Capital Portfolio Optimization

Utility capital planning that funds the projects removing the most risk, with each number traced to its asset records

See one case, screen by screen ↓
Watch with transcript →

Built forCapital plannersAsset managersFinance teamsRegulatory affairs teamsNetwork planners

The Problem Today

Every engineering team scores risk its own way, so projects can't be compared and the plan follows the oldest asset or the loudest request.

$1.1T
US investor-owned utility capital plans, 2025 to 2029 published
15 days
to re-run the plan by hand for a smaller budget our estimate

Four records, reconciled by hand

  • Proposals
  • Health
  • Failures
  • Budget
  • Business cases that don't compareCosts in different years' dollars, some benefits counted twice
  • A ranking that is hard to defendThe reasons are written from memory

The Solution

  1. Every business case is readCosts put in one year's dollars, with missing contingency and double counts flagged
  2. Risk is priced from the recordsAsset health and failure records, priced with the utility's approved values
  3. Any budget can be testedProjects ranked by risk removed per dollar, and a smaller budget shows what drops out
  4. The head of capital planning signsA justification for the same budget, with a source for each figure

Built-in controls

  • Each risk value cites its asset records
  • Asset data and business cases stay read-only
  • Must-fund projects are funded before any ranking

What You Get

Capital goes to the projects that remove the most risk, and each one has a sourced reason for the regulator.

  • Flawed business cases correctedEach correction shown beside the engineer's original
  • See the cost of a cut before offering itThe projects and risk a smaller budget gives up, shown up front
  • A planning cycle in 19 days instead of 75our estimateWorking days, for a cycle of about 200 business cases
In short

What is Capital Portfolio Optimization?

It means choosing which grid and water projects to fund from a fixed budget, so the plan removes the most risk for the money. Capital Portfolio Optimization does this with five agents. They read each business case, value each project's risk from its asset records and draw the efficient frontier. The head of capital planning signs the portfolio.

How to choose AI solutions for utilities →

Updated

The problem

Utilities have no fair way to compare their capital projects

Each planning cycle, a utility's capital planning team builds one plan for its grid and water network. Hundreds of requests come in. They cover replacements, load growth, resilience, data-center connections, water mains and treatment. The plan has to fit the budget the board and the regulator will allow. To choose fairly, the team has to compare every project on the same scale, and today it has no way to. The business cases arrive in different years' dollars. Some leave out contingency, the reserve for cost overruns. Some count the same benefit twice. On top of that, each engineering team rates its own risk high, medium or low in its own way. So the ranking ends up following the oldest asset or the loudest request.

The trouble grows when the budget changes. When finance asks what a smaller budget would mean, the spreadsheet is rebuilt over weeks. The answer is a list of projects, with no view of the risk left on the network. Then the regulator's staff ask why one project made the cut and the next did not. The reason is written by hand, from memory. That matters, because capital enters the rate base only when the utility shows the spending was prudent. The rate base is the investment that customers' prices pay back. A cost that cannot be shown to be prudent can be refused by the regulator.

typical$208Bof capital US investor-owned utilities planned to spend in 2025 (EEI)
typical$1.1Tof capital the same utilities planned for 2025 to 2029 (EEI)
typical$29Bin rate increases requested or won in the first half of 2025, a record (Utility Dive via POWER)
Where a capital plan's working days goestimated
By hand75 days
With the solution19 days
  • Reading business cases and putting them in one year's dollars15 → 3 d
  • Scoring each project's risk with the engineering teams20 → 5 d
  • Ranking against the budget, crews and dependencies10 → 2 d
  • Re-running the plan for a smaller budget15 → 1 d
  • Writing the investment justification10 → 4 d
  • Review and sign-off5 → 4 d

Our estimate for one planning cycle of about 200 business cases, in working days, by hand and with the solution.

