
Where a missing document's days goestimated
By hand12.4 days
With the solution3 days
  • Reading the notice and working out what exactly is missing5 → 0.5 d
  • Reminders, chasing calls and call-backs4 → 0.8 d
  • The consultant engineer revising, stamping and signing the document2 → 1.5 d
  • Resubmitting by email and the coordinator finding it1 → 0.1 d
  • Checking the document against the notice and accepting it0.4 → 0.1 d

Estimated split of the 12.4-day median wait for a missing document before launch, and of the 3-day target with the solution, in days.

How it works

From question to tracker: access, status, missing items and the expected date

What comes in
Questions in3 channels · portal, email, contact center
Agents at work
Access checknamed contacts only
Then
Status reader7-step tracker
Deficiency explainerwhat is missing
Then
Date forecasterexpected date
Then
Document checkerupload in the answer
Clock watcherreminders, escalations
A person decides
Connection coordinatoraccepts documents, answers handoffs
What comes out
Tracker answer, cited
Missing document back
Escalation before the clock
One case, step by step

A missing load schedule, found and fixed inside a connection application

A new building with 214 apartments, 6 shops and 48 EV charging bays comes with a new substation of 2 × 1,500 kVA. The application is in network design. Two weeks ago, the network designer found that the load schedule, the list of what the building will draw, left out the EV bays. Here is what happens today, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Before today

    Two weeks of notices, reminders and calls

    Connection coordinator

    The coordinator's screen shows the applicants, consultants and contact center agents asking right now. Each conversation shows its state. It may be answered, upload received, handed to a person, or the utility late and told plainly. For this application the history is a familiar one. A deficiency notice went by email, then two reminders, then two calls from the developer's project manager.

    Last week: “The developer called the contact center: ‘what exactly is missing’, 7 min”

  2. 02Mid-morning

    “Where is my application?”, answered as a tracker

    Developer's project manager

    The project manager has 6 open applications with the utility, and 1 is waiting on the project manager. Now they ask where the new building is. The answer shows the seven steps with their dates. Received, documents checked and site survey are done, and network design is the step now. The answer also shows who holds the step: “You: revised load schedule”, since the notice went out. The utility's design clock is paused at day 6 of 10.

    “Energization is expected on its planned date if we have the schedule within two days. Each working day later moves it by a day.”

  3. 03In the answer

    What is missing, from the notice itself

    Deficiency explainer

    Under the tracker, “What we need from you” leads with the document. It is a revised load schedule, stamped by the consultant engineer, that includes the 48 EV charging bays on drawing A-104. It lists the four things the schedule must show. These are the bays with charger rating and charging control, and the total connected load and maximum demand in kVA. The other two are the stamp and signature, and a single PDF. A citation opens the notice at the passages the answer used. The notice itself points to guide §5.2.

    The explainer does not relax or add a requirement. Each item cites the notice or the guide.

  4. 04A minute later

    The schedule is uploaded and checked while the developer watches

    Document checker

    The project manager drops the revised load schedule, rev 3, a 412 KB PDF, into the answer. Four checks pass on screen. The 48 EV bays are there at 7.4 kW, load-managed to 220 kVA at peak. Maximum demand is 2,180 kVA, up from 1,960 in rev 2. The consultant engineer stamped and signed it the day before. The load also fits the planned 2 × 1,500 kVA substation, at 73% at maximum demand.

    “With the coordinator to accept, usually within the hour. You will see it here.”

  5. 05Two minutes later

    Accepted in one click, and the clock restarts

    Connection coordinator

    One item reaches the coordinator's queue, load schedule rev 3, with 4 of 4 checks passed. The coordinator accepts it. The assistant tells the developer straight away. Network design restarts tomorrow at day 7 of 10, and the design is due within the week. The connection offer follows a week after that, and energization is still expected on its planned date.

    The document checker does not accept a document. The coordinator does.

  6. 06On the record

    The whole history, on the application

    Status reader

    The application now carries the whole story in order. It starts with the application, received with 14 documents. Then come the site survey report, the notice, both reminders and both calls. Last come the question, the upload and the acceptance. The documents list marks load schedule rev 2 as replaced and rev 3 as accepted. The step's clock shows day 6 of 10, with 4 working days left.

    Questions since the notice: 2 phone calls, 11 min of coordinator and agent time · 1 email · 1 question to the assistant.

  7. 07Earlier that morning

    A caller asks, and the late step is said plainly

    Contact center agent

    A builder calls about water for a housing development. The contact center agent sees the same tracker the applicant would. The application is at step 4 of 7, water main design, on day 12 of a 10-day clock. The water design team lead has it, and a call-back is booked for tomorrow. Water on is now expected two weeks later than first given.

