WorkflowSupply Chain, Procurement & Finance

Contractor Invoice Validation

Contractor invoice validation that pays for the work done in the field, at the contracted rate, and holds the rest with proof

See one case, screen by screen ↓
Watch with transcript →

Built forContract administratorsField supervisorsAccounts payable leadsInternal auditorsContract managers

The Problem Today

Reviewers check each rate against the contract but take the quantities on trust, so a trench billed to its design length is paid in full.

0.5-3%
of construction spend owners win back by enforcing contracts published
18 min
to check a 16-line invoice by hand, quantities taken on trust our estimate

Matched by hand, if at all

  • Invoice
  • Rate card
  • Site report
  • Hire log
  • Machines billed after returnHire days billed with no engine hours behind them
  • Same week billed twiceAn item already paid is billed again a month later

The Solution

  1. Each line priced from the contractEach line matched to its contract rate, its cap and the clause in force
  2. Quantities measured in the fieldTaken from the GPS survey, excavator track and site reports
  3. Machines and hours checkedHire days checked against telematics, overtime against signed timesheets
  4. The administrator decidesApproves the matched lines and short-pays the rest, with proof in the notice

Built-in controls

  • Undisputed lines are paid on time
  • Paying a large line as billed needs two approvers
  • Each finding cites its survey, log or clause

What You Get

Less money goes out for work not done. Each dollar paid or held stands up to audit and to the regulator's cost review.

  • Overbilling stopped before paymentEach dollar held is recorded by cause, contractor and month
  • Repeat patterns foundRepeated billing to the design length is raised at the quarterly review
  • Supervisors asked less oftenOnly when a measurement is disputed or unclear
In short

What is Contractor Invoice Validation?

It is the check that each line a contractor bills matches the rate in the signed contract and the work done in the field. Contractor Invoice Validation runs this check on each invoice the morning it arrives. Seven agents tie each line to its rate and its field evidence. Then the contract administrator approves, short-pays or queries each line.

How to choose AI solutions for utilities →

Updated

The problem

Utilities check each contractor's rates, but not the amount of work billed

Utilities hire contractors for field work. Civil works firms dig trenches and joint bays. Line contractors rebuild overhead circuits, tree contractors clear spans and metering firms exchange meters. Each one sends a monthly invoice priced from a schedule of rates, the price list in its contract. It bills by the meter, the item, the hour and the plant day (a day of hired machinery). Before the utility pays, a contract administrator should check each line two ways. The rate must match the signed contract, and the work must really have been done in the field.

Checking the rate is simple, because it sits in a contract PDF. The second check is much harder. Evidence of the work is spread across the field app, the plant hire portal and scanned handwritten daily reports. So the rate gets checked and the quantity is taken on trust. Nobody measures the trench. Contractors bill to the design length, and a route shortened in the field never shows on the invoice. The same patterns come back. Plant is billed for days after it went off hire. Overtime is billed with no signed timesheet. Handling charges go above the contract cap, and night rates are billed with no written instruction. Sometimes the same week appears on two invoices. And when a regulator reviews storm or capital costs, it questions any cost that cannot be traced to source documents.

typical0.5-3%of construction spend owners typically recover by enforcing their contracts
estimated10-20minper contractor invoice when each one is matched by hand, for a utility with more than 400 invoices a month
Where the minutes go when one invoice is reviewedestimated
By hand18 minutes
With the solution2.3 minutes
  • Reading the invoice and checking the arithmetic3 → 0.3 min
  • Finding each line's rate and clause in the contract4 → 0.3 min
  • Matching quantities to site reports, timesheets and hire logs6 → 1 min
  • Checking earlier invoices for the same week or item2 → 0.2 min
  • Writing the short-pay or query notice3 → 0.5 min

Our estimated split of the review time for one monthly civil works invoice of about 16 lines, in minutes. It compares the work by hand with the work using the solution. By hand, the field quantities are mostly taken on trust.

