WorkflowGrid Operations & Outage Management

Switching Order Management

Switching order management that simulates every step on the live network, so an unsafe step is blocked before anyone touches the network

See one case, screen by screen ↓
Watch with transcript →

Built forControl room operatorsSwitching order writersSenior control engineersField switching crews

The Problem Today

Orders are copied from the last job and read by a second engineer, so a copied step can send power onto a crew's grounded line.

13.8
deaths per 100,000 US line workers in 2024, vs 3.3 for all published

Read by a second engineer

  • Old order
  • Diagram
  • Rules
  • Customers
  • Records that do not closeA ground still shown as on after its permit ended
  • Clinics lose supply tooPriority and life-support customers dropped with the feeder

The Solution

  1. Copied steps spottedDraft compared with five years of orders on the same devices
  2. Each step simulatedEach switch changes state on the live diagram: live, dead or grounded
  3. Customers kept on supplyRedrafted to close the other feed before the old one opens
  4. The senior engineer signsThe order is issued only once the senior control engineer signs

Built-in controls

  • A blocked step cannot be issued
  • Each finding cites its safety rule
  • Read-only on the live network

What You Get

Unsafe steps are caught at the control desk before an order is issued, and fewer planned jobs cut off customers who could have stayed on.

  • Each ground accounted forCompleted orders matched to SCADA and the radio log, step by step
  • Priority customers kept onOrders redrafted so life-support customers stay on when another feed exists
  • Less time per orderour estimate2.6 → 0.7 hours of work on each switching order
In short

What is Switching Order Management?

Switching order management software takes a switching order from the work request to a checked, signed and reconciled order. A switching order lists the breakers to open, switches to lock, sections to prove dead and grounds to apply, then how to restore supply. Switching Order Management adds six agents. They find prior orders, draft the sequence, simulate each step on the live network and check the safety rules and the customer impact. They also reconcile the completed order against SCADA. The senior control engineer approves and signs.

How to choose AI solutions for utilities →

Updated

The problem

A switching order is checked only by reading it, so an unsafe copied step can get through

Before a crew works on a de-energized cable, the control room writes a switching order. It lists each step: the breakers to open, the switches to lock, the sections to prove dead and the grounds to apply. Grounds connect the line to earth, so it cannot hurt the crew if power comes back. The order also lists the steps to put everything back. Most orders are written by copying the last order for the same equipment and editing it. A second engineer then checks it by reading it. But a step that was right in the old order can be wrong in the new one. A reader who sees a familiar sequence passes it.

The mistakes that hurt people are steps done in the wrong order. Examples include closing a breaker onto a grounded section, or grounding a section still live from the far end. Others include opening a disconnector while it carries load, or issuing a permit before every ground is on. The mistakes that hurt customers are steps that break before they make. Opening the old supply before closing the new one drops a whole feeder, even when another feed was there. And after the job, the record often does not add up. Field confirmations are logged later than the matching event in SCADA, the control system. A clearance is released by the wrong person. A ground is still recorded as on after its permit was canceled.

typical13.8per 100,000fatal work injuries per 100,000 full-time-equivalent power-line installers and repairers in 2024, against 3.3 for all workers
Where one switching order's hours goestimated
By hand2.6 hours
With the solution0.7 hours
  • Finding prior orders and cloning a draft0.4 → 0.1 h
  • Checking every step against the diagram and the safety rules0.4 → 0.1 h
  • Working out customers off supply, priority customers and notices0.3 → 0.1 h
  • Second-engineer check and signature0.5 → 0.2 h
  • Reconciling the completed order against SCADA and the radio log1 → 0.2 h

Our estimate of the hours one planned 11 kV switching order takes, by hand and with the solution. It assumes a writer with 30 to 40 orders a week and a checker with 6 to 10 a day.

