SearchPower Generation & Water Production

Plant Operating Procedure Search

Power plant knowledge management with AI search: the approved procedure, with sources, drawn on the plant diagram in step order

See one case, screen by screen ↓
Watch with transcript →

Built forControl-room operatorsField operatorsShift supervisorsMaintenance techniciansProcedure owners

The Problem Today

At night, operators hunt through procedures, manuals and drawings, and what senior staff know leaves when they retire.

30%+
of operators at many utilities can retire within 5 years published

Four places to look, by hand

  • Procedure
  • Manual
  • Drawing
  • Logbook
  • Steps lag plant changesA valve added by a plant change is still missing from the steps
  • The why lives in one headRules about order, learned the hard way and never written down

The Solution

  1. Asked in plain wordsSuch as how to isolate a feed pump, read with the active alarms
  2. The approved steps, with sourcesThe latest approved version, with each step linked to its page
  3. Checked on today's drawingEach valve placed on the current drawing, plus any the steps miss
  4. The supervisor confirms, then it is sentThe missed valve is confirmed on shift, and the steps go to the field tablet

Built-in controls

  • Safety steps quoted word for word, as approved
  • Agents do not operate plant equipment
  • Each answer kept on the record

What You Get

Fewer shutdowns caused by operator error and safer isolations, even with newer operators on shift.

  • Procedure gaps fixedEach gap goes to its owner with evidence and draft wording
  • Senior know-how keptTips recorded beside the steps they explain, with their source
  • Days back for each operatorour estimate25 → 6.5 working days a year spent finding procedures
In short

What is Plant Operating Procedure Search?

It is AI search for plant staff that answers from the plant's own documents, with sources. Those are its operating procedures, maker manuals, alarm responses and drawings. Plant Operating Procedure Search returns the approved steps, each linked to its section and page. It draws them on the current plant diagram in step order, with the past events that explain the order.

How to choose AI solutions for utilities →

Updated

The problem

A procedure names its valves but leaves the operator to find them

Power plant operators follow written procedures to run the plant and make equipment safe for repair. Say a feed pump starts vibrating on night shift. Before it can be repaired, the operator must isolate it. That means closing and locking the right valves so a crew can work on it safely. The answer sits in three or four places: the operating procedure, the pump maker's O&M manual, the P&ID and the shift logbook. The O&M manual covers operation and maintenance, and the P&ID is the drawing of the plant's pipes and valves. A plant like the sample station has 412 procedures for one block, 2,140 drawings and 184,500 logbook entries. The procedure says which valves to close. It does not say where each valve is, or whether a plant change has added one since the last review. It does not say why the order matters either.

This matters because isolations are where people get hurt. A wrong valve or a wrong order can also trip the unit, which shuts it down suddenly. The written procedure for each piece of equipment is the safety control. A US workplace safety rule, OSHA 1910.269(d), says the isolation must be checked before work starts. The people who know the plant best are often senior operators close to retirement. They know which valve leaks when it is shut and which one is behind the coupling guard. That knowledge lives in their heads and in logbook notes nobody can search.

typical120deaths a yearand 50,000 injuries prevented by following lockout rules, by the US safety regulator OSHA's estimate
typical30+%of operators eligible to retire within 5 years at many utilities
estimated$500K-$2Ma tripwhen a combined-cycle unit shuts down unplanned, counting lost output, replacement power and restart
A control-room operator's year of finding and checking proceduresestimated
By hand25 days
With the solution6.5 days
  • Finding the approved procedure and its current revision6 → 1 d
  • Finding each valve and breaker on the drawing and in the plant5 → 1.5 d
  • Checking the drawing against the procedure after plant changes3 → 0.5 d
  • Finding the alarm response for an active alarm3 → 0.5 d
  • Searching the logbook and calling senior staff for the reasons4 → 1 d
  • Writing the isolation sheet for the field operator4 → 2 d

Our estimate of the working days one control-room operator spends each year finding and checking procedures, by hand and with the solution. It is not a measured figure. It is measured on the plant's own shifts once live.