How it works

Contractor invoice validation, line by line, rate and field evidence first

What comes in
Invoice inEach invoice line · invoice, rate card, GPS survey, telematics, site reports
Agents at work
Invoice readerlines + totals
Then
Rate checker
Field quantity checker
Field report reader
Plant and labour reconciler
Then
Duplicate and period checker
Query writernotice + evidence
A person decides
Contract administratorapproves, short-pays, queries
What comes out
Matched lines paid
Notice with proof
Recovered ledger
One case, step by step

A civil works invoice, from the supplier portal to an agreed credit note

A civil works contractor is building a low-voltage reinforcement scheme for the utility, under a civil works framework contract. At 06:42 one morning, its September invoice arrives through the supplier portal. It has 16 lines and comes to $204,436.00 before tax. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0106:51

    The invoice opens already tied out

    Contract administrator

    The administrator checks more than 60 contractor invoices a month across four framework contracts. This one opens in three columns. They show what the contract says, what the invoice claims and what the field shows. Each line is linked to its rate on the left and its evidence on the right. Nine lines are matched, two are queried and five are held. The amount payable today is $178,879.00.

    A person can check the rate by hand. Nobody can check the 480 meters that way.

  2. 0206:42-06:51

    Each line checked in nine minutes

    Seven agents

    The invoice reader takes the PDF from the supplier portal. It finds 16 lines for September, and the totals agree. The rate checker matches each line to schedule of rates v3. Line 10 breaks the cap in clause 14.3, and line 13 does not meet the condition in clause 9.2. The field report reader adds up four handwritten site reports of 96, 104, 112 and 98 m, for 410 m in all. The duplicate and period checker compares nine earlier invoices from the same contractor. It finds line 3 was already paid in August.

    The contract administrator decides · 9 lines ready to approve · nothing is paid or sent until then

  3. 03Line 4

    480 meters billed, 410 meters dug

    Field quantity checker

    The contractor billed 480 m of footway trench at $186.50 a meter. That is the length in design rev B. But rev C, issued earlier in the month, ends the run at joint bay JB3. The GPS as-laid survey measures 409.6 m from 164 points. The excavator track gives 411.2 m, and the crew's four daily reports give 410 m. With a tolerance of 2% or 5 m, the most that can be paid is 418.2 m. The proposal is to pay for 410 m, $76,465.00, and short-pay 70 m, $13,055.00, which means holding back that part of the payment.

    From the crew's own daily report: “Route ends at JB3 per rev C.”

  4. 04Line 8

    Six excavator days billed, four on hire

    Plant and labour reconciler

    The 14 t excavator with operator is billed for 6 days at $1,240.00 a day. The hire company's telematics, the machine's own engine data, show four working days: 7.6, 8.2, 7.9 and 6.8 engine hours. On the next two working days it sat at the depot with 0.0 hours. It went off hire at 18:10 on the fourth day, and the foreman wrote “Ex 14t off hire 18:00”. So two days, $2,480.00, are held.

    The ducts follow the trench, and 2 × 410 m is 820 m. So 140 m of duct on line 6 is held too, $1,988.00.

  5. 05Lines 12 and 13

    Two lines get a question instead of a hold

    Rate checker

    Clause 9.2 pays the night uplift, the extra rate for night work, only if the Employer gave a written instruction before the shift. No instruction is on file. The road permit also allows work only from 09:30 to 15:30. So three night shifts, $3,540.00, are queried. On line 12, three weekly sheets are signed for 38 of the 46 overtime hours. The 8 hours on a Saturday have no signature, so $1,056.00 is queried.

    For line 12, the contractor can send the signed sheet, or the field supervisor can confirm the hours.

