Contract obligation management that claims each penalty owed before its window closes and misses no renewal

See one case, screen by screen ↓
Watch with transcript →

Built forContract managersCategory managersLegal counselProject managersHeads of commercial

The Problem Today

Contract duties sit in PDFs and supplier reports are taken on trust, so money owed by suppliers goes unclaimed.

≈9%
of contract value lost to weak contract management published
~10%
of service credits actually charged, on two public contracts published

Obligations buried in PDFs

  • Credits
  • Renewals
  • Price index
  • Insurance
  • Exclusions never checked“Access denied” accepted without the proof the contract asks for
  • Contracts renew at old ratesA notice date passes before anyone decides

The Solution

  1. Each obligation quotedContracts and changes read, each duty with its clause, deadline and cap
  2. Measured from your own recordsService levels worked out again from your own job, call and meter records
  3. Each exclusion checkedEach job the supplier excludes, checked against the contract's rule
  4. Claim drafted, then signedCredit worked out up to the cap, then the contract manager signs and sends

Built-in controls

  • Large claims need a second signer
  • Counsel approves termination and dispute notices
  • Agents only read, and never contact a supplier

What You Get

More of the credits and overcharges owed under your contracts are claimed in time and come back as cash.

  • Renewals decided earlyEach contract end shown a year ahead, with the notice drafted
  • Price rises checkedIndex-linked rises checked against the index the contract names
  • Spending limits forecastThe day each blanket agreement runs out, at today's rate
In short

What is Contract Obligation Management?

It is software that turns the obligations in your contracts into dated items with owners, so you can act before they pass. These include service levels and credits, damages for delay, price-rise formulas, warranties, insurance, bonds, renewal notices and spending limits. Contract Obligation Management uses six agents. They read the contracts, measure suppliers from your own records and draft the claim or notice. The contract manager signs.

How to choose AI solutions for utilities →

Updated

The problem

Money suppliers owe goes unclaimed and renewals lapse, because contract duties sit in PDFs

A utility's contract managers make sure each supplier delivers what its contract promises. A utility holds thousands of these contracts, covering water network repairs, substation building, chemical supply, smart meter installs, call-center outsourcing and fleet leases. They include EPC contracts, where one firm designs and builds a project, and PPAs, agreements to buy power. Each contract carries duties with dates and money attached. A service level, for example, comes with service credits, the payments a supplier owes when it misses a target. There are also delay damages, price-rise formulas, warranties, guarantees on road repairs, insurance, bonds, renewal notice dates and spending limits. All of it sits in PDFs and in the contract manager's head.

Claiming a service credit is hard work on a short deadline. Someone has to measure the month's performance and serve a notice within a set window. On the sample repair contract, that window is ten business days. So the supplier's own monthly report gets taken on trust. The supplier leaves some jobs out of its figures, giving reasons such as “access denied” or “third-party damage”. These exclusions are rarely checked against the contract. Index-linked price rises are paid as invoiced. Warranty notice periods of 20 to 30 days run out. Contracts renew themselves at the old rates. Crews keep working after an insurance certificate expires, or after a blanket agreement (a standing order with a spending cap) goes past its limit.

typical≈9%of contract value lost on average to weak contract management, through missed entitlements, invoice errors and avoidable disputes
typical£56,000of service credits actually charged, out of £585,600 owed, on two outsourced public-sector contracts
Where one supplier's monthly service-credit check goes, in hoursestimated
By hand39 hours
With the solution3.6 hours
  • Reading the supplier's report and finding the clause, target and change3 → 0.2 h
  • Pulling job times from work management and working out the service level10 → 0.2 h
  • Checking each excluded job against the contract's evidence rule14 → 1 h
  • Working out the credit: full points, formula and cap2 → 0.2 h
  • Drafting the notice and the annex of jobs6 → 1 h
  • Approval and serving the notice the way the contract requires4 → 1 h

Estimated split for checking one supplier's monthly performance report and serving the claim, in working hours, by hand and with the solution. The claim window on the sample contract is 10 business days.