How it works

Capital portfolio optimization, business case through signed portfolio

What comes in
Requests inEach business case · cases, asset health, failure records, envelope
Agents at work
Business case reader2027 dollars · checks
Then
Risk valuerhealth × failures × values
Then
Portfolio optimiserfrontier + funding line
Scenario analyst
Then
Justification writerevery figure cited
A person decides
Head of Capital Planningdecides and signs
What comes out
Ranked portfolio
Scenarios with bill impact
Regulator justification
One case, step by step

214 requests, a $1.2B budget and the CFO's question about $1.0B

The sample utility runs an electricity and water network. Its three-year plan has 214 candidate projects. Together they ask for $2,310.0M, against a $1.2B budget set by the board. The board paper and the rate filing are both weeks away. Early in the week, the CFO asks what a $1.0B budget would give up. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Tuesday morning

    The plan opens on one curve, the efficient frontier

    Head of capital planning

    The plan opens on one curve, called the efficient frontier. Each project is a bead on it. The curve plots risk removed each year against total capital, with projects in order of risk removed per dollar. At the $1.2B budget line, 61 of 214 projects are funded for $1,190.0M. They remove $412.0M a year of risk, priced in dollars. The remaining $10.0M is held as contingency, and the household bill rises $3.40 a month. The six must-fund projects, $186M, sit shaded at the start. Last cycle's method, ranking by age, removes $296.4M, well below the curve.

    On the frontier: “+$115.6M a year more risk removed than last cycle's method for the same $1.2B (+39%).”

  2. 02The run

    214 cases read, valued and ranked under 7 constraints

    Business case reader, Risk valuer and Portfolio optimiser

    The run log shows each step. The Business case reader read 214 cases in 4.1 minutes. It put each cost in the plan's base-year dollars. The Risk valuer priced each project from the asset register, the failure records and value framework v3. The Portfolio optimiser funded the six must-fund projects first. It ranked the rest within the mains crews' 42 km a year, two cable jointing teams, a 30% floor for water work and four dependencies.

    Portfolio optimiser: “Ranked 214 projects under 7 constraints · 0.6 s”. It does not drop a must-fund project or break a dependency.

  3. 03Before ranking

    22 business cases corrected, each original kept

    Business case reader

    The Case corrected filter lists the 22 cases the reader fixed. Some were priced in older dollars and were brought up to date. Others counted a benefit twice, and the extra count was removed. Where contingency was missing, 10% was added. Cases whose scope overlaps another candidate are flagged too. Each correction sits beside the engineer's original figure. The reader flags problems and never rejects a case.

    “Shows the original beside every correction”

  4. 04At the line

    An oil-filled cable, valued from its own records

    Risk valuer

    Rank 60 is a 132 kV oil-filled cable replacement costing $68.0M. Its two circuits were laid in 1971, and their health scores are 28 and 31. The curve for this class of cable gives 0.14 major failures a year. This cable has had 3 oil leaks and 1 joint fault in 24 months, which raises it to 0.19. A major failure would cost $54.0M. That covers 38,400 customers off supply at $62.50 a customer-hour, oil in an estuary, repair, a reportable release and the public near the joint bays. So the risk today is $10.3M a year, and $0.4M after replacement. The project removes $9.8M.

    The Risk valuer never invents a failure rate. It uses the class curve when an asset's history is thin, and says so.

  5. 05The evidence

    Five records behind the number, and two fixes to the case

    Risk valuer and Business case reader

    Each record is linked. There were three oil leaks in two years, of 2,900 L, 3,600 L and 4,700 L. A joint fault took circuit 1 out for 31 hours, with 21,300 customers kept on supply from another circuit. A condition survey found failed sheath tests on 4 of 22 sections. The business case was priced in older dollars, so $6.3M of escalation is now included. An oil top-up saving was counted twice and is now counted once.

    Valuer run: “$9.8M a year removed · before $10.3M · after $0.4M · every input cited”

  6. 06The CFO's question

    Move the line to $1.0B and see what is given up

    Head of capital planning

    The regulator's staff proposed $1.0B in their opening testimony. The CFO asks what that would mean. The head of capital planning moves the budget line, and four projects drop. Two are phase 3 of a cast-iron main renewal ($52.0M, $7.9M a year) and a substation flood defense ($41.0M, $6.2M). The other two are the oil-filled cable ($68.0M, $9.8M) and a reservoir outlet tower ($33.0M, $4.6M). In all, 57 projects stay funded for $996.0M and remove $383.5M a year. The bill rise falls to $2.83 a month.