How it works

A plain question in, the approved steps on the current P&ID out

What comes in
Sources inThe plant’s document library · procedures, manuals, alarm responses, drawings, logbook
Agents at work
Question readerunit, tag, goal
Then
Procedure finder
Drawing mapper
History reader
Then
Answer writersteps with sources
Then
Procedure gap watcherdrawing vs procedure
A person decides
Shift supervisorconfirms and approves
What comes out
Steps on the P&ID
Isolation sheet to the field
Gap to the procedure owner
One case, step by step

Power plant procedure search on one feed pump isolation, from alarm to handover

It is night shift on Block 2, a 720 MW combined-cycle unit at a power station. High-pressure boiler feed pump 2B is vibrating, and the fitter is booked for 06:00. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0102:14

    The alarm comes with its response

    Control-room operator

    Feed pump 2B shows high vibration at the bearing away from the motor, 7.1 mm/s. The plant control system keeps a journal of alarms. Each alarm of the last 24 hours is linked to its alarm response procedure. This one gives the cause, what happens if nobody acts, what the operator should do and the time to respond: 15 minutes.

    “If nobody acts: trip at 11.0 mm/s; one pump left, block runs back to 60%.”

  2. 0202:31

    The operator asks how to isolate feed pump B

    Control-room operator, 8 months in the job

    At 02:22 the shift supervisor decided to switch to standby pump 2C and isolate 2B for its work order. The operator types the question in plain words. The question reader finds Block 2, the pump and the goal, which is to isolate it for maintenance. Then the procedure finder returns the feed pump isolation procedure, revision 6, and §6.3 and §6.5 of the pump manual.

    “Searching 7,692 documents, 2,140 drawings and 184,500 logbook entries…”

  3. 034.8 seconds later

    Ten steps with sources, drawn on the plant diagram

    Answer writer and Drawing mapper

    The answer is the approved revision 6 of the procedure. It has 10 steps, with 5 valves to close and 2 to open, from 7 sources. Each tag is numbered in step order on the current P&ID, revision F. Orange means close, blue means open, and violet marks the pump's breaker on the 6.6 kV board. Each step names who does it and links to its section.

    Drawing mapper: “14 tags on the P&ID rev F · 1 not in the procedure”

  4. 04Play on the drawing

    The drawing shows a valve the procedure misses

    Control-room operator

    Play walks through the steps one at a time. Each valve pulses, its line stops flowing and the step lights up. At step 6 the minimum-flow isolator has a second valve beside it. A plant change added a bypass 19 months ago, and nobody updated the procedure. The extra valve is drawn in amber, and the step is marked for the shift supervisor.

    “Also close the bypass isolator. Drawing rev F shows it (added by a plant change); the procedure rev 6 does not. It was found open on 2B earlier this month.”

  5. 05One click

    Each valve carries its history

    History reader

    Clicking a valve opens its card. The discharge valve is a motorized gate valve, DN250 PN250. It sits on the feed pump house mezzanine at +4.5 m, above 2B, with its actuator's power supply at the motor control center. Its card says it once leaked when shut and was re-seated under a work order a few weeks later. It points back to step 4.

    Step 4: “This valve has passed on close before; it was re-seated. Step 8 is your check.”

  6. 06Discharge first, suction last

    Why the order matters, from the plant's own events

    History reader

    Under the drawing, the reason for the order sits beside its source. A root-cause report records an earlier event on pump 1A. Its suction relief valve lifted at 22 bar because suction was shut while the discharge valve was leaking. The 5-minute hold in step 8 was added in revision 6. A senior operator's logbook note records the discharge valve on 2B leaking when shut, with suction creeping to 14 bar. The pump manual §6.3 says the suction side is not rated for discharge pressure.

    “A logbook note explains a step; it never becomes one.”

  7. 0702:44

    The supervisor confirms the marked step on shift

    Shift supervisor, Block 2

    The check of drawing against procedure shows 13 of 14 tags matching. One is on the drawing but not in the procedure. It also shows that the plant change asked for this review 19 months ago. The operator sends it to the shift supervisor with one click. The supervisor confirms the bypass isolator, and a procedure gap goes to the procedure owner.

    “Bypass isolator confirmed on shift · 02:44 · gap sent to the procedure owner”

  8. 08Sent to the field

    The sheet goes to the tablet, and the section is isolated

    Field operator

    Send to field puts all 10 steps, with the drawing, on the field operator's tablet. The field operator ticks each one as it is done. Then the isolated section of pipe is hatched on the drawing. The casing vent and drain are open, the pressure gauge reads 0 bar and the temperature is below 60 °C. The shift supervisor proves zero energy and hands the isolation over to the authorized person for the permit to work.