How it works

Each obligation read, measured, dated and claimed by the agents

What comes in
Contracts and performance incontracts, variations, supplier reports · job times, call logs, meter data, purchase orders
Agents at work
Contract readerquotes every obligation
Then
SLA performance trackermeasured from own records
Price and indexation checker
Spend and ceiling monitor
Then
Renewal and notice watcher
Then
Claim drafterformula, cap, notice
A person decides
Contract managerchecks, signs and sends
What comes out
Claim served in time
Renewal decided
Every clause on file
One case, step by step

A supplier's 97.8% report, measured again and claimed in time

The utility runs power and water networks. A civil works contractor holds its water network repair and maintenance contract, worth $3,800,000 a month. The contractor must reach Priority 1 bursts and leaks within 2 hours in 98% of cases. Its September report arrived five days ago. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0106:00 sweep

    The day opens on a radar of dates instead of a list

    Senior contract manager

    The contract manager runs 140 contracts. The radar is built from the utility's whole set of contracts, updated at 06:00. The rings show time: Now, 30 days, 90 days, 6 months and 12 months. Seven sectors show the types of obligation. Each dot's color and size show the money at stake. They include a substation project's delay damages at $240.5K, the call-center renewal at $372K and a $1.2M bond. The repair contract's KPI 2 sits in the 30-day ring as “Watching”. Its report has arrived but is not yet checked.

    Each dated obligation in the utility's contracts. The nearest are in the center. Color and size show the money at stake.

  2. 02One click

    September, measured again from the utility's own job times

    SLA performance tracker

    The contract manager clicks “Check September against the contract”. The tracker reads the contractor's report. It lists 1,214 Priority 1 jobs, with 61 excluded by the contractor and 97.8% reported. Then the tracker works out the figure again from the instruction and arrival times in work management. It finds that 1,128 of 1,214 jobs reached site within 2 hours. Each step appears in the side panel as it runs.

    Schedule 4, Table 4.1 · KPI 2. “The Contractor shall attend site within 2 hours of the instruction in not less than 98% of instances in each month.”

  3. 03The exclusions

    Each of 61 excluded jobs checked against §6.3

    SLA performance tracker

    A job may be excluded only if an access-denied or third-party record, with a photo, is logged before the 2-hour deadline. Only 9 of the 61 pass. Of the rest, 34 access-denied claims had no photo or were logged too late. Another 10 third-party claims had no record on the job, and 8 weather claims had no severe-weather event declared under §6.4. One burst main job was sent to the contractor at 02:14 and reached at 05:02. Access denied was logged at 05:09.

    Limit: the tracker works out a supplier's figure again before it accepts it. It only reads the source systems.

  4. 0493.6%

    The breach moves to the center of the radar

    Claim drafter

    The measured figure is 1,128 of 1,205 qualifying jobs, or 93.6%. That is 4 full points below the 98% target set by Variation 3, a later change to the contract. Under §5.2 the credit is 2.5% of $3,800,000 for each of the 4 points. That is $380,000, inside the 15% cap of $570,000. July was 97.2% and August 96.4%. So September is the third month below target, and clause 18.2 applies. The dot turns red, grows and moves into the Now ring, which rises to 2 open items and $435.5K.

    “Breach found · $380,000 claim drafted · window closes in nine days”

  5. 05The claim

    A notice on paper, each sentence tied to its clause

    Claim drafter

    The claim drafter writes the notice of service credits to the contractor's contract representative. Notes beside each paragraph show the 10-business-day window under §7.1 and the target from Variation 3. They also show the 52 rejected exclusions, the measurement from the month's jobs, and the formula and cap. Only full points count, so 4.39 becomes 4. The sum panel shows the working line by line, and Annex A lists the 52 jobs.