    “−$194.0M capital · −$28.5M a year of risk removed (6.9%)”

  7. 07Below the line

    A cast-iron main with 61 bursts in five years

    Water network planning

    The cast-iron mains were laid in 1934 and 1936. They have burst 61 times in five years, and the count rises each year: 9, 10, 12, 14, 16. The fitted trend expects 12.2 bursts next year, at $0.69M each. Renewing 14.2 km with plastic (PE) pipe removes $7.9M of its $8.4M a year of risk. Its records include a discolored-water notice with an action plan due. At $1.0B the main drops below the line. It comes back in at $1.05B.

    Asked to keep the main in at $1.0B, the assistant proposes deferring depot fleet charging and an 11 kV switchgear project. The plan then costs $999.5M and removes $383.0M a year, $0.5M less.

  8. 08Side by side

    Three budgets, with the risk each one leaves

    Scenario analyst

    The board plan at $1.2B removes $412.0M a year. At $1.1B, the CFO's test removes $397.6M and drops the cable and the outlet tower. Staff testimony at $1.0B removes $383.5M and drops all four. Risk removed is broken out by family. For customers and supply it is $233.2M, $228.4M and $220.7M a year. For water quality it is $19.0M, $19.0M and $16.9M. The bill impact sits under each.

    Scenario analyst: “Compares; does not choose.”

  9. 096 seconds later

    The justification, redrafted for $1.0B

    Justification writer

    The writer redrafts seven sections with nine sources. The new section names the four projects that drop. It gives the $194.0M of capital and the $28.5M a year of risk they carry. It explains why the oil-filled cable matters most. Three oil leaks and a joint fault in 24 months put its chance of a major failure at 19% a year. The bill section compares $2.83 a month with $3.40 for the board plan.

    The regulatory affairs manager's review note: “Staff will ask what a lower envelope gives up. Keep the $1.0B section ready, with the cable paragraph.”

  10. 10Signed at 10:12

    The recommendation signed, with what the signature means

    Head of capital planning

    The head of capital planning makes the $1.0B scenario the recommendation. They sign it together with the justification drafted for the same budget. The signature records its meaning, “I recommend this portfolio to the CFO and the board”, and what comes next. The CFO approves the budget, and regulatory affairs files with the regulator. The signing goes on the audit trail and the CFO is notified.

    If the draft and the recommendation are for different budgets, the solution asks for a redraft first and will not sign.

Who it’s for

Capital planning, finance, asset management and regulatory teams on one portfolio

The same plan, seen by the five roles who build, fund, value, defend and argue for it. First their cycle by hand, then with the agents.

Head of capital planning
Signs the recommended portfolio
Before
Owns the three-year plan, with 214 requests and one budget. The board paper and the rate filing are weeks apart. Ranking the projects is possible. The hard part is showing the regulator why one sits just below the line and the next just above it.
Now
Moves one budget line and sees which projects make the cut, the risk left on the network and the bill impact. Each project's risk is traced to its records.
Chief financial officer
Approves the budget
Before
Sets the budget and has to know what a cut costs before offering it in a settlement. If staff push the plan down to a billion, the CFO needs to know exactly which work stops.
Now
Sees the board plan, their own $1.1B test and the $1.0B staff testimony side by side. That shows the projects that differ, the risk removed by family and the bill for an average household.
Director of asset management
Owns the asset register and the value framework
Before
Owns the asset register, health scores and failure records. Wants each risk number to come from the utility's data, instead of from whoever argues loudest.
Now
Approves the value framework, the dollar values used to price each project. Sees the failure curve for each asset class, fitted on the utility's own records.
Regulatory affairs manager
Writes the capital testimony and files it
Before
Writes the capital testimony and answers data requests. Needs a reason to cite for each project in the filing.
Now
Gets an investment justification with a source on each figure. It is redrafted for whichever budget the regulator's staff put on the table.
Water network planning manager
Puts forward the water program
Before
Puts forward the water mains and treatment program. Needs a main with 61 bursts in five years to be seen.
Now
Sees the main's bursts, its discolored-water notice and its risk value on the same scale as each grid project. Also sees what it would take to keep it in.
The agents

