SystemGrid Operations & Outage Management

SAIDI and SAIFI Reliability Reporting

SAIDI and SAIFI reliability reporting where each outage record is checked against the meters and each major event day is justified

See one case, screen by screen ↓
Watch with transcript →

Built forReliability engineersNetwork performance headsRegulatory affairs teamsControl room managers

The Problem Today

Each quarter, engineers match up outage records by hand, and bad records skew the numbers regulators see.

15 days
to clean the records and write one quarterly report our estimate

Four sources, matched up by hand

  • Outages
  • Meter data
  • Customers
  • Crew notes
  • Placeholder restore timesA midnight placeholder left open after the crew moved on
  • Exclusions that are hard to defendEach major event day's justification is written by hand

The Solution

  1. Records checked against the metersDuplicates merged, and restore times and customer counts corrected
  2. Major event days foundA threshold from five years of daily data flags the days above it
  3. The engineer marks the dayThe numbers recalculate at once, and a day below the threshold stays in
  4. Signed, then filedA cited report with both sets of numbers, filed by regulatory affairs

Built-in controls

  • A day below the threshold is never excluded
  • Source outage records never change
  • One threshold, fixed for the whole year

What You Get

Fewer findings on the filing, because each exclusion comes with the calculation the regulator runs again.

  • Both sets of numbers reportedWith and without major event days, against the target
  • Weak feeders ranked outside stormsThe feeders that lose the most minutes on normal days come first
  • One method every quarterQuarterly and annual reports in the regulator's template
In short

What is SAIDI and SAIFI Reliability Reporting?

It is the regular report a power distribution utility files with its regulator. It covers how long (SAIDI) and how often (SAIFI) customers were without power, and how long each interruption lasted (CAIDI). Each is given with and without major event days. This solution checks each outage record against the smart meters and computes the numbers to IEEE 1366. It justifies each major event day and drafts the regulator report.

How to choose AI solutions for utilities →

Updated

The problem

Reliability numbers for the regulator are built from messy outage records

A power distribution utility reports to its regulator how reliable its supply was. The main measure is SAIDI, the minutes the average customer was without power. SAIFI is how often the average customer lost power. CAIDI is how long each interruption lasted on average. Each is reported twice, with and without major event days, the days of unusually severe outages that a utility may set aside. All of these numbers come from outage records in the outage management system. Dispatchers type those records in the middle of storms, and mistakes creep in. Some outages are logged twice. Some restore times are left as a 23:59 placeholder. Start times are taken from the first customer call, which can come well after the power went off. Customer counts come from the wrong transformer. Three-minute blips are logged as sustained outages, though only outages over 5 minutes should count. Each mistake goes straight into the number.

So before each filing, a reliability engineer cleans the records by hand. They match thousands of records in spreadsheets. They work out the major event day threshold in a workbook and write the justification for each excluded day. Excluding a major event day moves the reported number more than anything else. The regulator checks each one closely for that reason, and an exclusion without its calculation and evidence becomes a finding. The data to check the records already exists. Smart meters record the minute each customer lost power and got it back. Nobody has the time to match those meter events to the records.

typical11hoursof interruptions for the average US customer in 2024, nearly 9 of them from major events (EIA)
typical2hoursa year, roughly, of US outage time outside major events, so one minute of bad data is a real share of it
typical2.3daysa year, the number of major event days the 2.5 beta method is meant to flag, though real counts vary
Where a quarter's reporting time goes, in working daysestimated
By hand15 days
With the solution2 days
  • Exporting outage records and pulling meter events2 → 0.2 d
  • Matching records to the meters to fix duplicates and restore and start times6 → 0.5 d
  • Checking customer counts and cause codes2 → 0.3 d
  • Computing the indices and the major event day threshold2 → 0.1 d
  • Writing the major event day justification and the report3 → 0.9 d

Our estimated split for one quarterly reliability report at a distribution utility, in working days, by hand and with the solution.

How it works

Each outage record proved against the meters before it counts

What comes in
Data in4 sources · outage records, meter events, customers, weather
Agents at work
Outage record checkermeters vs records
Customer count checkerconnectivity model
Cause code checkercrew close-out notes
Then
Index calculatorIEEE 1366
Then
Major event day assessor2.5 beta threshold
Then
Report writercited draft
A person decides
Reliability engineeraccepts fixes, marks major event days
What comes out
SAIDI, SAIFI, CAIDI
Justified exclusions
Signed regulator report
One case, step by step

One storm day, followed through the Q3 reliability report

A large distribution utility serves customers across five regions. Its Q3 reliability report is due to the regulator at the end of next month. During the quarter, a line of thunderstorms crossed two of the regions in one afternoon. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Morning, 18 days to file

    The calendar opens on the day that needs a decision

    Reliability engineer

    Nine months sit on one reliability calendar, with each day colored by customer minutes lost. Year-to-date SAIDI without major event days is 62.2 minutes. That is 11.2 over the 51.0-minute target to the end of the quarter. Last night's run put one day at the top. It is the storm day, at 14.2 minutes, which is 3.5 times the major event day threshold. It also has 9 record problems that change its minutes.

