WorkflowGrid Operations & Outage Management

Outage Customer Communications

Outage notices that reach each premise first, in its own language, even when the outage area changes

See one case, screen by screen ↓
Watch with transcript →

Built forCommunications leadsOutage managersContact center managersPriority care advisorsField supervisors

The Problem Today

When a planned outage grows, nobody tells the streets that were added, so those customers learn of it when the power goes.

30%
of outage callers call more than once published

Four lists, built by hand

  • Premises
  • Channels
  • Languages
  • Care calls
  • Life-support customers learn by textOr not at all, when their street was added late
  • "Power is back," sent too earlyA smaller outage behind one fuse stays dark

The Solution

  1. Who is affected, re-tracedEach plan change is traced to the premises, with those added and removed
  2. Channel and language pickedApp, text, email, voice or door card, in the customer's own language
  3. Each fact checkedTimes, streets, reference and help number are checked against the record
  4. The lead approves one SendOne approval sends the wave, and a bounced text falls back to a door card

Built-in controls

  • At the minimum notice time, the outage manager decides
  • Life-support customers hear it from a person
  • "Power is back" only when the meter answers

What You Get

Outage days bring fewer repeat calls and fewer complaints that the notice came late.

  • Fault updates within minutesA fresh notice when the restoration time moves, on a set schedule
  • Replies answered from the recordMedical needs go to priority care at once
  • Late notices counted by causeA monthly report drafted for the customer director to sign
In short

What is Outage Customer Communications?

Outage customer communications software tells each customer in a planned outage or fault what is happening and when. It reaches them on a channel they use, in a language they read, before they call. Outage Customer Communications adds six agents. They trace the affected premises from the switching plan and pick each premise's channel and language. They draft the notices, guard the minimum notice time, keep restoration updates going and read the replies. A communications lead approves each planned notice.

How to choose AI solutions for utilities →

Updated

The problem

When an outage changes, the customers it now affects are not told

Before planned work on the power network, a utility must tell each customer whose supply will go off. The notice has to arrive a minimum time ahead. Three teams each own one piece of this. The control room owns the switching plan, which says which part of the network is switched off. The outage system owns the list of premises behind it. Customer communications sends the notices. Nothing links the three. Sometimes the field survey finds a switch unfit to operate. Then the isolation point, where the network is cut off, moves and the outage area grows. Nobody tells customer communications. The streets added after the first notice are the ones that complain. Their text came at 3:20, and the power went off at 3.

Faults go wrong in their own way. Customers get one vague message. Then they hear nothing when the estimated restoration time moves, so they call. The contact center agent knows no more than they do. "Power is back" goes to a whole feeder while a lateral fuse, which protects one side branch of the line, keeps a street dark. Life-support customers learn about planned work from a text. In one month of the sample utility's figures, 1,483 of 61,800 premises were told late or not at all. Of those, 944 were on streets added after the first notice.

typical30%of outage callers call more than once
typical27%more satisfied when customers get five pieces of outage information instead of one
typical$9.54the average cost of one utility contact-center call
Where a planned outage's notice hours goestimated
By hand13.5 hours
With the solution2.1 hours
  • Turning the switching plan into a premise list3 → 0.2 h
  • Re-checking the list when the switching plan is revised2 → 0.1 h
  • Matching each premise to a channel and a language2 → 0.3 h
  • Writing and translating the notice for each channel3 → 0.5 h
  • Building the life-support call list2 → 0.5 h
  • Approving, sending and chasing bounces1.5 → 0.5 h

Estimated split for one planned outage of about 1,800 premises, in working hours, by hand and with the solution.

How it works

Each switching-plan change, traced through to customer outage notices

What comes in
Outage data in5 sources · switching plan, outage system, ETRs, contacts, meters
Agents at work
Affected-premises tracerwho is inside
Then
Contact and channel picker
Notice writer
Then
Notice-time guardminimum enforced
Then
Restoration updater
Reply reader
A person decides
Communications leadapproves and sends
What comes out
Every premise told
Updates on every new time
Back on, by meter
One case, step by step

A moved isolation point, 120 premises not told and six hours to the minimum

A planned outage replaces a ring main unit, a sealed switching unit, on an 11 kV feeder. Supply is off from 15:00 to 19:00 on a set Tuesday. Friday's first notice went to 1,726 premises. On Monday morning the switching plan changed. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Monday, 09:00

    The outage opens as a map of who has been told

    Outage communications lead

    The communications lead approves each planned-outage notice at the utility. The home screen lists the four outages being notified now. It draws this one as an area of premises, each square colored by the channel that reached it. Inside the new area, 120 squares sit hollow with a red edge. The notice-time guard's alarm reads 120 premises not told, 6 h 00 m to the 24-hour minimum.