  6. 06Decided

    Sixteen lines decided, each by name

    Contract administrator

    The administrator accepts the proposals. Nine lines are approved, 5 are short-paid ($20,961.00) and 2 are queried ($4,596.00). Each line now shows its decision. Line 4 shows who short-paid it and the $13,055.00 sent to the notice, with Undo beside it. The administrator could have queried line 4 instead. Any line can also be paid as billed, with a reason that goes to the audit trail.

    16 of 16 lines decided · payable after decisions $178,879.00 · released to the next AP run · paid on 30-day terms.

  7. 0707:20

    The notice goes with its proof

    Query writer

    The query writer has drafted the payment notice under clause 22.4, addressed to the contractor's commercial manager. Each of the seven disputed lines lists the evidence attached. That includes the paid August invoice, the road permit, the GPS survey and the excavator telematics. The daily field report, design revision C, the contract, the supplier invoices and the timesheets are attached too. The administrator reads the notice and sends it at 07:20.

    The undisputed $178,879.00 is released to accounts payable today and paid on 30-day terms.

  8. 0811:05

    The contractor agrees, from the supplier portal

    Contractor's commercial manager

    The contractor replies in the supplier portal. “Lines 3, 4, 6, 8 and 10: agreed, credit note to follow. Line 12: signed sheet for the Saturday attached. Line 13: withdrawn, the night shifts were our choice.” The query writer reads the reply. It finds $24,501.00 agreed, and the signed sheet for line 12 matches the field supervisor's diary. The $1,056.00 for line 12 is released once the administrator approves.

    Before this notice, the contractor had asked that any short-pay show the measurement behind it.

  9. 09The ledger

    Each dollar stopped, with its evidence

    Internal audit manager

    The recovered-overbilling ledger shows $833,401 stopped before payment this year. That is 2.00% of contractor invoice value, and this invoice adds $20,961.00 today. The biggest cause is quantities billed above the field evidence, at $333,303. Labor hours and plant days come next. Each entry opens its evidence, for internal audit's quarterly sample and for the report to the board.

    Internal audit asks for the evidence behind each dollar stopped, and each one paid.

  10. 10The pattern

    The third time billed to the design length

    Contract administrator

    The contractor's billing record shows how much of each invoice was payable with no query or hold. It was 98.4% in July, 94.1% in August and 87.5% in September, against a target of 98%. Trench has now been billed to the design length instead of the as-laid length three times. That was 22 m on one street in June, 31 m on another in August and 70 m on this job in September. When the share falls below 95%, the contract manager raises it at the quarterly review.

    Another repeat: handling on materials billed at 15% against a contract cap of 8%, on both the August and September invoices.

Who it’s for

The administrator, supervisor, AP, audit and contract head on one invoice

Five roles answer for each contractor invoice. Each card shows their month by hand first, then the same month with the agents.

Contract administrator
Decides each line, sends the notice
Before
Checks more than 60 contractor invoices a month across four frameworks, rate by rate. The quantities are taken on trust. The rate can be checked, but the 480 meters cannot.
Now
Opens each invoice already tied to its rates and field evidence. Decides line by line and sends the notice with the proof attached.
Field supervisor
Signs timesheets and daily reports
Before
Signs timesheets and daily reports on live schemes, and knows what was really dug: 410 meters.
Now
Is asked only when a measurement is disputed or the evidence scores below 0.85 confidence. Sees the survey, the track and the day's report on one map.
Accounts payable lead
Pays released amounts on 30-day terms
Before
Pays on 30-day terms and chases holds. Needs to know what to pay today, what is held and the reason to give the contractor.
Now
Gets the undisputed amount released the day the invoice is decided. Each held dollar comes with its line, its reason and its notice.
Internal audit manager
Samples contractor payments each quarter
Before
Samples contractor payments each quarter and wants the evidence behind each dollar stopped and each dollar paid.
Now
Reads a ledger where each stopped dollar opens its survey, telematics extract, report line or clause. The ledger is sorted by cause, contractor and month.
Head of contract management
Countersigns above $250,000, owns the rules
Before
Countersigns invoices above $250,000. Answers for how tight the tolerances are and who decides.
Now
Sets them once as versioned rules. Tightened the quantity tolerance from 5% to 2% or 5 m once GPS surveys supplied the measured quantities.
The agents

Rate, field and duplicate checks on each contractor invoice, by agent

Each invoice line is tied to its contract rate and to the field record of the work. The contract administrator decides.

