- Before
- Owns membrane performance for 8 trains. Normalizes the data in a spreadsheet, plans the cleans and writes the monthly performance report.
- Now
- Opens each morning on trains already normalized and forecast, with the fouling type and the chemistry. Cleans Train 3 because it needs it, whatever the calendar says.
One train fouls fast after an algal bloom, and its clean moves to keep the city supplied
A seawater RO plant runs 8 trains of 25,000 m³/day each. It is a Tuesday. An algal bloom reached the intake earlier in the month. Demand rises to 172,400 m³ on a Thursday nine days away, in a heatwave. Here is what happens next, screen by screen, in the working solution.
A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.
- 0105:30
The overnight run normalizes each train
Data normaliserBefore the day shift, the data normaliser corrects 11,520 readings across the 8 trains to each train's baseline after its last clean. Two conductivity readings on Train 6 look wrong. They are marked suspect and left out of the calculation, but the readings themselves are kept. Yesterday's view still has Train 3 on Watch at +9.6 % differential pressure, the pressure drop across the train.
“8 trains · 11,520 readings normalized to their post-clean baselines; 2 suspect conductivity readings on Train 6 marked and not used”
- 0205:42
Train 3 turns amber, and its clean falls on Train 5's day
Process engineerThe process engineer opens the plant schematic. It shows the intake, flotation, filter banks A and B, cartridges and the 8 trains, each vessel grid colored by drift. Train 3 is at +11.8 % pressure drop since its last clean. It is rising 0.36 points a day, twice its rate the month before. The fouling forecaster puts its trigger on the peak Thursday, in 9 days, give or take two days. Its calendar clean is 14 days after that. The output band under the trains shows one day below demand.
“Peak Thursday: Trains 5 and 3 out → 162,500 m³ against a demand of 172,400 m³”
- 03One click
Stagger the cleans
Clean schedulerThe clean scheduler reads the demand forecast and tries the options in order. Moving Train 5 earlier is rejected. It is at +8.6 %, and cleaning it 7 days before its forecast wastes a clean. Moving Train 3 two days earlier, to the Tuesday, works. Its forecast pressure drop on the day is +14.1 %, still under the trigger. The plant then has 181,250 m³ available against 168,900 m³ (+7.3 %). Trains 8, 2 and 1 are matched to their own forecasts, and the CIP skid and crew are free.
“No day below demand · lowest margin +5.1 % on the peak Thursday · 4 bookings changed → the water production manager approves”
- 04The diagnosis
Biofouling in the lead elements, fed from filter bank B
Fouling diagnosticianIn Train 3, the rise sits in rows E to H, fed first from filter bank B. It also sits in the lead elements, the first membranes the water meets, where a biofilm starts. The diagnostician ranks biofouling at 78 %, particulate at 15 %, scaling at 4 % and organic at 3 %. Each comes with the evidence for and against. Chlorophyll-a is 6.8 µg/L and TOC, a measure of organic matter, is up since the bloom arrived. Against biofouling, salt passage is rising more slowly than a pure biofilm usually causes.
Against scaling: “Tail elements normal; antiscalant dosing in range; LSI −0.4 in the concentrate”
- 05The chemistry
Alkaline first, because the last clean was acid only
Fouling diagnosticianThe last clean was acid only and recovered 91 % of baseline flow. Earlier cleans recovered 96 to 98 %. The recommended clean starts with an alkaline cleaner at pH 12 and 35 °C for 6 hours. A non-oxidizing biocide follows, then citric acid at pH 2, then a flush and a new baseline at 24 hours. Cleaning two days early is expected to recover 97 %. Waiting for the calendar date would recover 90 %.
“An acid clean dissolves scale. It does not lift a biofilm.” The diagnostician recommends, and the process engineer chooses.
- 06Booked
The process engineer signs the booking for 06:00
Process engineerThe process engineer books the clean-in-place (CIP) for the Tuesday at 06:00. The train is offline for 18 hours and back in service at midnight, with day crew B and CIP skid 2. The signature records its meaning. The shift supervisor takes the train out of service on the day. The maintenance planner is told to have the crew and chemicals ready.
“Signed by the process engineer. Meaning: “Book CIP for Train 3”.”
- 07The plan
Each move in the plan, with its reason
Clean schedulerThe second version of the cleaning plan covers the next 30 days. Four bookings change, and five cleans come down to four. Train 1 moves a week later and Train 2 five days later, because the calendar was early. Train 8 comes forward two days, because its trigger falls before the calendar date. Train 5 stays on the peak Thursday.
Train 3: “Needs the peak Thursday, which already has Train 5 in a heatwave. Two days earlier is under the trigger (+14.1 %)”
- 08Signed · 09:40
The manager signs a plan with one train in CIP at a time
Water production managerThe process engineer sends the plan to the water production manager with each change and its reason. The lowest margin in the 30 days is +5.1 % on the peak Thursday, 181,250 m³ against 172,400 m³. No day falls below demand. The manager approves at 09:40, with the signature meaning “approve cleaning plan for the next 30 days”. The crew request goes to the maintenance planner.
A plan with any day under +5 % margin needs the water production manager.
- 09Same data
Membranes replaced when the evidence says so
Membrane plannerReplacing by age would buy new membranes for Trains 1, 2 and 6 next year, for $2.23M. Train 6 does have to go early next year, at $742,560 for 952 elements. Its salt passage is +31 % and its recovery is down to 89 %. Trains 1 and 2 still recover 97 to 98 % after each clean, with salt passage at +2 to 3 %. So the planner moves them a year later, and $1.49M is deferred.
“This supports the case to defer. It is not an order.”