    Suggested words for the caller: “We are two working days late on the design. Our team lead will call you tomorrow with the new date.”

  8. 08Before the clock

    The utility's own delays go to the team lead first

    Clock watcher

    Clocks lists the 29 utility-held steps that are within two working days of their service clock or past it. Of those, 23 are near and 6 are past. For the housing development, the escalation to the water design team lead gives the reason. One survey batch landed on one designer, while two designers were on leave. It also confirms the applicant has been told in each answer since the clock passed.

    A utility-held step goes to its team lead two working days before its clock. It goes to the head of customer connections on the day it passes.

  9. 09Earlier that morning

    A date change goes to a person, with the facts

    Connection coordinator

    A logistics park developer asks whether a warehouse can be energized four days earlier than planned. The assistant does not move dates. So it gathers the facts and hands the question to a coordinator. The works are 60% complete, and cable jointing is booked the week before. The earliest possible date is three days earlier than planned. A reply is drafted for the coordinator to edit and send.

    Date changes, charges, exceptions and compensation go to a person.

  10. 10Across the queue

    38 reminders that say exactly what is wanted

    Connection coordinator

    In all, 312 applications are waiting on their applicant, grouped by what is missing. Of these, 41 are missing a load schedule. Three of those are left out because their consultants uploaded a revised schedule today. The clock watcher drafts each reminder from the notice and the guide. Each one names the items wanted, the paused clock and the date at stake, with the upload inside it.

    Reminder cadence: day 2, day 5, day 10, then the coordinator calls on day 12.

Who it’s for

Developers, engineers, coordinators and the contact center on one application

The same applications, seen from five seats. They are the developer, the coordinator, the consultant engineer, the contact center and the head of customer connections. Here is what each did by hand, and what each does now.

Developer's project manager
Holds several open applications
Before
Chases the utility for a new building while the contractor waits to energize. That meant two reminders and two calls in two weeks. A portal code does not say who has the application or what is wanted.
Now
Asks in the portal and gets the seven steps, who holds the step and the expected date. Sees the exact document wanted, and uploads it in the answer.
Connection coordinator
Accepts documents and answers handoffs
Before
Spent half of each day on status calls. Most were one question that takes ten seconds to answer, unless the coordinator is already on another call.
Now
Accepts checked documents in one click, sends reminders by group and answers only the questions that need a person.
Consultant engineer
Stamps load schedules and diagrams
Before
Stamps load schedules and single-line diagrams for four developers. Can stamp the same day, once the designer's exact need is clear.
Now
Asks which applications need something from the firm and gets three. Each shows the document wanted and the notice behind it.
Contact center agent
Takes builder calls when coordinators are busy
Before
Takes builder calls when the coordinators are busy, and needs the same facts they have.
Now
Answers a named caller from the same tracker the applicant sees, with suggested words. The caller hears the same answer the developer reads.
Head of customer connections
Answers for connection times and complaints
Before
When a design team is behind, the developer usually finds out first, by calling. The head of connections hears of it after them.
Now
Team leads get each utility-held step two working days before its clock, and the head of connections is told on the day a clock passes.
The agents

Access, status, deficiency and date agents behind each application answer

Six agents read the application record, explain the status and what is missing, and check each upload in the answer. The coordinator accepts it.

Access check

Before any answer, confirms who is asking. It must be a named contact or registered consultant on the application, or a utility contact center agent asking for a named caller.

  • Never confirms another company's application exists
  • Consultants see only the applications they are registered on
  • Each refusal is logged
Status reader

Reads the application's milestones, notices, reminders, calls and team queues, and builds the tracker. It shows the steps done with their dates, the step now, who holds it and for how long.

  • Never shows internal notes or a designer's working
  • Dates are quoted as recorded, never inferred
Deficiency explainer

Turns a deficiency notice into plain words that say what is missing, to what standard and why. Leads with the document wanted, and cites the drawing or guide section behind it.

  • Never relaxes or adds a requirement
  • Each item cites the notice or the guide
Date forecaster

Gives the expected date from the step's service clock, the days held and the works program. Shows its basis, and what would move it.

  • Never promises a date. It says “expected”
  • Never gives a works date the planner has not set
  • Never changes a date. Date requests go to a person
Document checker

Reads a document uploaded inside an answer against the notice, the checklist and the application's own figures. One example is maximum demand against the planned substation. Shows each check to the applicant before sending the document to the coordinator.

  • Never accepts a document. The coordinator accepts
  • A failed check is shown to the applicant with the reason
Clock watcher

Checks each open step every hour. Sends missing-document reminders on their schedule, with the upload inside. Escalates a utility-held step to its team lead two working days before its clock. On the day the clock passes, escalates it to the head of customer connections.

