Post-Merger Integration Management

Post-merger integration management where every status colour and every saving is tied to its evidence

Every workstream status and synergy tied to its evidence in one view.

See one case, screen by screen ↓
demo4of 11 reportswhose colour the evidence did not support in the sample week, each flagged with its cited findings
demo8.6sfor the agents to check IT's weekly deck against its cutover plan, mock-cutover results and decision log
demo$4.1Mof savings claimed by two workstreams on the same contract, found and booked once
demo2.1hoursfor the IMO to consolidate week 6, against about 14 hours by hand (estimate)
In short

What is Post-Merger Integration Management?

Software the integration management office uses to run workstreams to Day-1, Wave 1 and Day-100 milestones, keep the risk and issue register, track synergies and report to the steering committee. Post-Merger Integration Management adds six agents that read every weekly report, check each colour against the workstream's own evidence and tie each saving to its contract, for the IMO lead to decide.

How to choose AI solutions for life sciences →

Updated

The problem

Why the weekly status says green until the week before go-live

After a biopharma deal closes, the integration management office runs ten to fifteen workstreams — IT, finance, people, commercial, manufacturing, quality, regulatory, R&D, legal, procurement, facilities, communications — to Day-1, Wave 1 and Day-100 milestones, while capturing the synergies promised to the board. Every week each lead sends a status deck with a red, amber or green colour. The colour is the lead's opinion. An IMO analyst reads twelve decks, updates the RAID log and drafts the steering brief by hand.

The plans, test results, trackers and contract clocks behind each deck often say something else. A cutover lead reports green while three critical-path tasks are late and a mock cutover missed its exit criterion. A CMO's right to terminate its supply agreement on a change of control is never escalated, though it could end supply from the only approved drug-product site. Marketing authorisation transfers fall behind plan, market by market. The same saving is claimed by Procurement and by R&D. The slip surfaces at go/no-go, when the fallback date is the only option left.

demo8of 11leads reported green in the sample week; their own evidence supported green for 5
estimated14hoursa week for an analyst to consolidate twelve workstream reports by hand
demo$4.1Mof CRO monitoring savings sitting in two workstreams' claims at once
Where the IMO's week goes, in hoursestimated
By hand14 days
With the solution2.1 days
  • Collecting the twelve reports and chasing late ones2 → 0.2 d
  • Reading decks for colour, issues, decisions and next steps4 → 0.3 d
  • Checking colours against plans, trackers and test results3 → 0.5 d
  • Updating the risk and issue register2 → 0.3 d
  • Reconciling synergy claims with contracts and the ledger1.5 → 0.3 d
  • Drafting the steering brief1.5 → 0.5 d

Estimated split of one week's consolidation for twelve workstreams, by hand and with the solution. The by-hand total of about 14 hours is our estimate.

How it works

How a week’s reports move

Six specialist agents read the reports, check each colour against the workstream's own evidence and tie every saving to its contract; the integration lead decides each colour.

What comes in
Reports in12 workstreams · decks, plans and savings claims
Agents at work
Status Report Reader
Synergy Evidence Validator
Then
Milestone Watcher
Evidence Checker
Then
Risk Register Keeper
Steering Brief Writer
A person decides
Integration leaddecides each colour; Finance and the sponsor sign off
What comes out
Cited steering brief
Risk register kept current
Savings booked once
One case, step by step

Week 6 of Project Harbor, from twelve decks to a signed brief

Northwind Bio closed its $8.4B acquisition of Calderra Biosciences on Sep 1. It is Wednesday Oct 7 — Day 37 of 100, with the Wave 1 ERP go-live on Nov 2 and the steering committee on Thursday at 08:00. Here is the week, screen by screen, in the working solution.

  1. 01Wednesday morning

    The workstream wall, with both colours

    Lena Ortiz · IMO lead

    Eleven of twelve reports arrived by the Tuesday 17:00 deadline. The leads reported 8 green and 3 amber; on their own evidence, 5 are green, 5 amber and 1 red. Four workstreams are flagged — IT & systems, Commercial, Regulatory and Legal & contracts — and four colours wait for her decision before the brief.

    “Each card takes the colour its own plans, test results and deadlines support, not the colour in its report. Where they differ, it is flagged and you decide.”

