SystemPower Generation & Water Production

Electricity and Water Demand Forecasting

Electricity and water demand forecast together, hour by hour, so you see the summer peak and what it does to your reservoirs before it arrives

See one case, screen by screen ↓
Watch with transcript →

Built forLoad forecastersDispatch shift managersWater production plannersEnergy schedulersSystem planners

The Problem Today

Power and water demand are forecast apart, so nobody sees when a heatwave peak cuts the water production a reservoir needs.

4.6%
of demand missed in day-ahead plans in the 2020 US grid outages published
$300K
a year per GW of peak for each point of forecast error our estimate

What each desk reads on its own

  • Weather
  • Calendar
  • Power load
  • Water use
  • Rules cut water uncheckedA dispatch rule curtails water production with no look at storage
  • Error averaged awayA monthly average hides the hottest days, where the error is

The Solution

  1. Both forecast on one weatherPower and water, hour by hour, from the same bulletin and calendar
  2. The peak, driver by driverHeat, humidity and haze on rooftop solar, each given its share
  3. The collision foundA dispatch rule cuts water production and a reservoir drops under its minimum
  4. Fixes priced, manager picksEach fix priced in storage, cost and CO₂, and the shift manager approves one

Built-in controls

  • No agent touches dispatch
  • The lead forecaster signs each version
  • Published versions kept as they were

What You Get

The cheapest fix is chosen while there is still time, so fewer heatwave days end with a reservoir under its minimum.

15%
lower pumping energy cost in one published simulation published
  • Less gas bought at peak pricesA surprise peak is seen a day ahead, before fuel is booked
  • Sharper on the hottest daysDay-ahead error scored hour by hour on each heat day
  • Drift caught earlyA zone that keeps missing is flagged for retraining
In short

What is Electricity and Water Demand Forecasting?

Electricity and water demand forecasting predicts how much electricity and water a system will need, hour by hour and a day ahead. Utilities use it for unit commitment, fuel nominations and water production scheduling. This solution makes the two forecasts together, on the same weather and calendar. So a utility that supplies both can see where one forces the other.

How to choose AI solutions for utilities →

Updated

The problem

Power and water demand are forecast apart, so no one sees how one affects the other

Some utilities supply both electricity and drinking water, and the two depend on each other. Some water plants run on steam from the power station. A power shortage can also trigger a rule that cuts water production. Yet the two demands are forecast by different desks with different tools. The load forecaster publishes the next day's hourly power forecast by 10:00. It feeds unit commitment, the choice of which power units run, and fuel nominations, the booking of fuel. The water production planner forecasts water demand by zone in a spreadsheet. That sets the steam-fed water units and the RO trains, the reverse osmosis units that make water. The dispatch center then applies its standing rules. One rule cuts interruptible water production when the reserve margin at peak, the spare power above demand, is under 10 %. Nobody checks what that does on the water side. When a new weather bulletin lands mid-morning, only the power model is run again.

So nobody sees where the two collide. Here is how it happens. A heatwave pushes the 3 pm power peak up, and the reserve margin drops under the trigger. The rule cuts the RO trains that fill a reservoir. Then water demand rises in the evening, and the reservoir falls under its minimum by midnight. Forecasts miss most on heat days, on hazy days that cut rooftop solar, in school terms and on holidays whose dates move each year. The monthly report of average error, called MAPE, blends those days in with the rest. So the misses stay hidden.

typical$300K/yrper GW of peak for each point of short-term load forecast error (MAPE, the average percentage miss), a published rule of thumb
typical2,164MWof demand (4.6 %) left out of the day-ahead schedule in California's August 2020 rotating outages
typical15%less pumping energy cost when pumps and valves follow an hourly water demand forecast, in a three-month simulation by Sydney Water and Data61
Where a heatwave day's forecasting hours goestimated
By hand12 hours
With the solution1.8 hours
  • Running the load model and publishing the day-ahead forecast3 → 0.5 h
  • Re-running after a revised weather bulletin1.5 → 0.2 h
  • Forecasting water demand by zone in a spreadsheet2 → 0.3 h
  • Working out what a dispatch rule does to each reservoir2.5 → 0.2 h
  • Pricing the fixes and getting the shift manager's decision2 → 0.5 h
  • Scoring accuracy against actuals1 → 0.1 h

An estimated split of hours for one day with a revised weather bulletin. It covers the forecasting, water and dispatch desks, by hand and with the solution.