    “Overnight run 02:10 · 6 agents · ready 02:40”

  2. 02Overnight

    Each outage record checked against the meters

    Outage record checker

    This year the checker has matched 2,671 records to 41.6 million meter events. On the storm day it found three duplicates, where one interruption was logged twice. It also found three restore times that the meters show are wrong. One record on a feeder breaker has a 23:59 placeholder, left open when the crew moved on. Of its 1,902 meters, 1,846 report power back between 17:41 and 17:47, so the checker proposes 17:44.

    The checks can raise the number too. One fix moves a start time from the first customer call at 15:40 to the meters' last power-off messages at 15:12. That adds 28 minutes.

  3. 03One click

    Nine fixes accepted, and the numbers recalculated

    Reliability engineer

    The reliability engineer accepts the 9 fixes. One came from the customer count checker. A transformer serves 148 meters, but the record used 412 customers from the transformer next to it. Another moves a 2 min 55 s recloser operation out of SAIDI and SAIFI as a momentary blip. The day goes from 218 to 214 interruptions, from 104,374 to 98,900 customers, and from 14.2 to 13.0 minutes. Year-to-date SAIDI falls from 62.2 to 61.0.

    “Run by the record checker and index calculator · accepted by the reliability engineer”

  4. 04Set at the start of the year

    The threshold, set from five years of daily SAIDI

    Major event day assessor

    This year's threshold comes from the five previous years. It uses 1,811 days that had interruptions and leaves out 15 days that had none. The mean of ln(daily SAIDI) is α = −1.622, and the standard deviation is β = 1.211. So the threshold T_MED = e^(α + 2.5β) is 4.08 minutes, fixed for the year. Only 10 of the 1,811 days were above it. Earlier years flagged 2 to 4 major event days each.

    “A day this year whose daily SAIDI is above 4.08 minutes is a major event day.”

  5. 05The decision

    The engineer marks the storm day as a major event day

    Reliability engineer

    At 13.0 minutes the day is 3.19 times the threshold, and the engineer marks it. The assessor counts 37 interruptions that ran past midnight against the storm day, the day they began. It gathers the weather and crew evidence. SAIDI without major event days falls from 61.0 to 48.0 minutes. SAIFI falls from 0.742 to 0.665, and CAIDI from 82.2 to 72.2. The utility is now 3.0 minutes inside the target.

    “Major event day · excluded from the indices excluding major event days, kept in the all-days figures.”

  6. 06The day file

    The justification note and its six sources

    Major event day assessor

    The day file shows the storm hour by hour, from 13:00 to the last restore at 06:10 the next morning. It lists the largest interruptions with the crew's cause and shows the threshold test. The evidence is cited. A weather station logged gusts of 96 km/h at 14:20, and there were 1,240 lightning strikes. The utility sent 31 crews and a contractor sent 12. The 9 accepted record corrections are cited too.

    The note reads “Before the test, each outage record for the day was checked against smart meter power-off and power-on events”. It adds that “9 corrections were accepted, which moved the day from 14.2 to 13.0 minutes.”

  7. 07A second try

    A heatwave day below the threshold stays in

    Major event day assessor

    On a Saturday earlier in the year, a heatwave overloaded transformers in two regions. It caused 61 interruptions for 31,240 customers and 3.91 minutes of daily SAIDI. That is 0.96 times the threshold. When asked to exclude the day, the assessor refuses and explains why. The day counts in each number, and the report narrative can describe it instead.

    “The heatwave day cannot be excluded. Its daily SAIDI of 3.91 min is below this year's threshold of 4.08 min.”

  8. 08Outside the storms

    The feeders that really lose the minutes

    Reliability engineer

    Feeders are ranked by customer minutes, leaving out major event days. One feeder leads with 1,290,486 customer minutes and a feeder SAIDI of 253 minutes. On it, 3,164 customers had three or more interruptions, and equipment failure is the top cause. The feeder that ranks first on all days drops to fifteenth once the storm is set aside. The engineer sends the leading feeder, with its year, to the next capital planning review.

    The leading feeder: “214,000 customer minutes on the storm day (major event day candidate).”