Invoice reader

Reads each contractor invoice from the supplier portal or email. Picks up each line's description, quantity, unit, rate, amount and work order, plus the markups and the period. Checks the arithmetic and the totals.

  • Never edits the contractor's figures
  • Flags what does not add up
Rate checker

Matches each line to its schedule-of-rates item and to the clause in the contract version in force for the period. Checks the rate and the unit. Also checks handling caps and the conditions for night, weekend and standing-time uplifts, the extra rates.

  • Uses signed contract versions only
  • Never applies a rate that is not in the signed contract
Field quantity checker

Measures each billed quantity from the field evidence. That means the GPS as-laid survey, the excavator's telematics track, the current design revision, as-builts, photos and daily reports. Compares the result with the billed quantity and the tolerance.

  • Never measures from the design alone
  • Below 0.85 confidence, asks the field supervisor
Field report reader

Reads scanned daily site reports and timesheets, including handwritten ones. Writes out the chainages (distances along the route), meters, plant on site, crew and hours.

  • Quotes the sentence for each figure it uses
  • Says when a word is unclear
Plant and labour reconciler

Ties plant days to hire logs and telematics, and labor hours to signed timesheets. Applies the contract's rules for overtime and standing time.

  • Never changes a timesheet or a hire record
Duplicate and period checker

Compares each line with the contractor's paid and pending invoices from the last three years, and with the billing period. Finds the same item billed twice for the same week.

  • Never rejects a whole invoice
Query writer

Drafts the short-pay and query notice under clause 22.4. Each disputed line carries its measurement, clause and evidence. Reads the contractor's reply when it comes back through the supplier portal.

  • Never sends. The contract administrator sends
Contract administrator

Decides each line and sends the notices.

Ask in plain words

What an administrator can ask about any contractor invoice, line or rate

Ask about any invoice, line, rate or contractor, or say what to approve, short-pay or query. Nothing is paid or sent until the contract administrator decides.

Why is line 4 held?

The contractor billed 480 m of footway trench, the length in the old design, rev B. Rev C stops at JB3. The GPS as-laid survey measures 409.6 m and the excavator track 411.2 m. And the crew's own report says “Route ends at JB3 per rev C”. The tolerance allows up to 418.2 m. So the proposal is to pay 410 m and short-pay 70 m, $13,055.00.

Accept the proposals on this civil works invoice

Done. Nine lines are approved, 5 short-paid ($20,961.00) and 2 queried ($4,596.00). Each short-pay carries its evidence: the survey, the telematics, the August invoice and clause 14.3. The remaining $178,879.00 is ready for accounts payable. The notice is not sent until you send it.

Has this contractor billed to the design length before?

Yes, twice this year. In June it billed 22 m over the as-laid survey, and in August 31 m over. Both were settled by credit note. This job makes it three. The contractor’s share of value matched the first time fell from 98.4% in July to 87.5% in September.

What have we stopped this year, and why?

This year, $812,440 was stopped before payment, 1.95% of contractor invoice value. The largest cause is quantities billed over the field evidence, at $318,260. Labor hours come next at $196,410, then plant days at $142,380. Each entry links to its evidence for internal audit.

The screens

The tie-out, the job measured, the notice and the recovered-overbilling ledger

From the working solution, on its sample data. Pick one to see it large.