Case reader, risk valuer and optimizer agents that rank the capital portfolio

Each business case is read, put in one year's dollars, valued for the risk it removes and placed on the efficient frontier. The head of capital planning signs the portfolio.

Business case reader

Reads each business case, PDF or workbook. Pulls out cost by year, contingency, scope, the assets it touches and the benefits it claims. Puts each cost in the plan's base-year dollars using finance's escalation index. Flags missing contingency, benefits counted twice and scope that overlaps another candidate.

  • Shows the original beside every correction
  • Flags a case and never rejects it
  • Reads business cases and never edits them
Risk valuer

Links each project to its assets in the register. Reads ten years of health scores and failure records. Estimates failures a year from the asset-class curve, adjusted by the asset's own record. Prices each consequence with the value framework, then computes the risk before and after the work.

  • Never invents a failure rate
  • Says when it used the class curve. An asset needs at least 3 records of its own.
  • Cites every input
Portfolio optimiser

Funds must-fund projects first. Ranks the rest by risk removed per dollar, within delivery limits, program floors and dependencies. Sets the funding line for any budget, and reports what each change adds or gives up.

  • Never drops a must-fund project
  • Never breaks a dependency
  • Holds any money left over as contingency, and never fills it quietly
Scenario analyst

Re-runs the portfolio for each budget or variant. Reports the funded projects, cost, risk removed by family, risk left and the bill impact for an average household. Names each project that differs from the board plan.

  • Compares options and never chooses
Justification writer

Drafts the investment justification for the recommended scenario. It covers how projects were ranked, must-fund obligations, what the budget buys, what a lower budget gives up and the bill impact. It also drafts answers to the regulator's questions. Each figure cites its business case, record or framework.

  • Stays a draft until signed
  • Never files with the regulator
  • No figure without a source
Head of Capital Planning

Signs the portfolio, and the CFO approves the budget.

Ask in plain words

The funding line, one project or a smaller budget, asked in plain words

Ask about any project, the funding line or a scenario, or say what to change. Each answer points to its records. These answers use the sample data.

What do we give up at $1.0B?

Four projects drop, and $28.5M a year of risk stays on the network. Two are phase 3 of the cast-iron main ($52.0M, $7.9M a year) and the substation flood defense ($41.0M, $6.2M). The other two are the 132 kV oil-filled cable ($68.0M, $9.8M) and the reservoir outlet tower ($33.0M, $4.6M). In all, 57 projects stay funded for $996.0M, removing $383.5M a year. The budget line is now at $1.0B.

Why is the oil-filled cable at the line?

It removes a lot of risk, $9.8M a year, but it costs $68.0M. That is $0.144M of risk removed for each $1M, rank 60 of 214. The value is high because the circuits have leaked oil three times in two years. A release would reach an estuary, which accounts for $19.4M of the $54.0M consequence. The business case was in older dollars, so $6.3M of escalation is included.

Keep the cast-iron main in at $1.0B

It can stay if the two lowest-ranked funded projects are deferred. These are depot fleet charging ($21.0M, $3.7M a year) and an 11 kV switchgear project ($27.5M, $4.7M a year). The plan then costs $999.5M and removes $383.0M a year. That is $0.5M a year less than the frontier, but it answers the main's discolored-water notice. Saved as scenario “$1.0B · main kept”.

Redraft the justification for $1.0B

Redrafting now. The new section names the four projects that drop and the $28.5M a year of risk they carry. It shows the bill difference, +$2.83 a month against +$3.40. Each figure keeps its source.