  • Never reminds an applicant about an item the utility holds
  • Never hides a utility delay from the applicant
Connection coordinator

Accepts documents and answers handoffs, and the team lead acts on escalations.

Ask in plain words

Answers on an application, a service clock or an applicant group

Coordinators and team leads ask in plain words, or say what to change in how the assistant answers. Each answer points to its records. These answers use the sample data.

Which utility-held steps will pass their clock this week?

In all, 23 steps are within two working days of their clock, and 6 are already past it. The largest group is water main design. One housing development is 2 working days past, and a logistics park's fire main is 1 day past. Both have been on the same designer since one survey batch.

Remind everyone still missing a load schedule

There are 41 applications waiting on a load schedule. I left out 3 whose consultants uploaded today, so 38 reminders go now. Each lists the items from its own notice, with the upload inside it.

Why did the developer keep calling about the new building?

They called twice after the notice. The notice named the load schedule, but the second call asked “what exactly is missing”. The point about the 48 EV bays on drawing A-104 was in the notice's third paragraph. In the assistant's answer it is the first thing the developer reads, with the upload under it.

What do applicants ask that the assistant hands to a person?

There were 524 questions in 30 days, or 12.4% of the total. Date changes are 38% of them, charges 24% and exceptions 21%. One question that keeps coming back is whether a capacity increase is a new application. Guide §6.1 answers it, but the approved answers do not cover it yet.

The screens

The applicant's tracker, the upload check and the coordinator's clocks

From the working solution, on its sample data. Pick one to see it large.

The applicant portalConversations from applicants, consultants and the contact center run down the left. The developer's six open applications show as mini trackers, and the history of notices, reminders and calls sits on the right.
The answer is a trackerStep 4 of 7, network design. It shows who holds the step, the paused design clock, and the expected energization date with its basis. Below are what is missing, and how the answer was made, step by step, with its sources.
Upload inside the answerThe revised load schedule, checked in front of the developer. The 48 EV bays are in, maximum demand is 2,180 kVA, it is stamped and signed, and it fits the planned substation.
Accepted, clock restartedThe coordinator accepts. Network design restarts the next working day at day 7 of 10, and energization holds on its expected date.
The sourcesThe deficiency notice, opened at the passages the answer cited, beside the connection guide, the drawing, the checklist and the service clock table.
The applicationEverything that happened to the application, in order. Beside it are its documents against the checklist, the step's clock and the people on it.
For the contact centerA contact center agent answers a named caller from the same tracker, with the late step said plainly and suggested words.
The trackerEach open application by step, who holds it, days held, the clock and the expected date. Each shows whether it sits with the applicant or the utility, and whether it is near or past the clock.
Missing documents312 applications waiting on their applicant, grouped by what is missing, with the reminder each one will read and the upload inside it.
ClocksUtility-held steps near or past their service clock, the escalation to the team lead with the reason, and what the applicant is told.
Handed to a personDate changes, charges, exceptions and compensation questions, with the facts gathered and a reply drafted for the coordinator to edit and send.
InsightsWhere applications wait, what applicants ask, status calls to coordinators by week and the days until a missing document is received.
Your rulesSteps and service clocks, reminders and escalation, what the assistant may say, who may ask and where.
Governance

Who may see a connection application, and the record behind each answer

Each fact cites its recordEach fact in an answer points to its source. That is the application record, the deficiency notice, the drawing or the developer connection guide. A citation check runs before the answer is shown. In the sample answer, 6 facts were cited to 4 sources.
Answered only to people on the applicationThe access check runs on each question. Named contacts see their own applications, and consultants see only those they are registered on. Contact center agents answer for a named caller, with the same answer the applicant would see.
People accept, change and decideThe agents do not accept a document, move a date or waive a requirement. They do not quote a charge that is not in an issued offer. The coordinator accepts documents and answers handoffs, and the team lead acts on escalations.
The utility's own delays are said plainlyWhen a utility-held step is late, the applicant is told plainly in each answer, with the team lead's name and the call-back date. The team lead is told two working days before the clock runs out.
Service clocks the agents cannot bendEach step runs on a service clock in working days. A deficiency notice pauses it, and acceptance restarts it the next working day. Only the coordinator's acceptance counts.
Each question on the application's recordEach question, answer, upload, check and acceptance is written to the application's timeline with its time, beside the notices, reminders and calls.
Configuration

Service clocks and status answer rules for each application step

Settings chosen by the utility cover the steps and their service clocks, reminders and escalation. They also cover what the assistant may say, and to whom.