    Before this screen, the lead could see what was sent. There was no way to see who had been told.

  2. 02Earlier, 08:40

    The isolation point moves, and the area grows

    Outage manager

    The field survey found the ring main unit's switch unfit to operate. So the outage manager revised the switching plan to rev 3 and moved isolation one unit up. At 08:41 the affected-premises tracer traced the network again. It found 120 premises added on two streets, 78 and 42, and none removed. Colored by notice time, the map shows 1,702 told 72 h or more ahead and 24 told 24 to 72 h ahead. The other 120 were not told at all.

    Notice-time guard, 08:42: alarm to the communications lead, 120 not told, 6 h 18 m to the 24 h minimum

  3. 0308:42

    Drafts for the 120, with each fact checked

    Notice writer

    The contact and channel picker chose SMS for 74, app for 26, email for 11, voice for 6 and door cards for 3. It flagged 3 life-support customers. The notice writer drafted the SMS, app, email, voice script and door card from the outage record. Then it ran its checks. Times must match the record, and streets must match the new trace. The reference and help number must be right. The reason must be in plain words with no equipment codes. Quiet hours and length are checked too.

    “The 1,726 already told get no new notice, as nothing changed for them. All 1,846 get the reminder on Tuesday at 07:00.”

  4. 04Before sending

    A second-language draft, for 33 premises

    Outage communications lead

    Languages come from the account, four in all across the 120 premises. The lead opens the draft for the 33 premises that read a second language. It is 154 characters, which is 3 SMS parts in Unicode. It has the same times, streets, reference and help number as the English. The checks run again for each language, with 3 parts allowed for this one.

    The notice writer states no time, street or reason that is not in the outage record.

  5. 05One Send

    One Send fills the map in

    Outage communications lead

    The lead presses Send 120 notices. The run goes step by step. First come 26 app notices and 74 SMS. Then come 11 emails, 3 automated landline calls and 3 voice messages to life-support customers. One SMS bounces because the number is not in service, and the channel picker moves it to a door card. The guard closes its alarm, with 1,846 of 1,846 told before the 24-hour minimum.

    “Each premise told before the 24-hour minimum. 1,842 delivered · 4 door cards with the field supervisor by 13:00 · 3 life-support calls with the priority care advisor.”

  6. 06By 11:00

    Three life-support calls, made by a person

    Priority care advisor

    The advisor called the first 11 life-support customers on Friday and Saturday. One customer's home ventilator now has a portable generator booked for 13:00 on the day. Another customer moved a Tuesday dialysis session to the morning. The three added that morning are due by 11:00 today. They are an oxygen concentrator user who reads a second language, a home dialysis patient and a powered wheelchair user.

    The rule asks for a personal call by 72 hours before planned work, and again if the area changes.

  7. 07Same morning

    A live fault, back on only where the meter answers

    Restoration updater

    Elsewhere on the network, a cable fault on one feeder took 412 premises off at 06:12. The first notice went at 06:20, 8 minutes later. At 08:47, 296 were back-fed, which means supplied from another direction. Of those, 287 meters answered, but 9 on one street did not, all behind one lateral fuse. "Power is back" went to the 287 only, and a crew was sent to the 9.

    The restoration updater says “restored” only once the premise's meter confirms supply.

  8. 0808:52

    A new restoration time, and an update within minutes

    Restoration updater

    At 08:50 the control room moved the ETR, the estimated restoration time, from 10:30 to 11:45. The joint bay is flooded and must be pumped first. The update went to the 116 still off at 08:52. The next is due at 09:52, or at once if the time moves 30 minutes. In all, 38 calls came in about this fault, 9 of them from repeat callers. Of those repeat calls, 6 came between 08:30 and 08:50, when the 10:30 time was already in doubt.

    “Update: the joint bay is flooded and must be pumped first. New time: 11:45. Sorry for the longer wait.”

  9. 09Replies

    Each reply read, sorted and answered

    Reply reader

    Since Friday, 37 replies came back to the planned-outage notice. There were 14 asking "is it my street?", 5 asking "can it move?", 2 medical needs and 3 stop texts. The reply reader drafted an answer for each from the outage record, such as yes, the whole street is in the area. It sent one dialysis reply straight to priority care. A local bakery's request to move the work was copied to the outage manager.

    The reply reader promises only a time the control room has set.