How it works

Electricity and water demand forecasting, from bulletin to signed version

What comes in
Data inweather, load, calendar, plants · bulletins, meters, SCADA, rules
Agents at work
Weather readerbands by zone
Calendar keeperschool terms, holidays
Then
Power demand forecasterhourly, P10 to P90
Water demand forecasterhourly, by zone
Then
Power-water balance checkerrules, reservoirs, options
Then
Accuracy trackerMAPE every night
A person decides
Lead forecaster and shift managerpublish and approve the plan
What comes out
Signed forecast
Plan to plants
Reservoirs held
One case, step by step

A heatwave bulletin at 09:40, a signed forecast and an approved fix by 10:34

A utility supplies both electricity and drinking water. On a summer Wednesday, the lead load forecaster has already published Thursday's day-ahead forecast. Then the weather service raises Thursday's maximum. Here is what happens next, screen by screen, in the working solution.

A worked example on sample data. Names, IDs and figures on the screens and in this section come from the demo.

  1. 0109:40

    A new bulletin puts Thursday 2.9 °C hotter at 15:00

    Lead load forecaster

    The 06:00 run, published at 06:41, had Thursday's peak under the all-time record. It had the north reservoirs at 47 % at midnight, with no conflict. Then the 09:40 bulletin from the weather service puts Thursday 2.9 °C hotter at 15:00 than the 05:30 bulletin did. It also forecasts haze from 09:00 to 17:00. The heatwave band is drawn across all four lanes of the chart before anything is run again.

    “Heatwave in the 09:40 bulletin · not yet in the forecast”

  2. 0210:11

    Power and water re-forecast on the same weather

    Six agents

    The lead forecaster presses Re-forecast both. The weather reader takes the bulletin and the 51-member ensemble, a set of 51 slightly different weather runs. The calendar keeper confirms a normal working day, with schools still on their summer holiday. Both forecasters then run on that one weather and calendar. The run log fills in the side panel, step by step, with a time on each.

    Power demand forecaster: “Thursday 15:00: up 0.54 GW, with its P10 to P90 band, above the all-time record”

  3. 0310:12

    The 15:00 peak, explained driver by driver

    Power demand forecaster

    Forecast v2 is set against v1, and each change is tied to its driver. Temperature, up 2.9 °C, adds 0.41 GW. Humidity adds 0.06, haze on rooftop solar 0.05 and building heat carried over from Wednesday 0.02. EV charging and the calendar were checked and did not change. Beside the bars sit the bulletin text the weather reader used, each line cited, and the weather by zone that both forecasts used.

    “The temperature effect is strongest from 13:00 to 17:00, when air conditioning is at full load.”

  4. 0410:12

    A dispatch rule drains the north reservoirs

    Power and water balance checker

    At the new peak, the reserve margin is 9.2 %, under the 10 % trigger. So the curtailment rule cuts four RO trains at one water plant, 61 MW of load, from 13:00 to 19:00. Water demand rises through the day, most of it after 17:00, when people come home. The north reservoirs feed three zones. At 10:00 they read 57.7 % on SCADA, the control room's live readings. By midnight they fall to 34 %.

    “The north reservoirs fall under 40 % at 19:00 and reach 34 % at midnight. A power-only forecast would not have shown this.”

  5. 05Three fixes

    Each option priced in storage, reserve, cost and CO₂

    Power and water balance checker

    Option A keeps the water plant at full and runs a peaker gas turbine. It gives 45 % at midnight for $78,400 and 218 t CO₂. Option B pre-fills the north reservoirs through the north main from a second reservoir, 22:00 tonight to 20:00 Thursday. It gives 46 % for $5,700 and 45 t CO₂, and the RO cut still frees 61 MW for the peak. That is $72,700 and 173 t of CO₂ less than option A for the day. Option C asks the north zones to save 5 % from noon. It gives 37 % and five hours under the minimum. Each option shows its storage path and who acts.

    Option B is recommended. The balance checker only proposes options. It does not change a plant schedule or send a dispatch instruction.