    “2B isolated on the drawing · 5 valves closed in order · ready to prove zero energy”

  9. 09On a 10-day clock

    The gap arrives with evidence and drafted wording

    Operations engineer, procedure owner

    The gap lands in the procedure owner's queue, due in 10 days. It sets what §5.6 of the procedure says beside what the current drawing shows. It crops the drawing at grid C4 to C6 and drafts new wording to edit. The evidence is the drawing, §3 of the plant change and the shift logbook. Nothing in the procedure changes until the owner raises a change request and the review board approves.

    Drafted: “5.6 Close the minimum-flow isolator downstream of the recirculation control valve and the bypass isolator.”

  10. 10Before the next isolation

    Practice on the real drawing, with the senior operator's tips

    Trainee record

    Practice asks the operator to click the valves in the order they are closed, on the real drawing. It uses the approved procedure plus the bypass isolator confirmed tonight. Beside it are tips recorded from senior staff, each with its source. The operator has 2 of 3 clean runs for a high-pressure feed pump isolation. They have practiced 14 of 22 Block 2 isolations.

    Senior operator, 31 years: “Discharge first, suction last. Then stand and watch the suction gauge for the full five minutes. That valve has passed before.”

Who it’s for

Operators, supervisors and owners using power plant knowledge search

The same isolation, seen by the five roles it touches. Here is what their night looked like, and what it looks like now.

Control-room operator
Runs the control system and writes isolations
Before
Runs the control system on nights, 8 months in the job, and writes isolations for the field operators. Knows where the procedure is, but not where each valve is.
Now
Asks in plain words and gets the approved steps drawn in order on the current drawing. The reason for the order and each valve's history sit beside them.
Shift supervisor
Approves each isolation and changeover on shift
Before
Approves each isolation and changeover on shift. Wants to know when the drawing and the procedure disagree before the fitter finds out.
Now
Gets each step that comes from the drawing, and not from the procedure, marked for confirmation. The drawing, the plant change and the logbook sit behind it.
Field operator
Operates the valves and hangs the locks
Before
Walks the plant, operates the valves and hangs the locks. Needs the valve, the floor and the order on a tablet.
Now
Gets the steps and the drawing on the tablet, with where each valve is and how to reach it. Ticks each step as it is done.
Senior operator
The one everyone calls at 2 a.m.
Before
Has 31 years on the plant and retires at the end of the year. Learned the hard way to close discharge first and suction last.
Now
Their tips are recorded beside the steps they explain, each with its source. The tips stay on the drawing after they retire.
Procedure owner
Owns the 412 Block 2 procedures
Before
Reviews each change to a procedure. A plant change from last year is still waiting for its procedure review. Fixes a procedure once shown the evidence and the drawing.
Now
Gets each gap with the procedure text, the current drawing, the evidence and draft wording, due in 10 days.
The agents

The agents behind power plant knowledge management AI search

Each answer comes from six agents that find the procedure, place every step on the current drawing and read the logbook. The shift supervisor confirms, and the procedure owner decides what changes.

Question reader

Reads the question along with the active alarms and open work orders for the operator's unit. Finds the unit, the equipment tag and the goal: isolate, return to service, respond to an alarm, or explain.

  • Never guesses a unit. Asks when two pieces of equipment match
  • Read-only
Procedure finder

Searches operating, emergency and alarm response procedures, maker manuals and bulletins for the equipment and goal. Returns the latest approved revision.

  • Never answers from a draft or an out-of-date revision
  • Each passage names its document, revision, section and page
Drawing mapper

Places each tag in the steps on the current approved drawing. Traces the line each step isolates and reports any isolation point the procedure does not name.

  • Never invents a tag or a position
  • A tag missing from the drawing is flagged, and never drawn
History reader

Reads the logbook, root-cause reports, work orders and plant changes that name the tags in the answer. Picks the events that explain a step or warn how a valve behaves, quoted with author and date.

  • A logbook note explains a step. It never becomes one
Answer writer

Writes the answer as numbered steps from the approved procedure and quotes safety-critical steps word for word. Adds a step only when the drawing mapper finds an isolation point the procedure misses.

  • Never rewrites a safety step
  • Each step names its source
  • Marked steps need the shift supervisor
Procedure gap watcher

Opens a gap for the procedure owner when a marked step is confirmed, or when a plant change closes with a procedure to review. Adds the evidence and draft wording, and tracks the 10-day deadline.

  • Never changes a procedure
  • Drafts only. The owner decides
Shift supervisor

Confirms marked steps on shift.

Ask in plain words

Plain-word questions to the plant's procedures, drawings and logbook

Ask in plain words. Each answer names its source and points to the place on the drawing. These answers use the sample data.

