WorkflowGrid Operations & Outage Management

Trouble Call Management

Trouble call management that pings the meters before the truck rolls, so crews go only where the power is really off

Crews go only where the power is really off, each outage confirmed in minutes.

See one case, screen by screen ↓
demo4.6minmedian from the first no-power call to a confirmed outage over 30 days in the demo, against 27 minutes before pings
estimated$1.1Ma year of truck rolls avoided to homes whose meter shows power — 3,700 rolls a year × $300 a roll
demo0of 41hazard calls sent to a self-check message in the last 30 days — every one went to a crew
demo81%of self-check messages solved by the customer in the last 30 days, with no visit
The problem

Why no-power calls still send trucks to homes that have power

When a fuse blows on a lateral, the outage desk gets dozens of no-power calls in minutes, by phone, app and text. Each one has to be sorted by hand: a network outage on a fuse, transformer or feeder, a single home with a failed service cable, an outage the desk already knows about, or a fault inside the customer's own home — a tripped main switch, an RCD or a blown fuse in the consumer unit. The dispatcher decides from the caller's words and a pin on a map, and many single-premise jobs end with the crew finding power at the meter.

The volume hides the calls that matter. “A bang and a flash at the pole” sits in the same list as forty “no power” calls unless someone reads every one, and a life-support customer looks like any other caller. Last gasp alone does not settle it: in a big outage, messages collide on the meter network and some never arrive. And a caller with a tripped RCD inside a network outage stays dark when the fuse is replaced, calls again two hours later, and a second truck goes back to the same street.

typical$250–$500for each truck roll, a conservative estimate
typical$9.54for a call to a utility contact centre, across 15 utilities
typical366minof power lost by the average US customer in 2023, including major events
Where a month's crew days go on no-power calls that need no truckestimated
By hand80 days
With the solution5.1 days
  • Trips to homes whose meter shows power — the fault is inside the home63 → 2.6 d
  • Separate crews sent to calls on the same fault8 → 1 d
  • Second visits to homes still dark after the fuse is replaced5 → 1 d
  • Single-home jobs raised when the whole lateral is off4 → 0.5 d

Estimated split for the demo utility's Haverford and Kingsmead districts, in crew days a month (8-hour days), by hand and with the solution. The first row uses the demo's counts — 338 jobs a month where the crew found power on at the meter before pings, 14 with them — at about 1.5 hours a job; the other rows are our estimate.

How it works

How a no-power call moves

Six agents read, group, ping and trace every no-power call; the dispatcher confirms the outage and sends the crew.

What comes in
Calls in4 sources · calls and app reports, meter pings and last gasps, outage incidents, premise history
Agents at work
Call readerpremise + hazard words
Then
Call grouper
Meter pinger
Then
Outage tracerlikely device
Then
Reply writer
Dispatch drafter
A person decides
Outage desk dispatcherconfirms and sends the crew
What comes out
Verified outage
One incident, one crew
Self-check reply
One case, step by step

How trouble call management works: one blown fuse, from 40 calls to one crew

Tuesday 13 October 2026, evening peak, Haverford district of Lumina Utilities. At 19:41:52 fuse F-2217 on pole CR07-118, on Halloway Lane by Larchmere Primary, blows and lateral CR07-L3 drops seven transformers, T-4411 to T-4417. Here is what happens next, screen by screen, in the working solution.

  1. 0119:42:10

    Forty no-power calls in four minutes, on the map as they arrive

    Rhiannon Teale · Outage desk dispatcher

    Rhiannon has the evening shift on the outage desk. The first call lands at 19:42:10 and by 19:46:05 there are 40 from Larchmere: 28 phone, 8 app and 4 text. Every call is a ring on the outage map, drawn on feeder CR-07 from Corwen Road substation, its laterals, fuse F-2217 and the nine transformers around the calls. At 19:44:02 the Call grouper opens a cluster on lateral CR07-L3: 3 calls inside 400 m and 10 minutes, and no incident open there in the outage system.

    “Larchmere: 40 no-power calls in 4 minutes” · 58 no-power calls tonight since 18:30

  2. 0219:43

    One call heard a bang at the pole — a hazard, crew first

    Call reader

    Tomasz Brennock reports from the app at 9 Halloway Lane: “Loud bang and a flash at the pole by the school, then everything went off.” The Call reader matches the premise and the meter, finds the hazard words “bang” and “flash”, and flags the call to the dispatcher at once. Whatever his meter says later, this call is never answered with a self-check message.