  10. 10Month end

    The notice performance report, signed

    Customer director

    The report writer drafts the month's notice performance from the notice record. Across 214 planned outages, 97.6 % of 61,800 premises were told before the minimum. The report says why 1,483 were late. The area widened after the first notice (944), or there was no usable contact data (311). In other cases work was brought forward (156), or a notice was sent late by hand (72). The communications lead sends it to the customer director for sign-off.

    “63 complaints in the quarter said the notice came late or not at all; 41 were on streets added after the first notice.”

Who it’s for

Outage customer communications from five seats in the utility

The same outage day for the five people who carry it, before the solution and with it.

Outage communications lead
Approves each planned-outage notice
Before
Approves each planned-outage notice, watches live faults and answers to the customer director for the complaints. Can see what was sent, with no view of who has been told.
Now
Opens each outage as a map of who has been told, on which channel and in which language. Approves the drafts in each language with one Send.
Outage manager
Owns switching plans and restoration times
Before
Changes isolation points when the field finds a problem. When an isolation point moves, nobody tells customer communications.
Now
Revises the switching plan, and the premises are traced again within a minute. At the minimum, decides whether to go ahead with door-knocks or move the work.
Contact center manager
Runs the contact center floor
Before
Outage days double the queue. Half the outage calls come from people the utility already told, or should have.
Now
Contact center agents see each notice and update sent. Replies arrive sorted, with an answer drafted from the outage record.
Priority care advisor
Calls life-support and medically dependent customers
Before
Builds the call list by hand before planned work. Holds to the rule that a dialysis patient should hear it from a person, three days ahead.
Now
Gets each life-support customer inside the outage on the list, including the ones added when the area changes. Logs the outcome of each call.
Field supervisor
Runs the planned job on site
Before
Hands out door cards where no digital contact exists. Gets them delivered if they arrive by noon.
Now
Gets printed door cards in each premise's language, with the reference and help number, and a delivery time before the minimum.
The agents

Tracer, notice writer and restoration updater behind outage communications

Six agents prepare each notice, from the trace to the replies. The communications lead approves it before it goes.

Affected-premises tracer

Traces the isolated section in each switching plan or control-room log to the premises it feeds, through transformers, service connections and meters. Traces again whenever the plan changes, and lists premises added and removed.

  • Never edits a switching plan
  • Uncertain connectivity goes to a person
  • Re-traces on every revision
Contact and channel picker

Chooses each premise's first usable channel in the order app, SMS, email, voice, door card. Takes its language from the account or the customer's replies. Flags life-support customers for a personal call, and falls back within 10 minutes when a message bounces.

  • Never uses a channel the customer opted out of
  • No planned notices in quiet hours
  • Contact details masked outside the care team
Notice writer

Drafts each notice from the approved wording for the outage type, in plain words and in each customer's language. Includes the times, the streets, the reason, the reference and the help number. Checks each fact against the outage record and the latest trace.

  • No time, street or reason that is not in the outage record
  • Never sends. A person approves
Notice-time guard

Works out the minimum notice time for each planned outage and counts the premises not told. Alarms the communications lead 12 h and 6 h before the minimum. At the minimum, asks the outage manager to decide.

  • Never lets the minimum pass silently
  • Never moves an outage
  • Never sends without approval
Restoration updater

On a fault, sends the first notice within 15 minutes of detection. Sends an update when the restoration time moves 30 minutes or more, and at least every 60 minutes. Pings the meters after each restoration step, and lists those that do not answer as a possible smaller outage inside the first.

  • Never says “restored” before the meter answers
  • Never sets a restoration time
Reply reader

Reads each reply and transcribed call about an outage, and sorts it. The groups are “is it my street”, “can it move”, medical need, stop texts and other. Drafts a reply from the outage record. Sends medical needs to priority care at once, and copies requests to move work to the outage manager.

  • Never promises a time the control room has not set
  • Never changes preferences without the customer's word
Communications lead

Approves every notice.

Ask in plain words

A street, a fault or a notice, answered from the outage record

Ask about an outage, a street or a notice in plain words, or say which rule to change. Each answer points to its records.

Why are 120 premises in the planned outage not told?

Because the outage area grew this morning. At 08:40 the outage manager moved the isolation point one unit up, as the old unit's switch is unfit to operate. The new trace added two streets, 78 and 42 premises. Friday's notice went to the old area only. The 24-hour minimum is Monday 15:00, so you have 6 hours. The drafts are ready in each customer's language.

Which life-support customers still need a call?

