- Before
- Approves 20 to 30 quotes a day and answers for turnaround and spend. “Tell me before I approve it, not after we’ve paid it.”
- Now
- Opens each unit with warranty, quote history and the shelf already worked and cited, and spends his time on the decision.
Rotable repair management, one generator at a time: IDG S/N 7731 at ORD
Rotable repair management at Corvane Airways, told through one integrated drive generator. On Thursday, October 15, 2026, Meridian Electric Power Services has quoted $48,200 to repair IDG S/N 7731 — a unit Meridian itself repaired eleven months ago. Here is what happens next, screen by screen, in the working solution.
- 01Thursday morning
Every rotable on one loop, and six decisions that need him
Marcus Reyes · Component Repair ManagerMarcus opens the repair loop: one circle of six stages with 1,284 units on it — 96 removed, 212 shipping, 341 at shop, 38 in warranty check, 486 in repair, 111 back to stock. Average turnaround is 47 days against a 35-day target, 63 units are late at the shop and $3.86M of warranty has been recovered this year. The selected dot is IDG S/N 7731, with the agents' note beside it, and under it, Needs you: 6.
“Proposes: Reject the quote and send warranty claim WC-2610-031 for $48,200.”
- 02One click
The unit's conversation with the agents, beside its evidence
Marcus Reyes · Component Repair ManagerOpen the unit and the agents' work reads as a conversation, each line with its source. The Removal reader captured the removal on Oct 9 from tech log TL-ORD-55218 and opened repair order RO-2026-20417. The Quote analyst set Meridian's $48,200 against twelve past repairs with the same bearing finding: median $31,400, $24,900 to $39,800. The rotor assembly ($14,600) was replaced in only 1 of 12. If the warranty were refused, it would counter at $32,000.
Quote against history: “+54% over median.”
- 03Before the quote
The shop's own clause, found and counted
Warranty checkerThe Warranty checker found Meridian's repair agreement §9.2 and the last repair, RO-2025-11842, released on Form 8130-3 MEP-25-11842 and shipped Nov 18, 2025. The unit has flown 1,900 of 4,000 flight hours in 11 of 18 months, and the teardown blames the bearing fitted at that repair. Every citation opens the passage the agents read.
§9.2: “Repaired units are warranted against defects in material and workmanship for 4,000 flight hours or 18 months from the date of shipment, whichever occurs first.”
- 04Checked twice
A second agent re-derives it without seeing the first working
VerifierThe Verifier works from the maintenance records and the release certificate alone, and agrees: 1,900 of 4,000 hours, 11 of 18 months. Marcus asks for the checks again and watches each step run in under a second — tech log, last repair, clause, independent re-check, quote history, shelf, claim — then the hand-off to him.
“Same result as this morning. 6 sources read · 97% sure · handed to the Component Repair Manager.”
- 058:31 am
The warranty claim, drafted with every statement cited
Claim drafterClaim WC-2610-031 for $48,200 is written to Meridian's warranty desk: the last repair, the installation on N812CV, the removal for low oil pressure after 1,900 flight hours and 11 months, the failed bearing and §9.2. It rejects quote QT-MEP-55021 and asks for the repair at no charge within the 21-day turnaround of Schedule B. The evidence pack holds four documents, and the Verifier's five checks all agree.
The Claim drafter asks one question first: §9.4 also makes Meridian pay the freight both ways on an accepted claim, $640 — add it to the claim?
- 068:43 am
He asks, instructs, then decides
Marcus Reyes · Component Repair ManagerMarcus asks what happens to stock at ORD. The Pool planner answers: 2 serviceable IDGs against a minimum of 3, and S/N 6624, repaired at Meridian, is on the ORD shelf Friday, Oct 16 with a $3,200 overnight expedite — no aircraft waits. He types “Ask Meridian for 21 days” and the Shop follower adds the 21-day turnaround and its 1% a day late credit to the claim. He rejects the quote with the reason code “Covered by repair warranty”, ticks the statement and approves the claim.
“Decided. Quote rejected and claim sent. Everything is in the audit trail.”
- 07On the record
Who did what, when, and on what evidence
Every agent and every personThe audit trail shows the morning entry by entry: the Warranty checker's finding at 8:20 am, the Verifier's agreement at 8:24, the quote comparison, the claim draft, the Pool planner's expedite proposal, Marcus's rejection at 8:48 and his approval at 8:51, and the claim sent to Meridian's warranty desk with four documents and a 30-day reply clock. It exports as CSV and as an evidence pack.
“Append-only · each entry signed.”
- 08The rest of the queue
Quotes read from the teardown, line by line
Quote analystAldergrove Hydraulics quoted $18,950 for engine-driven hydraulic pump S/N 2286 against a median of $12,400 over 14 repairs. The quote replaces the pump housing; the teardown says the housing is within limits, and it was replaced in only 2 of 14. Warranty was checked first — outside Aldergrove's 3,000 flight hours or 12 months, and the Verifier agrees. Proposed: counter at $12,900.
“No quote reaches “approve” until the warranty check has run.”
- 0919 days late
A late shop chased from its own contract
Shop followerAir cycle machine S/N 5012 has been at Cobalt Pneumatics 44 days against a 25-day turnaround, and reminders of Oct 5 and Oct 12 were not answered. §7.3 of the repair agreement allows escalation to the account director after 10 days late and two unanswered notices, so the Shop follower drafts the letter: a ship date within two business days, late delivery credits under Schedule B from day 26. It waits for a person to approve and send.
Routine first reminders go under a standing approval; escalations always need a person.
- 10SFO, empty shelf
Late units tied to the shelf they empty, with the fix priced
Pool plannerSFO holds no serviceable auxiliary power unit against a minimum of 1, because S/N 0418 is 7 days late at Harbor APU Services. The Pool planner prices three ways out: an exchange APU from the pool at SFO on Oct 17 for $96,000, moving the ORD spare for $4,800 and leaving ORD at 0 of 1 for 9 days, or waiting for the promised Oct 19. Above $75,000 the exchange needs the Director of Materials to co-sign.
“Agents never book an exchange or change a minimum.”