- Before
- Owns the quarterly and annual reliability filings and spends three weeks each quarter matching records. Trusts the calculation but not the 214 records under it.
- Now
- Opens the calendar on the one day that needs a decision. Accepts each fix with its meter evidence, and marks a major event day with the calculation already attached.
One storm day, followed through the Q3 reliability report
A large distribution utility serves customers across five regions. Its Q3 reliability report is due to the regulator at the end of next month. During the quarter, a line of thunderstorms crossed two of the regions in one afternoon. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 01Morning, 18 days to file
The calendar opens on the day that needs a decision
Reliability engineerNine months sit on one reliability calendar, with each day colored by customer minutes lost. Year-to-date SAIDI without major event days is 62.2 minutes. That is 11.2 over the 51.0-minute target to the end of the quarter. Last night's run put one day at the top. It is the storm day, at 14.2 minutes, which is 3.5 times the major event day threshold. It also has 9 record problems that change its minutes.
“Overnight run 02:10 · 6 agents · ready 02:40”
- 02Overnight
Each outage record checked against the meters
Outage record checkerThis year the checker has matched 2,671 records to 41.6 million meter events. On the storm day it found three duplicates, where one interruption was logged twice. It also found three restore times that the meters show are wrong. One record on a feeder breaker has a 23:59 placeholder, left open when the crew moved on. Of its 1,902 meters, 1,846 report power back between 17:41 and 17:47, so the checker proposes 17:44.
The checks can raise the number too. One fix moves a start time from the first customer call at 15:40 to the meters' last power-off messages at 15:12. That adds 28 minutes.
- 03One click
Nine fixes accepted, and the numbers recalculated
Reliability engineerThe reliability engineer accepts the 9 fixes. One came from the customer count checker. A transformer serves 148 meters, but the record used 412 customers from the transformer next to it. Another moves a 2 min 55 s recloser operation out of SAIDI and SAIFI as a momentary blip. The day goes from 218 to 214 interruptions, from 104,374 to 98,900 customers, and from 14.2 to 13.0 minutes. Year-to-date SAIDI falls from 62.2 to 61.0.
“Run by the record checker and index calculator · accepted by the reliability engineer”
- 04Set at the start of the year
The threshold, set from five years of daily SAIDI
Major event day assessorThis year's threshold comes from the five previous years. It uses 1,811 days that had interruptions and leaves out 15 days that had none. The mean of ln(daily SAIDI) is α = −1.622, and the standard deviation is β = 1.211. So the threshold T_MED = e^(α + 2.5β) is 4.08 minutes, fixed for the year. Only 10 of the 1,811 days were above it. Earlier years flagged 2 to 4 major event days each.
“A day this year whose daily SAIDI is above 4.08 minutes is a major event day.”
- 05The decision
The engineer marks the storm day as a major event day
Reliability engineerAt 13.0 minutes the day is 3.19 times the threshold, and the engineer marks it. The assessor counts 37 interruptions that ran past midnight against the storm day, the day they began. It gathers the weather and crew evidence. SAIDI without major event days falls from 61.0 to 48.0 minutes. SAIFI falls from 0.742 to 0.665, and CAIDI from 82.2 to 72.2. The utility is now 3.0 minutes inside the target.
“Major event day · excluded from the indices excluding major event days, kept in the all-days figures.”
- 06The day file
The justification note and its six sources
Major event day assessorThe day file shows the storm hour by hour, from 13:00 to the last restore at 06:10 the next morning. It lists the largest interruptions with the crew's cause and shows the threshold test. The evidence is cited. A weather station logged gusts of 96 km/h at 14:20, and there were 1,240 lightning strikes. The utility sent 31 crews and a contractor sent 12. The 9 accepted record corrections are cited too.
The note reads “Before the test, each outage record for the day was checked against smart meter power-off and power-on events”. It adds that “9 corrections were accepted, which moved the day from 14.2 to 13.0 minutes.”
- 07A second try
A heatwave day below the threshold stays in
Major event day assessorOn a Saturday earlier in the year, a heatwave overloaded transformers in two regions. It caused 61 interruptions for 31,240 customers and 3.91 minutes of daily SAIDI. That is 0.96 times the threshold. When asked to exclude the day, the assessor refuses and explains why. The day counts in each number, and the report narrative can describe it instead.
“The heatwave day cannot be excluded. Its daily SAIDI of 3.91 min is below this year's threshold of 4.08 min.”
- 08Outside the storms
The feeders that really lose the minutes
Reliability engineerFeeders are ranked by customer minutes, leaving out major event days. One feeder leads with 1,290,486 customer minutes and a feeder SAIDI of 253 minutes. On it, 3,164 customers had three or more interruptions, and equipment failure is the top cause. The feeder that ranks first on all days drops to fifteenth once the storm is set aside. The engineer sends the leading feeder, with its year, to the next capital planning review.
The leading feeder: “214,000 customer minutes on the storm day (major event day candidate).”
- 09The draft
The Q3 report, with both sets of numbers and each one cited
Report writerThe report writer drafts the Q3 report in the regulator's template. It has a summary, the method, major event days, data quality, worst-performing feeders, notable events and Appendix A with the justification note. It shows 61.0 minutes across all days and 48.0 without major event days, against a target of 51.0. The data-quality section records 2,667 sustained interruptions and 50 corrections accepted this year. The source records are unchanged.
“Drafted overnight at 02:40 · every number links to its source · re-drafts when a record changes”
- 10Signed, then filed
Signed, with what the signature means, then filed
Head of network performanceThe head of network performance opens the signature screen. It shows SAIDI without major event days at 48.0 minutes and 1 major event day, the storm day. They sign at 09:14. The regulatory affairs manager then files with the regulator and gets a filing receipt.
What the signature means: “I have reviewed the indices, the major event day exclusions and their justification, and approve this report for filing.”