    Limit: the claim drafter does not send, and a person signs. It does not claim past a cap, and it cites the clause for each figure.

  6. 06Approved and sent

    Over $250,000, so the head of commercial approves first

    Head of commercial

    The contract manager checks the clause, the figures and Annex A. The claim is over $250,000, so it goes for approval. The head of commercial approves: “Clause and sums agree. Approved.” The contract manager signs and sends it by email and recorded delivery, as clause 22.1 requires, with the notice and Annex A attached. Accounts payable is told to take $380,000 off the October invoice under clause 14.4.

    Signed by the contract manager and approved by the head of commercial. Sent 9 days before the window closes.

  7. 07Same month, each supplier

    31 service levels, the supplier's figure beside the utility's

    SLA performance tracker

    The Service levels screen shows each measured KPI for September across 12 contracts. The call-center supplier reported 79.1% of calls answered within 30 seconds. The utility's own call logs say 78.4% against an 80% target. That misses by 1.6 points, so $41,600 is due. The meter installer got 96.8% of jobs right the first time, against a 97% target. That is below target but by less than 1 point, so no credit is due. Only full points count.

    Each measured service level, worked out again from the utility's own job times, call logs and meter data, beside what the supplier reported.

  8. 08Behind each obligation

    214 pages read, 46 obligations, each with its quote

    Contract reader

    Open the repair contract, and each obligation is highlighted in the text with a note. They include the term and extension notice, the $228,000,000 spending limit and the 12-month guarantee on road repairs. Others are the right to deduct, the insurance clause, repeated failure and the notices clause. The reader took 3 min 12 s for 214 pages. It applied Variation 3 to KPI 2, which raised it from 97% to 98% from April. It linked 4 service levels to the utility's records.

    Sent to counsel: clause 9.6 says “reasonable endeavours” with no deadline, and counsel confirmed it has no date.

  9. 09Before the notice date

    Renew, extend, re-tender or let lapse, decided in time

    Category manager

    The call-center contract renews itself in the new year unless written notice goes out within three weeks. Quotes from other suppliers are about $372K a year lower. The fleet leases go month to month at +18% unless the option is used within two months. The transformer contract cannot be extended, and its 9-month lead time for a new tender passed 105 days ago. The watcher drafts the notice to end the call-center contract, and the category manager decides.

    The category manager decides. Nothing is served until the decision is recorded and the contract manager signs.

  10. 10Ceilings

    The blanket agreement that runs out before the rollout ends

    Spend and ceiling monitor

    At 06:00 the monitor matched 3,412 call-off orders and releases from purchasing to 5 blanket agreements. The smart meter agreement has $16.9M ordered against an $18M limit, at $0.9M a month. So it runs out next month, about 5 months before the meter rollout finishes. The contract manager can ask for a higher limit or pause new orders.

    Limit: the monitor never raises or cancels an order.

Who it’s for

Contract managers, counsel and approvers who answer for each obligation

Five roles answer for supplier contracts, from the contract manager to counsel. Here is how their month changes.

Senior contract manager
Checks and sends claims and notices
Before
Runs 140 contracts. Spends mornings chasing suppliers' monthly reports and afternoons on contract changes and disputes. Knows the repair contractor missed its burst times, but cannot prove it within ten days.
Now
Opens one radar of the dated obligations and runs the check on a supplier's report. Gets the claim drafted with each sentence tied to its clause. Then checks, signs and sends.
Head of commercial
Approves claims over $250,000
Before
Signs large claims and reports recovered value to the CFO each quarter. Signs the same day when the clause and the sum are shown.
Now
Gets the clause, the sum, the working and Annex A together. Approves, and sees the notice go out days before its window closes.
Network maintenance manager
Owns the water repair contract
Before
Owns the repair contract day to day and lives in the work-management system. There, the job times are the record, and the supplier's report is only a claim.
Now
Sees the supplier's figure beside the one measured from the utility's own job times. Sees each rejected exclusion with its job number, times and reason.
Category manager
Decides renewals and re-tenders
Before
Decides whether to renew, re-tender or let a contract lapse. Needs to hear ninety days ahead, because nine days is too late.
Now
Sees each contract end on a 12-month timeline, with its notice date worked out from the contract's own rule. The notice is drafted, ready for a decision.
Commercial counsel
Repeated failure, termination, disputes
Before
Reviews notices about repeated failure, termination and disputes. Knows that a notice not served the way the contract says does not count.
Now
Gets the clauses the contract reader could not put a date on. Approves each repeated-failure, termination, step-in and dispute notice before it goes.
The agents