How it works

Switching order management from work request to reconciled record

What comes in
Data in4 sources · work request, network model and SCADA, safety rules, prior orders
Agents at work
Prior-order findercopied steps
Order draftersequence + revisions
Then
Network simulatorevery step on the diagram
Then
Safety rule checker
Customer impact checker
Then
Order reconcilerafter execution
A person decides
Senior control engineerapproves and signs
What comes out
Signed switching order
Unsafe steps blocked
Reconciled against SCADA
One case, step by step

How one cable joint's switching order was blocked, redrafted and signed

A distribution control room has a cable joint to replace on an 11 kV ring. The ring has six ring main units, the switching points along it. The work is one Thursday from 09:00 to 15:30. Here is what happens to its switching order, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01A week before

    The work request asks for a dead, grounded cable and nobody off supply

    Cable engineer

    An online partial-discharge monitor, which picks up small sparks inside the insulation, reads 2,400 pC at the joint. The alarm level is 500 pC, and the reading has been rising for weeks. The cable engineer raises the work request. It asks for the cable to be isolated at the feeder breaker and at the first ring main unit, with a ground at each end. All six ring main units are to stay on supply from the neighboring feeder, which is 1,654 customers and 3.1 MW. Four priority customers are on the ring, including a clinic's dialysis unit.

    Work request: the cable dead and grounded at both ends from 09:00 to 15:30, and nobody on the ring off supply.

  2. 02Checked 08:47

    Rev A is copied from last year's order and checked by four agents

    Switching order writer

    The writer drafts rev A, a 16-step order copied from last year's joint on the next cable section. As soon as it is submitted, the agents check it. The prior-order finder finds 3 earlier orders on the feeder breaker and the first ring main unit. It shows rev A is 81% identical to last year's order. The network simulator runs all 16 steps on a model of the two feeders, starting from the SCADA states.

    Prior-order finder: “rev A is 81% identical to last year's order. Step 7 is copied unchanged from its step 9.”

  3. 03Step 3

    Opening the feeder first drops the whole ring

    Customer impact checker

    Rev A opens the feeder breaker before closing the open point, the normally open switch at the far end of the ring. On the diagram, each ring main unit goes off supply, cutting off 1,654 customers, including the clinic and 3 life-support registrations. They stay off for the roughly 22 minutes it takes to reach the far end. That is 36,388 customer minutes on a job that needed none. Last year's order did exactly this.

    Rule 5.4 · “An alternative feed exists: close the open point first.” · Warning

  4. 04Step 7

    A copied step would close onto a grounded cable, so it is blocked

    Safety rule checker

    At step 6 the crew closes the ground switch at the breaker end, so the cable is grounded. Step 7 was copied from step 9 of last year's order. It closes the feeder breaker to restore supply. In the old order, the worked section was farther around the ring and this cable was not grounded. Here the breaker would close onto the crew's grounds. The run stops and the breaker is ringed in red on the diagram. The step is marked Blocked, and it cannot be issued.

    “Rule 4.3 · The feeder breaker would close onto the cable grounded at step 6. This step cannot be issued.”

  5. 05The fix

    Rev B keeps customers on and removes the copied step

    Order drafter

    The order drafter proposes rev B as a side-by-side change to the order. It does not rewrite the whole order. Closing the open point now comes before opening the feeder breaker, so all 1,654 customers stay on supply. The copied step 7 is removed. The breaker's restoration close already sits at new step 13, after both grounds are off. Grounds, permit and restoration are unchanged, and the order now has 15 steps.

    The drafter changes as little as possible and explains each change. It does not issue or approve an order.

  6. 06Re-simulated

    Fifteen steps, nothing blocked, nobody off supply

    Network simulator

    Rev B is applied and the simulator runs each step again. It finds 0 blocked steps, 0 customers off supply and 3 notes. The two feeders run in parallel through the open point for a moment, which is permitted. Both are on the same 132 kV group, at an angle of 0.4°. The neighboring feeder carries 7.3 MW of its 8.0 MW rating, or 91%. At the 15:00 peak it is forecast at 7.6 MW, or 95%, which is within the limit.