Three, all on the added streets. They are an oxygen concentrator user who reads a second language, a home dialysis patient and a powered wheelchair user. The 72-hour call has already passed for them, so they are due by 11:00. The other 11 were called on Friday and Saturday.

Is the fault area really back on?

Not all of it. 296 premises were back-fed at 08:47. Of those, 287 meters answered, but 9 on one street did not, all behind one lateral fuse. "Power is back" was held for those 9. The other 116 are still off, now expected at 11:45 after the joint bay flooded.

Raise the water minimum notice to 72 hours

Done. Water planned work now needs at least 72 hours' notice, up from 48. One outage is affected. It is a water shut-off that starts Thursday at 22:00, so its minimum is now 22:00 today. If the drafts are approved before then, it still meets the rule. The new rule set is on the record.

The screens

The notice coverage map, a live fault and the monthly notice report

From the working solution, on its sample data. Pick one to see it large.

The notice coverage mapThe outage drawn as premises, each colored by the channel that reached it, with the 120 not told left hollow. The notice timeline runs against the 24-hour minimum, beside the guard's alarm.
Colored by notice timeThe same premises by how far ahead they were told. That is 72 h or more, 24 to 72 h, under 24 h, or not told.
Notice draftsSMS, app, email, voice script and door card for the 120 added premises. Each check against the outage record is shown, with what changed since Friday.
The second-language draftThe same facts in a second language for 33 premises, with its Unicode SMS length and the checks re-run for the language.
Each premise toldEvery premise told before the minimum, 1,846 of 1,846. The bounced text is moved to a door card, and the send runs step by step.
The notice runwayThe planned outages of the next 14 days, with their notices sent and scheduled, the 72-hour standard and the minimum-notice line.
A live fault on the mapThe fault area after the back-feed. Power is back where the meter answered, 9 premises behind one fuse gave no answer, and some are still off.
Restoration updatesPremises off over time, each restoration time and each message sent, with the next update clock and the meter check.
Priority callsLife-support and medically dependent customers inside today's outages, each called by a person, with the need, the language and the outcome.
Replies and callsReplies to the notice sorted with a drafted answer for each, and the repeat callers on the live fault.
A planned water shut-offA valve replacement on a 300 mm main. 640 drafts are ready, to approve by 22:00 for the 72-hour standard.
Notice performancePremises told before the minimum by month, why the late ones were late, fault update measures and what customers said.
The notice rulesNotice times, fault updates, channels and languages, and who decides, with each change on the record.
Governance

Approval, meter checks and the record behind customer outage notices

Each notice cites its outage recordEach notice is checked against the outage record and the latest trace before anyone approves it. The check covers times, streets, reference, help number and the reason in plain words. A notice states only facts that are in the record.
A person approves each planned noticeThe communications lead, or a named deputy, approves each wave in each language. The agents draft and send only what was approved. The guard can raise an alarm but cannot send.
The minimum does not pass silentlyThe notice-time guard alarms the communications lead 12 h and 6 h before the minimum for any premise not told. At the minimum, the outage manager decides whether to go ahead with door-knocks or move the work.
"Power is back" only when the meter answersAfter a back-feed or repair, the restoration updater pings the meters and tells only the premises whose meter answers. The rest are listed as a possible smaller outage and told a crew is coming.
Life-support customers hear it from a personEach life-support and medically dependent customer inside an outage goes on the priority care call list. They are called at least 72 hours before planned work, and again if the area changes. A person makes the call and logs the outcome.
Each step on the recordEach trace, draft, approval, send, delivery receipt, reply and rule change is recorded with its time and who did it. Customer contact details are masked outside the care team.
Configuration

Notice times, fault updates and channels for outage communications

The minimum notice, the fault update cadence, the channels, the languages and who decides are settings, chosen by the utility. Each change goes on the record.

SettingDefaultChoose from
Minimum notice for planned electricity work24 hoursHours before supply goes off. Below this, the outage manager decides
Minimum notice for planned water work48 hoursHours before supply goes off
Standard first notice72 hoursHours before supply goes off, for all planned work · a reminder at 07:00 on the day to each premise told
Alarms to the communications lead12 h and 6 hHours before the minimum, for any premise not told
Life-support call72 hoursPersonal call, hours before planned work, and again if the area changes
Fault updatesFirst notice in 15 min · update on a 30 min change · at least every 60 minMinutes after detection, minutes of change in the restoration time, and the longest gap while any premise is off. "Power is back" is sent only when the meter confirms
Channel order and fallbackApp → SMS → email → voice → door cardFirst usable channel per premise, with opt-outs respected. Fall back within 10 min after a bounce. Quiet hours are 22:00 to 07:00 for planned notices
Who decidesCommunications lead · outage managerThe lead approves planned notices, with a deputy, and the outage manager decides at the minimum. The priority care advisor makes life-support calls. The customer director signs the monthly report
Connections

