Reads work orders, paper charts, certificates, spreadsheets and daily reports.
- Never edits a test
- Never writes a result the crew did not state
Well integrity management that draws each well with its barriers, follows each element to the test that proves it, and leaves every status change to a signed decision.
Follow 14-118 from a rising annulus to a signed status ↓Proof that a barrier works sits in charts, work orders, certificates and spreadsheets, so a well's status is only as fresh as its last review. Tracing one element by hand means three systems and the best part of an hour.
The gaps come from ordinary work. A workover swaps the safety valve, and the test plan stays on the old serial, so no work order is ever raised. An annulus that creeps up a little each week reads like heat or lift gas, until someone lines it up against flow and temperature.
Built forWell integrity engineersWell integrity authoritiesProduction supervisorsWells data coordinatorsInternal auditors
Proof of each barrier sits in charts, work orders and reports, so a well's true status goes stale between reviews.
Chased by hand today
Built-in controls
Well teams see each barrier's proof or its gap, and each status change carries who signed it and why.
A gas producer on a platform, back from a workover that replaced its tubing and safety valve. Since summer its A-annulus has risen every week.
demoPlatforms, wells, valves, people and pressures are sample data.
The well is drawn as engineers draw it, with primary and secondary barriers traced around it. Each element shows when it was last proven and by what test. Most read proven. The tubing reads in question, and the downhole safety valve reads 14 days overdue, on the same well.
The annulus watch puts the trend under the limit lines: 2,000 psi limit, 1,800 action, 1,600 alert. Tubing pressure, gas flow and wellhead temperature held steady over the same weeks, so heat does not explain it. Fifteen other flags today are explained, mostly heat after restarts and lift gas.
Asking the safety valve to prove itself goes straight to the test record: the inflow test after the workover, 14 psi rise in 30 minutes, worked out to 3.2 scf/min against 15 allowed, with the valve serial and work order beside it. It passed then. The question is why there has been no test since.
The work order closure shows the valve removed and the valve fitted. The six-month test plan was never moved to the new serial, so no work order was raised and the test slipped past its due date. Nobody missed a test on purpose; the plan was attached to a part no longer in the well.
An anomaly draft puts the two together. With the tubing in question and the valve unproven, and the leak depth unknown, closing the valve may not stop it. So the engineer proposes moving the well to Restricted, with conditions. He cannot sign his own proposal.
The authority opens the annulus readings with tubing, flow and temperature, the tubing pressure test, the safety valve test, the workover record and the limit calculation. Each shows opened by her name. Only then can she sign, with send back and reject beside it.
Her signature moves the well and changes the fleet count on the spot. The test plan moves to the new valve serial, a 1,800 psi ceiling goes live, and three conditions go to their owners with dates. The anomaly stays open; signing a status does not clear it.
The supervisor's work list opens with the downhole safety valve inflow test, a bleed-down and build-up test under a permit, and a daily hand gauge reading checked against the transmitter. The overdue tests on other wells follow, oldest first.
The drawing now carries the new status and the ceiling, and the tracer names who signed it. Restricted stops any well work on the tubing or annulus without the authority. The next step is the signed decision itself, one click away for anyone who asks why.
An element is proven only with a test on file, in date, with nothing waiting on it.
| Proven, with a test in date | 16,981 |
| Test overdue | 214 |
| Cannot be proven from any record | 97 |
| Failed or in question | 58 |
| Newer record waiting on a person | 10 |
| Barrier elements across 1,240 wells | 17,360 |
demoSample data, from the working solution. Fourteen elements a well. The four groups outside proven do not overlap.
The screens the coordinator, the supervisor and the authority return to each week.
demoSample data, from the working solution.
Their limits are written into the work, not left to a setting.
Reads work orders, paper charts, certificates, spreadsheets and daily reports.
Keeps the envelope and answers prove it for any element.
Reads each annulus against its limits and triggers, and tells heat and lift gas apart.
Tracks intervals and finds plans left on old serials.
Drafts the anomaly, its risk and a proposed status.
Prepares the periodic review and draws the random sample.
The agents read, trace and propose. These stay with people.
Well integrity management keeps each well's barriers proven and its status current. In this well integrity management, agents read test records in any format, tie each barrier element to its last test, watch each annulus against its limits, and propose status changes that a well integrity authority signs.
The annulus watcher reads each annulus against its limit, action and alert levels, and checks flow, tubing pressure and temperature to tell heat and lift gas from a real rise. A rise it cannot explain becomes a draft anomaly for the engineer.
The test clock follows the serial numbers. When a part is swapped and its plan stays on the old serial, the clock finds it and the plan moves once the status decision is signed.
No. An element is proven only with a test on file and in date. Where no record exists, it reads cannot be proven, and it is never assumed good.
The well integrity engineer proposes and the well integrity authority signs, after opening each piece of evidence. The fleet counts change the moment she signs.
Clean wells go through on one signature only after a random draw from them has been opened and agreed. Any well with an overdue test, an open flag or a record waiting is set apart and decided one at a time.
Offset hazards traced to the program step that handles them, and the untraced ones shown plainly.
1-min demoOffset Well AnalysisThe kick nobody would have picked, found in the daily reports and cited to its page.
1-min demoNPT AnalysisLost time read from the words, not the codes: both sides answer, one person signs.
1-min demoWe will draw each well's barriers and show which ones your records actually prove.