  6. 0610:21

    Forecast v2 signed, with the meaning of the signature

    Lead load forecaster

    The signature box shows what is being published. That is the new 15:00 peak with its P10 to P90 band and the revised water forecast. Both were made from the 09:40 bulletin, and they replace v1. The lead forecaster chooses the meaning, “Approved for dispatch and production planning”, and signs with a password. On publish, v2 goes to unit commitment, fuel nominations, the water control room and energy trading.

    Only the lead forecaster publishes. The forecasters draft.

  7. 0710:34

    The shift manager approves option B

    Dispatch shift manager

    The lead forecaster sends option B to the shift manager with a note. It reads: “Heatwave Thursday: north reservoirs short by midnight on the current plan.” The shift manager approves at 10:34. The plan goes to the power station and the water control room, which opens the north main valve at 22:00. The water production planner is told. Option A would have had the fuel scheduler booking gas for the peaker.

    “Option B approved by the shift manager at 10:34 · north reservoirs 46 % at midnight”

  8. 08Back on the forecast

    The north reservoirs hold at 46 % overnight

    Lead load forecaster

    The Forecast screen now shows v2, published at 10:21. The north main transfer is drawn on the coupling strip, from Wednesday 22:00 to Thursday 20:00. The storage lane stays above the 40 % line. The same strip shows the link working the other way too. Four steam units at the power station are held at 1.42 GW overnight, because the water units they feed need steam.

    “North main opens at 22:00 tonight. The four RO trains still give 61 MW to the peak.”

  9. 09On the record

    v1 is replaced and kept as it was

    Forecast versions

    Each version is kept, with what it was made from, its peak and water total, its status and who signed it. Thursday's v1 shows Replaced 10:21. Tuesday's v2 already carries its actual peak and its MAPE, 1.7 %. The v1 against v2 chart shows the change by hour. The largest is +0.54 GW at 15:00.

    “Each version is kept · a version is published only with the lead forecaster's signature”

  10. 1001:00 each night

    Scored by hour and by heat day, with drift found

    Accuracy tracker

    The accuracy tracker scores each published version against actuals. Over 90 days, the joint forecast's day-ahead MAPE is 2.4 %, against 3.6 % for the previous model. The error is highest at the afternoon peak and again at 21:00, when EV charging and evening cooling overlap. On the 14 heat days of the summer, its day-ahead power error was 2.9 %. The previous model, run in parallel, scored 5.1 %. The tracker found one zone's water forecast running 2.6 % low each day since 2,140 new connections came on. A retrain is ready.

    The accuracy tracker retrains a model only with approval. This retrain waits for the head of system planning.

Who it’s for

Forecasters, dispatch, water production and planning on one heatwave day

The same heatwave Thursday, seen by the five people who forecast, schedule, produce and decide. Here is what their day looked like, and what it looks like now.

Lead load forecaster
Publishes each forecast version
Before
Publishes the day-ahead forecast at 10:00 and runs the power model again when the weather changes. Can give the 3 pm peak, but cannot say what it does to the reservoirs.
Now
Forecasts power and water together on each new bulletin. Sees the reservoir path beside the peak. Signs each version, with its meaning recorded.
Dispatch shift manager
Approves any change to the plant plan
Before
Applies standing curtailment rules with no view of what they do to water storage. Wants the options laid out with a cost on each.
Now
Gets the conflict and three priced options side by side, with storage, reserve at 15:00, cost and CO₂. Approves one, on the record.
Water production planner
Sets water plant output by zone each day
Before
Forecasts water demand by zone in a spreadsheet. Learns at 2 pm that the power desk has cut the RO trains.
Now
Sees the zone forecasts, each reservoir's path to midnight and each plant's plan. Is told the moment an option that touches those plants is approved.
Fuel and energy scheduler
Nominates gas and books peaker hours
Before
Hears about a surprise peak when gas is already expensive. So each surprise peak means a gas turbine run at the worst price.
Now
Sees each option priced in megawatt-hours and dollars a day ahead, before booking anything. The peaker costs $78,400 and the north main $5,700.
Head of system planning
Owns forecast accuracy and approves retrains
Before
Gets accuracy as a monthly average that looks fine. But the 14 hottest days are where the error hurts.
Now
Sees MAPE each morning, by hour, on each heat day and over holiday periods. Drift is found, and a retrain is ready to approve.
The agents

Who reads the weather, forecasts each demand and checks the balance

Six agents forecast power and water together and check each against the other. The lead forecaster publishes and the shift manager approves.

