WorkflowGrid Operations & Outage Management

Planned Outage Management

Planned outage management that never approves an outage while its backup feed is out, and tells every customer in time

See one case, screen by screen ↓
Watch with transcript →

Built forOutage coordinatorsMaintenance plannersProject engineersCommunications leadsControl engineers

The Problem Today

Coordinators check for clashes in spreadsheets, so an outage whose backup feed is already out is found the day before.

31 h
a week of one coordinator's planning, done by hand our estimate
£35
owed to each British home given under 2 days' notice of work published

Held in spreadsheets and memory

  • Requests
  • Backup feed
  • Crews
  • Notices
  • Outages canceled lateThe crew and kit are stood down, and customers get a second letter
  • Medical needs missedCustomers on the wider section never get a call

The Solution

  1. Requests read into fieldsEmails, work orders and forms, with each field linked to its sentence
  2. Six checks the moment it is placedBackup feed, clashes, crews, medical customers, events and weather
  3. The clash is shown and a clear day foundThe customers off on the clash day are counted, and the outage moves to a clear day
  4. The coordinator approvesNotices are drafted to the deadline and wait until someone releases them

Built-in controls

  • Switching stays with network control
  • A second approver for big or unusual outages
  • Each check cites its source

What You Get

Fewer outages are canceled the day before, and the customers who lose power get their notice in time.

  • Planning time backour estimate7.5 h a week of coordinator planning with the solution
  • Events and weather in viewEvent bans and wind warnings applied on each move
  • Generators for life supportA generator booked for home life-support equipment
In short

What is Planned Outage Management?

It takes planned outage requests from maintenance, projects, connections and water teams. It schedules them, checks each against the network and the plan, and tells the affected customers in time. Planned Outage Management puts the outages on one chart by substation and feeder. Six agents check each one the moment it lands on a date, and the outage coordinator approves.

How to choose AI solutions for utilities →

Updated

The problem

Coordinators check outages in spreadsheets and from memory, so clashes are found late

A utility sometimes switches off part of its network on purpose so crews can work on it safely. Maintenance, capital projects, new connections, tree cutting and water-main work all ask for these planned outages. An outage coordinator places 40 to 60 of them a week. Each one has to pass several checks. The customers outside the section being worked on need a backup feeder, a second line that can carry their power. That backup must not depend on the same normally-open point, the switch that links two feeders, as another job that day. The crew must be free, and the day must be clear of event bans and weather warnings. Each affected customer must also get notice within the rules. Today coordinators hold all of this in spreadsheets, a wall planner and the control engineer's memory.

So clashes are found late. An outage is approved on a feeder whose backup is already out for another job. The control room finds it the day before. The outage is canceled and the jointing crew and its kit are stood down. Customers who already got a letter get another one. Sometimes the outage goes ahead on the wrong assumption instead. Then a 412-customer outage becomes a 1,284-customer one. Customers on the wider section who rely on power for medical equipment were never on the call list.

typical£35 / £70paid to each home / business customer in Great Britain when notice of planned work is under 2 days
typical4business daysof written notice a registered life-support customer must get before a planned outage, under Australia's National Energy Retail Rules
Where a coordinator's planning hours go each weekestimated
By hand31 hours
With the solution7.5 hours
  • Reading requests from emails, work orders and the connections portal6 → 1.5 h
  • Checking each outage's backup feed and its spare capacity on the day8 → 2 h
  • Finding overlapping outages, shared open points and double-booked crews4 → 1 h
  • Building customer lists and matching them to the priority care register5 → 1 h
  • Checking events, road closures and weather warnings2 → 0.5 h
  • Drafting letters, texts and call lists before the notice deadline6 → 1.5 h

Our estimate for one coordinator placing 40 to 60 outage requests a week, in hours, by hand and with the solution.

How it works

Six checks on each planned outage the moment it lands on a date

What comes in
Requests inEach week's requests · maintenance, projects, connections, water
Agents at work
Request readerwhat the work needs
Then
Network checker
Clash finder
Customer impact finder
Event and weather watcher
Then
Notice writerpost-by deadline
A person decides
Outage coordinatorapproves, moves or returns
What comes out
A plan without clashes
Conflicts with first clear day
Letters, texts and calls
One case, step by step

A ring main unit swap, a Thursday clash and letters ready to post

A utility is planning next week's outages across three primary substations and a water supply zone. It is Tuesday, 10:20. Next week's letters must post by Wednesday at 16:00. Here is what happens to one request, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Tuesday 10:20

    The week on one chart, by substation and feeder

    Outage coordinator

    The coordinator's plan shows 12 outages and 1,980 customers and properties off. There are 5 requests to schedule and 1 conflict. A lane across the top shows a road closure on Thursday, an amber wind warning on Friday, a cup semi-final and a half marathon. The one red bar is an overhead line job, where old wires are being replaced. The event and weather watcher has already flagged it.