The screens

The efficient frontier, a project's risk case and the $1.0B scenario

From the working solution, on its sample data. Pick one to see it large.

The efficient frontier214 projects on one curve of risk removed against capital. The budget line sits at the $1.2B board plan, with what it funds, removes and costs a household.
The optimiser's runEach step of the run. Cases are read and put in one year's dollars, each project is valued, must-fund projects go first and seven constraints set the funding line.
Business cases correctedThe 22 cases the reader fixed, beside their originals. Fixes cover escalation, double-counted benefits, missing contingency and overlapping scope.
Projects at the lineThe projects either side of the funding line, with cost, risk removed per $1M, where the risk comes from and the business-case check.
A project's risk caseThe oil-filled cable's risk built step by step. Failures a year × cost of each failure gives the risk today, then the risk removed, with the consequence broken down.
The records behind itThe five failure and condition records used, the business-case checks and the valuer's run, each input cited.
Risk valuesThe value framework that prices each consequence, and the failure curve for each asset class fitted on the utility's records.
What $1.0B gives upThe budget line moved to $1.0B. Four projects drop, and the shaded stretch of the curve shows $28.5M a year of risk given up.
A water main below the lineThe cast-iron mains, with 61 bursts in five years, the trend, the cost of each burst and the discolored-water notice.
Scenarios side by sideThe board plan, the CFO's test and the staff testimony side by side. It shows the projects that differ, risk removed by family and the household bill.
The investment justificationRedrafted for $1.0B, with the section on what it gives up. Each figure is cited in the margin, and the regulatory affairs review note is shown.
Sign the recommendationThe recommendation signed with its meaning and the signer. Next, the CFO approves the budget and Regulatory Affairs files.
SettingsThe budget by year, must-fund rules, delivery limits, approvers and what each agent may do.
Governance

Cited risk values and signed plans in capital portfolio optimization

Each risk value cites its inputsEach project's risk shows the asset register record, the failure records, the class curve and the value framework version behind it. Each figure in the justification links to its source.
Named people decide and signThe head of capital planning signs the recommendation, and the meaning of the signature is recorded. The CFO approves the budget, and regulatory affairs files. Agents read, value, rank and draft. They do not sign or file.
No signature on a draft for a different budgetSometimes the justification is drafted for one budget and the recommendation is for another. The solution then says so. It will not sign until the draft is redone or the recommendation changes.
Read-only on asset dataThe agents read the asset register, failure records and business cases and do not edit them. The utility's data stays in its own environment.
Obligations first, limits respectedMust-fund projects are funded before any ranking. These include regulatory orders, dam safety directions, signed connection agreements and permit limits. Crew limits, program floors and dependencies hold in each run.
Each run and change on the audit trailThe audit trail records who did what, and when. It covers each optimiser run and each re-valuation after new failure records. It also covers business-case corrections, comments on a project, approval of the value framework and each signature.
Configuration

Budget, must-fund rules and crew limits for capital portfolio optimization

The budget, what is funded first, what the crews can deliver and who signs are all settings. The utility chooses them.

SettingDefaultChoose from
Budget, 2027 to 2029$1,200.0MSet by year. In the sample plan: 2027 $380M · 2028 $410M · 2029 $410M
What happens to money left under the lineHeld as contingency (≤ 1 %)Hold the remainder as contingency · Fill it with smaller projects below the line
Must-fund rules, funded before ranking5 of 6 onRegulatory orders and directions. Dam safety inspector's directions. Signed connection agreements. Permit limits with a date. Metering code failures. Board commitments in the last rate case (off).
Water mains crews42 km a yearOn · Off. A limit on what crews can deliver, which the optimiser respects
Cable jointing teams2 major cable projects at a timeOn · Off
Water programs' share of discretionary spend≥ 30 %On · Off. A minimum share for the water program
Dependencies and outage windows4 dependencies · 132 kV outages April to October onlyOn · Off. For example, a second transformer only after the interconnection
ApproversHead of Capital Planning · CFORecommendation: Head of Capital Planning · Budget: CFO · Value framework: Director of Asset Management · Filing: Regulatory Affairs Manager
Connections