    “The words “bang” and “flash” are on the hazard list. A crew checks pole CR07-118 before the fuse is replaced. A self-check is never sent for a hazard call.”

  3. 0319:46:20

    Ping 214 meters — the callers and every neighbour

    Rhiannon Teale · Outage desk dispatcher

    Before anyone is sent, Rhiannon presses Ping 214 meters: the callers and their neighbours on 9 transformers. The Meter pinger sends on-demand pings through the head-end, with 3 retries per meter at most, and the wave runs out from the calls across the streets of Larchmere.

    “Ping the meters to see which homes are really off. Until then every call waits on the cluster, except the hazard.”

  4. 0411 seconds later

    38 callers off, 2 on — and one fuse behind the dark homes

    Meter pinger and Outage tracer

    At 19:46:31 the answers are in: of 214 homes, 171 are off and 43 are on; of 40 callers, 38 are off and 2 are on. The dark homes trace a single lateral back to fuse F-2217, and the Outage tracer names it the likely device at 92%. From the first call at 19:42:10 to the outage confirmed with its fuse at 19:46:40 took 4 minutes 30 seconds.

    “Likely device: fuse F-2217 · 92%” · “First call 19:42:10 → outage confirmed with its fuse 19:46:40 · 4 min 30 s”

  5. 05The agents' run

    Every step on the record, with its proof

    Six agents

    The run on the cluster shows each agent's step and its time. All 171 silent meters sent last gasp at 19:41:52–54; the 43 that answer read 236–242 V. Every dark meter is behind F-2217 and no answering meter is. The Reply writer drafts 2 self-check messages, and the Dispatch drafter proposes truck 14 — Joel Varga, 6 minutes away, 100 A fuse kit on board — and waits for the dispatcher.

    “Dispatch drafter · truck 14 proposed … Waiting for the dispatcher”

  6. 0614 Linden Row

    The street is dark, but her meter answers at 239.6 V

    Elsie Hale · Customer

    Elsie called at 19:42:35: “Power’s gone. The whole street is dark, I can see it from the window.” Her meter answers at 239.6 V. Her home is on transformer T-4421, fed from lateral CR07-L4, which never lost supply. The load fell to zero at 19:41:55, three seconds after the voltage dip from the fuse on the next lateral, and the premise history shows two earlier RCD resets here, in March and August 2025. Most likely the RCD tripped again.

    Without the ping, she would stay dark after the fuse is replaced and call again.

  7. 07Why fuse F-2217

    One incident for 171 customers, with the evidence

    Outage tracer

    INC-26-30871 groups 40 calls into one incident: 171 customers off, 3 on the priority register. The Outage tracer lists its reasons — the last gasps from T-4411 to T-4417, the seven transformers sharing only lateral CR07-L3, the 43 meters on CR07-L4 answering, the bang at pole CR07-118, and no incident open on CR07-L3 before the calls. It also shows what it ruled out: transformer T-4411 alone, at 3%, because six other transformers are dark too.

    Below 80% confidence the Outage tracer names the area, not a device. The dispatcher confirms the device.

  8. 0819:47

    Two self-checks sent, the incident confirmed, truck 14 approved

    Rhiannon Teale · Outage desk dispatcher

    Rhiannon sends the self-check to the two homes with power, confirms the incident and approves truck 14, with a restoration estimate of 21:30. 169 customers get the restoration update by text and app; Amara Quist in the contact centre phones 2 of the 3 priority customers; the third asked for text only. At 19:52 Elsie Hale replies: “FIXED, the trip switch was down.” Marcus Webb at 7 Orchard Close replies FIXED at 19:55.

    “Elsie Hale, 14 Linden Row: “FIXED, the trip switch was down” · 19:52”

  9. 09After the message

    The self-check, then a re-ping 20 minutes later

    Reply writer and Meter pinger

    The message tells the customer their smart meter shows power reaching the home, asks them to check the fuse box — main switch and trip switch first, and not to touch it if it is wet, damaged or hot — and to reply FIXED or STILL OFF. Twenty minutes later the meter is pinged again: load back closes the call with no visit; still off with voltage present brings electrician advice and a call-back; a meter that has gone silent gets a crew job drafted.

    Sent only when the meter answers with voltage, the call has no hazard words and the customer is not on life support.