    Rule 7.1 · “Neighboring feeder at 7.3 MW of 8.0 MW (91%). Forecast 7.6 MW (95%) at the 15:00 peak, within the 100% limit.” · Note

  7. 07Signed 09:16

    The senior engineer signs, with the meaning of the signature

    Senior control engineer

    Approve and sign stays locked while any step is blocked or has a warning. Rev B is clean. The senior control engineer sees the order, the work and the time window. All 15 steps are simulated, with none blocked and no customers off at any step. The engineer signs with a password and the meaning “Checked and approved for issue”. On Thursday at 09:00 the control room operator issues it. The permit goes to the senior authorized person in the field.

    Approve and sign opens only when no step is blocked or has a warning.

  8. 08On the day

    Each step is read back, confirmed and matched to SCADA as it happens

    Control room operator

    During breaker maintenance on another order at 33 kV, the operator instructs the field switcher over the radio, one step at a time. Each step records when it was instructed, the repeat-back, the field confirmation and the SCADA event. For example, the breaker was isolated at 09:21:57 and the ground switch closed at 09:30:52. The order reconciler marks each one Match. Step 7, the permit, waits for the operator to confirm it.

    Repeat-back, confirm, next. One step at a time.

  9. 09After the job

    Two flags the paper record would have hidden

    Order reconciler

    Next comes a different job, a cooling fan replacement on a substation transformer that finished on Monday at 16:58. Of its 15 steps, 13 matched SCADA and the radio log automatically. All 4 grounds were applied and removed. Two flags go to the senior control engineer. First, the field confirmation that the transformer's ground switch was open came in after the disconnector and the transformer breaker had closed. Second, the control room operator released the clearance for the permit. Only the field switcher who received it should have released it.

    “The ground was off in time. The record is not.” · Rule 6.5: only the person who received a clearance may release it, unless a transfer is recorded.

  10. 10The next morning

    The grounds on the network, and the one that should not be there

    Order reconciler

    The grounds board lists 11 grounds under 5 clearances, drawn from SCADA, permits and field confirmations. Ten are under a live permit. One, on a transformer at another substation, is still recorded as applied 40 hours after its permit was canceled. Until it is confirmed removed, rule 4.3 blocks any close onto that transformer's 11 kV side. The senior control engineer asks the field to confirm, with a photo.

    “Still recorded · 40 h after permit canceled”

Who it’s for

Writers, engineers and crews who run a utility's switching orders

The same switching order, seen by the five roles who own it, in their week before and their week now.

Senior control engineer
Checks, approves and signs each order
Before
Checks and approves 6 to 10 switching orders a day as the second person, before they are issued. Reads each one twice, knowing the risk is the step read only once.
Now
Opens each order on the live single-line diagram, the control room's map of the network. Each step is simulated and each finding is tied to its rule. Decides the reconciliation flags after the job.
Switching order writer
Writes 30 to 40 orders a week
Before
Writes most orders by copying the last one for the same equipment, and wants something that reads a copied order with fresh eyes.
Now
Sees which steps were copied and whether they still fit, and gets a proposed revision as a change to read line by line.
Senior authorized person
Holds the permit in the field
Before
Carries out the field steps, proves the line dead, applies the grounds and receives the permit. Trusts the order, which is exactly why it has to be right.
Now
Works from an order whose steps were all simulated on the live network before issue. Both grounds are on before the permit is issued.
Control room operator
Issues and instructs orders
Before
Instructs each step on the radio and confirms it against SCADA: repeat-back, confirm, next, one step at a time.
Now
Sees each step's instruction, repeat-back, field confirmation and SCADA event side by side. Sees all the grounds on the network on one board.
Cable engineer
Raises the work request
Before
Raises the work request and states the clearance needed: the cable dead and grounded both ends for the work window.
Now
Sees the clearance requirement, the priority customers on the ring and the drafted sequence that keeps them on supply.
The agents

Drafting, simulation and rule-check agents for utility switching orders

Six agents find, draft, simulate and check each switching order on the live network, then reconcile it against SCADA. The senior control engineer approves and signs.