  2. 02One click

    “Re-check all reports”, workstream by workstream

    The agents

    Each workstream shows Checking while its report is read again and set against its own trackers. Where the evidence differs from the report, the workstream is flagged. Communications sent its deck at Wed 08:12, after the deadline, so it shows as late and waits to be read.

    The same rule, playbook 4.3, is applied to every workstream.

  3. 038.6 seconds

    IT says green. Its own plan says amber.

    Evidence Checker

    Sam Patel's deck says “Overall status: green. ERP Wave 1 cutover remains on track for November 2.” The cutover plan shows three of eight critical-path tasks late — the customer master load, the open AR/AP conversion and the EDI link to the Memphis warehouse — with 4 working days of float to go-live. Mock cutover 2 matched 91.4% of 13,980 ship-to records against an exit criterion of 99.5%; the deck calls these “minor data issues”.

    Playbook 4.3: “Two or more critical-path tasks late, or an exit criterion missed, with under 10 working days of float to the next go-live.”

  4. 04Her decision

    Amber goes into the brief, and the risk is raised

    Lena Ortiz · IMO lead

    She can use the evidence colour, keep the lead's colour with a note for the committee, or ask Sam first. She chooses amber, with the note “Mock 2 missed its exit criterion; go/no-go Oct 20 with Nov 30 fallback.” The Risk Register Keeper adds R-019 — Wave 1 ERP cutover at risk, customer master below exit criterion.

    “Your decision is recorded with your name and time.”

  5. 05Legal & contracts

    Amber on the deck, red on the contract clock

    Milestone Watcher

    Hannah Osei reports amber: 12 of 31 change-of-control consents received. Clause 18.3 of the Ridgefield supply agreement lets the CMO terminate within 60 days after the change of control — that is Oct 31 — and the consent request has had no reply since Sep 4. Ridgefield is the only approved drug-product site for Corventa.

    Playbook 4.3 red: “A go-live date, legal deadline or regulatory clock will be missed without a decision from the steering committee.”

  6. 06Synergies

    $162.4M planned, $18.4M confirmed, three flags

    Synergy Evidence Validator

    Fifteen initiatives make up the Year-1 run-rate plan of $162.4M; $63.8M is evidenced or better and $18.4M is confirmed by Finance. The evidence check flags three: S-02 shares a contract with S-09, S-04's ERP licence exit depends on the Wave 1 cutover, and S-13 was marked Evidenced without a signed contract.

    Playbook 6.2: a saving moves to Evidenced only with a signed contract or decision and an effective date.

  7. 07S-02 and S-09

    The same $4.1M, claimed twice

    Synergy Evidence Validator

    Procurement's CRO preferred-provider panel (S-02, $14.5M) and R&D's monitoring rate harmonisation (S-09, $6.2M) both draw on Brightline amendment 4, which cuts monitoring and site-management rates by 12%: $34.2M of monitoring spend × 12% = $4.1M in both claims. The proposal books it once, to S-02, because Procurement owns the contract; S-09 keeps $2.1M from in-house monitor rates.

    “Year-1 plan restates from $162.4M to $158.3M.”

  8. 08Signed and countersigned

    Proposed by the IMO, confirmed by Finance

    Lena Ortiz and Omar Haddad

    Lena signs with the meaning “I reviewed the cited evidence and propose this booking against the locked baseline.” Omar Haddad, the synergy controller, countersigns. S-02 is confirmed at $14.5M, S-09 is restated to $2.1M, and both are recorded in the audit trail.

    No saving moves to Confirmed without Finance.

  9. 09The register

    R-019 lands at the top, with its source

    Risk Register Keeper

    R-019 is scored likelihood 4 × impact 5 = 20 and marked new today. The register now holds 13 open risks and issues, three of them scoring 15 or more — those go to the steering brief. Every one links the passage it came from. Only its owner, or the IMO lead on the owner's behalf, closes it.

  10. 10Thursday 08:00, drafted Wednesday

    One page, every number cited, for the sponsor to approve

    Steering Brief Writer

    The brief leads with the integration amber on evidence — 5 workstreams amber and 1 red, where the leads' own reports show 3 amber and no red — and Wave 1 at risk. Colours not yet decided go in marked “proposed — not yet decided”. It asks the committee for three decisions: the Ridgefield consent, the Wave 1 go/no-go gate and a local entity in Brazil. Lena reviews it and sends it to Rebecca Lang, the sponsor, before it goes to the 9 committee members.