Six specialist agents that read, measure and claim

The agents quote each obligation, measure service levels from the utility's own records and draft each claim. The contract manager signs.

Contract reader

Reads signed contracts, schedules and changes in date order. It records each obligation with its exact quote, clause and page. It also records the trigger, the deadline in calendar or business days, the formula and any cap. It applies each change to the clause it amends and keeps the history.

  • Never records an obligation without the exact quote
  • Disputed or undated clauses go to counsel
SLA performance tracker

When a supplier's performance report arrives, it works out each service level again from the utility's own records. These are job instruction and arrival times, contact-center logs and meter data. It checks each excluded job against the contract's exclusion clause and its evidence rule.

  • Never accepts a supplier figure without recomputing
  • Only reads each source system
Claim drafter

Works out service credits, damages and warranty claims with the contract's own formula. It counts full points only where the clause says so, and stops at the cap. It drafts the notice citing each clause, with the evidence attached. It addresses the notice the way the notices clause requires.

  • Never sends. A person signs
  • Never claims past a cap
  • Each figure cites its clause
Renewal and notice watcher

Works out notice, option and re-tender dates from each contract's own rule. That includes calendar or business days and how the notice must be sent. It reminds the people who decide at 60, 30 and 10 days.

  • Never serves a notice
  • Never lets an auto-renewal pass without a recorded decision
Price and indexation checker

Checks index-linked prices against the index and month the contract names. It flags price notices and invoices that charge more. In the sample, a chemical supplier announced +11.4% when the index moved +6.2%.

  • Never holds a payment itself. It asks accounts payable
Spend and ceiling monitor

Matches call-off orders and releases to their blanket agreements and frameworks. It forecasts the day each spending limit is reached at the current monthly rate.

  • Never raises or cancels an order
Contract manager

Checks and signs, and Head of Commercial approves over $250K.

Ask in plain words

Questions on any contract obligation, claim, renewal or notice date

Ask about any contract, obligation, claim or date, or say what to draft. Each answer points to its clause.

What money can we claim before the month is out?

Five claims are owed and dated within the month. The repair contractor's service credit of $380K is due first, in nine days. Then come the transformer warranty at $64.5K and the repair contractor's failed road repairs at $55.5K. Last are the meter warranty at $49.4K and the call-center service credit at $41.6K. The $380K credit is the largest, and its window closes first.

Why is the repair contractor's figure different from ours?

The contractor reported 97.8% by excluding 61 late jobs. The contract allows an exclusion only with a photo logged before the 2-hour deadline, and 9 qualify. Counting the other 52, the utility's job times give 1,128 of 1,205, or 93.6%. That is 4 full points under 98%, so the credit is $380,000.

Which renewals need a decision in the next few weeks?

Two. The call-center contract renews itself unless notice goes out within three weeks, and quotes from other suppliers are about $372K a year lower. The chemical supplier raises prices next month by 11.4% when the index moved 6.2%. The transformer contract also ends in March with no new tender started. Its 9-month lead time has passed.

Draft the reply to the substation contractor's extension claim

Drafted for the project manager and counsel. The contractor asks for 21 more days because of late switchgear. Under the contract, delay damages have run at $18,500 a day since the end of September, $240,500 so far. The draft accepts 6 days, for the switchgear delivery the utility changed. It rejects 15 and asks for the updated schedule within 7 days. It is due early next month.

