Switching Order Management demo
Every switching step checked before anyone touches the network. 1:14
What the demo shows
A workflow solution for control room operators that drafts and safety-checks switching orders.
A single-line diagram of the live network sits above every drafted switching order; as the order is stepped through, each breaker and switch changes state on the diagram, sections go live, dead or grounded, customers off supply and feeder loading are recomputed, and a step that would close onto a ground, ground a live section or drop customers who could stay on is blocked or flagged before the order can be issued. Agents find the prior orders, draft and simulate the sequence, check the safety rules and the customer impact, and reconcile every completed step against SCADA; the senior control engineer approves and signs.
Transcript
- Switching Order Management drafts and Safety Checks Switching Orders for Control Room Operators.
- Orders are cloned from old ones, and one copied step can close onto a cruise Earth's.
- Thursday's cable job, the live network above, Ravi's order below, every step simulated first.
- Step 3 opens the feeder first.
- Over 1,600 customers lose supply.
- Flagged. Step 6 earths the cable.
- Step 7 tries to close onto it and is blocked.
- Piper explains, Step 7 was copied from last year's order, where that cable was never earthed.
- The drafter proposes revision B, make before break, and it simulates clean.
- Layla signs, Nobody off supply, every earth accounted for, every step checked first.
- built on Botminds, agents, data, screens, and governance on one platform.
Transcribed from the film’s narration. Captions are on the player.