The invoice tie-outThree columns show what the contract says, the invoice claims and the field shows. Each line is tied to its rate and evidence, with the 480 m trench open in the line inspector.
The run logSeven agents at work from 06:42 to 06:51. Each step shows what it found, and the decision is left to the contract administrator.
The job, measuredDesign rev B and rev C, the GPS points, the excavator track and the trench dug day by day. The scanned field report and its transcription sit beside them.
Plant days against telematicsSix excavator days billed. Engine hours show four days on hire and two at the depot after the off-hire.
An uplift without an instructionThree night shifts queried. Clause 9.2 needs a written instruction, and the road permit allows work from 09:30 to 15:30 only.
Each line decidedEach line approved, short-paid or queried by name, with Undo, and the amount payable after decisions.
The notice with its proofSeven disputed lines, each with the evidence attached, and the undisputed amount released to accounts payable.
The contractor's replyThe disputed lines with their evidence, and the contractor's reply from the supplier portal, read for a decision on line 12.
Recovered overbillingStopped before payment by month and by cause, and a ledger where each entry opens its evidence.
Contractor invoicesThis month's invoices across civil works, overhead line, vegetation, water and metering, each split into payable, queried and held.
A contractor's billing recordThe value matched the first time each month against a 98% target, the repeat patterns and each invoice from the contractor.
The schedule of ratesEach rate item with what was billed against it this month, and the contract clauses the agents apply, quoted from the signed contract.
Validation rulesTolerances, the evidence each line type needs, who decides, and each change to the rules with its reason.
Governance

Cited findings, named decisions and authority limits on contractor invoices

Each finding cites its sourceEach held or queried line points to what showed it. That can be the survey file and its points, the telematics extract or the line of the scanned field report. It can also be the contract clause in force, the timesheet or the earlier invoice.
A person decides each lineThe agents propose. The contract administrator approves, short-pays, queries or pays as billed. A person sends each notice. The field supervisor confirms any disputed measurement.
Undisputed lines are paid on timeOnly the disputed amount is held. The undisputed sum goes to accounts payable the day the invoice is decided. It is paid on the contract's terms, so nothing the contractor is owed waits on a query.
Authority limits, built inThe contract administrator decides up to $250,000 an invoice. Above that, the head of contract management countersigns. Paying a line as billed over $5,000 needs a reason and a second approver.
Rules the agents cannot changeContract management sets the tolerances, the evidence each line type needs and who decides. Each version is kept. An invoice is checked against the version in force when it arrived. The agents do not change an invoice, a timesheet or a hire record.
A ledger internal audit can sampleAgent steps and decisions are recorded with their time and author. The recovered-overbilling ledger links each stopped dollar to its evidence, by cause, contractor and month.
Configuration

Tolerances, evidence and approval limits, versioned by contract management

Contract management chooses the tolerances, the evidence each line type needs and who decides. These are settings, kept as versions.

SettingDefaultChoose from
Measured quantities2% or 5 m, whichever is greater1% or 2 m · 2% or 5 m · 5% or 10 m
Plant daysMust match telematics or the hire logTelematics or hire log · Hire log only
OvertimeSigned timesheet, 0 h tolerance0 h · 2 h a week
DuplicatesSame item, same week, any earlier invoiceAny earlier invoice · Last 12 months
Field supervisor asked when confidence is below0.850.75 · 0.85 · 0.95
Evidence each line type needsTrench and duct: GPS as-laid survey or as-built drawingRequired or optional per line type. Reinstatement needs a highway inspection sheet, spoil needs tip tickets and plant needs telematics or a hire log. Overtime needs a signed sheet and uplifts need a written instruction. Joint bay photos are optional.
Approve, short-pay, queryContract administrator, up to $250,000 an invoiceAbove $250,000 the head of contract management countersigns
Pay as billed over $5,000Needs a second approver and a reasonThe reason goes to the audit trail
Connections