    “Event and weather watcher read the amber wind warning for Friday: the overhead reconductoring job must move”

  2. 02Read at 09:40

    A planner's email, read into nine fields

    Request reader

    The maintenance planner emailed the afternoon before. The planner wants to replace a ring main unit, a switching unit on the cable network. It failed its partial discharge survey, a test for insulation wear, earlier in the month. The request reader fills in the asset, work, dates, times, crew, section off, backup, kit and requester. Each field links to the sentence it came from. The work runs 08:00 to 14:00 with a contractor's jointing crew. It takes 412 customers off between the neighboring ring main units. The rest are back-fed from a second feeder through a normally-open point at 3.9 MVA.

    One assumption flagged: back-feeding the rest from the second feeder assumes that feeder is in service on the day.

  3. 03Picked up

    Each day on the feeder's row lights up before the job is placed

    Outage coordinator

    The coordinator picks the request from the tray, and each day on the feeder's row lights up. On Monday and Tuesday the primary substation runs on one transformer while T2 is overhauled. Wednesday is amber, with 4 medically dependent customers and 412 customers off. On Thursday the backup feeder is out. From Friday to Sunday the jointing crew is not free.

    “Thursday: the backup feeder is out”

  4. 04Dropped on Thursday

    A red bar, linked to the outage that causes it

    Network checker

    Thursday is one of the crew's two preferred days, so the coordinator drops the job there. The six checks run again in the side panel and the bar turns red. A red link points to another outage. A project engineer's cable diversion for a new rail station takes the backup feeder out from 07:00 to 17:00. The open point has nothing to close onto. The only other linked feeder already carries 1.8 MVA of the backup's load. That leaves 0.3 MVA spare against the 3.9 MVA needed.

    “Can't go on Thursday. The backup feeder is out. Without it, 1,284 customers would be off for 6 hours instead of 412, and 11 medically dependent instead of 4.”

  5. 05The reason

    Spare backup capacity, feeder by feeder, day by day

    Network checker

    The backup feeds view shows the spare capacity on each feeder's backup for the week. It counts the approved outages and uses the current version of the network model. The job's feeder needs 3.9 MVA from its backup. Most days there is 4.9 MVA spare. On Thursday there is 0. The substation's one-line diagram for Thursday shows the backup feeder out, with nothing behind the open point.

    “Thursday: the backup feeder is out all day for the cable diversion … the job's feeder has no backup that day.”

  6. 06Moved to Wednesday

    The first clear day, with actions

    All six agents

    One click moves the job to Wednesday, the first clear day. The backup feeder takes 3.9 MVA through the open point. It has 4.9 MVA spare, against 4.29 MVA needed with the 10 % margin. Both transformers are in service. No other outage uses the open point, the crew is free, and no event, closure or warning is nearby. One amber remains: 4 medically dependent customers and a primary school of 312 pupils. The four rely on a home ventilator, two oxygen concentrators and home dialysis.

    “Clear, with actions · 4 medically dependent customers · 412 customers off”

  7. 07Approve

    What the coordinator approves, and what stays with others

    Outage coordinator

    The approval shows the outage, its date and hours, 412 customers off and the backup through the open point. It lists the open tasks handed to the notice writer. It also says what the approval does not do. Network control still writes and runs the switching. Nothing reaches a customer until the communications lead releases it.

    “Network control writes and runs the switching from this plan. Nothing is sent to customers until the communications lead releases the notices.”

  8. 08Approved

    Letters, texts, calls and a generator, drafted

    Notice writer

    The bar turns green on Wednesday. The notice writer drafts 412 letters, 386 texts and 241 emails to post by this Wednesday at 16:00. It books 4 priority care calls and a mobile generator for the home ventilator. It also writes a letter to the school. All of it waits for release.

    “Notices drafted · waiting for the communications lead to release.”

