SystemInflight Services & Supply Chain

Galley Planning

Galley planning that re-plans every galley a change touches — checked, cited and approved before a caterer loads it

See one case, screen by screen ↓

Built forGalley plannersInflight product managersCatering operations managersWeight and balance engineers

The Problem Today

Galley planners redraw plans by hand after each menu, trolley or tail change, so caterers load to stale plans for weeks.

23%
of cabin waste is food and drink nobody touched published
18 days
of planner work to re-plan one widebody menu cycle by hand our estimate

Redrawn from these, by hand

  • Menu spec
  • Drawings
  • Placards
  • Weights
  • A cabin short of mealsPremium passengers go without their hot course
  • Weights out of dateLoad control computes with the old catering weight

The Solution

  1. Each affected plan foundA change in menu, trolley, tail or aircraft type traced to each galley
  2. Each galley re-plannedOvens, carts and chillers filled; what flies back untouched taken out
  3. Checked, and timedSpace, ovens and weight re-derived; service timing simulated by cabin
  4. The planner publishesApproved with a reason; each caterer gets a plain change list to confirm

Built-in controls

  • No caterer sees a plan before a planner approves
  • Each position cites its drawing or spec
  • Special meals never moved or removed without a person

What You Get

Each galley plan reaches its caterer checked against the tail and bookings, with trolleys that fly back untouched proposed for removal.

  • Tail swaps re-planned before cut-offRe-planned for the new layout, approved before the caterer loads
  • Load weights kept currentNew catering weights approved before a plan publishes
  • Under one planner day a menu cycleour estimateFrom the menu change to each caterer notice
In short

What is Galley Planning?

Galley planning is deciding what goes in each position of each aircraft galley (ovens, compartments, cart bays and chillers) for each aircraft layout, route and cabin, and publishing that galley load plan to the caterers who load it. Galley Planning brings that airline catering load planning into one place, with six AI agents: when a menu cycle, an equipment change or a tail swap lands, they re-plan each affected galley, check space, ovens, placards, weight and service flow by cabin, and write each caterer's change list. The galley planner answers the questions only a person can and approves each plan before a caterer sees it.

How to choose AI for airlines: a buyer's guide to agentic AI solutions →

Updated

The problem

One menu change can make hundreds of galley plans wrong at once

Galley planning decides what goes in each fixed position of each galley (cart bay, oven insert, standard-unit compartment, chiller) for each aircraft layout, route and cabin, and publishes that galley load plan to the caterer at each station, who loads to it as the galley loading plan for the flight. The plans live in galley drawings, a legacy galley system and spreadsheets, and the catering weight of each galley feeds the standard catering weights load control uses on each flight.

Then something changes. A new menu cycle, a lighter trolley, a tail swap to an aircraft with a different galley layout or a new aircraft type can make hundreds of plans wrong at once. The planner works out which galleys are touched, counts oven loads and placards again, recomputes the weights and writes a notice to each caterer. That takes weeks, or hours when operations swaps a tail before the caterer cut-off. A wrong plan leaves a cabin short of meals, or flies weight nobody uses: almost a quarter of cabin waste is food and drink nobody touched.

typical23%of cabin waste is untouched food and drink
typical0.94kgof cabin waste per passenger, on average
Where a menu cycle's galley planning days goestimated
By hand18 days
With the solution0.9 days
  • Working out which galley plans the change touches2 → 0.1 d
  • Re-planning each galley, position by position8 → 0.3 d
  • Checking ovens, placards, restraint and chilled bays3 → 0.1 d
  • Recomputing catering weights for load control2 → 0.1 d
  • Writing caterer notices and chasing acknowledgements3 → 0.3 d

Estimated split, in planner days, for one widebody menu cycle re-planned by hand and with the agents. These are estimates, not measurements.

