Utility NOC Application Processing demo
Each no-objection request checked against the asset map. 1:15
What the demo shows
A workflow solution for permit teams that reviews no-objection requests near utility assets.
The developer's site plan is laid over the utility's cables, mains and substations, with a buffer drawn around each. Six agents read the drawings themselves (basement walls, piles, ramps, hoarding, cranes), align them to the parcel, find every clash and draft the no-objection letter with one condition per asset affected, each citing its rule and drawing. Engineers concur on hard clashes; the no-objection officer signs.
Transcript
- Utility NOC Application Processing reviews no-objection requests near Lumina's cables and mains.
- 165 arrive each working day, and each is still checked by eye.
- Here, the Jumana Creek site plan is laid over Lumina's assets.
- Agents read the drawings themselves—the basement wall, ramp, hoarding, and crane.
- Each asset gets its buffer, and every proposal is laid out.
- work is measured against it.
- The proposed basement cuts into the 11 kV cable buffer, 80 centimeters away.
- So the letter adds its condition, trial pits required.
- Collet and ILSA concur, and Samir assigns the certificate.
- Every NOC checked against every buffer issued inside two working days.
- Built on Botminds: agents, data, screens, and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.