  9. 09The draft

    The Q3 report, with both sets of numbers and each one cited

    Report writer

    The report writer drafts the Q3 report in the regulator's template. It has a summary, the method, major event days, data quality, worst-performing feeders, notable events and Appendix A with the justification note. It shows 61.0 minutes across all days and 48.0 without major event days, against a target of 51.0. The data-quality section records 2,667 sustained interruptions and 50 corrections accepted this year. The source records are unchanged.

    “Drafted overnight at 02:40 · every number links to its source · re-drafts when a record changes”

  10. 10Signed, then filed

    Signed, with what the signature means, then filed

    Head of network performance

    The head of network performance opens the signature screen. It shows SAIDI without major event days at 48.0 minutes and 1 major event day, the storm day. They sign at 09:14. The regulatory affairs manager then files with the regulator and gets a filing receipt.

    What the signature means: “I have reviewed the indices, the major event day exclusions and their justification, and approve this report for filing.”

Who it’s for

Reliability engineers and regulatory affairs behind SAIDI and SAIFI reporting

The same Q3 report, seen by the four people who own it. Here is what their quarter looked like before, and what it looks like now.

Reliability engineer
Accepts record fixes, marks major event days
Before
Owns the quarterly and annual reliability filings and spends three weeks each quarter matching records. Trusts the calculation but not the 214 records under it.
Now
Opens the calendar on the one day that needs a decision. Accepts each fix with its meter evidence, and marks a major event day with the calculation already attached.
Head of network performance
Signs the filing, approves the threshold
Before
Signs the filing and answers to the COO for the regulator's performance scheme. Wants the reason for any excluded day on one page.
Now
Reads one day file per exclusion, with the threshold test, evidence and justification note. Signs, and what the signature means is recorded.
Regulatory affairs manager
Files and answers data requests
Before
Files with the regulator and answers its data requests. Knows the regulator runs the numbers again, and they must come out the same.
Now
Files a report where each number links to its source. The threshold calculation can be exported for the regulator to run again.
Distribution control manager
Runs the team that creates outage records
Before
Runs the control room through each storm. Records get logged first and tidied later, and later rarely comes.
Now
Sees the checks on the team's records, such as the duplicate, the placeholder restore and the late start, with the meter evidence. Can comment on each.
The agents

Meter checks, index math and the threshold, each done by an agent

Six agents check each outage record against the meters, set the major event day threshold and draft the report. A reliability engineer decides.

Outage record checker

Matches each outage record to the smart meters' power-off and power-on events and to breaker operations, within ±10 minutes. The power-off message is called the meter's last gasp. Finds duplicates, wrong restore and start times, and momentary blips logged as sustained. Proposes each fix with its meter evidence.

  • Proposes a fix only when at least 80% of the meters on the device agree
  • Never edits the outage management system or any source record
  • A fix counts only when the reliability engineer accepts it
Customer count checker

Counts the active meters below each device at the time of the outage, using the model of which meters sit on which transformer. Checks that count against the customers interrupted on the record.

  • Flags a difference of more than 5%
  • Only flags, and never changes the connectivity model
Cause code checker

Reads the crew close-out notes. Where a note names a different cause, it proposes the code from the cause list and quotes the note. For example, “tree limb on phase B, span 14-15, cleared” becomes Vegetation.

  • Only proposes. A person accepts every cause change
Index calculator

Computes SAIDI, SAIFI, CAIDI, MAIFI and CEMI-3 to IEEE 1366, the IEEE standard for these measures, from accepted records. Gives them with and without major event days, by region, feeder and cause. Recomputes after each accepted change.

  • Plain arithmetic that gives the same answer each time, with no estimates
  • Sustained means longer than 5 minutes. Each interruption counts against the day it began
Major event day assessor

Builds five years of daily SAIDI and computes α, β and the threshold by the 2.5 beta method. Flags the days above it. Gathers weather station, lightning and crew log evidence, and drafts each justification note with citations.

  • Never excludes a day itself. The reliability engineer decides
  • Refuses any day below the threshold
Report writer

Drafts the quarterly and annual reliability reports and the major event day appendix in the regulator's template, with each number cited. The template covers the summary, method, major event days, data quality, worst feeders and notable events.

  • No number without a source
  • Never files. The head of network performance signs and regulatory affairs files
Reliability engineer

Accepts every fix and every exclusion.

Ask in plain words

Any day, feeder or exclusion, asked about in plain words

Ask about any day, feeder, index or exclusion, or say what to change. Each answer points to its records.

Is the storm day a major event day?