How it works

Galley planning from a changed menu, trolley or tail to a loaded galley

What comes in
Change inper change · menu spec, drawings, tail swap, bookings
Agents at work
Change watcherfinds every affected plan
Then
Planner agentre-plans each position
Then
Fit and weight checkerspace, ovens, weight
Service flow agentsimulates the service
Then
Short-load guardplan × tail × bookings
Caterer brief writerplain change lists
A person decides
Galley planneranswers the question, approves, publishes
What comes out
Approved galley plan, every position cited
Change list each caterer acknowledges
Weights kept current for load control
One case, step by step

Galley planning for a winter menu, from spec sheet to caterer

A sample airline's winter business menu replaces the cold starter with a hot starter in a casserole on long-haul Asia and Europe flights from a set date. Here is how the widebody galley planner works through it with the agents, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 01Mid-morning

    The agents did the morning's work; nine things need the planner

    Galley planner, widebody

    The Today screen shows 9 items that need the planner, 2 today and 7 from the winter menu, 405 plans re-planned this week and 23 short-loads stopped before a station in the last 30 days, none of which reached an aircraft. Beside the list, the agents report what they read, what they changed and what each needs.

    Planner agent: “On ORD–NRT the new menu needs six oven loads and G1 holds four. I moved two to G2 and removed a spare trolley that comes back untouched: −38 kg. One timing question for you.”

  2. 02Earlier that morning

    One menu spec, 214 galley plans re-planned

    Change watcher

    The change watcher read the inflight product manager's spec sheet and found 214 plans on 31 routes that the menu touches: 118 on the 787-9 C layout, 6 on the 787-9 P layout from an acquired fleet and 90 on the 777-300ER. The planner agent re-planned all 214, the fit and weight checker re-checked each from the drawings and placards, and the service flow agent ran each service. 207 pass all checks and can be approved in bulk with a reason; 7 have a question.

  3. 03The galley builder

    Chicago–Tokyo, already re-planned

    Planner agent

    The first of the seven opens on a 787-9 with 48 business, 24 premium economy and 218 economy seats, drawn in plan view with G1 to G4 marked, and G2 at door 2, aft-facing, in front elevation. The new menu needs 96 business casseroles, 16 to an oven load: six loads, and G1 has four ovens. The planner agent moved two loads to G2's OV3 and OV4, serves business rows 9–12 from there, and marked each position it changed.

    Checks under the galley: Space, all 88 positions fit · Ovens, 6 loads, G1 4 + G2 2 · Weight, −38 kg, W&B approved · Short-load, each cabin loaded to seats.

  4. 04One question

    The planner asks why, in plain words

    Galley planner, widebody

    The planner types “Why remove the spare trolley?” beside the galley. The planner agent answers from the Chicago caterer's return-load report: the spare bread and dessert half-trolley in G1 T5 came back untouched on 22 of 31 flights, 71%. The new menu plates dessert from galley stowage, so the trolley has no job, and removing it takes 38 kg off each flight. Each source is numbered and opens the passage.

  5. 05One click

    A galley position explains itself, with its source

    Planner agent

    The planner opens G2's T7. It holds chiller drawers with the 32 casseroles for rows 9–12, 22 kg, where the duty-free cart used to stand. The reason is one sentence with three sources: the galley drawing, the equipment library and food safety rule FS-3. The duty-free cart, which needs no chilling, has moved to the free full-size bay T9 in G4.

    “The only chilled bay in G2; the casseroles must stay chilled until the ovens.”

  6. 06Drag to ask

    A cart moved by hand, and what that move breaks

    Planner agent

    The planner tries the chiller drawers in T6 instead. A move is a question to the agent, and it does not change the plan silently. The planner agent answers at once with its sources: T6 is not chilled, so the casseroles would sit out of chill for about 55 minutes before OV3 starts, and FS-3 allows 30. The planner undoes it. A move that breaks nothing can be kept, with a reason.

    “That breaks the chill rule… Undo it, or ask me for another way.”