    “Clean-team data from Project Lark is never used in this brief.”

Who it’s for

Built for everyone who carries the integration.

The same week, seen by the five people who carry it — what their week looked like, and what it looks like now.

LO
Lena OrtizIntegration management office lead, Northwind Bio
IMO lead
Before
Collects twelve decks by Tuesday 17:00, chases the late ones and writes Thursday's brief by hand — and everything is green until the week before go-live.
Now
Opens a wall where every workstream already carries the colour its evidence supports, decides the four that differ, and reviews a drafted brief.
SP
Sam PatelIT & systems workstream lead · ERP Wave 1 cutover
Workstream lead
Before
Reports a colour each week from his own read of the programme — “Mock 2 had minor data issues; we will close them before Mock 3”.
Now
Sees exactly which tasks and test results moved his colour, with the passage for each, and gets the questions before steering, not at go/no-go.
OH
Omar HaddadFinance · synergy controller · steering committee
Synergy controller
Before
Locks the baseline and signs a number once — then has to find the contract and the ledger line behind every claim himself.
Now
Countersigns savings that already cite the locked baseline, the signed contract, the effective date and the ledger, with overlaps booked once.
RL
Rebecca LangChief Operating Officer · executive sponsor
Executive sponsor
Before
Answers to the board on synergies and asks one thing each week: the decisions she has to take.
Now
Approves a one-page brief that leads with the colour on evidence and the three decisions the committee must take, every number cited.
HO
Hannah OseiLegal & contracts workstream lead · General Counsel office
Legal & contracts lead
Before
Chases 31 change-of-control consents and reports progress as a count — twelve in, the critical ones moving.
Now
Sees the clause and the date that make a consent critical — Ridgefield's termination window closes Oct 31 — in front of the committee in time.
Built on the engine

6 agents. Each with one job, and hard limits.

Six specialist agents read the reports, check each colour against the workstream's own evidence and tie every saving to its contract; the integration lead decides each colour.

Status Report Reader

Reads every weekly status deck, document and project-tool export, and pulls the colour, accomplishments, issues, decisions required, help needed and next steps — each with its slide, page or row.

  • Never changes the colour the lead reported — it records it as said
  • Every field cites its slide, page or row
  • Never reads the clean-team room
Evidence Checker

Applies playbook section 4.3 the same way to every workstream's own trackers, test results and deadlines — late critical-path tasks, missed exit criteria, float to the next go-live, legal and regulatory clocks — and proposes the colour the evidence supports.

  • Proposes, never sets, a colour; the IMO lead decides
  • A differing colour comes with at least two cited passages
Milestone Watcher

Recomputes the critical path, float in working days to the Wave 1 go-live and Day 100, and the dependencies between workstreams every time a plan changes — such as Commercial's CRM load waiting on IT's customer master.

  • Dates come from the plan of record
Risk Register Keeper

Drafts and updates risks and issues from reports and trackers when a finding threatens a milestone, a saving or a legal or regulatory clock, scores likelihood and impact 1–5 with reasons, and merges duplicates.

  • A risk always cites its source
  • Never closes a risk — only the owner closes
Synergy Evidence Validator

Ties each claimed saving to its locked baseline line, signed contract or decision, effective date and ledger, finds claims that draw on the same contract and computes the overlap.

  • A saving is booked once
  • No saving moves to Confirmed without Finance
Steering Brief Writer

Drafts the one-page weekly steering brief — headline, workstream colours, synergies, decisions needed, top risks and the next two weeks — in plain words, with every number cited.

  • Uses only decided colours; marks the rest as proposed
  • Clean-team data is never used
Integration lead

Decides each colour. The agents propose; a named person decides.

Ask in plain words

Ask about any workstream, risk or saving

Ask about any workstream, risk, saving or milestone of the integration — or say what to change. Every answer cites its passage.

Why is IT amber when the lead says green?

Sam Patel's deck says green and “on track for November 2”. His own evidence disagrees: 3 of 8 critical-path tasks are late with 4 working days of float, and Mock cutover 2 matched 91.4% of customer records against an exit criterion of 99.5%. Playbook 4.3 makes that amber. The colour is yours to decide.