Weather reader

Reads the weather service bulletin, the 51-member ensemble and the haze bulletin. It builds hourly temperature, humidity and solar haze by zone, and draws the weather bands. It compares the bulletin with a second weather model and quotes each value with its bulletin line.

  • Never edits a forecast it did not make, or a bulletin
  • Flags sources more than 1.5 °C apart instead of averaging them
Calendar keeper

Keeps holidays, school terms, events and office hours for 18 months, each with its source and status. A holiday whose date moves each year stays “expected” until the date is announced.

  • Never adds an event without a source
  • Marks expected and confirmed dates
Power demand forecaster

Forecasts hourly electricity demand for 7 days with a P10 to P90 band, the likely range of demand. It nets out rooftop solar and EV charging, and works from weather, calendar and the last 3 years of load. It ties each change from the last version to its driver.

  • Drafts only. The lead forecaster publishes
Water demand forecaster

Forecasts hourly water demand by zone for 7 days, with its band. It works from weather, calendar, connections and the last 3 years of flow, on the same weather run as the power forecast.

  • Drafts only. The lead forecaster publishes
Power-water balance checker

Joins both forecasts with the plant plan and its rules. These include steam must-run for the water units, RO power draw, transfer limits and the water production curtailment rule. It then projects each reservoir hour by hour. If a reservoir falls under its minimum, or the reserve under its floor, it prices options in storage, reserve, cost and CO₂. Then it recommends one.

  • Never changes a plant schedule
  • Never sends a dispatch instruction. It proposes options only
Accuracy tracker

Scores each day's published versions at 01:00, with MAPE by hour and heat days and holidays tracked separately. It finds drift when a zone is biased for 14 days. It prepares the retrain and runs back-casts, which test a model on past days.

  • Never retrains a model without the head of system planning's approval
Lead forecaster

Publishes, and the shift manager approves plan changes.

Ask in plain words

Any hour of the electricity or water forecast, asked in plain words

Ask about any hour of the power or water forecast, or say what to change. Each answer points to its sources. These answers use the sample data.

Why do the north reservoirs run short tonight?

Because the power peak cuts the water production that fills them. The 09:40 bulletin puts Thursday 2.9 °C hotter at 15:00. That lifts the peak above the all-time record and drops the reserve margin to 9.2 %. Under 10 %, the curtailment rule cuts four RO trains from 13:00 to 19:00, and those trains feed the north reservoirs. With the evening rise in demand, the reservoirs fall under 40 % at 19:00 and reach 34 % at midnight.

Compare the fixes for Thursday

There are three options, priced with today's fuel and energy prices. Option A runs a peaker instead of cutting RO. It leaves the north reservoirs at 45 % at midnight and costs $78,400. Option B pre-fills them through the north main from 22:00 tonight. It gives 46 % for $5,700, and it is recommended. Option C asks the north zones to save 5 %. It gives 37 %, still under the minimum.

What if Thursday runs 1.5 °C hotter than the bulletin?

At 1.5 °C above the bulletin, which is beyond the ensemble's 90th percentile, the peak would rise further. The reserve margin would fall to 6.3 %, under the 8 % floor, so dispatch would need more capacity. The north reservoirs would reach 33 % at midnight without a fix, or 45 % with option B.

How close was the forecast over last year's holiday period?

Over that period the joint forecast's day-ahead MAPE was 3.4 %, against 6.8 % for the previous model. Next year's dates are already in the calendar as expected, to be confirmed when they are announced.

The screens

The joint forecast, the reservoir paths and the three priced fixes

From the working solution, on its sample data. Pick one to see it large.