  7. 07Later that morning

    The service is simulated, and one question is asked

    Service flow agent

    G2 is worked by one flight attendant at 2L. Its two ovens heat the starters first, then the mains, so business mains for rows 9–12 are ready at T+1:05, ten minutes later than today's T+0:55. Service standard IS-J-04 allows business mains to start up to T+1:15 on flights over 10 hours, so the call is the planner's. The fit and weight checker, working from the drawings and without the planner agent's working, agrees: 3,019 kg becomes 2,981 kg, the index moves +0.9 against a ±1.5 tolerance, and the weight and balance engineer has approved the new standard catering weight.

    “Can the aft business service start 10 minutes later?”

  8. 08Approved

    A yes, signed with a reason

    Galley planner, widebody

    The planner answers “Yes, start at T+1:05”. Approve and publish opens the sign-off: effective on a set date from Chicago and the day after from Tokyo, 6 lines, −38 kg, aft business service +10 minutes, 5 of 5 checks passed. The planner picks the reason code “Within service standard IS-J-04”, confirms the review of the six changes and the weights, and publishes to the caterers at ORD and NRT.

  9. 09Sent

    Each caterer gets a plain six-line change list

    Caterer brief writer

    The Tokyo caterer's change list says what changes from the set date, position by position: hot starters and mains in G1's ovens for rows 1–8, chiller drawers in G1 T6, rows 9–12 served from G2's ovens and T7, the spare half-trolley removed, the duty-free cart moved from G2 T7 to G4 T9, desserts plated from galley stowage. The flight's catering weight goes from 3,019 kg to 2,981 kg. The caterer brief writer sent it only after the planner approved, and tracks the acknowledgment against the 48-hour SLA.

  10. 10The same morning

    A tail swap before the caterer cut-off

    Short-load guard

    Operations swapped a 787-9 in the P layout onto a Chicago–London Heathrow flight leaving Friday at 6:20 pm, with a decision due by 4:00 pm. With the old plan, premium economy would be 3 meals short against 27 booked, 6 business meal sets would fly unused, and 2 economy breakfast carts would not fit the smaller G4. The agents re-planned for the P layout, −22 kg, under the W&B threshold, and the planner approves, edits or rejects before the Chicago caterer's cut-off at 6:20 am tomorrow.

Who it’s for

The four desks that carry a galley load plan to the aircraft

Four roles carry the same winter menu to the aircraft.

Galley planner
Approves and publishes within the service standard
Before
Owns about 400 widebody galley plans. Each menu cycle and equipment change means weeks of redrawing galleys and re-typing loading lists.
Now
Opens each galley already re-planned and checked, answers the question only a planner can, and publishes with a reason. The job moves from redrawing galleys to the few decisions that need a person.
Inflight product manager
Owns menus, service standards and timing beyond the standard
Before
Issues a menu cycle, then waits to learn which galleys cannot serve it and whether the main course will be late.
Now
Sees the menu land on each galley the same day. A business main course served late can undo a good menu, so any service timing beyond the standard comes to this desk.
Catering operations manager
Runs the caterers at each station
Before
Sends notices to 37 caterers at 64 stations by email and portal, and chases acknowledgements station by station.
Now
Each station gets a plain change list after approval, acknowledgements are tracked against the 48-hour SLA, and caterer questions come with a cited draft answer. A caterer can only load what it was told, in time to load it.
Weight and balance engineer
Owns standard catering weights (pantry codes)
Before
Finds out about galley changes after load control has been computing with the old weights.
Now
Sees each plan's weight change by galley and the index shift, and approves any change over 25 kg per galley or 0.5 index units before it publishes. A small weight change is fine; one the engineer did not know about is the problem.
The agents

Re-planning a galley change: what each of six agents does

Six agents re-plan every galley a change touches, check each other and simulate the service; the planner answers one question and publishes.

Change watcher

Reads menu specs, equipment notices, tail swaps from operations control and new-type drawings, and opens a change case listing each affected galley plan.

