Offset well analysis for 14-153: the kick nobody keyed in
A new well targets the N-2 Sand east of a fault. The draft program uses the 12 nearest offsets and carries 11.0 ppg in the 8-1/2 in hole.
demoThe field, the wells, the people and all of the numbers are sample data.
- 01Review prep
64 of 64 wells read, and the five nearest look clean at the N-2
Drilling engineerThe planned well sits at the center of a map with every well within the radius as a dot. Ranked by distance, the nearest show no trouble at the N-2. One of them, 14-006, looks clean only because its last 55 days of reports are missing, and the screen calls it too thin to tell instead.
- 02Review prep
Turned to same rock, a well 31st by distance comes first
Drilling engineerMoving the lens from nearest to same rock re-ranks the wells on sand, fault side, hole size and depth. 14-031, 5.6 miles away across the fault on the east side, comes to the top with a kick in the N-2. The draft program did not include it.
- 03Review prep
A kick at 11,420 ft, written by hand in the margin of report 38
Drilling engineerOn the typed line: drilling ahead, circulating and weighting up. In the margin, by hand, the rest: a kick in the N-2 sand, 14 bbl pit gain, shut in, SIDPP 360, SICP 590, mud 11.2, raised to 11.9. No event for it exists in the well database. Beside the page, a sum shows the draft mud about 502 psi under it, if that sand pressure carries to the new well.
- 04Pressure ruling
East of the fault, three wells read near 7,000 psi across seven years
Geomechanics specialistThe engineer takes the kick into the plan, where it waits for a pressure ruling. The specialist opens the cited page, then the N-2 pressure across 23 wells. West of the fault the sand has drawn down with production; east of it, the readings sit flat. The draft used the west.
- 05Pressure ruling
She enters her own forecast: 11.9 ppg at the top plus 0.3 margin
Geomechanics specialistThe ruling is hers, typed in her own figures with a reason, not a preset. The 8-1/2 in mud plan now reads 11.0 to 12.2 ppg, waiting for the senior engineer to sign. Agents gathered the points and did the arithmetic; none of them set a weight.
- 06Sign-off
He opens the page himself before the sign button will work
Senior drilling engineerEach hazard needs one person to propose it, the specialist on pressure, and the senior engineer to open its pages and sign. He cannot check his own work. Routine hazards wait in a lot that he can sign only after opening a sample, while well control items go one by one.
- 07Sign-off
The offset summary is built only from what people signed
Senior drilling engineerThe summary lists the offset list, with thin wells named as thin, and each hole section's hazards. Unsigned hazards say so and stay out of the file. Gates show what still blocks issue. The largest change sits on its own line: the mud plan moving from 11.0 to 12.2 ppg, with who ruled and who checked.
- 08Afterwards
Who proposed, who ruled and who signed, in order
Assurance reviewerThe trail runs from the agents' reading through the analyst's reading of the handwritten note and the engineer's check of it, the engineer's proposal, the specialist's ruling with its reason, to the signature. Nothing can be edited. An assurance reviewer can read and export it but act on nothing.