Prior-order finder

Searches 5 years of switching orders, incidents and complaints on the same devices and sections. Scores how much of a draft was copied. Checks whether each copied step's worked section, grounds and feeds still match this order.

  • Never edits an order
  • Shows the match score and the source step
Order drafter

Drafts the switching and restoration sequence from the work request, the clearance needed and the network model. That covers the isolation boundary, points of isolation, grounds and make before break. It can also propose a revision that clears a finding.

  • Never issues or approves an order
  • Every draft is simulated before hand-over
  • Explains each change in a revision
Network simulator

Steps each action through the network model, starting from the current SCADA states. After each step it works out which sections are live, dead or grounded and which customers are off supply. It checks feeder loading against rating, using the forecast for the work window, and any parallel between sources.

  • Read-only: never operates a device
  • Uses the model version of the check date
Safety rule checker

Tests each simulated step against the 10 rules in issue 7 of the utility's switching safety rules. Each finding names the rule, the step, the device and the simulated state that triggered it. A Block finding stops the order from being issued.

  • Never overrides a block
  • A rule changes only with the rules owner's signature
Customer impact checker

Lists the customers off supply at each step by site, with priority and life-support registrations. Works out customer minutes from the order's timings. Checks that notices for planned interruptions go out in time.

  • Never contacts customers itself
  • Drafts notices for the planner to send
Order reconciler

Matches each step's radio-log instruction, field confirmation and SCADA event, during and after the work. Flags records out of order and devices without telemetry that lack evidence. Also flags clearances released by someone other than the receiver, and grounds still recorded after their permit is canceled.

  • Never closes an order or a clearance
  • Flags go to the senior control engineer
Senior control engineer

Approves and signs.

Ask in plain words

Questions about a blocked step, a ground left on or a new switching rule

Ask in plain words about an order, a ground or a rule, or say what to change. Each answer points to the rule, the simulated state or the record behind it. These answers use the sample data.

Why is step 7 of rev A blocked?

Step 7 of rev A closes the feeder breaker onto a grounded cable. At step 6 the ground switch at the breaker end is closed, so the cable is grounded. Closing the breaker from the live busbar onto it breaks rule 4.3. The step was copied unchanged from step 9 of last year's order. In that order the worked section was farther around the ring, and this cable was not grounded. Rev B deletes it.

Who would lose supply under rev A?

At step 3, rev A opens the feeder breaker before the open point is closed. That drops all 1,654 customers on the ring, including a clinic's dialysis unit and 3 life-support registrations. They stay off for the drive of about 22 minutes to the far end, which is 36,388 customer minutes. The request asked for the ring to stay on supply, and rule 5.4 asks for make before break. Rev B closes the open point first, so nobody goes off.

Which grounds are on the network right now?

There are 11 grounds under 5 clearances. Ten are under a live permit. One needs you: a ground on a substation transformer is still recorded as applied 40 hours after its permit was canceled.

Make a control-room close wait for the field to confirm the grounds are off

The proposed rule is 6.6, set to Block. “A close from the control room waits for the field to confirm each ground on the section is off.” Yesterday's fan replacement shows why. The transformer breaker closed at 16:51, four minutes before the ground removal was confirmed. Once the head of network control signs it, the rule applies to orders checked from then on.

The screens

The live single-line diagram, the blocked step and the signed order

From the working solution, on its sample data. Pick one to see it large.