  10. 10Tonight

    One crew to the fuse, seven truck rolls held

    Joel Varga · Troubleman, truck 14

    Joel is on the way to pole CR07-118 to inspect it and replace F-2217, with the hazard note “Bang reported · check before re-fusing”. Every job on the crew board carries its proof: a ping with 171 off and last gasp, hazard words with the meter on, a meter off alone, a silent meter with its neighbours on. Seven homes whose meter answered with voltage got a self-check message instead of a crew.

    “The meter answered with voltage, so the home has power: a self-check message went instead of a crew.”

Who it’s for

Built for everyone on the outage desk, and the crew it sends.

The same blown fuse, seen by the people who take the calls, decide, drive out and switch the lights back on — what their night looked like, and what it looks like now.

RT
Rhiannon TealeOutage desk dispatcher, evening shift, Haverford district · confirms every incident and approves every crew
Outage desk dispatcher
Before
Watches the outage map 16:00–00:00 with 11 crews to send, and builds incidents by hand from the callers' words and pins on a map.
Now
Sees which homes are really off before anyone is sent, with the likely device and its proof. “Tell me which houses are really dark before I send anyone.”
GM
Gideon MarshOutage desk supervisor · crew levels, storm escalation and the outage-minutes report
Outage desk supervisor
Before
Owns crew levels and storm escalation, and approves second crews and estimate changes. “Every truck that finds the lights on is a truck not on a real fault.”
Now
Sees truck rolls held, calls pinged before a decision and minutes from first call to confirmed outage over 7, 30 or 90 days, and approves each message version.
AQ
Amara QuistContact centre agent · takes no-power calls and phones priority customers
Contact centre agent
Before
Takes 40 no-power calls in four minutes when a fuse goes. “I can't tell a tripped switch from a blown fuse over the phone.”
Now
Phones the priority customers on the incident while 169 restoration updates go by text and app, and can send a crew from any call.
JV
Joel VargaTroubleman, truck 14 · first responder to fuses, service faults and wires down
Troubleman
Before
Sent to single homes where the fault turns out to be inside. “Send me to the fuse, not to a house with a tripped RCD.”
Now
Gets one job to pole CR07-118 with the device, the evidence and the hazard note, and reports restored on site.
EH
Elsie HaleCustomer, 14 Linden Row · on a different transformer from the homes across the road
Customer
Before
Saw the street go dark and phoned in. “Everyone's off, so I assumed we were too.”
Now
Gets a text saying her meter shows power, resets the trip switch and replies FIXED five minutes after the message.
Built on the engine

6 agents. Each with one job, and hard limits.

Six agents read, group, ping and trace every no-power call; the dispatcher confirms the outage and sends the crew.

Call reader

Reads every phone summary, app report and text; matches the premise and its meter from the caller ID, account or registered mobile, notes the symptoms in plain words and finds any hazard words.

  • Never downgrades a hazard — a call with a hazard word goes to the dispatcher at once
  • Never contacts the customer itself
Call grouper

Places each call on its transformer, lateral and feeder; opens a cluster when 3 calls share a device within 10 minutes and 400 m, and attaches calls inside an open incident or planned work so the customer is told its estimate.

  • Never closes or merges an incident in the outage system
  • Proposes; the dispatcher confirms
Meter pinger

Pings the callers' meters and every neighbour on the same transformers; records the answer, voltage, load and last gasp. A meter with no answer and no last gasp is silent, and its neighbours are pinged.

  • At most 3 pings per meter in 10 minutes
  • Never connects or disconnects a meter
Outage tracer

Walks the network model upstream from the dark meters to the deepest device they all share and no answering meter shares, weighs the callers' words and the last-gasp times, and gives the likely device with its confidence and evidence.

  • Below 80% confidence it names the area, not a device
  • The dispatcher confirms the device
Reply writer

Drafts the self-check message for a home whose meter answers at 207 V or more, the restoration update with the estimate the dispatcher set, and call-back notes for priority customers; books the re-ping 20 minutes after a self-check.

  • Never sends a self-check to a hazard call or a life-support customer
  • Never invents a restoration estimate
Dispatch drafter

Drafts the crew job for a confirmed incident or a single home with no answer — device, pole, hazard notes and evidence — and proposes the nearest free crew with the right skill and kit.

  • Never dispatches; the dispatcher approves every crew
  • A second crew needs the supervisor
Outage desk dispatcher

Confirms every incident and crew. The agents propose; a named person decides.

Ask in plain words

Ask about any call, home or incident

Ask about any call, home or incident in plain words, or say what to change. Every answer points to the ping, the meter events or the network model behind it.

Why are 14 Linden Row and 7 Orchard Close not part of the outage?