Surveys, telematics, site reports and rate schedules behind each invoice

Contractor invoicesfrom the supplier portal or email, with the contractor's paid and pending invoices
Contracts and schedules of ratesframework contracts, rate versions, indexation and clauses
GPS as-laid surveys and design revisionsGNSS rover surveys, as-built drawings and the current design revision
Plant telematics and hire logsengine hours, on-hire and off-hire dates from the hire company
Daily site reports and timesheetsscanned and handwritten, with chainages, meters, crew and hours
Work orders and site recordsroad permits, tip tickets, highway inspection sheets, cable scans and photos
What it changes

Overbilling held with proof, and contractor invoices tied out in minutes

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1-2%
of contractor invoice value held with proof, before it is paid
target
100%
of invoice lines tied to a contract rate and a field record
Each line on the sample invoice
tied out early in the sample morning
target
<3min
of review per invoice, instead of 10 to 20
By hand10 to 20 min
With agents2 to 3 min

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” is our estimate of how the review minutes split for an invoice of about 16 lines. The 18 minutes is the sum of the by-hand rows. “typical” means published figures from Daily Reporter/BridgeTower on construction audits. Owners typically recover 0.5 to 3% by enforcing their contracts. “estimated” also marks vendor-reported figures from a utility's DistribuTECH presentation. It gave more than 400 contractor invoices a month, at 10 to 20 minutes each. Regulatory context: Florida PSC storm cost audits trace contractor costs to source documents. Names on the screens are sample data.

Questions

Contractor invoice validation questions from contract management and audit

What is contractor invoice validation?

It is the check that each line a contractor bills matches the rate in the signed contract and the work done in the field. Contractor Invoice Validation runs this check on each invoice the morning it arrives. Seven agents tie each line to its rate and its field evidence. Then the contract administrator approves, short-pays or queries each line.

How does contractor invoice validation software for utilities work?

The invoice reader takes the invoice from the supplier portal or email. The rate checker matches each line to the schedule of rates and its clauses. Three agents check quantities, hours and plant days against the field records. They are the field quantity checker, the field report reader and the plant and labour reconciler. The duplicate and period checker looks for lines already paid. The query writer drafts the notice, and a person decides and sends it.

How does it check quantities against the work done in the field?

It does not measure from the design alone. It uses the field evidence: the GPS as-laid survey, the excavator's telematics track, the current design revision and the crew's daily reports. In the sample case, 480 m of trench was billed to an old design. The survey, the track and the reports all gave 410 m, so 70 m was short-paid.

Can it read handwritten site reports and timesheets?

Yes. The field report reader reads scanned daily site reports and timesheets, including handwritten ones. It quotes the sentence behind each figure it uses and says when a word is unclear. Below 0.85 confidence, the field supervisor is asked to confirm.

Does it catch duplicate billing, plant after off-hire and markups above the contract cap?

Yes. The sample invoice shows each of these. A traffic management week was already paid on the August invoice. Two excavator days were billed after the off-hire. Handling was billed at 15% against a contract cap of 8%. There was also overtime with no signed sheet and a night uplift with no written instruction.

Will contractors be paid late?

No. Only the disputed amount is held. The undisputed lines go to accounts payable the day the invoice is decided and are paid on the contract's terms. The contractor gets a notice showing the measurement, the clause and the evidence for each line held.

Who signs off what is paid, and above what amount?

People do. The agents propose, and they do not change the contractor's invoice, a timesheet or a hire record. The contract administrator decides each line up to $250,000 an invoice and sends each notice. Above that, the head of contract management countersigns. Paying a line as billed over $5,000 needs a reason and a second approver.

What do we provide to try it on our own invoices?

You provide your framework contracts and schedules of rates, your evidence rules and a sample of past invoices with their field records. The Agentic Solution Engine builds and deploys the solution from those requirements and documents. It goes live once each quality gate has passed. We will walk you through it on your own invoices first.

Try contractor invoice validation
on your own paid invoices.

We'll run Contractor Invoice Validation on a sample of your own paid contractor invoices and their field records.