- Before
- Runs 140 contracts: mornings chasing suppliers' monthly reports, afternoons in variations and disputes. Knows the repair contractor missed its burst times, but cannot prove it inside ten days.
- Now
- Opens one radar of the dated obligations, runs the check on a supplier's report, and gets the claim drafted with each sentence tied to its clause, then checks, signs and sends.
A supplier's 97.8% report, measured again and claimed inside its window
The utility runs power and water networks. A civil works contractor holds its water network repair and maintenance framework: $3,800,000 a month, Priority 1 bursts and leaks attended within 2 hours in 98% of instances. The contractor's September report arrived five days ago. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0106:00 sweep
The day opens on a radar of dates instead of a list
Senior contract managerThe contract manager runs 140 contracts. The radar is read from the utility's whole contract portfolio, swept at 06:00. Rings are time (Now, 30 days, 90 days, 6 months, 12 months) and seven sectors are the obligation types. Each blip's color and size are the money at stake: a substation project's delay damages at $240.5K, the call-center renewal at $372K, a $1.2M bond. The repair framework's KPI 2 sits in the 30-day ring as “Watching”: report received, not yet checked.
Each dated obligation in the utility's contracts. The nearest are in the center; color and size show the money at stake.
- 02One click
September, recomputed from the utility's own job times
SLA performance trackerThe contract manager clicks “Check September against the contract”. The tracker reads the contractor's report (1,214 Priority 1 jobs, 61 excluded by the contractor, 97.8% reported), then recomputes from the work-management instruction and arrival times: 1,128 of 1,214 reached site within 2 hours. Each step appears in the side panel as it runs.
Schedule 4, Table 4.1 · KPI 2: “the Contractor shall attend site within 2 hours of the instruction in not less than 98% of instances in each month.”
- 03The exclusions
61 exclusions, each tested against §6.3
SLA performance trackerA job may be excluded only where an access-denied or third-party record, with a photograph, is logged before the attendance deadline. 9 of the 61 pass. 34 access-denied claims had no photo or were logged after the 2-hour deadline, 10 third-party claims had no record on the job, and 8 weather claims had no severe-weather event declared under §6.4. One job, a burst main, was instructed at 02:14 and reached at 05:02; access denied was logged at 05:09.
Limit: the tracker recomputes a supplier figure before it accepts one, and is read-only on the source systems.
- 0493.6%
The breach moves to the center of the radar
Claim drafterMeasured: 1,128 of 1,205 qualifying jobs, 93.6%, 4 full points below the 98% target that Variation 3 set. Under §5.2 that is 4 × 2.5% × $3,800,000 = $380,000, inside the 15% cap of $570,000. July was 97.2% and August 96.4%, so September is the third month below target and clause 18.2 applies. The blip turns red, grows and moves into the Now ring, which rises to 2 open items and $435.5K.
“Breach found · $380,000 claim drafted · window closes in nine days”
- 05The claim
A notice on paper, each sentence tied to its clause
Claim drafterThe claim drafter writes the notice of service credits to the contractor's contract representative, with margin notes beside each paragraph: the 10-business-day window under §7.1, the target from Variation 3, the 52 exclusions rejected, the measurement from the month's work-management jobs, and the formula and cap (full points only, so 4.39 becomes 4). The sum panel shows the working line by line, and Annex A lists the 52 jobs.
Limit: the claim drafter does not send (a person signs), does not claim past a cap, and cites the clause for each figure.
- 06Approved and sent
Over $250,000, so the head of commercial approves first
Head of commercialThe contract manager checks the clause, the figures and Annex A, and sends the claim for approval because it is over $250,000. The head of commercial approves: “Clause and sums agree. Approved.” The contract manager signs and sends it by email and recorded delivery, as clause 22.1 requires, with the notice and Annex A attached. Accounts payable is told to deduct $380,000 from the October invoice under clause 14.4.
Signed by the contract manager, approved by the head of commercial. Sent 9 days before the window closes.
- 07Same month, each supplier
31 service levels, the supplier's figure beside the utility's
SLA performance trackerService levels shows each measured KPI for September across 12 contracts. The call-center supplier reported 79.1% of calls answered within 30 seconds; the utility's call logs say 78.4% against an 80% target, missed by 1.6 points, $41,600 due. The meter installer's right-first-time rate came in at 96.8% against 97%: below, but under 1 point, so no credit (full points only).
Each measured service level, recomputed from the utility's own records (job times, call logs and meter data), beside what the supplier reported.
- 08Behind each obligation
214 pages read, 46 obligations, each with its quote
Contract readerOpen the repair framework and each obligation is highlighted in the text with its note: the term and extension notice, the $228,000,000 ceiling, the 12-month reinstatement guarantee, the deduction right, the insurance clause, persistent failure and the notices clause. The reader took 3 min 12 s for 214 pages, applied Variation 3 to KPI 2 (97% to 98% from April) and linked 4 service levels to the utility's records.
Sent to counsel: clause 9.6 “reasonable endeavours” has no clock, and counsel confirmed it is not dated.
- 09Before the notice date
Renew, extend, re-tender or let lapse, decided in time
Category managerThe call-center contract auto-renews in the new year unless written notice is served within three weeks, and re-tender quotes are about $372K a year lower. The fleet leases go month to month at +18% unless the option is exercised within two months. The transformer framework cannot be extended, and its 9-month re-tender lead time passed 105 days ago. The watcher drafts the call-center non-renewal notice; the category manager decides.
The category manager decides. Nothing is served until the decision is recorded and the contract manager signs.
- 10Ceilings
The blanket agreement that runs out before the rollout ends
Spend and ceiling monitorThe monitor matched 3,412 call-off orders and releases to 5 agreements from purchasing at 06:00. The smart meter agreement has $16.9M released against an $18M ceiling at $0.9M a month, so it runs out next month, about 5 months before the meter rollout finishes. The contract manager can request a ceiling variation or hold new releases.
Limit: the monitor never raises or cancels an order.