The screens

The obligation radar, the breach, the claim and the renewal timeline

From the working solution, on its sample data. Pick one to see it large.

The obligation radarEach dated obligation on one radar, with the nearest in the center and seven types as sectors. Color and size show the money at stake. The screen also shows the supplier reports waiting to be checked.
Checking a supplier's reportThe September check runs step by step. The report is read, the service level is worked out from the utility's job times, the exclusions are checked and the credit is calculated.
A breach in the centerMeasured at 93.6% against 98%, the repair contract's service level moves into the Now ring. A $380,000 claim is drafted, and its window is closing.
The service credit claimThe notice with a note for each paragraph, the sum worked line by line, and the approval chain from drafter to recipient.
Sign and sendThe recipient, the method the notices clause requires, attachments and the deduction. The contract manager signs it after the Head of Commercial's approval.
Service levelsEach measured service level for the month: the target, what the supplier says, what the utility measured, the result and the credit due.
The exclusion checkSix months of the supplier's figure against the utility's. Each claimed exclusion is checked against §6.3, with the jobs and the reason it was rejected.
The contract, readThe contract text with each obligation highlighted and noted. The panel shows how the contract was read, the change applied and the obligations it put on the radar.
Add a contract or variationA new contract change read on arrival. Pages are read, new obligations quoted and checked against the contract, then added to the radar.
The obligation registerEach obligation with its date, type, contract, clause, owner, money at stake and state.
Renewals and noticesContract ends on a 12-month timeline with notice windows, and the decisions still to record: renew, extend, re-tender or let lapse.
Spending limitsBlanket agreements and frameworks with spend against limit, the monthly rate and the day each runs out.
Commercial rulesApproval limits, reminders, how service levels are measured, the radar's bands and the data sources the agents only read.
Governance

Quoted clauses and signed claims in contract obligation management

Each obligation quotes its clauseEach obligation on the radar and in the register carries its exact quote, clause and page, and the change that set it. Each figure in a claim links to its working and the source records behind it.
Agents suggest, and a person signs and sendsThe contract manager checks and sends each claim and notice. Claims over $250,000 need the head of commercial. Over $1,000,000, the CFO signs as well.
Counsel on the notices that matterNotices about repeated failure, termination, step-in and disputes need counsel's approval. Any clause without a clear deadline also goes to counsel.
Measured from the utility's own recordsService levels are measured from the utility's own records instead of the supplier's report alone. An exclusion is rejected only under the contract's own rule, job by job, with the evidence shown.
Source systems are read and never changedThe agents do not contact a supplier, serve a notice, hold a payment or edit source data. They read work management, call logs, meter data, purchasing and invoices, and change none of them.
Each step on the activity trailThe trail records who measured, who drafted, who approved, who sent and when. Each settings change is saved as a new version.
Configuration

Approval limits, reminders and measurement rules set by the commercial team

Approval limits, reminders, how service levels are measured and how the radar reads are all settings, chosen by the commercial team.

SettingDefaultChoose from
Claims that need the Head of CommercialAbove $250,000Set in steps of $50,000 · service credits, damages and warranty claims above this sum
Claims that need the CFOAbove $1,000,000$500,000 · $1,000,000 · $2,000,000 · the CFO signs as well
Notices that need counselOnOn · Off · repeated failure, termination, step-in and dispute notices
Reminder ladder60 · 30 · 10 days60 · 30 · 10 days, or 90 · 60 · 30 · 10 days, or 30 · 14 · 7 days. Each set counts back from a notice, option or claim date
Escalate to the category manager10 days5, 10 or 14 days before, when no decision is recorded
Re-tender lead time9 months6, 9 or 12 months before a contract ends, if no re-tender has started
Measure from the utility's own recordsOnOn · Off · work-management job times, contact-center logs and meter data, never the supplier's report alone
Check each exclusion against the contractOnOn · Off · an exclusion counts only with the evidence its clause requires
Connections