  • Never changes a plan
  • Never guesses a menu's equipment; where the spec is silent, it asks Inflight Product
Planner agent

Re-plans each affected galley position by position (ovens, compartments, cart bays and chillers), moves items between galleys when one is full, and takes out what the caterers' return-load reports show flies back untouched.

  • Never publishes
  • Never uses a non-certified position
  • Never removes a special meal
Fit and weight checker

Re-derives space, oven loads, placard and restraint limits, and the weight by galley and index, from the drawings, placards and equipment library alone, and agrees or disagrees in writing.

  • Never reads the planner agent's working
  • Any disagreement goes to a person; over 25 kg or 0.5 index units, to the W&B engineer
Service flow agent

Simulates the service by cabin, minute by minute (oven cycles, cart runs and crew positions), against the service standards, and asks the one timing question a person must answer.

  • Never accepts a timing beyond the standard; routes it to Inflight Product
Short-load guard

Checks plan, tail and bookings by cabin 72 hours ahead, and reads the caterers' return-load reports for over-loads.

  • Never changes a caterer order inside the cut-off without a person
  • Top-ups go by rule; anything else goes to a person
Caterer brief writer

Writes each station's change list in plain words, one line per change with where, what and from when, sends it after approval, tracks the acknowledgment and drafts cited answers to caterer questions.

  • Never sends before a person approves
  • Never promises a commercial term
Galley planner and weight and balance engineer

The planner answers the agents' question and publishes; the W&B engineer approves weight changes over the threshold.

Ask in plain words

Plain-word questions on any galley load plan, caterer or weight

Ask in plain words, or tell the agents what to do. Each answer cites the menu spec, drawing, booking or report it came from, and nothing changes in a plan until a person approves it. These answers come from the sample menu above.

Why does ORD–NRT need G2's ovens?

The winter menu adds a hot starter: 96 business casseroles, 16 a load, so six oven loads. G1 has four ovens. The planner agent moved two loads to G2 and the duty-free cart to G4, and removed a spare trolley that came back untouched on 71% of flights: −38 kg.

Which flights could be short of meals in the next 72 hours?

Three need a person. ORD–LHR: the tail swap leaves premium economy 3 meals short. SFO–FRA: premium economy 26 booked, 24 loaded. ORD–SFO: first class, already with a colleague. Six more were handled by rule.

What did the lightweight trolley change for weight and balance?

The new trolley weighs 17.2 kg instead of 21.3 kg. With 34 trolleys, the 787-9 economy figure falls 139 kg, index −0.3: over the 25 kg threshold, so the weight and balance engineer approves it. Standard weights must stay current.

Draft the change list for the Tokyo caterer

Done: six lines for the caterer at NRT, flight weight 3,019 → 2,981 kg. It goes when you approve this plan; the caterer acknowledges within 48 hours.

The screens

The galley builder, the short-load watch and catering weight views

From the working solution, on its sample data. Pick one to see it large.

TodayWhat needs the galley planner today, plans re-planned this week, short-loads stopped before a station, and the agents' reports.
One menu change, all its plansA menu change as a case: the spec sheet cited, 214 galley load plans re-planned by layout, 207 ready for bulk approval, 7 with a question.
The galley builderThe airline galley load plan for a 787-9: plan view with G1 to G4, G2 in front elevation, the five checks and the conversation with the agents.
Ask whyA plain question beside the galley layout, answered with numbered sources from the return-load report and the menu spec.
A position explains itselfOne galley position: what it holds, its weight, what it held before and why, with sources in the drawing, equipment library and chill rule.
Drag to askThe planner moves the chiller drawers to another bay and the agent replies that it breaks the chill rule, with the source and an Undo.
Service flow by cabinThe service minute by minute: oven cycles, drinks and meal service by crew position, against the business mains limit.
Approve and publishEffective dates, changes, checks and weight approval, the caterers it publishes to, a reason code and a statement for the record.
The caterer's change listThe galley loading list changes as the caterer sees them: six plain lines, with weights and the 48-hour acknowledgment.
A tail swap, re-planned before the cut-offSeats, bookings and the old plan by cabin, the short-load and the carts that do not fit, the re-plan and the approval before the cut-off.
Short-load watch, next 72 hoursEach plan checked against its tail and bookings by cabin, so an inflight catering short-load is caught before a station loads; top-ups go by rule.
Standard catering weightsStandard catering weights by pantry code, the index shift, the engineer's approvals and one plan's weight by galley.
Audit trailEach step with the time, the actor, the plan and the reason, and the evidence pack to export.
Governance