Is anything counted twice?

Yes — $4.1M. Procurement's CRO panel (S-02, $14.5M) and R&D's monitoring rates (S-09, $6.2M) both use the 12% cut in Brightline amendment 4. The playbook books it once, to the contract owner.

Which consents are still missing?

12 of 31 consents are in; 4 critical are outstanding. Still open: Ridgefield Contract Manufacturing (no reply since Sep 4), the Arden University licence (in negotiation) and Kestrel Logistics (no reply). Ridgefield matters most: clause 18.3 lets it terminate within 60 days of the change of control, and it is Corventa's only drug-product site.

What must the steering committee decide this week?

Three decisions: the Ridgefield CMO consent, since Ridgefield can terminate the Corventa supply agreement until Oct 31; the Wave 1 go/no-go gate — confirm 99.5% match at Mock 3, with Nov 30 as the fallback; and the Brazil local entity, needed before the marketing authorisation transfer can be filed. They lead the week 6 brief.

Every screen

The working solution, as it ships.

13 screens from the working solution, on its sample data. Pick one to see it large.

The workstream wallTwelve workstreams with the lead's colour beside the evidence colour, what the leads reported against what the evidence supports, and the selected workstream's findings.
Re-check all reportsEach workstream is read again and checked against its own evidence in turn; the late Communications report waits to be read.
One workstream's checkThe week's sources, the critical path to go-live, the lead's colour against the evidence colour, each agent's step with its time, and the source passage.
The colour decidedThree cited findings and the IMO lead's decision for the steering brief, with the risk it added to the register.
All workstreamsLead says, evidence says and what goes into the brief for every workstream, with Wave 1 readiness, milestones and the next date.
A contract clock turns redChange-of-control consents against the supply agreement's termination clause, with the clause highlighted where it lives.
The synergy ledgerYear-1 run-rate plan by stage and category, the flags from the evidence check and all 15 initiatives.
A saving claimed twiceThe evidence chain for S-02, both claims on the same amendment, the arithmetic of the overlap and the proposal to book it once.
Confirmed by FinanceProposed by the IMO lead, countersigned by Finance against the locked baseline, with the restated plan.
Risks and issuesA 5×5 heat map and the register, each risk scored, owned and linked to the passage it came from.
The steering briefThe one-page brief drafted from decided colours, the register and the synergy ledger, with its approval track and the committee.
The dashboardReports read on time, colour differences caught, confirmed run-rate against plan, colour on evidence week by week, risks and one-time costs.
Your rulesThe weekly cycle — report deadline, steering slot and late-report threshold — and the playbook 4.3 colour rules, with the 10-day float threshold.
Governance

Built for a steering committee: cited, decided, signed.

Every colour cites its passageEach proposed colour, finding, risk and number in the brief links the slide, page, row or clause it came from. Sources are read where they live; the check cites them and never changes them.
Agents propose; the IMO lead decidesThe evidence colour is a proposal until the IMO lead decides it — use the evidence colour, keep the lead's with a note, or ask the lead first. Each decision is recorded with name and time, and can be undone.
One rule for every workstreamColours are set by the playbook's rules — late critical-path tasks near a go-live, missed exit criteria, legal and regulatory clocks — applied the same way to IT, Regulatory or Legal.
Savings booked once, countersigned by FinanceThe IMO lead proposes a booking with the meaning of the signature; Finance countersigns against the locked baseline. Two claims on the same contract are booked to the initiative that owns it.
The clean team stays cleanUntil a deal closes, the two companies must keep competing independently. For Project Lark, signed but not closed, the other company's pricing, customer terms and pipeline plans stay in the clean-team room for named people. No agent reads it, and it never reaches a brief.
Every step on the audit trailUploads, agent proposals, colour decisions, countersignatures and the sponsor's approval of each brief are recorded with who, what and when, for people and agents alike.
Configuration

Your playbook, not ours

The weekly cycle, the colour and synergy rules and who approves are settings, and every change is on the audit trail.