The switching simulatorThe live single-line diagram above the drafted order. Step 7 is blocked under rule 4.3, the feeder breaker is ringed in red on the grounded cable, and the checks sit on the right.
The agents' runPrior-order finder, network simulator, safety rule checker, customer impact checker and order drafter, each with what it found and how long it took.
Customers off supplyAt step 3 of rev A each ring main unit is off supply, with the priority and life-support customers named.
The proposed revisionRev A beside rev B: the open point closed first, the copied step struck out, and each change explained.
Rev B, simulated cleanFifteen steps, nothing blocked, nobody off supply. Notes on the parallel and the neighboring feeder's loading, and the prior orders on these devices.
Approve and signThe order, the window and the simulation result on one screen, signed with the meaning of the signature.
The work request and the drafted sequenceThe clearance requirement, the priority customers on the ring with their notices, and the order drafter's 15-step sequence.
Live executionEach step's instruction, repeat-back, field confirmation and SCADA event, matched as it happens.
Grounds on the networkEach ground now applied, with its order, permit and who applied it, and the one still recorded after its permit was canceled.
ReconciliationA completed order step by step against SCADA and the radio log, with the two flags that need a decision.
Switching safety rulesThe ten rules the checker applies, their level and how often each fired, and a back-test against 1,284 completed orders.
The dashboardOrders checked per week, findings by rule, orders reconciled within 12 hours and customer minutes kept on supply.
The settingsApprovals, loading and parallels, customer notices and how fast each order is reconciled.
Governance

Switching order checks a utility control room can audit

A blocked step cannot be issuedA Block finding stops the order from being issued, and there is no override. The order is revised and simulated again. Only then can it be signed.
The senior control engineer signsEach order needs the senior control engineer's e-signature, with its meaning recorded. The meaning is “Checked and approved for issue” or “Checked, return to writer”. A second senior engineer can be required for 33 kV and above, or when priority customers go off.
Each finding cites its ruleEach finding names its rule in issue 7 of the utility's switching safety rules. It also shows the simulated state that triggered it: the device, the section and the step.
Read-only on the networkThe network model and SCADA states are read-only to the solution. Agents find, draft, simulate, check and reconcile. They do not issue or approve an order, operate a device or release a clearance.
Rules change only with a signatureThe switching rules belong to the head of network control. A new or changed rule is proposed, can be tested against past orders first, and applies only once the head of network control signs it.
Each step on the recordThe issue, each instructed step, each repeat-back, each field confirmation and each SCADA event sit in the order's trail. The control room sets how fast each completed order must be reconciled. In the sample it is 12 hours.
Configuration

The approvals, loading limits and parallels your control room sets

What the checker enforces, who signs and how fast the record must close are all settings. The control room owns them.

SettingDefaultChoose from
Also a second senior engineer for33 kV+, or priority customers off33 kV+, or priority customers off · 132 kV only
Tell the engineer above / block above90 % / 100 % of ratingFeeder loading after a transfer, as a share of the feeder's rating
Forecast usedPeak of the work windowPeak of the work window · Now
Parallels permittedSame 132 kV group, under 10°Same 132 kV group, under 10° · Never
Make before breakWarn if another feed existsWarn if another feed exists · Block
Priority and life-support notice48 hoursNotice before a planned interruption. Other customers get 5 days
Travel time between sitesFrom the crew's last locationFrom the crew's last location · Fixed 20 min
Reconcile every completed order within12 hoursAlert for a ground left on, 2 hours after its permit is canceled. Devices without telemetry need a photo and a repeat-back
Connections

The SCADA states, network model and radio log behind each order

Network connectivity modelfeeders, ring main units, normal open points and ratings, with the model version of the day
SCADA states and event historybreaker and switch states at the time of the check, and each event during execution
Work requests and clearance requirementsthe work, the window, the crew, the points of isolation and the grounds needed
Switching rules and safety manualyour switching safety rules, by section and issue
Prior switching ordersearlier orders, incidents and complaints on the same devices and sections
Radio logs, permits and the priority registerinstructions and repeat-backs, permits to work and clearances, priority and life-support customers
What it changes