What has to happen before a galley plan reaches a caterer

Agents propose; people publishA galley planner approves, edits or rejects each plan with a reason code and a statement, and no caterer sees a plan or change list before that. Answers to caterer questions are drafts for Catering Operations to approve.
Each position cites its sourceEach position's reason, each agent message and each number cites a passage (the menu spec, the galley drawing, the placard, the equipment library, the service standard, the bookings or the return-load report), and one click opens it.
A second agent checks the firstThe fit and weight checker re-derives each plan from the drawings, placards and equipment library alone, without the planner agent's working. If the two disagree, a person decides.
Weight changes reach load controlA change over 25 kg per galley or 0.5 index units waits for the weight and balance engineer, so the standard catering weights load control uses stay current, as FAA AC 120-27F expects of an operator using standard weights.
Rules the agents cannot bendEach cart goes in a certified bay of its size, within its placard: the restraint 14 CFR 121.576 asks of galley equipment and serving carts. Chilled items stay in chilled bays, special meals are not moved or removed without a person, and timing beyond the service standard goes to Inflight Product.
Each step on the audit trailEach agent step and human decision is recorded with the time, the actor, the plan and the reason, and nothing is edited or deleted. Each plan's evidence pack exports, and a change to a setting is logged with its old and new value.
Configuration

Weight thresholds, caterer notice and service rules for each galley plan

The thresholds and rules the agents escalate by are settings the airline's administrator owns. Each change is logged with the old and new value.

SettingDefaultChoose from
W&B sign-off above (kg per galley)25 kgAny number of kilograms
W&B sign-off above (index units)0.5Any number of index units
Over-load flag above booked5%Any percentage
Caterer notice for a menu cycle21 daysAny number of days
Caterer notice for a swap12 hoursAny number of hours
Acknowledgment SLA48 hoursAny number of hours
Agent confidence below which a person decides0.85Any value from 0 to 1
RulesAll seven onChilled items only in chilled positions (FS-3) · Business mains by T+1:15 on flights over 10 hours (IS-J-04) · Items returned untouched on more than 60% of flights proposed for removal · Any cabin loaded below booked blocks publication · Always on: certified bay within its placard (14 CFR 121.576), special meals never moved or removed without a person, agents never publish, send or change a caterer order inside the cut-off
Connections

The drawings, bookings and reports behind a galley load plan

Menu spec library and service standardsmenu cycles, service sequences and standards such as IS-J-04, from Inflight Product
Galley drawings and equipment libraryelevations, placards and equipment per configuration, from Engineering
Schedule and tail assignmenttail swaps from operations control
Reservationsbooked loads by cabin for the next 72 hours
Weight and balance · load controlstandard catering weights and the index
Caterer portal, email and return-load reportschange lists, acknowledgements, questions and what came back untouched
What it changes

What galley planning software changes for cabins, caterers and fuel

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
0
plan-caused short-loads reaching an aircraft, the design goal: plan, tail and bookings checked first
Every hot dish loaded
business cabin, one sample flight
demo
12t
of fuel a year from 38 kg off the sample widebody plan on one daily route pair
Before3,019 kg
Proposed2,981 kg
target
1day
for a menu, equipment or tail change to be re-planned and published, where by hand it takes weeks
By handweeks
Targetsame day