SettingDefaultChoose from
Reports dueTuesday 17:00Tuesday 17:00 · Monday 17:00 · Wednesday 12:00
Steering committeeThursday 08:00Thursday 08:00 · Friday 09:00
Flag a late report after2 hoursStep up or down
Amber when critical-path tasks are late close to a go-liveTwo or more late, float under 10 daysThreshold steps up or down · on or off
Red when a legal or regulatory clock will be missedOnConsent windows, filing deadlines, works council dates · on or off
Evidenced needs a signed contract and an effective dateOnClaims without them stay Actioned · on or off
Synergy countersignOmar HaddadOmar Haddad · Rebecca Lang
Closing a riskRisk ownerRisk owner · IMO lead only
Connections

Works with what an integration already runs on

Integration playbookcolour rules, synergy evidence standard and the Day-1 checklist
Workstream foldersweekly status decks and documents, read on arrival
Project toolthe twelve workstream plans, synced every 30 minutes
ERP extractgeneral ledger, daily at 06:00
HR system extractheadcount and retention, weekly
Contract systemsigned contracts, amendments and change-of-control consents
What it changes

The difference, in numbers.

Every figure is labelled: a target the solution is built to, an estimate, a typical published result, or a proven one.

estimated
2hours
to consolidate the week’s twelve reports, from about 14 by hand
By hand≈ 14 h
With agents≈ 2 h
target
4of 11
reports this week whose colour the evidence did not support, caught before steering
4 of 11 reports flagged
each with its cited evidence
target
$4.1M
of savings claimed by two workstreams, caught and booked once before Finance countersigns

“demo” = seen in the working solution, on its sample integration · “estimated” = our estimate (about 14 analyst hours a week to consolidate twelve reports by hand, and the split of those hours). Project Harbor, Project Lark, Northwind Bio, Calderra Biosciences, Quillon Therapeutics, Ridgefield Contract Manufacturing, Brightline Clinical and every person named on this page are fictional — characters and sample data in the working solution.

Questions

What integration leaders ask us.

What is post-merger integration management software?

Software the integration management office uses to run workstreams to Day-1, Wave 1 and Day-100 milestones, keep the risk and issue register, track synergies and report to the steering committee. Post-Merger Integration Management adds six agents that read every weekly report, check each colour against the workstream's own evidence and tie each saving to its contract, for the IMO lead to decide.

How does it check a workstream's red, amber or green status?

The Evidence Checker applies the playbook's colour rules to the workstream's own plans, trackers, test results and deadlines — late critical-path tasks within the float threshold of a go-live, missed exit criteria, legal and regulatory clocks. Where the result differs from the lead's colour, the workstream is flagged with at least two cited passages.

How does it stop the same synergy being counted twice?

The Synergy Evidence Validator ties every claim to its locked baseline line, signed contract or decision, effective date and ledger, and finds claims that draw on the same contract. In the sample, $4.1M of CRO monitoring savings sat in two claims; it was booked once, to the initiative that owns the contract, and Finance countersigned.

Does it handle regulated workstreams like marketing authorisation transfers and quality?

Yes. In the working solution, Regulatory is checked against its transfer tracker — filed in 9 of 23 markets against a plan of 14 — and Quality against its SOP harmonisation matrix and the quality change freeze. Milestones such as local regulatory contacts, Qualified Person release continuity, CMO quality agreements and the clinical trial database cutover sit on the plan of record.

Does the AI change a lead's colour or close risks?

No. The Status Report Reader records the lead's colour as said, the Evidence Checker only proposes, and the IMO lead decides which colour goes into the brief. Risks are drafted with their source; only the owner, or the IMO lead on the owner's behalf, closes them.

How is clean-team data kept out?

For a deal that is signed but not closed, pricing, customer terms and pipeline plans stay in the clean-team room. Only named people see it, every view is on the audit trail, no agent of the solution reads it, and the steering brief never uses it.

Do people stay in control?

Yes. Agents propose; the IMO lead decides every colour, Finance countersigns every saving against the locked baseline, and the executive sponsor approves the steering brief before it goes to the committee. Every decision is recorded with name and time.

How long does it take to go live?

The Agentic Solution Engine builds and deploys it from your requirements and documents — your integration playbook, workstream plans and a few weeks of status reports and synergy claims — and it goes live once every quality gate has passed. We will walk you through it on your own reports first.

See it on
your integration.

We'll run Post-Merger Integration Management on a sample of your own workstream reports, plans and synergy claims.