The outage, network, meter and customer systems behind each notice

Outage management systemplanned outages, switching plans and their revisions, fault incidents and the control-room log
Network modelconnectivity from isolation points to transformers, service connections and premises
Estimated restoration timeseach ETR the control room sets or moves, as it changes
Customer accounts and contactschannels, language, quiet hours and opt-outs for each premise
Priority services registerlife-support and medically dependent customers who consented to calls before planned work
Smart metersmeter answers that confirm supply is back, premise by premise
What it changes

Fewer repeat calls once customer outage notices arrive first

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of premises told before the minimum notice time, up from 97.6% today, even when the outage area changes
Every premise in the area told
6 hours before the 24-hour minimum
target
Every
life-support customer called by a person before planned work, and again when the area changes
14 of 14 called
3 added by this morning's change
demo
≈ $89K a year
of repeat outage calls avoided by cutting repeats by a third, the sample's figure
Repeat callers today29%
Target19%

“demo” means seen in the working solution, on its sample outage data. “target” means the design goal, measured in the live solution. “estimated” means our estimate, including the split of a planned outage's notice hours. The ≈ $89K figure is 96,400 outage contacts × 29 % repeats × ⅓ × $9.54, for a large utility on sample inputs. “typical” means published figures. Southern California Edison, via smartgrid.gov, found 30 % of outage callers call again. E Source puts a utility call at $9.54. OPPD, citing J.D. Power, reports customers 27 % more satisfied with five points of outage information. Regulations named as context are Ofgem Guaranteed Standards, Regulation 12, which asks for 2 days' notice of a planned interruption. The other is CPUC D.19-05-042, which sets notice windows for public-safety power shutoffs. Names on the screens are sample data.

Questions

Outage customer communications questions from utility teams

What is outage customer communications software?

Outage customer communications software tells each customer in a planned outage or fault what is happening and when. It reaches them on a channel they use, in a language they read, before they call. Outage Customer Communications adds six agents. They trace the affected premises from the switching plan and pick each premise's channel and language. They draft the notices, guard the minimum notice time, keep restoration updates going and read the replies. A communications lead approves each planned notice.

How does proactive outage notification work when the switching plan changes?

The affected-premises tracer traces the network again on each switching-plan revision. It lists the premises added and removed. In the sample case, an isolation point moved at 08:40. The new trace at 08:41 found 120 premises that Friday's notice had not reached. Drafts in each customer's language were ready by 08:42. Premises already told get no new notice when nothing changed for them.

Does it enforce a minimum notice time for planned outages?

Yes. The notice-time guard counts down to the minimum for each premise not told. It alarms the communications lead 12 h and 6 h before it. At the minimum it asks the outage manager to decide whether to go ahead with door-knocks or move the work. The guard cannot let the minimum pass silently, and it sends nothing without approval.

How does it handle estimated restoration time updates during a fault?

The restoration updater sends the first notice within 15 minutes of detection. It sends an update whenever the restoration time moves 30 minutes or more, and at least every 60 minutes while anyone is off. The restoration time itself stays with the control room. "Power is back" goes only to premises whose meter answers.

How are life-support and medically dependent customers handled?

Each life-support customer inside an outage goes on the priority care call list. A person calls them at least 72 hours before planned work, and again if the area changes. The reply reader sends any medical need in a reply to priority care at once. In the sample outage, 14 life-support customers were on the advisor's list, 3 of them added by the morning's change.

Which channels and languages does it use?

It uses app, SMS, email, automated voice and printed door cards, in the order the utility sets. It respects opt-outs and quiet hours, and falls back within 10 minutes when a message bounces. The sample utility notifies each customer in their language, taken from the account or from the customer's replies.

Can the agents change a switching plan, a restoration time or a notice's facts?

No. A communications lead approves each planned notice in each language. The outage manager owns the times and the decision at the minimum, and a person makes each life-support call. The agents do not edit a switching plan or set a restoration time. They state only facts that are in the outage record.

What does the utility provide to get started?

You provide your customer charter or notice rules, approved notice wording, channel and language data and a sample of past outages. The Agentic Solution Engine builds and deploys the solution from those. It goes live once each quality gate has passed. We first run it with you on your own outages.

Try it on
your next planned outage.

We'll run Outage Customer Communications on a sample of your own planned outages and faults.