Desalination plant performance monitoring of one fouling train, run to plan
A seawater RO plant runs 8 trains of 25,000 m³/day each. It is a Tuesday. An algal bloom reached the intake earlier in the month, and demand rises to 172,400 m³ on a Thursday nine days away, in a heatwave. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0105:30
The overnight run normalizes each train
Data normaliserBefore the day shift, the data normaliser corrects 11,520 readings across the 8 trains to each train's post-clean baseline. Two conductivity readings on Train 6 look wrong; they are marked suspect and left out of the calculation, and the readings themselves are kept. Yesterday's view still has Train 3 on Watch at +9.6 % differential pressure.
“8 trains · 11,520 readings normalized to their post-clean baselines; 2 suspect conductivity readings on Train 6 marked, not used”
- 0205:42
Train 3 turns amber, and its clean falls on Train 5's day
Process engineerThe process engineer opens the plant schematic: intake, flotation, filter banks A and B, cartridges and the 8 trains, each vessel grid colored by drift. Train 3 is at +11.8 % pressure drop since its last clean, rising 0.36 points a day, twice its rate the month before. The fouling forecaster puts its trigger on the peak Thursday, in 9 days, with a band of two days either side, while its calendar clean is 14 days after that. The output band under the trains shows one day below demand.
“Peak Thursday: Trains 5 and 3 out → 162,500 m³ against a demand of 172,400 m³”
- 03One click
Stagger the cleans
Clean schedulerThe clean scheduler reads the demand forecast and tries the options in order. Moving Train 5 earlier is rejected: it is at +8.6 %, and cleaning it 7 days before its forecast wastes a clean. Moving Train 3 two days earlier, to the Tuesday, works: forecast pressure drop on the day +14.1 %, still under the trigger, with 181,250 m³ available against 168,900 m³ (+7.3 %). Trains 8, 2 and 1 are matched to their own forecasts, and the CIP skid and crew are free.
“No day below demand · lowest margin +5.1 % on the peak Thursday · 4 bookings changed → the water production manager approves”
- 04The diagnosis
Biofouling in the lead elements, fed from filter bank B
Fouling diagnosticianIn Train 3, the rise sits in rows E–H, fed first from filter bank B, and in the lead elements, where a biofilm starts. The diagnostician ranks biofouling at 78 %, particulate at 15 %, scaling at 4 % and organic at 3 %, each with the evidence for and against. Chlorophyll-a is 6.8 µg/L and TOC is up since the bloom arrived; against it, salt passage is rising slower than a pure biofilm usually gives.
Against scaling: “Tail elements normal; antiscalant dosing in range; LSI −0.4 in the concentrate”
- 05The chemistry
Alkaline first, because the last clean was acid only
Fouling diagnosticianThe last clean was acid only and recovered 91 % of baseline flow; earlier cleans recovered 96–98 %. The recommended clean is an alkaline cleaner at pH 12 and 35 °C for 6 hours, a non-oxidizing biocide, then citric acid at pH 2, then flush and a new baseline at 24 hours. Cleaning two days early is expected to recover 97 %; waiting for the calendar date, 90 %.
“An acid clean dissolves scale; it does not lift a biofilm.” The diagnostician recommends; the process engineer chooses.
- 06Booked
The process engineer signs the booking for 06:00
Process engineerThe process engineer books the clean-in-place (CIP) for the Tuesday at 06:00: 18 hours offline, back in service at midnight, with day crew B and CIP skid 2. The signature records its meaning, and the shift supervisor takes the train out of service on the day. The maintenance planner is notified to have the crew and chemicals ready.
“Signed by the process engineer. Meaning: “Book CIP for Train 3”.”
- 07The plan
Each move in the plan, with its reason
Clean schedulerThe second version of the cleaning plan covers the next 30 days: 4 bookings changed, and 5 cleans down to 4. Train 1 moves a week later and Train 2 five days later, because the calendar was early. Train 8 comes forward two days, because its trigger falls before the calendar date. Train 5 stays on the peak Thursday.
Train 3: “Needs the peak Thursday, which already has Train 5 in a heatwave; two days earlier is under the trigger (+14.1 %)”
- 08Signed · 09:40
The manager signs a plan with one train in CIP at a time
Water production managerThe process engineer sends the plan to the water production manager with each change and its reason. The lowest margin in the 30 days is +5.1 % on the peak Thursday, 181,250 m³ against 172,400 m³, and there is no day below demand. The manager approves at 09:40, signing approve cleaning plan for the next 30 days, and the crew request goes to the maintenance planner.
A plan with any day under +5 % margin needs the water production manager.
- 09Same data
Membranes replaced on evidence instead of age
Membrane plannerReplacing by age would buy new membranes for Trains 1, 2 and 6 next year, $2.23M. Train 6 has to go early next year (salt passage +31 % and recovery down to 89 %) at $742,560 for 952 elements. Trains 1 and 2 still recover 97–98 % after each clean with salt passage at +2–3 %, so the planner moves them a year later: $1.49M deferred.
“This supports the case to defer; it is not an order.”