SettingDefaultChoose from
Network design service clock10 working daysSet per step. Documents checked 3 · site survey 10 · network design 10 · connection offer 5 · energization 2. Works go by program, and single homes, rooftop solar, EV charging and water each have their own table
Missing-document reminders2 · 5 · 10Day 2, day 5, day 10, then the coordinator calls on day 12 · or 3 · 7 · 14
Upload inside every reminderOnOn · Off. The applicant uploads straight into the answer, with no email
Escalate a utility-held step to the team lead2 days before its clock1 day · 2 days · 3 days before the clock
At the clock, tell the head of customer connectionsHead of customer connectionsOn · Off
Dates as “expected”, with their basisOnOn · Off. A date is never a promise, and the planner confirms works dates
Say plainly when the utility is lateOnOn · Off. The answer gives the team lead's name and the call-back date
Name utility staff beyond the coordinator and team leadOffOn · Off. When off, designers and surveyors are named by team, except on a notice they signed
Connections

Application records, deficiency notices and the guides behind each answer

Application records and milestoneseach open application's steps, dates, holder, reminders and calls, read live
Deficiency noticeswhat the designer or coordinator found missing, and when the clock paused
Process guides and service clocksthe developer connection guide and the service clock table for each application type
Document checklists and drawingswhat each document must show, and the drawings an application was made with
Approved answersthe builder questions the connections team has approved, reviewed monthly
Portal, e-mail and contact-centre deskwhere applicants and callers ask, and where the answer reaches them
What it changes

Fewer status calls, and missing documents back in days

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
90%
of status questions answered first time, with no call to a coordinator
Status calls to coordinators, sample month2,940
With the assistant, sample month1,130
target
2working days
warning to the team lead before any utility-held step passes its service clock, and the developer told plainly
target
3days
to get a missing document back, against 12 today, because the upload sits inside the answer

“Demo” means seen in the working solution, on its sample data. The sample utility started at 2,940 status calls to coordinators in a month, and a 12.4-day median wait for a missing document. “Target” means the design goal, measured in the live solution. “Estimated” means our arithmetic, with the inputs shown. The $207K comes from 1,810 fewer calls a month, times 12 months, times $9.54 a call. That uses contact center cost, so it is a floor. The days split is also our estimate. “Typical” means published figures. An E Source benchmark of 15 utility contact centers found about $9.54 a call, and ~15% lower satisfaction for each extra contact. The US DOE, via PV Tech, found that over 90% of interconnection applications received are deficient. For regulatory context, in Great Britain the Electricity (Connection Standards of Performance) Regulations 2015 set guaranteed connection timescales. When one is missed, the customer is paid. Names on the screens are sample data.

Questions

Connection application status questions from connections teams

What is a connection application status assistant?

A connection application status assistant answers where-is-my-application questions in plain words. It answers developers, builders, installers and consultant engineers. Connection Application Status Assistant shows the steps done, the step now, who holds it and since when. It gives the expected date with its basis. When the step is waiting on the applicant, it says exactly which document is missing and what it must show.

How does connection application tracking work?

Six agents answer each question. First, the access check confirms the asker is on the application. The status reader builds the seven-step tracker from the milestones. Next, the deficiency explainer turns the notice into what is missing, and the date forecaster gives the expected date from the service clocks. The document checker reads anything uploaded in the answer. Last, the clock watcher sends reminders and escalations.

Does it work for each type of connection application?

Yes. In the working solution it answers for new buildings and substations, single homes, rooftop solar, EV charging and water mains. Each has its own steps and service clock table. Questions come in through the applicant portal, email replies and the contact center desk.

How does it get missing documents back faster?

The answer and each reminder say exactly what is wanted, from the notice and the guide. Then the applicant uploads the document inside the answer. The document checker shows each check while they wait. The coordinator accepts it with one click, which restarts the clock. In the sample data, the median wait fell from 12.4 days to 4.1 two months later, against a target of 3.

Does it promise or change connection dates?

No. Dates are stated as “expected”, with their basis and what would move them. Works dates come only from the planner. Some questions go to a coordinator, with the facts gathered and a reply drafted. These are requests to move a date, and questions on charges, exceptions or compensation.

Who can see an application?

Only the people named on it. The access check runs on each question. Consultants see only the applications they are registered on, and contact center agents answer for a named caller. To anyone else, it does not confirm that an application exists.

What will the assistant not do without a coordinator?

It will not accept a document, change a date or waive a requirement. It will not quote a charge that is not in an issued offer. The agents read, explain, check and remind. Coordinators accept documents and answer handoffs, and team leads act on escalations about utility-held steps.

What does the assistant need from our connections team?

Your connection guide, service clock table, document checklists, notices and a sample of applications. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own applications first.

Answer connection application status questions
from your own records.

We'll run Connection Application Status Assistant on a sample of your own applications, notices and connection guide.