Yes, it qualifies. After the 9 record fixes its daily SAIDI is 13.0 min, against this year's threshold of 4.08 min. That is 3.2 times over. It had 214 interruptions and 98,900 customers, with thunderstorms and 96 km/h gusts. Marking it takes SAIDI without major event days from 61.0 to 48.0 min, inside the 51.0 target. The all-days 61.0 stays on the report beside it.

Can we exclude the heatwave day as well?

No. The heatwave day had a daily SAIDI of 3.91 min, below this year's threshold of 4.08 min. IEEE 1366 treats a day as a major event day only above the threshold, so the heatwave counts in each number. You can describe it in the report narrative instead.

Which feeders lose the most minutes outside storms?

Leaving out major event days, the top three feeders lose 1,290,486 customer minutes (mostly equipment failure), 1,283,210 and 914,008. Together that is 2.7 min of the system's SAIDI.

Add the heatwave to the report narrative

Added to section 6 of the Q3 draft: “A heatwave overloaded distribution transformers in two regions. It caused 61 interruptions for 31,240 customers and 3.91 minutes of system SAIDI.” It is counted in each number, and section 3 says so.

The screens

Calendar, record checks, the storm-day file and the signed Q3 report

From the working solution, on its sample data. Pick one to see it large.

The reliability calendarNine months of daily SAIDI on one calendar, with the year-to-date numbers against the target. It shows the day that needs a decision and the feeders losing the most minutes.
Record checksEach exception with what the record says, what the meters or crew say, the proposed fix and its effect on the minutes.
Fixes acceptedThe storm day after 9 fixes, at 13.0 minutes and 98,900 customers, and the run that recalculated the numbers.
The major event day thresholdThe 2.5 beta calculation from five years of daily SAIDI: α, β, the 4.08-minute threshold and major event days by year.
A major event day markedThe storm day left out of the figures without major event days, with SAIDI at 48.0 against 51.0 and the assessor's evidence steps.
The day fileThe storm hour by hour, the largest interruptions, the threshold test, the cited evidence and the justification note.
Below the thresholdThe heatwave day at 3.91 minutes cannot be excluded. It counts in each number, with the reason on screen.
Worst-performing feedersFeeders ranked by customer minutes, with and without major event days. Each shows feeder SAIDI, CEMI-3, top cause and the year.
By region and causeMinutes of system SAIDI by region and cause, and SAIDI through the year against the regulator's target.
The Q3 reliability reportThe draft in the regulator's template, with both sets of numbers side by side and each one linked to its source.
Sign the reportThe head of network performance signs, with what the signature means and the exclusions in view.
Filed with the regulatorThe report filed with the regulator, with its receipt. The record checks are complete and one major event day is justified.
Method settingsThe major event day method, the reporting day, meter matching, targets and who decides.
Governance

Signed exclusions and traced numbers in SAIDI and SAIFI reporting

Each number links to its sourceEach figure in the report links to the records and calculation behind it. That covers the interruptions counted, the threshold's α and β, the justification note, the record checks and the feeder ranking. Each fix carries its meter evidence.
Named people decide and signAgents propose. Only a reliability engineer accepts a record fix or marks a major event day. The head of network performance alone signs, and what the signature means is recorded. Regulatory affairs is the only team that files with the regulator.
A day below the threshold cannot be excludedThe major event day assessor refuses any day whose daily SAIDI is at or below the threshold, and says why. Record problems that change a day's minutes must be accepted or rejected before the day can be marked.
Source records stay unchangedThe outage management system and the connectivity model are read and never edited. Corrections are kept beside the source record, with who accepted them and when, and the report says so.
One threshold for the yearThe threshold is set from five years of daily SAIDI at the start of the reporting year. This year that was 2 January, approved by the head of network performance. It stays fixed for the year.
Each step on the activity trailEach agent step and each human decision is recorded with its time. That covers who accepted a fix, who marked or undid a major event day, who sent the report for signature, and who signed and filed. The calculation and the daily figures export for the regulator to run again.
Configuration

Method, meter matching and the SAIDI and SAIFI targets

The method, the reporting day, the meter matching, the targets and who decides are all settings. Each change is saved as a new version and logged.