Unsafe steps blocked and customers kept on with switching order management

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of switching steps simulated on the live network before issue: an unsafe step cannot be issued
every step, every order
before the order is issued
demo
≈1.0M
customer minutes a year kept on supply by make-before-break sequencing, on sample inputs
Break before make36,388 min in one order
With the simulator0
target
12h
to reconcile every completed order against SCADA, with every ground and clearance accounted for
Todaydays, or never
With agentswithin the shift

“Demo” means seen in the working solution, on its sample network data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate. The figure of about 1.0M customer minutes a year comes from sample inputs. It multiplies 1,900 planned orders a year × 6% with an avoidable break-before-make step × 1,100 customers × 8 minutes. The utility's own rate would replace these inputs. The hours split for one order, 2.6 hours by hand and 0.7 with the solution, is also our estimate. “Typical” means a published figure. The BLS Census of Fatal Occupational Injuries 2024 was reported by Relia Magazine. It counts 13.8 deaths per 100,000 full-time power-line installers and repairers, against 3.3 for all workers. Regulatory context: OSHA 29 CFR 1910.269(m) covers de-energizing lines, and says the employee in charge releases a clearance. See also the Electricity at Work Regulations 1989, reg. 13. Names on the screens are sample data.

Questions

Questions utility engineers ask about switching order management

What is switching order management software?

Switching order management software takes a switching order from the work request to a checked, signed and reconciled order. A switching order lists the breakers to open, switches to lock, sections to prove dead and grounds to apply, then how to restore supply. Switching Order Management adds six agents. They find prior orders, draft the sequence, simulate each step on the live network and check the safety rules and the customer impact. They also reconcile the completed order against SCADA. The senior control engineer approves and signs.

How does it check a switching sequence before it is issued?

The network simulator steps each action through the network model, starting from the current SCADA states. After each step it shows which sections are live, dead or grounded, which customers are off supply and how loaded the feeders are. The safety rule checker tests each step against your switching rules. A step that breaks a block-level rule, such as closing onto a ground, is blocked and the order cannot be issued. In the sample control room, 14 unsafe steps were blocked in eight weeks, and none reached the field.

Does it catch steps copied from an old switching order?

Yes. The prior-order finder shows how much of a draft was copied, and from which order. It checks whether each copied step's worked section, grounds and feeds still match. In the sample case it found rev A was 81% identical to last year's order. Step 7 had been copied from a job where the cable was not grounded.

How does it keep customers on supply during planned switching?

The customer impact checker counts the customers off at each step and names priority and life-support customers. It warns when a step breaks before it makes while another feed exists. The order drafter then reorders the steps so the other feed closes first. In the sample order that kept 1,654 customers on supply, including a dialysis unit. A back-test of 1,284 completed orders in the sample found 74 (5.8%) that broke before making when another feed was available.

Does it reconcile completed switching orders against SCADA?

Yes. The order reconciler matches each step's instruction, repeat-back, field confirmation and SCADA event, during and after the work. It flags records out of sequence and clearances released by someone other than the person who received them. It also flags devices without telemetry that lack evidence, and grounds still recorded after their permit is canceled.

Can the agents operate a device or override a blocked step?

No. The agents read the network model and SCADA. They do not operate a device, issue or approve an order, or release a clearance. A blocked step has no override. Each order needs the senior control engineer's e-signature with its meaning, and rule changes need the head of network control's signature.

Can we use our own switching rules and approvals?

Yes. The rules are yours, by section and issue, and each is set to Block or Warning. Approvers, the second-engineer rule, loading limits, parallels, make before break, notice periods, travel time and the reconciliation clock are all settings. A new rule can be back-tested against your completed orders before it is signed.

What do you need from our control room to start?

Your switching rules, order template, network model and a sample of completed orders. The Agentic Solution Engine builds and deploys the solution from those requirements and documents, and it goes live once each quality gate has passed. We will walk you through it on your own switching orders first.

Run switching order management
on your own completed orders.

We'll run Switching Order Management on a sample of your own completed switching orders and your network model.