Utility NOC Application Processing demo

Each no-objection request checked against the asset map. 1:15

What the demo shows

A workflow solution for permit teams that reviews no-objection requests near utility assets.

The developer's site plan is laid over the utility's cables, mains and substations, with a buffer drawn around each. Six agents read the drawings themselves (basement walls, piles, ramps, hoarding, cranes), align them to the parcel, find every clash and draft the no-objection letter with one condition per asset affected, each citing its rule and drawing. Engineers concur on hard clashes; the no-objection officer signs.

Transcript

  1. Utility NOC Application Processing reviews no-objection requests near Lumina's cables and mains.
  2. 165 arrive each working day, and each is still checked by eye.
  3. Here, the Jumana Creek site plan is laid over Lumina's assets.
  4. Agents read the drawings themselves—the basement wall, ramp, hoarding, and crane.
  5. Each asset gets its buffer, and every proposal is laid out.
  6. work is measured against it.
  7. The proposed basement cuts into the 11 kV cable buffer, 80 centimeters away.
  8. So the letter adds its condition, trial pits required.
  9. Collet and ILSA concur, and Samir assigns the certificate.
  10. Every NOC checked against every buffer issued inside two working days.
  11. Built on Botminds: agents, data, screens, and governance on one platform.

Transcribed from the film’s narration. Captions are on the player.