SettingDefaultChoose from
Major event day method2.5 beta2.5 beta (IEEE 1366, threshold = e^(α + 2.5β) from daily SAIDI) · Regulator-defined
Years of daily data behind the threshold5 years3 years · 5 years
Threshold fixed for the reporting year2 JanuaryFixed for the reporting year · approved by the Head of Network Performance
ScopeUnplannedUnplanned · All. Planned interruptions are reported separately
Meter time tolerance±10 min±5 min · ±10 min · ±15 min. Meter events this close to a record's times count as a match
Meters that must agree to propose a fix80%70% · 80% · 90% of the meters on the device
Targets, excluding major event daysSAIDI 68 min · SAIFI 0.95 a yearFrom the regulator's performance scheme, shown pro rata as 51.0 min and 0.713 to 30 Sep
Who decidesTwo reliability engineersReliability engineers accept fixes and mark major event days · the head of network performance signs · regulatory affairs files
Connections

Outage records, meter events and the connectivity model behind the indices

Outage management system recordsinterruptions by device and feeder, with start, restore, customers and cause
Smart meter eventspower-off (last gasp) and power-on messages, minute by minute
Breaker operationsfeeder breaker and recloser operations from the control system
Connectivity model and customers servedmeters below each transformer and device, and the monthly average of active accounts
Weather and lightningweather station gusts and rainfall, and lightning strikes in the service area
Crew dispatch log and close-out notescrews out, last restore, and the cause in the crew's own words
What it changes

Faster reports and defended exclusions with SAIDI and SAIFI reporting

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of major event day exclusions carry their calculation and evidence
each exclusion justified
IEEE 1366 2.5 beta
target
Every
outage record checked against the meters before it counts
Checked by handa sample
With agentsall 2,671
target
2days
to a drafted quarterly report, against about 3 weeks by hand
By hand≈ 3 weeks
With agents2 days

“Demo” means seen in the working solution, on its sample network data. “Target” means the design goal, measured in the live solution. “Estimated” means our estimate of the working-days split for one quarterly report at a distribution utility. The 15 days by hand is the sum of its rows. “Typical” means published figures. In Today in Energy, EIA reports that US customers averaged about 11 hours of interruptions in 2024. Nearly 9 of them came from major events, and about 2 hours a year came without them. In its evaluation of the IEEE 1366 major event day method, LBNL looks at the 2.5 beta method. That method is built to flag about 2.3 major event days a year. The method used is IEEE Std 1366, 2.5 beta. Names on the screens are sample data.

Questions

SAIDI SAIFI reliability reporting software questions from regulatory teams

What is SAIDI and SAIFI reliability reporting?

It is the regular report a power distribution utility files with its regulator. It covers how long (SAIDI) and how often (SAIFI) customers were without power, and how long each interruption lasted (CAIDI). Each is given with and without major event days. This solution checks each outage record against the smart meters and computes the numbers to IEEE 1366. It justifies each major event day and drafts the regulator report.

How are SAIDI, SAIFI and CAIDI calculated?

SAIDI is total customer minutes interrupted divided by customers served. SAIFI is total customers interrupted divided by customers served. CAIDI is SAIDI divided by SAIFI. Only sustained interruptions count, meaning those longer than 5 minutes. Each one counts against the day it began. The calculator uses accepted records only and recomputes after each change.

How does the 2.5 beta method find major event days?

It takes five years of daily SAIDI and leaves out days with no interruptions. It takes the natural log of each day and computes the mean α and standard deviation β. The threshold is e^(α + 2.5β). Any day in the reporting year above it is a major event day. In the sample, 1,811 days from the five previous years give 4.08 minutes for the year.

How does it check outage records against smart meter data?

The outage record checker finds the meters behind each device in the connectivity model. It looks for their power-off and power-on events within ±10 minutes. When at least 80% agree, it proposes a fix with the evidence. It might merge a duplicate, replace a placeholder restore time with the meters' time, move a late start or take out a momentary blip. Some fixes add minutes.

Can a day below the threshold be excluded?

No. The major event day assessor refuses any day at or below the threshold and says why. In the sample, a heatwave day at 3.91 minutes, against a threshold of 4.08, stays in each number. The report narrative can describe it instead.

Does it produce a worst-performing feeders report?

Yes. Feeders are ranked by customer minutes, with and without major event days. Each shows feeder SAIDI, customers with three or more interruptions (CEMI-3), top cause and the year month by month. A feeder can be sent to the capital planning review, and the top five go into the report.

Can an agent accept a record fix or exclude a day on its own?

No. Agents propose and draft. They do not edit a source record, accept a fix, exclude a day or file. A reliability engineer accepts each fix and marks each major event day. The head of network performance signs, and what the signature means is recorded. Regulatory affairs files.

What does a utility provide for its first SAIDI and SAIFI report here?

Your outage records, meter event feed, connectivity model, regulator template and past filings. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on a past quarter of your own outage data first.

Run a past quarter
of your own outage records.

We'll run SAIDI and SAIFI Reliability Reporting on a past quarter of your own outage records and meter events.