  9. 09Before release

    Who is off, who needs a call, and what they will read

    Customer communications lead

    The communications lead sees the four medically dependent customers. Each shows what they need power for and what will be done. The ventilator customer gets a generator on site and a call. A call 48 hours before goes to the other three. The school gets its own letter and a call, because its kitchen and heating are off from 08:00 to 14:00. Beside them are five streets and 412 customers, 386 of them with a mobile number, with the plain-English letter and text.

    Letter: “If you rely on power for medical equipment and have not told us, call us so we can help.”

  10. 10The clock

    Each notice on its clock

    Customer communications lead

    On the notices list, the outage shows Drafted, with its deadline at “tomorrow”. Its letters post by Wednesday. The fortnight's other outages sit beside it, sent or being drafted as each was approved, with their channels and calls. The communications lead releases them. Each step, by agent and by person, is already in the decision log, which cannot be edited.

    “Letters post by 16:00 on the post-by day · texts and emails go at 09:00 the next morning · regulatory floor: 2 days”

Who it’s for

Who requests, plans, switches and announces a planned outage

The same ring main unit outage, seen by the five people who request it, plan it, switch it and tell its customers. Here is what their week looked like, and what it looks like now.

Outage coordinator
Approves, moves and returns outages
Before
Places 40 to 60 outage requests a week and builds next week's plan by Wednesday so letters can go out. Learns that a backup feeder is out when the control room calls that morning.
Now
Sees each day on a feeder's row light up green, amber or red before dropping an outage. Gets the reason and the first clear day the moment it lands.
Maintenance planner
Requests outages, books the crews
Before
Books jointing crews and kit a month ahead, and loses the crew each time an outage moves.
Now
Sends the request by email as before. It is read into fields, checked against the crew's free days and placed on a day that will hold.
Project engineer
Requests outages for connections projects
Before
Needs cable diversions done on the contractor's dates. The tunnel contractor has the road closure on Thursday only.
Now
Keeps the diversion on Thursday, with the road closure on the plan. Any job that needs the same feeder as its backup that day turns red the moment it is dropped.
Customer communications lead
Releases the customer notices
Before
Sends the letters, texts and calls for each outage, and is the one on the phone to the ombudsman when a letter goes out late.
Now
Gets letters, texts, emails and priority care calls drafted the moment an outage is approved, each with its post-by deadline, and releases them.
Control engineer
Writes and runs the switching
Before
Makes the N-1 call on the day, the check that the network can lose one more line and keep everyone supplied. Does not want two outages that need the same open point.
Now
Receives a plan where no two outages rely on the same normally-open point on the same day, and each backup's spare capacity is checked.
The agents

Agents that read requests, check feeders and draft customer notices

The moment an outage lands on a date, six agents check its feed, clashes, customers and notice deadline. The outage coordinator approves.

Request reader

Reads each outage request, whether a form, email, work order or project plan. It pulls out the asset, feeder, section to switch off, preferred dates, hours on site, crew and the switching the requester assumes. Each field links to the sentence it came from.

  • Never changes a requested date
  • Never approves or schedules
  • Flags any assumption about the state of the network on the day
Network checker

Counts the customers in the section that goes off and the load to move. Finds the backup feeder and its open point, then subtracts the other outages that day. Checks the safety margin and that the primary substation still has both transformers.

  • Never writes or runs switching. The control engineer does that
  • Never approves a deviation from the backup rule
Clash finder

Finds any outage on the same feeder in the same hours, any other outage that needs the same open point, and any crew booked elsewhere. It names the outage and the time.

  • Never cancels or moves another outage
Customer impact finder

Lists each customer in the section by street and matches them to the priority care register, with what each relies on. It also lists schools, surgeries, care homes and pumping stations. If the backup is lost, it gives the list for the whole feeder.

  • Never contacts a customer
  • Register data is visible to outage planning and customer communications only
Event and weather watcher

Each morning and on each placement, reads council event lists, roadworks permits, school calendars and national weather warnings. Matches them to the feeders they touch, then applies the event ban and the wind rule.

  • Never overrides an embargo
Notice writer

Works out the post-by date from the notice rules. Drafts the letter, text and email in plain English and builds the call list for medically dependent customers. Books a generator for life-support equipment and drafts letters for sensitive sites.

  • Never sends without the coordinator's approval and the communications lead's release
  • Plain English only
Outage coordinator

Approves, and the communications lead releases notices.

Ask in plain words

Plain-words questions about any planned outage, feeder or notice

Ask about any outage, feeder, customer list or notice, or say what to prepare. Each answer points to its records.