“demo” = seen in the working solution, on its sample data · “target” = the design goal, measured in the live solution · “estimated” = our estimate (the days split; the fuel figure: 38 kg × ~3.5% per flight hour × 12.5 h × 730 legs, a rule of thumb to be measured, on sample inputs) · “typical” = published figures (IATA cabin waste: 0.94 kg per passenger, 23% of it untouched food and drink). Regulations are named as context: 14 CFR 121.576 (galley equipment secured) and FAA AC 120-27F (standard weights kept current). Names on the screens are sample data.

Questions

Menu changes, tail swaps and catering weights in galley planning software

What is Galley Planning?

Galley planning is deciding what goes in each position of each aircraft galley (ovens, compartments, cart bays and chillers) for each aircraft layout, route and cabin, and publishing that galley load plan to the caterers who load it. Galley Planning brings that airline catering load planning into one place, with six AI agents: when a menu cycle, an equipment change or a tail swap lands, they re-plan each affected galley, check space, ovens, placards, weight and service flow by cabin, and write each caterer's change list. The galley planner answers the questions only a person can and approves each plan before a caterer sees it.

How does galley planning software re-plan galleys when the menu changes?

The change watcher reads the menu spec and finds each plan it touches; the planner agent re-plans each galley position by position; the fit and weight checker re-derives each plan independently; and the service flow agent simulates the service. In the sample, one winter business menu touched 214 plans: 207 passed all checks and 7 came to the galley planner with a question.

What happens to the galley load plan when an aircraft is swapped?

The short-load guard checks the new tail's galley layout against the plan and the bookings by cabin, and the planner agent re-plans for the new layout. In the sample, a swap to a 787-9 in another layout would have left premium economy 3 meals short and 2 economy carts that did not fit; the galley planner approves, edits or rejects the re-plan before the caterer cut-off.

How are standard catering weights kept current for weight and balance?

Each plan carries its catering weight by galley and the index shift. A change over 25 kg per galley or 0.5 index units waits for the weight and balance engineer's approval before it publishes, so load control is told about the weight before it computes with it. FAA AC 120-27F expects an operator using standard weights to keep them current.

Does it check placards, restraint and chilled bays?

Yes. The planner agent puts each cart in a certified bay of its size, within its placard, and the fit and weight checker re-checks each position against the drawings, placards and restraint. 14 CFR 121.576 requires galley equipment and serving carts not in use to be secured against shifting. Chilled items stay in chilled bays, and the agents do not use a non-certified position. If the planner moves a cart, the agents say what the move breaks, with the source.

How do caterers know what to load in each galley position?

The catering loading plan a station works from changes only after the galley planner approves it. Then the caterer brief writer sends each station a plain change list, one line per change with where, what and from when, plus the weights, through the caterer portal or by email. It tracks the acknowledgment against the SLA, sends reminders, and drafts cited answers to caterer questions for Catering Operations to approve.

Can an agent publish a galley plan or change a caterer order on its own?

No. The agents do not publish a plan, send anything before a person approves, change a caterer order inside the cut-off without a person, remove a special meal or accept a timing beyond the service standard. The galley planner approves, edits or rejects each plan with a reason code; the weight and balance engineer approves weight changes over the threshold; Inflight Product decides timing beyond the standard. Each step is on the audit trail.

What do we hand over to run galley planning on our own fleet?

The Agentic Solution Engine builds and deploys it from your requirements and documents: your galley drawings, equipment library, menu specs, service standards and current loading lists. It goes live once all quality gates have passed. Setup goes in order: fleet layouts, equipment library, service standards, caterers and stations, rules and thresholds, then connections.

Bring one fleet's galley drawings
and your next menu cycle.

We'll run Galley Planning on your own galley drawings, menu specs and loading lists, for one fleet and one menu cycle.