Why close the suction valve last?

Because the suction side is not rated for discharge pressure. The pump maker's manual says to shut the discharge valve before the suction valve (§6.3, p. 88). It has happened at this plant. An earlier root-cause report records the suction relief on pump 1A lifting at 22 bar. Suction had been shut while the discharge valve was leaking. That is why step 8 holds for 5 minutes and watches the suction gauge.

Which procedures name the minimum-flow valves?

Four procedures name the minimum-flow isolators. Three also name the bypass isolator the plant change added: two other feed pump procedures and the recirculation valve maintenance procedure. The isolation procedure, revision 6, does not. That is the open gap.

Has the discharge valve on 2B ever passed?

Once on record. A senior operator's night-shift note says it was leaking when shut, and suction crept to 14 bar with suction closed. It was re-seated under a work order a few weeks later. It has held on each isolation since, most recently this year.

Set up a practice run of this isolation for the new operator

Done. The practice uses the approved steps of the isolation procedure, revision 6, plus the bypass isolator confirmed tonight. It runs on the current drawing, revision F. The operator has 2 of 3 clean runs. After one more, the shift supervisor can sign the operator off for feed pump isolations.

The screens

Power plant search screens: the drawing, a valve card, gaps and practice

From the working solution, on its sample data. Pick one to see it large.

Ask on the drawingThe shift details, the question, the agents' work, and the answer drawn on the plant diagram in step order beside the steps and their sources.
AlarmsThe last 24 hours of the control system's alarm journal. Each alarm links to its response: cause, result, operator action and time to respond.
Agents at workSix agents read the question, find the approved procedure, map each tag on the current drawing and read the logbook.
Play on the drawingThe steps played one by one on the drawing, with the valve the procedure misses marked in amber for the shift supervisor.
A valve's cardType, location, normal position, when it was last operated and whether it has leaked, with the step that uses it.
The section isolatedAll ten steps done, the isolated section hatched, the zero-energy check and the handover to the authorized person.
Why this orderThe root-cause report, logbook note and manual section behind the order, with the drawing checked against the procedure and the supervisor's confirmation.
The procedureThe approved procedure with the lines the answer cites highlighted, and notes in the margin from the drawing, the manual and the logbook.
Past eventsLogbook entries, root-cause reports, work orders and plant changes that name the pump or its valves, newest first.
DocumentsThe sources the answers come from, by type, with revision, status and how many drawing tags each one links to.
Procedure gapsWhere a procedure disagrees with its current drawing, manual or bulletin, with the evidence and draft wording for the owner.
PracticeClick the valves in the order you close them, on the real drawing, beside senior staff's tips and the trainee's record.
Source rulesSources in order of priority, the drawing rule, who confirms marked steps, the gap owner, the practice rule and the alarm feed.
Governance

Steps with sources, confirmed changes and a record of each isolation answer

Each step names its sourceEach step names a document, revision, section and page. It may instead name a drawing and its revision, or a logbook entry with its author and date. Read the procedure opens the document with the cited lines highlighted.
Safety steps quoted, word for wordSafety-critical steps are quoted word for word from the approved procedure. Draft and out-of-date revisions are kept for the record, and no answer comes from them.
The current drawing onlyAnswers are drawn only on the current approved revision of the drawing. If a tag is missing from the drawing, the drawing is blocked and the tag is flagged. Nothing is placed by guesswork.
The shift supervisor confirms marked stepsA valve on the drawing but not in the procedure becomes a marked step. It stays marked until the shift supervisor on duty confirms it. The difference is shown and confirmed, so nothing changes quietly.
Agents find and cite, and people operate the plantThe agents find, map and cite. They do not operate plant, issue isolations or permits, or change a procedure. The authorized person issues the permit to work. The procedure owner and review board approve each change.
Each answer on the recordEverything is recorded with who and when. That covers the question, the sources read, the answer and drawing revision, and the steps ticked in the field. It also covers the confirmations and the gaps raised.
Configuration

Sources in order of precedence, and who confirms a step the drawing adds

What the answers may draw on, in what order, and who confirms what. Each change is saved as a new version with its author.