Why can't the ring main unit swap go on Thursday?

On Thursday its backup is gone. The job back-feeds 872 customers from the backup feeder, a 3.9 MVA transfer. That feeder is out all day for the rail station's cable diversion. The only other linked feeder already carries 1.8 MVA of its load. So all 1,284 customers on the job's feeder would be off for 6 hours, with 11 medically dependent instead of 4. The first clear day is next Wednesday. Its letters must post by this Wednesday at 16:00.

Which outages does Friday's wind warning put at risk?

One: the overhead line job at the second substation, with 318 customers off on Friday from 09:00 to 15:00. Rule 7 moves overhead work off an amber wind day. Another overhead job is on the plan too, but its substation is outside the warning area. The contractor's crew is free the following Monday, and the letters would still be in time.

Draft the notices for the ring main unit swap

They are drafted: 412 letters, 386 texts and 241 emails for next Wednesday. There are 4 priority care calls, a mobile generator for the ventilator customer's home and a letter to the primary school. They wait for the communications lead to release them.

The screens

The outage chart, a Thursday clash and the notices waiting for release

From the working solution, on its sample data. Pick one to see it large.

The outage planThe week's planned outages on one chart by substation and feeder. Events and weather run across the top, with the requests to schedule and the plan checks.
Outage requestsRequests waiting for a date, by where they came from. One email is read into fields, each linked to its source, with one assumption flagged.
Pick a dayPicking up a request lights each day on its feeder green, amber or red, with the reason for each.
A conflict, the moment it landsThe outage dropped on Thursday turns red. It links to the outage that takes its backup feeder, with the extra customers and the first clear day.
Backup feedsSpare capacity on each feeder's backup, day by day, after the approved outages, with the one-line diagram for the chosen day.
Clear, with actionsOn the first clear day all six checks pass. The medically dependent customers and the school are listed as tasks.
ApproveThe outage, its backup and the tasks handed to the notice writer. Switching and release stay with the people who own them.
ApprovedThe outage on its day in green, with the notices drafted and waiting for the communications lead to release them.
Affected customersMedically dependent customers and what they need power for, sensitive sites, the streets, and the plain-English letter and text.
NoticesThe fortnight's customer notices with their channels, post-by date, deadline and status.
Events, weather and bansRoad closures, weather warnings, public events and school holidays, each with the outages it touches and its source.
Decision logWho decided what and when, agents and people, with the checks behind it. It can be exported but not edited.
Rules and settingsBackup margin, network rules, event and weather rules, notice periods, and the people who approve, switch and release.
Governance

Second approvers, released notices and a decision log for planned outages

Each check cites its sourceEach finding names what it rests on and the rule that applies. That might be the network model version, the clashing outage, a priority care register entry, an event listing or a weather warning.
The coordinator decidesAgents check, calculate and draft. The outage coordinator approves, moves or returns each outage. When there is a conflict, the screen offers a move to the first clear day and no approval.
A second approver for big or unusual outagesOutages with more than 1,000 customers off, or any exception to the backup rule, also need the network operations manager's named approval. In the sample week, the cable diversion carries that second approval. It back-feeds 1,226 customers.
Switching stays with network controlNo agent writes or runs switching. The control engineer writes and runs it from the approved plan, and makes the N-1 call on the day.
Medical data kept closeOnly outage planning and customer communications can see the priority care register, and no agent contacts a customer. Nothing is sent until the communications lead releases it.
A decision log that cannot be editedEach agent finding and each human decision is recorded: who placed, approved and released, when, and the checks behind it. The log can be filtered and exported, but nobody can edit it.
Configuration

Backup margin, event bans and notice periods in planned outage management

What the checks test and who decides are settings, owned by the network operations manager. Here it is rules version 9, approved at the start of the month.