Because their meters answer. At 19:46 the ping found 239.6 V at 14 Linden Row and 241.2 V at 7 Orchard Close. Both homes are on transformer T-4421, fed from lateral CR07-L4, which never lost supply; the homes across the road are on CR07-L3 behind fuse F-2217. At Linden Row the load fell to zero three seconds after the voltage dip, so the RCD most likely tripped; it has happened there twice before.

Which calls tonight could still waste a truck roll?

Three to watch: 4 Mill Pond Lane — the meter is silent with no last gasp and its 6 neighbours are on; truck 3 is going, but it may be the meter's radio, not the supply. 3 Cooper's Yard — meter on at 238.8 V, self-check sent 19:38, no reply yet; re-ping at 19:58. 21 Tanners Hill — still off with voltage present after the self-check: an electrician is advised, not a crew.

Ping the cluster automatically at the third call

Done. New rule, version 8: when 3 calls cluster on a shared transformer or lateral within 10 minutes, the Meter pinger pings every meter on it without waiting. You still confirm the incident and approve the crew. Hazard calls still go to a crew first. Tonight that would have pinged Larchmere at 19:44:02, two minutes sooner.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The outage map after the pingLarchmere's 214 homes, dark or green: 38 callers off and 2 on, 171 homes off behind fuse F-2217 at 92%, and what the desk does next.
Calls arriving on the map40 no-power calls in 4 minutes, each a ring on the streets, grouped on lateral CR07-L3, with the hazard call flagged crew first.
Pinging the metersOn-demand pings to the callers and their neighbours on 9 transformers, before anyone is sent.
The agents on the clusterEach agent's step with its time and proof, from 40 calls read to truck 14 proposed and waiting for the dispatcher.
Confirmed and on the waySelf-checks sent, the incident confirmed, truck 14 on the way with a 21:30 estimate, and the first customer reply.
Tonight's no-power calls58 calls with what the customer said, the meter's answer and the verdict: network outage, known outage, single home off, power at the home, hazard, priority customer, meter silent.
A call with power at the home14 Linden Row: the meter answers at 239.6 V on a different transformer, the premise history shows earlier RCD trips, and the self-check message.
A hazard callA bang and a flash at the pole: hazard words found, a crew checks the pole before the fuse is replaced, never a self-check.
The grouped incident40 calls into 1 incident: why fuse F-2217, the homes off by transformer, the crew and the customers told.
The crew board11 crews on the evening shift, tonight's jobs with their proof, and the truck rolls held because the meter showed power.
Self-check messagesThe message as the customer sees it, tonight's replies and outcomes, and what happens after the 20-minute re-ping.
Trends30 days: truck rolls held, what the meters said on 4,380 calls, calls pinged before a decision and minutes from first call to confirmed outage.
Your rulesGrouping, pings, who gets a self-check, hazard words and who decides, each change saved as a new version.
Governance

Built for the storm night: every verdict proved, every crew approved.

Every verdict shows its proofEach verdict cites what it rests on — the ping answer with its voltage and time, the last gasp, the path in the network model, the caller's own words — and every crew job on the board carries that proof.
The dispatcher confirms and approvesAgents read, group, ping, trace and draft — they never dispatch. The dispatcher confirms every incident, approves every crew and sets the restoration estimate; a second crew on one incident or an estimate change over 2 hours needs the supervisor.
Hazards always go to a crewA call with any word on the hazard list — wires down, sparking, bang, flash, smoke, burning smell, tree on the line, shock and more — goes to a crew, never to a self-check. It is a fixed rule that cannot be switched off.
Life-support customers get a personA self-check message is never sent to a life-support customer; a person in the contact centre phones them instead.
Meters are read, never switchedThe Meter pinger sends at most 3 pings per meter in 10 minutes and never connects or disconnects a meter. Customer data stays with Lumina.
Every step on the audit trailEach agent step and each person's decision is recorded with who, when and the evidence — who pressed Ping, who confirmed the incident, who approved the crew. Customer messages are kept with the call, and every settings change is saved as a new version.
Configuration

Your outage desk's rules, not ours

How calls are grouped, when meters are pinged, who gets a self-check and who decides are settings. Every change is saved as a new version.