Business cases, asset health, failure records and the rate model

Project business casesPDFs and workbooks: cost by year, scope, assets touched and claimed benefits
Asset register and healtheach asset with its class, age, location, criticality and health score
Failure recordsfaults, bursts, leaks, inspections and near misses, linked to assets
Budget envelopes and the rate modelthe board's budget by year and the household bill impact
Value frameworkthe dollar value of each consequence: customer-hours, safety, environment, water quality
Regulatory priorities and filingsorders and directions, past capital testimony and data requests
What it changes

More risk removed per capital dollar, and the cost of a cut seen the same day

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
30%
more risk removed for the same capital than ranking by asset age
Ranked by ageOn the frontier
target
100%
of projects in the filing traced to their asset health and failure records
Each project in the sample plan
risk value cited
target
Sameday
to show what a budget cut gives up, instead of a three-week spreadsheet rebuild
Spreadsheet≈ 3 weeks
Budget lineminutes

“demo” means seen in the working solution, on its sample plan data. “target” means the design goal, measured in the live solution. “estimated” means our estimate for one planning cycle of about 200 business cases. That is 75 working days by hand and 19 with the solution. Re-running for a smaller budget takes 15 of those days by hand. “typical” means published figures. EEI reports that US investor-owned utilities plan about $208B of capital in 2025 and over $1.1T for 2025 to 2029. Utility Dive via POWER reports a record $29B of rate increases requested or won in the first half of 2025. Names on the screens are sample data.

Questions

Capital portfolio optimization questions from planners and regulatory teams

What is capital portfolio optimization for utilities?

It means choosing which grid and water projects to fund from a fixed budget, so the plan removes the most risk for the money. Capital Portfolio Optimization does this with five agents. They read each business case, value each project's risk from its asset records and draw the efficient frontier. The head of capital planning signs the portfolio.

How does risk-based capital planning work in this software?

Each project's risk is the chance its assets fail times the cost of that failure, before and after the work. Must-fund projects are funded first. The rest are ranked by risk removed per dollar, within crew limits, program floors and dependencies. They are funded in that order until the budget is used.

Where do the risk numbers come from?

From the utility's own data. That means health scores in the asset register, failure records and the failure curve for each asset class. It also means a value framework approved by the director of asset management. When an asset has fewer than three records of its own, the class curve is used and the project says so.

Can it show what a budget cut gives up?

Yes. Move the budget line or pick a budget, and the frontier shows which projects drop and the risk they carried. In the sample plan, moving from $1.2B to $1.0B drops four projects and $194.0M of capital. It leaves $28.5M a year of risk on the network.

Does it help defend the capital plan in a rate case?

Yes. A rate case is where the utility asks the regulator to approve its prices. The Justification writer drafts the investment justification, with a source on each figure. It covers how projects were ranked, must-fund obligations, what the plan buys, what a lower budget gives up and the bill impact. It can be redrafted for any budget. Regulatory affairs edits and files it.

Who signs the portfolio, and can the agents change asset data?

The head of capital planning signs the recommendation and the CFO approves the budget. Changes to the value framework need the director of asset management. The agents read, value, rank and draft. They do not sign or file, and they do not edit the asset register, failure records or business cases.

Does it work for water as well as electricity?

Yes. Water and electricity projects are valued on the same scale. That covers water mains, treatment, wastewater, resilience, growth and electricity network work. The scale counts customer-hours off supply, properties without water, discolored-water and boil-water notices, sewage spills, safety and repair. So a burst main and a leaking cable can be compared fairly.

What records does it need from our planning cycle?

Your business cases, asset register, failure records, value framework and planning rules. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once every quality gate has passed. We will walk you through it on your own capital plan first.

Try capital portfolio optimization
on your own business cases.

We'll run Capital Portfolio Optimization on a sample of your own business cases and asset records.