Work management, call logs, meter data and the contract repository

Contract repositorysigned contracts, schedules and changes
Work managementjob instruction and arrival times, hourly
Contact-center platformcall answer and abandonment logs, daily
Meter data managementmeter communications and installs, daily
Purchasingpurchase orders, call-off orders and releases against blanket agreements
Accounts payablesupplier invoices, deductions and holds
What it changes

Contract obligation results: credits claimed and renewals decided in time

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

estimated
$3.1Ma year
in service credits, damages, warranty claims and overcharges claimed in time, at 0.5% of a large utility's third-party spend
Value lost to weak contract management≈9%
Recovered by claiming in time0.5%
target
0
renewal, option, warranty, insurance or bond dates left to pass without a recorded decision: the design goal
Decided 20 days out
on a 90-day notice clause
target
Minutes
to put a new contract's obligations on the radar, each with its clause quoted, instead of days of legal reading

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” means our estimate: 0.5% of an illustrative $610M a year of third-party spend. “typical” means published figures. World Commerce & Contracting, Contract Management: An Overlooked Driver of Business Agility and Financial Performance, 2025: average value lost almost 9%. The UK National Audit Office's Yarl's Wood report, as reported by BDC Magazine, 2018: £56,000 of £585,600 in service credits charged, about 10%. Names on the screens are sample data.

Questions

Contract obligation management questions from commercial and procurement

What is contract obligation management software?

It is software that turns the obligations in your contracts into dated items with owners, so you can act before they pass. These include service levels and credits, damages for delay, price-rise formulas, warranties, insurance, bonds, renewal notices and spending limits. Contract Obligation Management uses six agents. They read the contracts, measure suppliers from your own records and draft the claim or notice. The contract manager signs.

How does it measure supplier service levels instead of trusting the supplier's report?

The SLA performance tracker works out each service level again from your own records. These are job instruction and arrival times, contact-center logs and meter data. It checks each excluded job against the contract's exclusion rule. In the sample case, the repair contractor reported 97.8%. But 52 of 61 exclusions failed the contract's photo and timing rule, so the measured figure was 93.6%.

How does it get service credits and damages claimed in time?

Each claim window is worked out from the contract's own clause, in calendar or business days. As soon as a breach is measured, the claim drafter writes the notice with the contract's formula and cap. In the sample case, the $380,000 notice went out 9 days before its 10-business-day window closed.

Does it work for utilities' power purchase and construction contracts too?

Yes. The sample set includes a 120 MW solar power purchase agreement with a built-in price rise. It also has a substation design-and-build contract with delay damages of $18,500 a day and a long-term turbine service agreement. Supply frameworks, outsourced services and leases are in it too.

Does it stop auto-renewals and expired cover slipping through?

Yes. The renewal and notice watcher works out each notice, option and re-tender date. It reminds owners at 60, 30 and 10 days and goes to the category manager when no decision is recorded. A contract cannot renew itself without a recorded decision. Insurance certificates, bonds and spending limits on blanket agreements sit on the same radar.

Who signs a claim before it reaches the supplier?

People do. The agents suggest and draft. They do not contact a supplier, serve a notice, hold a payment or edit source data. The contract manager checks and sends. Claims over $250,000 need the head of commercial. Notices about repeated failure, termination and disputes need counsel.

Can we set our own approval limits and reminders?

Yes. Approval limits, counsel review, the reminder steps, escalation days and re-tender lead time are all settings. So are how service levels are measured, the exclusion check, the radar's money bands and its center ring. Each change is saved as a new version.

What do we provide to try it on our own contracts?

You provide your contracts and changes, a month of supplier performance reports and the records you measure them against. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once it passes each quality gate. We will walk you through it on your own contracts first.