SettingDefaultChoose from
Calls that make a cluster3 callsCalls on a shared transformer or lateral inside the window and radius — set with − and +
Window10 minTime between the first and the last call — set with − and +
Radius400 mDistance between calls in a cluster — set with − and +
Ping a clusterOffOff: the dispatcher presses Ping · On: the Meter pinger pings at the third call
Ping every single-home call before a job is draftedOnOn · Off — a crew is drafted only if the meter does not answer
Voltage that counts as power at the home207 V230 V minus 10% — set with − and +
Re-ping after20 minMinutes after the self-check message — set with − and +
Never to a hazard callAlways onFixed rule, cannot be switched off; the hazard word list is versioned (version 7)
Connections

Works with the systems your outage desk already runs on

Calls and app reportscontact centre call summaries, app reports and texts
Smart meter head-endon-demand pings, last-gasp events and meter events
Outage systemopen incidents and the planned work calendar
Network modelfeeders, laterals and transformers, and past incidents by device
Premise history and priority registerearlier calls at the address, life-support and priority customers
Crews and work managementcrew locations, skills, jobs and van stock
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
5min
from the first call to a confirmed outage and its likely fuse
Calls only≈ 27 min
With pings≈ 5 min
estimated
$1.1M
a year of truck rolls avoided to homes whose meter shows power
Before pings338 a month
With pings14 a month
target
Every
hazard call goes to a crew, never to a self-check message
41 of 41 to a crew
hazard calls, last 30 days

“demo” = seen in the working solution, on its sample outage-desk data · “estimated” = our arithmetic, inputs shown ($1.1M = 3,700 truck rolls a year to homes whose meter shows power × $300 a roll; the crew-days split is our estimate on the demo's counts) · “typical” = published figures (S&C Electric, The Real Cost of a Truck Roll — $250–$500 a dispatch; E Source, 15 utilities — $9.54 a call; US EIA, Electric Power Annual Table 11.1 — 366 minutes in 2023 including major events). Practice described as context: the smartgrid.gov OMS ping and on-demand poll use cases. Lumina Utilities and the people, streets, substations, crews and records named on this page are fictional — characters and sample data in the working solution.

Questions

What outage desks ask us.

What is trouble call management?

Trouble call management is how an outage desk handles no-power calls: deciding, call by call, whether it is a network outage, a single home, an outage already known or a fault inside the customer's home, and sending a crew only where one is needed. Trouble Call Management does it with six agents that read, group, ping and trace every call, while the dispatcher confirms every incident and approves every crew.

How does AMI outage verification work before a truck rolls?

When calls arrive, the Meter pinger sends an on-demand ping to the callers' smart meters and their neighbours on the same transformers, and reads the answer, voltage, load and last gasp. A meter that sent last gasp and does not answer is off; one that answers with voltage has power at the home; one with no answer and no last gasp is silent, and its neighbours are pinged. In the demo, the ping of 214 meters took 11 seconds: 171 off and 43 on.

How does trouble call software reduce OK-on-arrival truck rolls?

Every single-home call is pinged before a job is drafted, and a crew is drafted only if the meter does not answer. A home whose meter answers at 207 V or more, with no hazard words and not on life support, gets a self-check message instead. In the demo's last 30 days, 312 truck rolls were held and jobs where the crew found power on at the meter fell from 338 a month to 14.

Does it ever send a self-check message to a hazard call?

No. A call with any word on the hazard list — wires down, sparking, bang, flash, smoke, burning smell, tree on the line and more — goes to a crew. It is a fixed rule that cannot be switched off; in the demo's last 30 days, 41 hazard calls went to a crew and none to a self-check.

How does it find the device behind an outage?

The Outage tracer walks the network model upstream from the dark meters to the deepest device they all share and no answering meter shares, and weighs the callers' words and the last-gasp times. It gives the likely device with its confidence and evidence, and below 80% it names the area, not a device.

What happens to life-support and priority customers?

They are never handled by a self-check message. A person in the contact centre phones them, and the Reply writer drafts a call-back note for each. On the demo incident, 2 of the 3 priority customers were phoned — the third asked for text only — while 169 customers got the restoration update by text and app.

Do dispatchers stay in control?

Yes. The agents propose and draft; they never dispatch, never close or merge an outage-system incident and never connect or disconnect a meter. The dispatcher confirms every incident, approves every crew and sets the restoration estimate, and the supervisor approves a second crew or an estimate change over 2 hours.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your call scripts, hazard words, self-check rules and a sample of past no-power calls, meter events and incidents — and it goes live once every quality gate has passed. We will walk you through it on your own calls first.

See it on
your no-power calls.

We'll run Trouble Call Management on a sample of your own no-power calls, meter events and outage incidents.