SettingDefaultChoose from
Backup headroom margin10 %0 to 30 %, set with − and + · the spare capacity the backup must keep above the load it takes
Feeder work at a primary on one transformerBlockedBlocked · Warned, control approves
Shared normally-open pointsOnOn · Off · two outages may not rely on the same open point on the same day
More than 1,000 customers off: second approverNetwork operations managerNetwork operations manager · Control engineer
Event venuesOnOn · Off · no work on a feeder serving a venue from 4 h before to 2 h after an event
Overhead work under an amber wind warningMovedMoved · Warned · underground work is not affected
School exam daysOnOn · Off · taken from the councils' calendars
Notice periodsHomes 5 working daysBusinesses 10 working days. Medically dependent customers: a letter, then a call 48 h before. Schools, surgeries and care homes 10 working days. Water low pressure 2 working days. Legal minimum 2 days.
Connections

The network model, crew calendars and customer systems behind the outage plan

Outage requestsrequest emails, work orders, the connections portal and project programs
Network modelfeeders, sections, normally-open points, backup capacity and load history
Crew calendarsyour own crews and contractors, with the days each is free
Customer system and priority care registercustomers by section and street, and who relies on power or water for medical equipment
Events, permits and warningscouncil event lists, roadworks permits, school calendars and national weather warnings
Letter, text and email servicescustomer notices, priority care calls and generator bookings
What it changes

Late cancellations and planning hours with planned outage scheduling

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
planned outages approved while their backup feed is out, the design goal
Found by controlthe day before
With agentson the drop
demo
$0.6M
a year in canceled-outage costs avoided, on sample inputs
Canceled lateCaught at planning
target
100%
of medically dependent customers called before their outage
each one called
before the outage

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” means our estimate. The $0.6M a year rests on sample inputs for a large utility. The inputs are its planned outages in a year, 8 % of them canceled within 48 hours, and half of those caught at planning. Each cancellation costs $6,200. That covers a four-person jointing crew for a day, plus a generator, traffic control and new notices. The 31 hours a week by hand and 7.5 with the solution are totals of the estimated hours split. They are for one coordinator placing 40 to 60 requests a week. “typical” means published rules. The first is the Electricity (Standards of Performance) Regulations 2015, regulation 12. A utility pays £35 to a home and £70 to a business when notice of planned work is under 2 days. Under the National Energy Retail Rules, Part 7, registered life-support customers get 4 business days' written notice. Context: NERC IRO-017-1 Outage Coordination. Names on the screens are sample data.

Questions

What outage coordinators ask about planned outage management software

What is planned outage management software?

It takes planned outage requests from maintenance, projects, connections and water teams. It schedules them, checks each against the network and the plan, and tells the affected customers in time. Planned Outage Management puts the outages on one chart by substation and feeder. Six agents check each one the moment it lands on a date, and the outage coordinator approves.

How does it check the backup feed and N-1 for a planned outage?

The network checker finds the section to switch off, the load to move, and the backup feeder with its open point. It subtracts the other outages that day. Then it checks the spare capacity against the load plus a safety margin, 10 % by default. It also checks the primary substation still has both transformers. If the backup is out, it names the outage that takes it and how many customers would then be off.

How does it find clashes between planned outages?

The clash finder looks for any outage on the same feeder in the same hours. It also looks for another outage that needs the same open point on the same day, and any crew booked twice. The event and weather watcher adds road closures, event bans, school calendars and weather warnings. A conflict shows as a red bar with the reason and the first clear day.

How does it protect customers who rely on power for medical needs?

The customer impact finder matches each customer in the section to the priority care register and says what each relies on. In the sample case that is a home ventilator, two oxygen concentrators and home dialysis. The notice writer builds the call list for 48 hours before and books a generator for life-support equipment. If the backup is lost, the list widens to the whole feeder.

Does it keep planned outage notices inside the notice period?

The notice writer works out each outage's post-by date from your notice rules. In the sample that is 5 working days for homes and 10 for businesses, with a legal minimum of 2 days. It drafts letters, texts and emails as soon as the outage is approved. The notices show their deadlines on one list, and nothing is sent until the communications lead releases it.

Does it work for water shutoffs as well as electricity?

Yes. Water supply zones sit on the same chart as electricity feeders, with their districts and boundary valves. In the sample, a trunk main valve replacement switches supply to a nearby source. It also sends bottled water to two home dialysis customers.

Can the agents approve an outage, write switching or contact a customer?

No. The agents read, check and draft. They do not approve, move another outage, write switching, override an event ban or contact a customer. The coordinator approves. Outages with over 1,000 customers off also need the network operations manager. The control engineer runs the switching, and the communications lead releases the notices.

What do we hand over before planned outage management goes live?

Your network rules, notice rules, letter templates, crew calendars and a sample of past outage requests. The Agentic Solution Engine builds and deploys it from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on a week of your own outages first.

Place next week's outages
on your own feeders.

We'll run Planned Outage Management on a week of your own outage requests.