Power and water, togetherPower demand with its P10 to P90 band, water demand against plant output and north reservoir storage share one hourly axis. It shows where one forces the other. The conflict and the agents' run sit in the side panel.
A new weather bulletinThe 09:40 bulletin puts Thursday 2.9 °C hotter. The heatwave band is drawn across each lane before the forecast is run again.
Why the forecast movedThe 0.54 GW rise at 15:00, explained driver by driver, beside the cited bulletin and the weather by zone.
Zones, reservoirs and plantsWater demand by zone, each reservoir's level now and at midnight against its minimum, and the Thursday plan for each water plant.
Three fixes, pricedEach option with its storage path, level at midnight, cost and CO₂, and the side-by-side comparison below.
Publish with a signatureForecast v2 signed by the lead forecaster, with the meaning of the signature recorded, and sent to unit commitment, fuel, water and trading.
The shift manager approvesOption B approved by the dispatch shift manager at 10:34. The north reservoirs hold at 46 % at midnight.
The plan on the forecastForecast v2 published, the north main transfer on the coupling strip and the storage lane above its minimum.
The season aheadWeekly peak, water and lowest storage from September to August, with holiday periods, school terms and the summer heat drawn as bands.
Forecast versionsEach version with what it was made from, its peak, water total, status and signature, and v1 against v2 hour by hour.
Calendar and eventsTwelve months of expected daily peak, the events in the forecast with their sources, and last year's holiday back-cast.
Forecast accuracyDay-ahead MAPE for 90 days against the previous model, error by hour of day and the drift the accuracy tracker found.
SettingsReservoir minimums, the plant rules the balance checker applies, the publish deadline, sources and who decides.
Governance

Signatures, cited drivers and read-only agents on each demand forecast

Each number cites its sourceEach driver, bulletin line and figure on the plan links to where it came from. That can be the weather bulletin, the ensemble, the SCADA reading, the plant plan, the curtailment rule, the price sheet or the accuracy record.
The lead forecaster signs each versionA forecast version is published only with the lead forecaster's e-signature, with its meaning recorded. The meaning is “Approved for dispatch and production planning” or “Approved for information only”. The forecasters draft, and only the lead forecaster publishes.
No agent touches dispatchThe agents can only read SCADA, plant plans and meters. The balance checker proposes options. It does not change a plant schedule or send a dispatch instruction. Any change to the plant plan needs the dispatch shift manager.
Retrains need the head of system planningWhen the accuracy tracker finds drift, it prepares the retrain and asks. Nothing changes in a model until the head of system planning approves, and the approval is on the record.
Published versions are kept unchangedA published version is not edited. A new bulletin makes a new draft. When that draft is signed, the old version is marked Replaced. So the forecast that unit commitment and fuel nominations read at 10:00 can always be shown again.
Runs, versions, approvals and setting changes on the trailEach agent step and each human decision is recorded with its time. That covers who read the bulletin, who published v2, who approved option B and who changed the heat band trigger. Utility data stays with the utility.
Configuration

Reservoir minimums and dispatch rules behind each water demand forecast

Reservoir minimums, the dispatch rules the balance checker applies, the publish deadline and who decides are all settings. Changes are logged and need the owner shown.

SettingDefaultChoose from
Water storage minimumsNorth reservoirs 40 %A % for each reservoir. North reservoirs 40 %, a second reservoir 35 %, the water towers 40 %
Curtail interruptible water productionUnder 10 %The reserve margin at peak below which four RO trains at one plant (61 MW) are cut, 13:00 to 19:00
Reserve margin floor8 %Below this, dispatch must add capacity
Must-run for water unit steam1.42 GWThe steam units' minimum while the water units they feed run
North main transfer limitSet per mainSecond reservoir → north reservoirs
Day-ahead publish deadline10:00The time unit commitment and fuel nominations read it
Re-forecast on every new weather bulletinOnOn · Off. Both forecasts run together, as a draft for the lead forecaster
Heat bandA set maximum or +2 °C on the last runDraws a heatwave band and widens the confidence band. The P10 to P90 band is shown on every chart and sent with each version
Connections

Weather bulletins, SCADA, meters and plant plans the forecasts are built on

Weather forecaststhe national weather service's bulletin, 51-member ensemble and haze bulletin, and a second weather model
Smart meters and SCADAhistorical load, 15-minute load by zone, reservoir levels and plant output
Calendar and eventsholidays, school terms, events and office hours, each with its source
Rooftop solar and EV registersinstalled rooftop solar and EV chargers, netted out of the load forecast
Plant plans and dispatch rulesdaily production plans, must-run limits, transfer limits and rules such as water production curtailment
Fuel and energy pricesthe price sheet each option is costed with, in dollars and megawatt-hours
What it changes