SettingDefaultChoose from
Approved operating and emergency proceduresInstruct · always firstLocked on: this row protects every answer
Alarm response proceduresInstructLocked on
Maker O&M manuals and bulletinsExplain and confirmOn · Off
Drawings, current approved revision onlyPlace every tagLocked on
Root-cause reports and plant changesExplain whyOn · Off
Shift logbookExplain, never a stepOn · Off
Draft and out-of-date revisionsNever answered fromLocked off
A valve on the drawing but not in the procedureMarked step · shift supervisor confirmsConfirmed by the shift supervisor on duty
Connections

Procedures, maker manuals, plant drawings, the alarm journal and the shift logbook

Operating and emergency proceduresstandard, emergency and alarm response procedures, with revision, status and owner
OEM O&M manuals and bulletins1,284 manuals and 618 technical bulletins in the sample plant, each linked to section and page
P&IDsthe current revision of each drawing, each tag placed on its symbol
DCS alarm journalalarms read every 30 seconds and linked to their response procedures
Shift logbook and RCAslogbook entries since 2014 and root-cause reports since 2009, linked to tags
Work orders and plant changeswork order history and plant change records for the equipment
What it changes

Power plant search that checks each isolation and trains operators sooner

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
100%
of isolation answers checked against the current drawing, steps in order
demo
$1.1Ma year
in lost output avoided, the sample plant's figure: 2 fewer trips from operator error × $550K
Trips today6 a year
With answers on the drawing4 a year
target
9months
for a new operator to stand a shift alone, down from 18
9 of 18 months
time to stand a shift alone

“demo” means seen in the working solution, on its sample plant data. “target” means the design goal, measured in the live solution. “estimated” means our arithmetic on sample inputs, replaced by the customer's own. The sample has 6 trips a year caused by operator error. A third fewer is 2 trips, at $550K a trip, the low end of the vendor range. The days split is our estimate. “typical” means published figures. OSHA, via ISHN, says following lockout rules prevents about 120 deaths and 50,000 injuries a year. Power Engineering says 30 % or more of operators can retire within 5 years. “estimated” also marks vendor figures. An unplanned shutdown of a combined-cycle unit costs $500K to $2M per event, from vendor sources, as a rough guide. OSHA 1910.269(d) is named as context. Names on the screens are sample data.

Questions

Power plant knowledge management AI search: what operations teams ask

What is plant operating procedure search?

It is AI search for plant staff that answers from the plant's own documents, with sources. Those are its operating procedures, maker manuals, alarm responses and drawings. Plant Operating Procedure Search returns the approved steps, each linked to its section and page. It draws them on the current plant diagram in step order, with the past events that explain the order.

How does power plant knowledge management AI search work?

Six agents work on each question. They read the question and the shift details, then find the latest approved procedure and manual sections. They place each tag on the current drawing and read the logbook, root-cause reports and plant changes. Then they write the steps with sources. Any difference between procedure and drawing is raised as a gap. In the sample case, one isolation answer took 4.8 seconds and drew on 7 sources.

What happens when the procedure and the drawing disagree?

The drawing mapper finds isolation points on the current drawing that the procedure does not name. The step is marked in amber, and the shift supervisor confirms it on shift. Next, the procedure owner gets a gap with the evidence and draft wording. Only a change request and the review board can change the procedure itself.

Does it replace our permit-to-work or lockout system?

No. It supports the written procedure for each piece of equipment and the check that the isolation is in place. That means the steps, the order, where each valve is and the zero-energy check. The authorized person still issues the permit to work. The agents do not operate plant or issue isolations.

Does it cover alarm response procedures too?

Yes. Each alarm from the control system's alarm journal is linked to its response procedure. That gives its cause, what happens if nobody acts, what the operator should do and the time to respond. It can be shown on the drawing. Any unit whose procedures, alarms and drawings are loaded is answered the same way.

How does it help new operators and keep senior operators' knowledge?

New operators practice each isolation on the real drawing from the approved procedure. They need 3 clean runs and a supervisor sign-off before they write one. Senior staff's tips are recorded beside the steps they explain, each with its source. The aim is a new control-room operator standing a shift alone in 9 months, against 18 today.

Can an answer ever change a safety step or skip the supervisor?

No. The agents find, map and cite. They do not rewrite a safety step, answer from a draft or change a procedure. The shift supervisor confirms marked steps, the authorized person issues permits and the procedure owner decides each change. Each answer, confirmation and gap is on the record.

What documents does the plant provide to start?

The Agentic Solution Engine builds and deploys it from your requirements and documents. Those are your procedures, maker manuals, alarm responses, plant drawings and logbook. It goes live once each quality gate has passed. We will walk you through it on your own procedures and drawings first.

Ask it about
your own isolations.

We'll run Plant Operating Procedure Search on a sample of your own procedures, manuals and drawings.