Forecast error, pumping cost and warning time for electricity and water demand

Each figure carries its label: a target the solution is built to, an estimate, a typical published result, or a proven one.

target
1day
warning before a reservoir runs short in a heatwave, seen when the forecast is made
typical
$300K/yr
per GW of peak for each point of short-term forecast error (MAPE) cut
typical
15%
less pumping energy when pumps follow an hourly water demand forecast
pumping energy cost

“demo” means seen in the working solution, on its sample data. “target” means the design goal, measured in the live solution. “estimated” means our estimate. The $72,700 is the peaker option's $78,400 (390 MWh at $201) less the north main option's $5,700 (110 MWh at $52). It covers the one day, on sample inputs. The 173 t is 218 t less 45 t of CO₂. The split of hours is an estimate of desk practice. “typical” means published figures. Tao Hong (EnergyBiz 2015, as summarized on Wikipedia) puts each point of short-term MAPE at about $300K a year for a 1 GW utility. We have not re-checked that figure. The outage figure is from the CAISO root cause analysis of August 2020, via Western Resource Advocates. The Sydney Water / Data61 pump scheduling simulation found about 15 % lower energy cost. Names on the screens are sample data.

Questions

Electricity and water demand forecasting questions from system operators

What is electricity and water demand forecasting?

Electricity and water demand forecasting predicts how much electricity and water a system will need, hour by hour and a day ahead. Utilities use it for unit commitment, fuel nominations and water production scheduling. This solution makes the two forecasts together, on the same weather and calendar. So a utility that supplies both can see where one forces the other.

How does the short-term load forecast work?

The power demand forecaster forecasts hourly demand for 7 days with a P10 to P90 band. It works from weather, calendar, rooftop solar, EV charging and the last 3 years of load. Each change from the last version is tied to its driver. In the sample case, temperature added +0.41 GW, humidity +0.06 and haze on rooftop solar +0.05.

Why forecast power and water demand together?

Because one can force the other. A power peak can trigger a rule that cuts RO trains. And steam-fed water units keep power units running overnight. The balance checker pushes the power result through the plant rules into each reservoir's path. In the sample case, that showed the north reservoirs at 34 % by midnight, a day ahead. A power-only forecast would not have shown it.

How does it handle heatwaves, haze, school terms and moving holidays?

The weather reader draws a heatwave band and widens the confidence band. It does this at the set temperature or at 2 °C above the last run. It also accounts for haze on rooftop solar. The calendar keeper keeps school terms and holidays. A holiday whose date moves each year stays “expected” until it is announced. Over last year's holiday period, the joint forecast's back-cast MAPE was 3.4 %, against 6.8 % for the previous model.

How is forecast accuracy (MAPE) tracked?

The accuracy tracker scores each published version against actuals at 01:00 each night, by hour of day. Heat days and holidays are tracked separately. When a zone is biased for 14 days, it prepares a retrain. In the sample, one zone's water forecast had run 2.6 % low each day after 2,140 new connections.

Can an agent change the plant plan or publish a forecast?

No. The forecasters draft, and the lead forecaster publishes each version with an e-signature. The balance checker proposes priced options. It does not change a plant schedule or send a dispatch instruction. The dispatch shift manager approves any change to the plant plan. The head of system planning approves retrains.

Can we set our own plant rules and reservoir minimums?

Yes. You set the minimum for each reservoir and the reserve margin that triggers water production curtailment. You also set the reserve margin floor, must-run limits, transfer limits and the publish deadline. Re-forecasting on each bulletin, the heat band, the weather sources and who decides are settings too. Each change is logged.

What data does it need from our control room to start?

The Agentic Solution Engine builds and deploys it from your requirements and documents. These are your load and water history, weather feeds, calendar, plant plans and dispatch rules. It goes live once each quality gate has passed. We will first walk you through it on a back-cast of your own last heatwave.

Back-cast your own last heatwave
with both forecasts together.

We'll run Electricity and Water Demand Forecasting on a back-cast of your own last heatwave.